June 5, 1992
D. Brian Fulmer
3505 Wayzata Boulevard
Long Lake, MN 55356
RE: Septic System Repairs
Dear Mr. Fulmer:
This is a reminder that a recent inspection revealed that your
septic system is failing and must be repaired.
Please contact me as soon as possible to discuss your options.
You have until August 10 , 1992 in which to make repairs to the
system. Enclosed is a copy of your most recent septic report.
The procedure for initiating septic system repairs is as follows:
1. Hire a Soil/Site Evaluator to do the necessary testing
and design.
2. Submit the design to the City for approval.
3. Once the design is approved, have one or more
contractors bid on the approved design.
4 . The contractor you choose should then obtain a permit
from the City before starting work, and he will call
for the required inspections.
If you have any questions please contact me at the City offices.
Thank you for your prompt attention to this letter.
Sincerely,
Stephen Weckman
On-Site Systems Manager
Enclosure
SW/lsv
TELEPHONE-473-7357•FAX-473-0510
/ 0,
CITY of ORONO
Municipal Owes
Past Office Box
Cristal Bay,.N%weswa 553z34W
kE9H0
July 2, 1992
D. Brian Fulmer
3505 Wayzata Blvd.
Long Lake, MN 55356
RE: Septic System Repairs
Dear Mr. Fulmer:
A recent inspection revealed that your septic system is failing
to treat waste properly and must be repaired.
On at least two separate occasions you have been sent
notifications of the required septic system repair and a August
10 deadline has been established. We still have not received
any indication that repairs have begun. Unless a repair permit is
issued or a repair schedule approved by August 10, 1992, we will
turn this matter over to the City Attorney.
Please contact the City offices as soon as possible to discuss
your repair options. Thank you for your prompt attention to this
matter.
Sin erely,
Stephen Weckman
On-Site Systems Manager
SW/lsv
TELEPHONE—473-7357 9 FAX-473-0510
`e CITY of ORONO
Municipal Offices
Post OfficeBox 66
Crystal Bay,Mhmm to 5532.34066
04�
January 20, 1993
Brian Fulmer
3505 Wayzata Blvd.
Long Lake, MN 55356
Dear Mr. Fulmer:
Last year while pursuing the repair of a failing septic system on
your property, it was discovered that both your residence and the
kennel facilities adjacent to it were to be hooked up to City sewer
by June 9, 1987 as required for the expansion of your kennel
facilities . The purpose of this memo is to remind you of the
required hookup, provide a procedure for the hookup, and establish
a time table for the expeditious completion of the project.
The steps required to make the connection to City sewer are as
follows :
1 . Engineering must be submitted to the City Engineer for
City and Metropolitan Waste Control Commission approvals.
2 . Once these approvals are granted, hookup to City sewer
must be made by June 1, 1993 .
Please call me at the City offices if there are any questions.
Sincerely,
Stephen Weckman
On-Site Systems Manager
SW/lsv
TELEPHONE-473.7357•FAX-4734510
METROPOUTAn
WA/TE
COnTROLmmiffion
4 19
r
May 13, 1986
Mr. Mark Bernhardson
City Administrator
City of Orono
P.O. Box 66
Crystal Bay, Minn. 55323
RE: Fulmer Property 7 3505 WayzataBoulevar
Dear Mr. Bernhardson:
This letter is in response to your letter dated May 5, 1986
requesting permission to connect the subject property to the Com-
mission' s Maple Plain Interceptor, MWCC 83-52 .
The Commission has reviewed your request and offers the following
comments:
j As per the City' s request, the Commission designed the Maple Plain
interceptor with no reserve capacity available for the City of
Orono. Although no capacity was designed for Orono, the connec-
tion of this one property should not cause a capacity limitation
f
within our system for Maple Plain.
Policy 7, of the Metropolitan Council' s Water Quality Management
Development Guide/Policy Plan, states, "Metropolitan sewer system
6 facilities ( treatment plants and interceptors) irrespective of
location, should provide service only to land inside the Urban
Service Area. Any deviation from this policy must be incorporated
into an approved Metropolitan Development Guide/Policy Plan on
Water Quality Management. " The subject property is located within
ethe rural service area of the City of Orono. Thus, the Commis-
sion, at this time, cannot allow the connection to our intercep-
tor.
If the City intends to pursue this connection, it must first
either amend its comprehensive plan, requesting this property to be
included within the Urban Service Area, or request that the Metro-
politan Development Guide/Policy Plan be amended to allow the con-
Metro Square Building, Saint Paul, Minnesota 55101 612-222-8423
Mr. Mark Bernhardson
Page Two
5.13.86
nection of this property in the rural service area of Orono. When
the proper amendment has been approved by the Metropolitan Coun-
cil, then the City can apply for a connection permit from the Com-
mission for this potential connection.