HomeMy WebLinkAbout1999 - progress report Ern
,qco
GME CONSULTANTS, INC. p
CONSULTING ENGINEERSE _o)
14000 21st Ave.No./Minneapolis,MN 55447
Phone(612)559-1859 / Fax(612)559-0720
March 30, 1999C(E,
Mr. Rich Kiemen �t
Project Manager fi
KM Building Company
1620 Central Avenue Northeast
Minneapolis, Minnesota 55413 GME Project No. 8216
RE: Progress report for construction observation and testing
services for the Service 800 Building in Orono, Minnesota for
the period between February 20 and March 20, 1999
Dear Mr. Kiemen:
We have provided construction observation and testing services for this
project in accordance with our proposal dated February 19, 1999 . Our
testing services have been provided on a part-time basis coordinated
through Mr. Steve Weibel, your site superintendent . This report
discusses our construction services performed to date, and includes our
Daily Field Reports and test results .
Background Information
You have indicated that there were no soil borings drilled specifically
for this building. However, borings were drilled on this site in
December, 1972 by another geotechnical firm. One of the borings falls
within the building footprint . This boring shows a layer of topsoil
underlain by stiff gray-brown silty sandy clay to the termination depth
of the boring.
The Service 800 Building will be a single-story, slab-on-grade
structure of masonry bearing wall and steel frame construction. The
building slab will be cast-on-grade, covering a footprint of about
11, 000 square feet . You have indicated that the grading plan calls for
approximately 2 to 3 feet of cut in the northern portion of the
building, and limited amounts of fill at the southern end. The grading
plan does not yet take into consideration the possibility of subcutting
and soil correction under this structure.
Paved parking and drive areas will be constructed around the building.
Earthwork Testing
We observed test pits excavated around the perimeter of the building to
determine the suitability of the soils . We observed that there was an
average of 2 feet of brown clayey sand fill underlain by a naturally-
WILLIAM C. KWASNY, P.E. THOMAS P. VENEMA, P.E. WILLIAM E. BLOEMENDAL, P.E.
GREGORY R. REUTER, P.E. CHARLES M. ALL000D, P.E. MERVYN MINDESS, P.E.
MARK D. MILLSOP, P.G. TIMOTHY F. McGLENNEN STEVEN J. RUESINK, P.E.
An Equal Opportunity Employer
A
Mr. Rich Kiemen 2 March 30, 1999
GME Project No. 8216
occurring brown and gray mottled silty clay with traces of sand. We
recommended that the foundations rest upon the natural soils. We
observed loaded tandem-axle trucks traversing over the subgrade soil,
indicating no deflection and approximately 1/2 inch to 1 inch of
rutting. Based on our observations, it is our opinion that these soils
are suitable for slab support or placement of fill for slab support .
We observed and tested foundation base soils for the perimeter footings
using a Static Cone Penetrometer (SCP) . The base soils consisted of
naturally-occurring brown and gray mottled silty clay. In our opinion,
the base soils are suitable for support of the design bearing pressure
of 2, 000 pounds per square foot at the times, locations, and elevations
tested.
We observed and tested foundation base soils for the interior column
pads using a Dynamic Cone Penetrometer (DCP) . The base soils consisted
of newly compacted brown sand over the naturally-occurring silty clay.
In our opinion, the base soils are suitable for support of the design
bearing pressure of 2 , 000 pounds per square foot at the times,
locations, and elevations tested.
Reinforcing Steel Observations
We observed the reinforcing steel installation during construction of
the footings . We observed that the correct number, type, size, and
configuration of reinforcing steel bars were placed in accordance with
the project plans and specifications . We also observed that the steel
appeared to generally be placed at the required embedment depth within
the forms for proper concrete coverage .
Concrete Testing
We performed laboratory compressive strength testing on concrete
cylinders cast by the contractor' s personnel . The test results are
forwarded on a weekly Concrete Strength Reports . In reviewing the
seven-day test results, it is our opinion that the required compressive
strength will be met at 28 days . Additional test data will be
forwarded as they become available.
Masonry Testing
We performed laboratory compressive strength testing on corefill
cylinders cast by the contractor' s personnel . The test results are
forwarded on our weekly Masonry Strength Reports . In reviewing the
seven-day test results, it is our opinion that the required compressive
strength will be met at 28 days . Additional test data will be
forwarded as they become available .
GME CONSULTANTS,INC.
Mr. Rich Kiemen 3 March 30 , 1999
GME Project No. 8216
Standard of Care
The conclusions in this report represent our professional opinions,
based on our interpretation of the site observations and test data.
These opinions were arrived at in accordance with currently accepted
engineering practices at this time and location. Other than this, no
warranty is implied or intended.
Closure
This report summarizes our observation and testing services performed
between February 20 and March 20 , 1999 . Our Daily Field Reports
describing our on-site activities are enclosed, along with pertinent
test data.
If you have questions regarding this report, please contact us at 559-
1859 .
Sincerely,
GME CONSULTANTS, INC.
Brett S . Maki, E . I .T.
Project Engineer
Steven J. Ruesink, P .E .
Project Engineer
Enclosures : Daily Field Reports
Static Cone Penetrometer Test Reports
Dynamic Cone Penetrometer Test Reports
cc : Mr. Dick Koehn
RRK Structural Engineering
City of Orono
Building Inspection Department
BSM:ms
C:\BSM\8216.PRG