HomeMy WebLinkAbout2008 TH 12 Sewer and Water Service Connections 9d Memorandum Bonestroo Date: 2335 Highway 36 W To: Scott Oberaigner Project: TH 12 Sewer&Water 1 0/1 3/20 St.Paul,MN 55113 Service Connections 0 8 Tel 651-636-4600 Fax 651-636-1311 From: Jared Ward Client: City of Orono www.bonestroo.com Re: Contract Quantities File No: 000139-07020-0 Remarks: Scott, This memo is to inform you on the TH 12 Sewer and Water Service Connections quantities, The original contract amount was$67,408.51. The amount completed to date is $67,286.85, which includes Pay Request#1 for$59,197.00 and Change Order#1 for $8,089.85. Attached is a draft form of the change order that will be ready for the next Council Agenda. All quantities that exceeded the contract quantities are paid for under Change Order#1. Please let me know if you have any questions. Thanks, Jared TH12 SEWER AND WATER SERVICE CONNECTIONS CHANGE ORDER ITEM 1&2: This gate valve and watermain was installed so water service could be maintained during construction in the Sugarwoods neighborhood. ITEM 3: Larger area disturbed than expected. ITEM 4: This T was listed as an 8x8 instead it was a 8x6 T. ITEM 5&6: This was buried and was unknown until exposed during construction. ITEM 7: This is required to operate valves deeper than 8'. Change Order Form '4 Bonestroo File No: 000139-07020-0 Project Name: T.H. 12 Sewer and Water Service Connections Client: City of Orono Contractor: Burschville Construction Prepared By: Jared Ward Date Needed: 10/13/08 Change Order No: 1 Draft or Final: If applicable, include: MSA No., MSA(Non)Participating;MSA Item No's.,Project No.,Time Extension, FmHA,MPCA, No.of Additional Copies(5+) . Other Description of Work: Items 1 &2:Additional GV and watermain needed to isolate Sugar Woods Development Item 3: Additional area disturbed to install water main. Item 4: Installation of tee on existing line. As-built called out wrong tee size. Items 5&6: Additional fittings needed for watermain service connection at TH 12. Item 7: Nut extension needed in order to operate GV. Borrestroo:IC.SJICharge Order Form-1 jtwl{VLM 021307] Page 1 of 2 Change Order Form No. 'Item Unit Contract Qty Unit Price Total Amount 1 6" GV and Box EA 1 $925.00 $925.00 2 6" DIP Water Main, Class 52 LF 39 $50.00 $1950.00 3 Seeding, Incl Seed, Fertilizer,Mulch and Disk Anchor AC 0.25 $5000.00 $1250.00 4 8"x 8"Tee and Sleeve LS 1 $2913.73 $2913.73 5 8"x 6" Cross EA 1 $348.12 $348.12 6 6"-90 Deg. Bend EA 2 $250.00 $500.00 7 Rod Nut Extender EA 1 $203.00 $203.00 Total Change Order#1 $8,089.85 Bonestroo:IC.S JICharge Order form-1 jtwEVLM 021307) Page 2 of 2 L4 IIL ge-c t • :srt)( fl 3 - `! ( 2 1/0 ( — 4 L-soLok 2_ S e-6-' 7175" r 71— J, , .