ASBUILT CONDITIONS
<br />.,I
<br />66 �\ ' I C
<br />�\ \ C) \
<br />x96iO
<br />V
<br />X 973.
<br />V
<br />D ELECTRICAL
<br />(0x967 EASMENT
<br />0) BEE FND IP I/21J"
<br />7 966.5 4 966.9 966.8 FND IIP 3/4 FND IP 3/4
<br />x 66 6 967.2 �Q� F
<br />x , x 96 ,81 MAP ID" - -�_� 100 - MAP 12' " /
<br />x 66.8 x x 9688' 968.8 967.2 15 967. ELM 10 I /
<br />x 967.2 967 o t` 966.8
<br />X 9683. _ x 969.1 r x 969.6 1 x 67.% 7!1�� 6 ��
<br />968.8 x 969.2 1 x " ` 9 7. x 960.7
<br />966. ` �� ��, / 968.BS6 9� 2g ; 967.0 / G
<br />x V ;
<br />V (6 CO o, 69.2 969.5 9.7 x 969.2
<br />SBL--- 13 ,FL- r. .7- 961, `Z
<br />V 8_ �1 24.0 .968.5 967.9 B L L BSBL-��BSB� BSBL BL BSBL - BSBL ;
<br />- �,----50----------- 962.s
<br />X 66.7 x o o �� ERIC C 965. �- -�
<br />L I m = 970.3 = ❑A x367.2 --
<br />a - TDF= e9 TAINING STAIRS 959.2 i N
<br />.
<br />m 6 ss 9qE J / m< --� ----50 /--------f
<br />966. „ ,; 67 �jy \ - MAP 20"
<br />_ = I B' I. cr 4.0 9.5 ALL 959.2 `
<br />O 959.3 ry 957.D
<br />�Q 967.0 �J� �
<br />x 966.4 v " x \ m n GFE= I / �J \ \ ml
<br />\ 969.7.. �'i (vP 959.3 _
<br />I4.6% \ (J ') cv WALKOUT 1967.7 / K965.9 v
<br />570 ORONO N a`O WELL _� P F
<br />fi K x 964.7 _ 959.3 O 9 7.0, %
<br />m ORCHARD ROAD DE � t� `� /
<br />96 9967. 96 9.5 9'65.7 ® < L � ,a m
<br />I� \ 969.1 �-- - Q D
<br />55.0 /
<br />m
<br />m
<br />l+> ' 969.3 969. cD J v / O�- 958.8 ; i ' /
<br />x 966.4 x 967.4 968.6 x 969.8 < <v O
<br />v 69 6.0 15.5 Q x 955.7 l m
<br />i t v F 9 m 6q. �r-+R TAINT
<br />�.J \ 969.3 O o x9 6J`l' A
<br />RETAINF�lG !
<br />.965.6 9 969.4 an d FFE= rn 96 I/ o I rn
<br />WALL - 6?� N o - 97L2 - - I /
<br />964.6 x O 9624 \ y
<br />O x(966.2 x964.3 \ h \ 969.5 96 .6 61.9 I \ 9Sg 959. 1/ / m
<br />O f i .:9Gy Lx 968. cn 4.0 15.5 961.5 9 %0 ' ` / ( \ /
<br />I ------ _ 970.7 959.358 _ 0.
<br />959.
<br />N I INV- 50--y� 66 g6 - O WOE= 59.913.5 60.9 y59.9 9 \.2 - -------- /
<br />961. �.: ^� of 960.5 G SUN o iX x 2 S� -- '�_ X55.4 / - -50 ------- -
<br />J --- \. 52.3 30.0 NT_ ROOM -F 959.0 / CONC`Lid--'�- / i m / -
<br />O 5F _ PAD
<br />96 I g I x x( \ \ 963 I 962 7 59' BSB BS - B �'3 �4.0�_- / BSBL�BL BSL BSB L BL BSBL-I- BSBL BSBL BSBL / BSBL
<br />960.9 J \ • 962.5 959.7 _ _ � 3
<br />cd,\�. 961.0 x ` x 62.6 939.3' I C�1PJ �' 3 <L ? x 955.3 / /
<br />I 0) x 959. ,-f2�AiN1L_ - ' i =L- ivTAP 30 / �) 20"/LANDSCAPE
<br />I WALL - _ 9.3 � PAD 1 i 95 8 0�58� 568 <ix 9 6.3
<br />x 959.0 - x959.1 - x 958.7 I x 959. I o iCJ
<br />9 > rn �� 12"
<br />66 I 'v ; rn_ LANDSCAPE-- ' -,- I -„J I / ° }955.6 x 954
<br />_ L�✓ 6
<br />1 9 x 9 7.8 x 957.0 bWD P 7006
<br />� 0 958955.5
<br />FND.1 j`�20'' SPR 12" 57.6 FND IP I
<br />J x 957.6 0 957.1 957.6 i 956.0 .955
<br />x 956.9 x 956.9 x 958.4 _ � car, x 955.7 x 95
<br />x 954.6 O
<br />O
<br />X6.5.6 x 957.2 x 955.9 x 955.2 x 954.9
<br />X
<br />956.9 x 956.4 x 956.2
<br />lr \
<br />x 955.8 ^ \ ' x 955.6
<br />\ lJ \
<br />x 955.6 x 955.7
<br />FIELD CREW
<br />NO.
<br />BY
<br />DATE
<br />REVISION
<br />USE (INCLUDING COPYING, DISTRIBUTION, AND
<br />CONVEYANCE OF INFORMATION) OF THIS PRODUCTCT IS
<br />STRICTLY PROHIBITED WITHOUT SATHRE-BERGQUIST, INC.'s
<br />EXPRESS WRITTEN AUTHORIZATION. USE WITHOUT SAID
<br />AUTHORIZATION CONSTITUTES AN ILLEGITIMATE USE AND
<br />SHALL THEREBY INDEMNIFY SATHRE-BERGQUIST, INC. OF
<br />ALL RESPONSIBILITY. SATHRE-BERGQUIST, INC. RESERVES
<br />THE RIGHT TO HOLD ANY ILLEGITIMATE USER OR PARTY
<br />LEGALLY RESPONSIBLE FOR DAMAGES OR LOSSES
<br />RESULTING FROM ILLEGITIMATE USE.
<br />I hereby certify that this survey, plan or report was prepared by me or under my direct supervision and that I am a duly Licensed
<br />Land Surveyor under the laws of the State of Minnesota.
<br />Dated this 12t day of M , 2016.
<br />9 L1 �
<br />David B. Pemberton, PLS Minnesota License No. 40344
<br />pemberton@sathre.com
<br />CL AT 6 EMW 10/24/2016 REVISED SUN ROOM
<br />DRAWN 8 DBP 11/8/2016 CITY COMMENTS/HARDCOVER
<br />EMW 9 EMW 12/16/2016 STAKED HOUSE
<br />CHECKED 10 EMW 12/20/2016 RAISED TOF FOR TOP CHORD BEARING TRUST
<br />DBP 11 EMW 1/4/2017 FOUNDATION ASBULT
<br />DATE 12 BRV 2/21/2018 GRADING ASBUILT
<br />04-27-16 13 BRV 10/29/2018 UPDATE ASBUILT
<br />:0
<br />W
<br />Z
<br />= 969.7
<br />Z
<br />= 971.2
<br />Asbuilt Top of Foundation Elevation
<br />= 970.3
<br />w
<br />J
<br />= 960.5
<br />0-
<br />(n
<br />o n
<br />�m
<br />60
<br />SATHRE-BERGQUIST, INC.
<br />150 SOUTH BROADWAY WAYZATA, MN. 55391 (952) 476-6000
<br />WWW.SATHRE.COM
<br />DESCRIPTION OF PROPERTY SURVEYED
<br />Lots 8, 9, 16, 17, Block 13, MINNETONKA BLUFFS, according the recorded plat thereof, Hennepin County, Minnesota,
<br />including the vacated alley.
<br />1. Site Addresses: 570 Orono Orchard Road South, Orono, Minnesota
<br />2. Flood Zone Information: This property appears to lie in Zone X (Areas outside the 1 -percent annual chance floodplain, areas
<br />of 1% annual chance sheet flow flooding where average depths are less than 1 foot, areas of 1% annual chance stream flooding
<br />where the contributing drainage area is less than 1 square mile, or areas protected from the 1% annual chance flood by levees.
<br />No Base Flood Elevations or depths are shown within this zone. Insurance purchase is not required in these zones.) per Flood
<br />Insurance Rate Map, Community Panel No. 27053C0308E, effective date of September 2nd, 2004.
<br />3. Parcel Area Information: Gross Area: 26,711 s.f. - 0.613 acres
<br />4. Benchmark: Elevations are based on MnDOT Geodetic Station Name: EL WELL which has an elevation of: 980.36 feet
<br />(NAVD88).
<br />5. Zoning Information: The current Zoning for the subject property is RR -1B (One Family Rural Residential) per the City of
<br />Orono's zoning map dated March 2011. The setback, height, and floor space area restrictions for said zoning designation were
<br />obtained from the City of Orono found on their web site on the date of May 11th, 2016 and are as follows:
<br />Principal Structure Setbacks - Front: 50 feet (Orono Orchard Road)
<br />Side: 30 feet
<br />Rear: 50 feet
<br />Height: 30 feet
<br />Hardcover: 35 percent of lot area Tier 3 per the City of Orono's Stormwater Quality Overlay
<br />Please note that the general restrictions for the subject property may have been amended through a city process. We could be
<br />unaware of such amendments if they are not in a recorded document provided to us. We recommend that a zoning letter be
<br />obtained from the Zoning Administrator for the current restrictions for this site.
<br />6. Utilities: We have shown the location of utilities on the surveyed property by observed evidence only. There may be underground
<br />utilities encumbering the subject property we are unaware. Please note that we have not placed a Gopher State One Call for this
<br />survey. There may or may not be underground utilities in the mapped area, therefore extreme caution must be exercise before any
<br />excavation takes place on or near this site. Before digging, you are required by law to notify Gopher State One Call at least 48
<br />hours in advance at 651/454-0002.
<br />PrODOsed Elevations
<br />Proposed Garage Floor Elevation = 970.0
<br />Proposed Top of Foundation Elevation = 970.3
<br />Proposed First Floor Elevation = 971.3
<br />Proposed Basement Floor Elevation -'960.6
<br />Proposed Setbacks
<br />Min. Front Yard Setback = 50'
<br />Min. Side Yard Setback = 17' per variance from the city of Orono
<br />Min. Rear Yard Setback = 50'
<br />Asbuilt Elevations
<br />Asbuilt Garage Floor Elevation
<br />= 969.7
<br />Asbuilt First Floor Elevation
<br />= 971.2
<br />Asbuilt Top of Foundation Elevation
<br />= 970.3
<br />Asbuilt Basement Floor Elevation
<br />= 960.5
<br />X972.5 FOUNDATION ASBUILT ELEVATION
<br />X972.5 GRADING ASBUILT ELEVATION
<br />IDOf
<br />y y
<br />v
<br />WO0uH7�tL o HtttS C
<br />CI"KE'63N S'. ;� I$
<br /># f 3 I
<br />of F'','_< N
<br />Fox sT.
<br />N N
<br />WfPEP H1<<s T I SNeF�"\ w FFD I
<br />O xq �q �i f �R��,D "AL T �ORI
<br />�
<br />R23W \ I tN. y
<br />S i Bearings are based on the Hennepin County
<br />C - 11, M Coordinate System (NAD 83 - 1986 adj.)
<br />AA
<br />p, i annyer
<br />ake P 20 10 0 10 20 40
<br />E tpP ,,�• �W
<br />SURVEY LEGEND SCALEIIVFEET
<br />CAST IRON MONUMENT A/C UNIT _ BITUMINOUS
<br />® CATCH BASIN © CABLE TV PEDESTAL BUILDING SETBACK LINE
<br />Q FLARED END SECTION ELECTRIC TRANSFORMER CTv CABLE TV
<br />N GATE VALVE ELECTRIC MANHOLE -- CONCRETE CURB
<br />GUY WIRE ELECTRIC METER CONCRETE
<br />HYDRANT GAS METER - x CONTOUR EXISTING
<br />O SURVEY MONUMENT SET GAS VALVE CONTOUR PROPOSED
<br />SURVEY MONUMENT FOUND -°-°-°- GUARD RAIL DT DRAIN TILE
<br />Q SURVEY CONTROL POINT HAND HOLE --- r--- - ELECTRIC UNDERGROUND
<br />LIGHT POLE SOIL BORING FENCE
<br />POWER POLE
<br />TREE CONIFEROUS FO FIBER OPTIC UNDERGROUND
<br />SANITARY MANHOLE
<br />TREE DECIDUOUS GAS UNDERGROUND
<br />Q SANITARY CLEANOUT O TELEPHONE MANHOLE OVERHEAD UTILITY
<br />-a- SIGN
<br />(] TELEPHONE PEDESTAL RAILROAD TRACKS
<br />972.5 GROUND ELEVATION CT__- TRAFFIC SIGNAL > SANITARY SEWER
<br />� STORM DRAIN O UTILITY MANHOLE
<br />» STORM SEWER
<br />sT STORM MANHOLE Q1UTILITY PEDESTAL TEL TELEPHONE UNDERGROUND
<br />uTL UTILITY UNDERGROUND
<br />YARD LIGHT O WELL -
<br />X972.5 FOUNDATION ASBUILT ELEVATION I WATERMAIN
<br />TWPA 17 - RGE.23 - SEC.02 CERTIFICATE OF SURVEY FILE NO.
<br />Project City: Orono
<br />Hennepin County GRADING ASBUILT40995-007,
<br />�d J 1
<br />PREPARED FOR:
<br />JOHN BRUNELLO CiWOFCi`ONO 1
<br />
|