HomeMy WebLinkAbout2017 SWPPP 2 of 4PROJECT DESCRIPTION: E. THE CONTRACTOR MUST DIRECT DISCHARGES FROM BMPS TO VEGETATED AREAS OF THE SITE IN CONTRACTOR. A STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IS NOT REQUIRED AS PART OF THE GENERAL PERMIT ORDER TO INCREASE SEDIMENT REMOVAL AND MAXIMIZE INFILTRATION UNLESS INFEASIBLE. THE M. CONTRACTOR SHALL PROTECT INFILTRATION/ FILTRATION AREAS FROM SEDIMENTATION AND AUTHORIZATION TO DISCHARGE STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY UNDER THE CONTRACTOR MUST UTILIZE VELOCITY DISSIPATION DEVICES IF NECESSARY TO PREVENT EROSION OVER -COMPACTION. DURING EXCAVATION, SEDIMENT AND EROSION CONTROL DEVICES MUST BE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)/STATE DISPOSAL SYSTEM (SDS) WHEN DIRECTING STORMWATER TO VEGETATED AREAS. UTILIZED BY CONTRACTOR TO PREVENT SEDIMENTATION AND THE AREA MUST BE STAKED OFF AND CONSTRUCTION STORMWATER PERMIT FOR THE PROJECT, HOWEVER ALL SITE WORK SHALL FOLLOW THE MARKED SO THAT HEAVY CONSTRUCTION EQUIPMENT WILL NOT COMPACT THE SOIL. EA) PERMIT GUIDELINES AND RULES. 3. SEDIMENT CONTROL PRACTICES N. INSPECTIONS CAN BE SUSPENDED DUE TO FROZEN GROUND CONDITIONS UNTIL FIRST RUNOFF THE GOAL OF POLLUTION PREVENTION EFFORTS DURING PROJECT CONSTRUCTION IS TO CONTROL SOIL AND CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING SEDIMENT CONTROL PRACTICES: OCCURS OR CONSTRUCTION ACTIVITIES RESUME. A R C: H I T E ; T POLLUTANTS ON THE SITE AND PREVENT THEM FROM LEAVING THE PROJECT SITE AND FLOWING TO SURFACE A. CONTRACTOR MUST INSTALL ALL DOWN GRADIENT PERIMETER CONTROLS BEFORE ANY UP GRADIENT WATERS. THE PURPOSE OF THIS SWPPP IS TO PROVIDE GUIDELINES FOR ACHIEVING THAT GOAL. THE SWPPP DISTURBANCE BEGINS. CONTRACTOR SHALL MAINTAIN PERIMETER CONTROLS UNTIL FINAL 6. POLLUTION PREVENTION MEASURES MUST BE KEPT ONSITE AND UPDATED AS NECESSARY DURING THE COURSE OF CONSTRUCTION TO KEEP IT STABILIZATION HAS BEEN ESTABLISHED. CONTRACTOR SHALL BE RESPONSIBLE FOR IMPLEMENTING THE FOLLOWING POLLUTION PREVENTION CURRENT WITH ANY MODIFICATIONS TO THE POLLUTION CONTROL MEASURES BEING UTILIZED. B. CONTRACTOR SHALL PROVIDE GRADING AND BMP INSTALLATION TO LIMIT ALL SLOPES OF 3H: 1V OR MANAGEMENT MEASURES ON THE SITE: THIS PROJECT CONSISTS OF AN ADDITION TO THE EXISTING HOUSE AND EXPANSION OF A CONCRETE STEEPER TO AN UNBROKEN LENGTH OF 75 FEET OR LESS. A. THE CONTRACTOR SHALL MINIMIZE THE EXPOSURE OF ALL PRODUCTS, MATERIALS, AND WASTES DRIVEWAY ON THE SOUTH SIDE OF NORTH SHORE DRIVE IN ORONO, MINNESOTA. C. IF DOWN GRADIENT SEDIMENT CONTROLS ARE OVERLOADED, THE CONTRACTOR MUST INSTALL FROM STORMWATER WHICH MAY BE A SOURCE OF CONTAMINATION TO STORMWATER OR ARE NOT ADDITIONAL UPGRADIENT SEDIMENT CONTROL PRACTICES OR REDUNDANT BMPS TO ELIMINATE DESIGNED TO BE EXPOSED TO STORMWATER. THERE IS NO STORMWATER MANAGEMENT DESIGN REQUIRED BY THE CITY OF ORONO AND THE MINNEHAHA OVERLOADING. THE SWPPP MUST BE AMENDED TO IDENTIFY THESES ADDITIONAL PRACTICES. B. BUILDING PRODUCTS THAT MAY LEACH POLLUTANTS MUST BE UNDER COVER (PLASTIC SHEETING, CREEK WATERSHED DISTRICT SINCE THE PROJECT IS A RESIDENTIAL ADDITION AND HAS LESS THAN ONE D. TIMING AND INSTALLATION OF SEDIMENT CONTROL DEVICES CAN BE ADJUSTED BY CONTRACTOR TO TEMPORARY ROOFS, ETC.) TO PREVENT THE DISCHARGE OF POLLUTANTS OR PROTECTED BY A ACRE OF DISTURBED AREA. THIS PROJECT IS ALSO NOT REQUIRED TO MEET THE MPCA PERMANENT ACCOMMODATE SHORT-TERM ACTIVITIES SUCH AS CLEARING AND GRUBBING OR VEHICLE PASSAGE. SIMILARLY EFFECTIVE MEANS DESIGNED TO MINIMIZE CONTACT WITH STORMWATER. STORMWATER MANAGEMENT REQUIREMENTS BECAUSE THE DISTURBED AREA IS LESS THAN ONE ACRE AND ANY SHORT-TERM ACTIVITY MUST BE COMPLETED AS QUICKLY AS POSSIBLE AND THE SEDIMENT C. PESTICIDES, HERBICIDES, INSECTICIDES, FERTILIZERS, TREATMENT CHEMICALS, AND LANDSCAPE THE INCREASE IN IMPERVIOUS AREA IS LESS THAN ONE ACRE. CONTROL PRACTICES MUST BE INSTALLED IMMEDIATELY AFTER THE ACTIVITY IS COMPLETED AND IN MATERIALS MUST BE UNDER COVER (PLASTIC SHEETING, TEMPORARY ROOFS, ETC.) TO PREVENT THE REGULATORY CONTEXT: ALL CASES PRIOR TO THE NEXT PRECIPITATION EVENT. DISCHARGE OF POLLUTANTS OR PROTECTED BY A SIMILARLY EFFECTIVE MEANS DESIGNED TO DISCHARGE TO SPECIAL OR IMPAIRED WATERS WITHIN ONE MILE OF SITE: E. ALL PUBLIC AND PRIVATE STORM SEWER INLETS AND OUTLETS SHALL BE PROTECTED BY CONTRACTOR MINIMIZE CONTACT WITH STORMWATER. -THIS PROJECT DISCHARGES TO LAKE IN CRYSTAL - THIS PORTION OF LAKE MITERS WITH APPROPRIATE BMPS DURING THE WORK. THESE PRACTICES SHALL REMAIN IN PLACE UNTIL THE D. HAZARDOUS MATERIALS, TOXIC WASTE, (INCLUDING OIL, DIESEL FUEL, GASOLINE, HYDRAULIC FLUIDS, PIERCE PINI & TER O THENKA BAY IS IDENTIFIED AS AN IMPAIRED WATER ON THE MPCA'S 303(D) IMPAIRED WATERS LIST FOR MERCURY LIST POTENTIAL SOURCES FOR DISCHARGING SEDIMENT TO INLETS HAVE BEEN STABILIZED BY PAINT SOLVENTS, PETROLEUM-BASED PRODUCTS, WOOD PRESERVATIVES, ADDITIVES, CURING ASSOCIATES INC. IN FISH TISSUE. THESE IMPAIRMENTS ARE CONSIDERED TO BE NON -CONSTRUCTION RELATED AND DO CONTRACTOR. COMPOUNDS, AND ACIDS) MUST BE STORED IN SEALED CONTAINERS TO PREVENT SPILLS, LEAKS OR Consulting Civil Engineers NOT REQUIRE ADDITIONAL BMPS AS OUTLINED IN APPENDIX A OF THE MPCA PERMIT. F. TEMPORARY SOIL STOCKPILES MUST HAVE SILT FENCE OR OTHER EFFECTIVE SEDIMENT CONTROLS. OTHER DISCHARGE. RESTRICTED ACCESS STORAGE AREAS MUST BE PROVIDED TO PREVENT SOIL STOCKPILES SHALL NOT BE PLACED IN SURFACE WATERS OR STORMWATER CONVEYANCES. VANDALISM. STORAGE AND DISPOSAL OF HAZARDOUS MATERIALS MUST COMPLY WITH ALL STATE ACCEPTABLE PROTECTION INCLUDES COVER OF MULCH, EROSION CONTROL MATS, OR PLASTIC REQUIREMENTS. PLACEMENT OF FILL IN WATERS OF THE STATE: SHEETING. E. SOLID WASTE MUST BE STORED, COLLECTED, AND DISPOSED IN COMPLIANCE WITH ALL STATE -N/A G. ROCK CONSTRUCTION ENTRANCES OR EQUIVALENT SYSTEM MUST BE INSTALLED BY CONTRACTOR TO REQUIREMENTS. _ DRINKING WATER SUPPLY MANAGEMENT AREA: MINIMIZE TRACKING FROM SITE. CONTRACTOR SHALL PROVIDE STREET SWEEPING AS NECESSARY IF F. PORTABLE TOILETS MUST BE POSITIONED SO THAT THEY ARE SECURE AND WILL NOT BE TIPPED OVER. -N/A BMPS ARE NOT ADEQUATE TO PREVENT SEDIMENT FROM BEING TRACKED ONTO THE STREET. SANITARY WASTE MUST BE DISPOSED OF IN ACCORDANCE WITH ALL STATE REQUIREMENTS. H. CONTRACTOR SHALL PROVIDE TEMPORARY SEDIMENTATION BASINS AS REQUIRED BY THE PERMIT. G. THE CONTRACTOR SHALL TAKE REASONABLE STEPS TO PREVENT THE DISCHARGE OF SPILLED OR THE PROJECT STORMWATER DISCHARGE IS NOT ANTICIPATED TO IMPACT ANY OF THE FOLLOWING: 1. CONTRACTOR MUST MINIMIZE SOIL COMPACTION AND PRESERVE TOPSOIL, UNLESS INFEASIBLE. LEAKED CHEMICALS, INCLUDING FUEL, FROM ALL AREAS WHERE CHEMICALS OR FUEL WILL BE MINIMIZING SOIL COMPACTION IS NOT REQUIRED WHERE THE FUNCTION OF A SPECIFIC AREA OF THE LOADED OR UNLOADED. THE CONTRACTOR MUST CONDUCT FUELING IN A CONTAINED AREA UNLESS -OUTSTANDING RESOURCE VALUE WATERS, TROUT WATERS, WETLANDS, CALCAREOUS FENS, PROPERTIES SITE DICTATES THAT IT BE COMPACTED. INFEASIBLE. THE CONTRACTOR MUST ENSURE ADEQUATE SUPPLIES ARE AVAILABLE AT ALL TIMES TO LISTED BY THE NATIONAL REGISTER OF HISTORIC PLACES OR ARCHAEOLOGICAL SITES J. THE CONTRACTOR MUST PRESERVE A 50 FOOT NATURAL BUFFER OR PROVIDE REDUNDANT SEDIMENT CLEAN UP DISCHARGED MATERIALS AND THAT AN APPROPRIATE DISPOSAL METHOD IS AVAILABLE FOR CONTROLS WHEN A SURFACE WATER IS LOCATED WITHIN 50 FEET OF THE PROJECT DISTURBANCE RECOVERED SPILLED MATERIALS. ALL SPILLS MUST BE CLEANED UP AND REPORTED IN ACCORDANCE THE PROJECT STORMWATER DISCHARGE IS NOT SUBJECT TO ADDITIONAL REGULATION DUE TO ANY OF THE LIMITS AND STORMWATER FLOWS TO THE SURFACE WATER. WITH STATE REQUIREMENTS. DRY CLEAN UP MEASURES SHALL BE USED WHERE POSSIBLE. FOLLOWING: K. IF POLYMERS, FLOCCULANTS, OR OTHER SEDIMENTATION TREATMENT CHEMICALS ARE USED ON SITE, H. THE CONTRACTOR MUST LIMIT VEHICLE AND EQUIPMENT WASHING TO A DEFINED AREA WHEN -OTHER FORMAL ENVIRONMENTAL REVIEWS, ENDANGERED OR THREATENED SPECIES THE CONTRACTOR MUST COMPLY WITH THE FOLLOWING REQUIREMENTS. COMPLETED ON THE PROJECT SITE. RUNOFF FROM THE WASHING AREA MUST BE CONTAINED IN ASEDIMENT BASIN OR OTHER SIMILARLY EFFECTIVE CONTROLS AND WASTE FROM THE WASHING a. THE CONTRACTOR MUST USE CONVENTIONAL EROSION AND SEDIMENT CONTROLS PRIOR TO ACTIVITY MUST BE PROPERLY DISPOSED OF. THE CONTRACTOR MUST PROPERLY USE AND STORE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IMPLEMENTATION RESPONSIBILITIES: CHEMICAL ADDITION TO ENSURE EFFECTIVE TREATMENT. CHEMICALS MAY ONLY BE APPLIED SOAPS, DETERGENTS, OR SOLVENTS. NO ENGINE DEGREASING IS ALLOWED ONSITE. WHERE TREATED STORMWATER IS DIRECTED TO A SEDIMENT CONTROL SYSTEM WHICH ALLOWS 1. THE OWNER AND CONTRACTOR ARE PERMITTEE(S) AS IDENTIFIED BY THE NPDES PERMIT. FOR THE SETTLEMENT OF THE FLOC PRIOR TO DISCHARGE. I. THE CONTRACTOR MUST PROVIDE EFFECTIVE CONTAINMENT FOR ALL LIQUID AND SOLID WASTES 2. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ON-SITE IMPLEMENTATION OF THE SWPPP, INCLUDING THE b. CHEMICALS MUST BE SELECTED THAT ARE APPROPRIATELY SUITED TO THE TYPES OF SOILS GENERATED BY WASHOUT OPERATIONS (CONCRETE, STUCCO, PAINT, FORM RELEASE OILS, CURING ACTIVITIES OF ALL OF THE CONTRACTOR'S SUBCONTRACTORS. LIKELY TO BE EXPOSED DURING CONSTRUCTION. CHEMICALS MUST BE USED IN ACCORDANCE COMPOUNDS, AND OTHER CONSTRUCTION MATERIALS) RELATED TO THE PROJECT CONSTRUCTION 3. CONTRACTOR SHALL PROVIDE A PERSON(S) KNOWLEDGEABLE AND EXPERIENCED IN THE APPLICATION OF - WITH ACCEPTED ENGINEERING PRACTICES, AND WITH DOSING SPECIFICATION AND SEDIMENT ACTIVITY. NO WASHOUT WASTES MAY CONTACT THE GROUND, AND THE CONTAINMENT MUST BE DESIGNED SO THAT IT DOES NOT RESULT IN RUNOFF FROM THE WASHOUT OPERATIONS OR ARE EROSION PREVENTION AND SEDIMENT CONTROL BMPS TO OVERSEE ALL INSTALLATION AND MAINTENANCE REMOVAL DESIGN SPECIFICATION PROVIDED BY THE MANUFACTURER. LIQUID AND SOLID WASTES MUST BE DISPOSED OF PROPERLY AND IN COMPLIANCE WITH ALL MPCA OF BMPS AND IMPLEMENTATION OF THE SWPPP. RULES. A SIGN MUST BE INSTALLED ADJACENT TO EACH WASHOUT FACILITY THAT REQUIRES SITE 4. CONTRACTOR SHALL PROVIDE PERSON(S) MEETING THE TRAINING REQUIREMENTS OF THE NPDES PERMIT 4. DEWATERING AND BASIN DRAINING PERSONNEL TO UTILIZE PROPER FACILITIES FOR DISPOSAL OF CONCRETE AND OTHER WASHOUT TO CONDUCT INSPECTION AND MAINTENANCE OF ALL EROSION PREVENTION AND SEDIMENT CONTROL BMPSWASTES. IN ACCORDANCE WITH THE REQUIREMENTS OF THE PERMIT. ONE OF THESE INDIVIDUAL(S) MUST BE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING DEWATERING REQUIREMENTS: AVAILABLE FOR AN ONSITE INSPECTION WITHIN 72 HOURS UPON REQUEST BY MPCA. CONTRACTOR SHALL A. CONTRACTOR'S DEWATERING ACTIVITIES THAT HAVE SEDIMENT -LADEN DISCHARGE WATER MUST BE PROVIDE TRAINING DOCUMENTATION FOR THESE INDIVIDUALS) AS REQUIRED BY THE NPDES PERMIT. THIS DISCHARGED INTO A TEMPORARY OR PERMANENT SEDIMENTATION BASIN WHENEVER POSSIBLE, 7. FINAL STABILIZATION TRAINING DOCUMENTATION SHALL BE RECORDED IN OR WITH THE SWPPP BEFORE THE START OF OTHERWISE IT MUST BE DISCHARGED THROUGH SOME FORM OF BEST MANAGEMENT PRACTICE (BMP) THE CONTRACTOR SHALL ENSURE FINAL STABILIZATION OF THE SITE. FINAL STABILIZATION REQUIRES THE CONSTRUCTION OR AS SOON AS THE PERSONNEL FOR THE PROJECT HAVE BEEN DETERMINED. BY CONTRACTOR TO LIMIT SEDIMENT FROM LEAVING THE SITE. PRIOR TO DISCHARGE, THE FOLLOWING: DOCUMENTATION SHALL INCLUDE: CONTRACTOR SHALL PERFORM A VISUAL TEST TO ENSURE ADEQUATE TREATMENT IS OBTAINED IN THE A. ALL SOIL DISTURBING ACTIVITIES ARE COMPLETE AND A UNIFORM PERENNIAL VEGETATIVE COVER 4.1. NAMES OF THE PERSONNEL ASSOCIATED WITH THE PROJECT THAT ARE REQUIRED TO BE TRAINED PER BASIN OR BMP AND APPLY ADDITIONAL TREATMENT AS REQUIRED TO ENSURE ADEQUATE TREATMENT. WITH A DENSITY OF 70% OVER THE ENTIRE PERVIOUS SURFACE HAS BEEN ACHIEVED, INCLUDING PART III. F.1 OF THE PERMIT. B. THE CONTRACTOR SHALL DISCHARGE WATER FROM DEWATERING IN A MANNER THAT DOES NOT STABILIZATION OF ALL DITCHES AND SWALES. 4.2. DATES OF TRAINING AND NAME OF INSTRUCTOR AND ENTITY PROVIDING TRAINING. CAUSE NUISANCE CONDITIONS. THE DISCHARGE WATER SHALL BE DISPERSED OVER AN ACCEPTED B. CONTRACTOR SHALL ENSURE THAT ALL PERMANENT STORMWATER TREATMENT SYSTEMS ARE 4.3. CONTENT OF TRAINING COURSE OR WORKSHOP INCLUDING THE NUMBER OF HOURS OF TRAINING. ENERGY DISSIPATION MEASURE AND NOT ADVERSELY AFFECT THE RECEIVING WATER OR CONSTRUCTED IN ACCORDANCE WITH THE REQUIREMENTS OF THE NPDES PERMIT. DOWNSTREAM LANDOWNERS OR WETLANDS. 5. FOLLOWING FINAL STABILIZATION AND THE TERMINATION OF COVERAGE FOR THE NPDES PERMIT, THE C. IF CONTRACTOR IS USING FILTERS WITH BACKWASH WATER, THE CONTRACTOR SHALL HAUL THE C. CONTRACTOR SHALL REMOVE ALL TEMPORARY SYNTHETIC AND STRUCTURAL BMPS. OWNER IS EXPECTED FURNISH LONG TERM OPERATION AND MAINTENANCE (O 8v M) OF THE PERMANENT BACKWASH WATER AWAY FOR DISPOSAL, RETURN THE BACKWASH WATER TO THE BEGINNING OF THE STORM WATER MANAGEMENT SYSTEM. TREATMENT PROCESS, OR INCORPORATE THE BACKWASH WATER INTO THE SITE IN A MANNER THAT RECORD AVAILABLITY AND RETENTION: - DOES NOT CAUSE EROSION. -THE CONTRACTOR SHALL MAKE THE SWPPP, INCLUDING ALL CERTIFICATES, REPORTS, RECORDS, OR OTHER STORMWATER DISCHARGE DESIGN REQUIREMENTS: INFORMATION OF THE PERMIT, AVAILABLE TO FEDERAL, STATE, OR LOCAL OFFICIALS WITHIN 72 HOURS UPON THE FOLLOWING SIZING CRITERIA APPLY TO THE DESIGN OF STORMWATER TREATMENT FACILITIES. N/A 5. INSPECTIONS AND MAINTENANCE REQUEST FOR THE DURATION OF THE PERMIT AND FOR THREE YEARS FOLLOWING THE SUBMITTAL OF THE INDICATES NOT APPLICABLE OR NOT CONSTRUCTED AS PART OF THIS PROJECT. CONTRACTOR SHALL BE RESPONSIBLE FOR PERFORMING THE FOLLOWING INSPECTIONS AND NOTICE OF TERMINATION. 2465 1. TEMPORARY SEDIMENTATION BASINS: N/A MAINTENANCE: Remodel 2. PERMANENT WET SEDIMENTATION BASINS: N/A A. WHEN INSPECTIONS FIND EROSION PREVENTION AND SEDIMENT CONTROL BMPS THAT ARE -THE CONTRACTOR SHALL MAKE THE RESPONSIBLE PERSON, TRAINED AS REQUIRED BY THIS PERMIT, 3. PERMANENT INFILTRATION/FILTRATION : N/A NONFUNCTIONAL, ALL NONFUNCTIONAL BMPS MUST BE REPAIRED, REPLACED, OR SUPPLEMENTED AVAILABLE ON SITE WITHIN 72 HOURS WHEN REQUESTED BY THE MPCA FOR AN ONSITE INSPECTION. 4. PERMANENT REGIONAL PONDS: N/A WITH FUNCTIONAL BMPS WITHIN 24 HOURS AFTER DISCOVERY OR OTHERWISE IN ACCORDANCE WITH THE NPDES PERMIT REQUIREMENTS. THE CONTRACTOR SHALL ALSO PLACE ANY ADDITIONAL EROSION INSPECTION AND ENTRY: 5. ALTERNATIVE METHODS: N/A CONTROL MEASURES DEEMED NECESSARY BY MPCA WITHIN 24 HOURS OF NOTICE FROM MPCA. -THE CONTRACTOR MUST ALLOW ACCESS AS REQUIRED BY STATE REGULATIONS FOR REPRESENTATIVES OF B. THE CONTRACTOR MUST ROUTINELY INSPECT THE SITE ONCE EVERY 7 DAYS DURING ACTIVE THE MPCA OR ANY MEMBER THEREOF WHEN AUTHORIZED BY IT, TO ENTER UPON THE PROJECT SITE FOR THE SEQUENCE OF CONSTRUCTION: CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 0.5 INCHES IN 24 PURPOSE OF OBTAINING INFORMATION, EXAMINATION OF RECORDS, OR CONDUCTING SURVEYS OR 2465 North Shore Drive THE FOLLOWING SEQUENCE DESCRIBES, IN GENERAL, THE WORK ON THE SITE: HOURS. INVESTIGATIONS. Orono, MN 1. CONTRACTOR SHALL VERIFY THAT ALL PERMITS HAVE BEEN OBTAINED AND/OR OBTAIN THE NECESSARY C. ALL INSPECTIONS AND MAINTENANCE CONDUCTED DURING CONSTRUCTION MUST BE RECORDED IN PERMITS. WRITING BY CONTRACTOR AND RETAINED WITH THE SWPPP BY CONTRACTOR. MAINTENANCE MUST BE 8. CHANGES TO SWPPP - COMPLETED BY CONTRACTOR IN CONFORMANCE WITH NPDES PERMIT. CONTRACTOR'S RECORDS MUST - - - 2. CONTRACTOR SHALL PERFORM SITE INSPECTIONS, RECORD KEEPING AND RECORD RETENTION IN NCLUDE: -THE PERMITTEE MUST AMEND THE SWPPP AS NECESSARY TO INCLUDE ADDITIONAL REQUIREMENTS, SUCH AS Stormwater ACCORDANCE WITH ALL PERMITS. a. DATE AND TIME OF INSPECTION. ADDITIONAL OR MODIFIED BMPS, DESIGNED TO CORRECT PROBLEMS IDENTIFIED OR ADDRESS SITUATIONS PO11UtlOri 3. CONTRACTOR SHALL INSTALL ALL PERIMETER AND DOWN -GRADIENT EROSION CONTROL AND SEDIMENT b. NAME OF PERSON CONDUCTING INSPECTION. WHENEVER: Prevention CONTROL BEST MANAGEMENT PRACTICES (BMPS), CONSTRUCTION ENTRANCES AND INLET PROTECTION 1. THERE IS A CHANGE IN DESIGN, CONSTRUCTION, OPERATION OR MAINTENANCE, WEATHER OR SEASONAL Notes DEVICES PRIOR TO SITE GRADING, EXCAVATION, STOCKPILING OR DISTURBING EXISTING VEGETATIVE c. FINDING OF INSPECTION INCLUDING RECOMMENDATIONS FOR CORRECTIVE ACTION. CONDITIONS THAT HAVE SIGNIFICANT EFFECT ON DISCHARGE. INSPECTION IS REQUIRED WITHIN 24 HOURS COVER. d. DETAILS OF CORRECTIVE ACTION TAKEN (DATE. TIME. PARTY COMPLETING MAINTENANCE OF A RAINFALL EVENT GREATER THAN ONE-HALF INCH. 4. CONTRACTOR SHALL PERFORM SITE GRADING, EXCAVATION, STOCKPILING WORK IN ACCORDANCE WITH ACTIVITIES). 2. INSPECTION OR INVESTIGATION BY SITE OPERATORS, LOCAL, STATE OR FEDERAL OFFICIALS INDICATE THE THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP). e. DATE AND AMOUNT OF RAINFALL GREATER THAN 0.5 INCHES IN 24 HOURS. SWPPP IS NOT EFFECTIVE. 5. CONTRACTOR SHALL INSTALL, INSPECT, MONITOR AND MAINTAIN TEMPORARY AND PERMANENT EROSION f. IF ANY DISCHARGE IS OBSERVED TO BE OCCURRING DURING THE INSPECTION, A RECORD OF 3. THE SWPPP IS NOT ACHIEVING THE GENERAL OBJECTIVES OF CONTROLLING POLLUTANTS OR THE SWPPP IS CONTROL BMPS AS SHOWN ON PLANS & IN CONFORMANCE WITH NPDES PERMIT, CONTINUOUSLY DURING ALL POINTS OF THE PROPERTY FROM WHICH THERE IS A DISCHARGE MUST BE MADE, AND THE NOT CONSISTENT WITH THE TERMS AND CONDITIONS OF THIS PERMIT. THE WORK. CONTRACTOR SHALL STABILIZE ALL EXPOSED SOILS NO LATER THAN 7 DAYS AFTER THE DISCHARGE SHALL BE DESCRIBED (COLOR, ODOR, FLOATING, SETTLED, OR SUSPENDED SOLIDS, 4. THE MPCA DETERMINES THAT DISCHARGE MAY CAUSE OR CONTRIBUTE TO NON -ATTAINMENT OF ANY CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS TEMPORARILY OR PERMANENTLY CEASED. FOAM, OIL SHEEN, AND OTHER INDICATORS) AND PHOTOGRAPHED. APPLICABLE WATER QUALITY STANDARDS OR THE SWPPP DOES NOT INCORPORATE THE REQUIREMENTS 6. CONTRACTOR SHALL REPLACE OR REPAIR EROSION CONTROL AND SEDIMENT CONTROL BMPS THAT ARE g. DOCUMENTATION OF CHANGES MADE TO SWPPP. RELATED TO AN APPROVED TOTAL MAXIMUM DAILY LOAD (TMDL). NOT FUNCTIONING PROPERLY. D. IN AREAS OF PROJECT WHERE FINAL STABILIZATION IS COMPLETE INSPECTIONS CAN BE REDUCED TO Construction 7. CONTRACTOR SHALL PERFORM SITE RESTORATION ACTIVITIES FOR PERMANENT VEGETATIVE ONCE A MONTH. THESE AREAS SHALL BE INSPECTED BY CONTRACTOR FOR MINIMUM PERIOD OF 12 9. SWPPP CERTIFICATION: Documents ESTABLISHMENT. NON -WINTER MONTHS AND WITHIN 24 HOURS OF FIRST SPRING RUNOFF OR PRIOR TO RESUMING - THIS STORMWATER POLLUTION PREVENTION PLAN WAS PREPARED BY INDIVIDUALS) TRAINED IN 8. CONTRACTOR SHALL REMOVE SEDIMENT CONTROL DEVICES AT END OF PROJECT. CONSTRUCTION FOLLOWING ANY WINTER STOPPAGE, WHICHEVER COMES FIRST. ACCORDANCE WITH THE PERMIT'S TRAINING REQUIREMENTS FOR PREPARATION OF SWPPPS. INDIVIDUALS) E. THE CONTRACTOR IS RESPONSIBLE FOR THE INSPECTION AND MAINTENANCE OF BMPS UNTIL PREPARING THIS SWPPP: 1. CONSTRUCTION ACTIVITY FIELD REQUIREMENTS: ANOTHER PERMITTEE HAS OBTAINED COVERAGE, OR THE PROJECT HAS UNDERGONE FINAL STABLIZATION AND AN NOT HAS BEEN SUBMITTED TO THE MPCA. ALL FIELD REQUIREMENTS SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THE PREPARED BY: - -- NPDES PERMIT AND STORMWATER POLLUTION PREVENTION PLANSWPPP . ( ) F. ALL EROSION CONTROL MEASURES MUST BE INSTALLED AND MAINTAINED BY CONTRACTOR KEVIN GARDNER, P.E. ACCORDING TO THE DETAILS INCLUDED IN THE CONSTRUCTION DOCUMENTS AND IN ACCORDANCE , A. THE CONTRACTOR MUST IMPLEMENT THE SWPPP AND PROVIDE BMPS IDENTIFIED IN THE SWPPP IN AN WITH THE PRODUCT MANUFACTURER'S RECOMMENDATIONS. PIERCE PINI AND ASSOCIATES APPROPRIATE AND FUNCTIONAL MANNER. G. ALL PERIMETER CONTROL DEVICES MUST BE REPAIRED, REPLACED OR SUPPLEMENTED BY THE KEVIN@PIERCEPINI.COM°� o B. THE CONTRACTOR SHALL RESPOND TO CHANGING SITE CONDITIONS AND IMPLEMENT/ SUPPLEMENT EROSION PREVENTION AND SEDIMENT CONTROL MEASURES UTILIZED TO PROVIDE ADEQUATE CONTRACTOR WHEN THEY BECOME NON-FUNCTIONAL OR THE SEDIMENT REACHES ONE-HALF THE 763-537-1311�RpNO OF J HEIGHT OF THE DEVICE. CONTRACTOR SHALL REPAIR OR REPLACE DEVICE THAT IS NONFUNCTIONAL CSN - PROTECTION OF DISTURBED SOILS AND ADEQUATE PREVENTION OF SEDIMENT TRANSPORT OFF-SITE. BY THE END OF THE NEXT BUSINESS DAY AFTER DISCOVERY, OR THEREAFTER AS SOON AS FIELD AT A MINIMUM, THE FOLLOWING STORM WATER POLLUTION PREVENTION CONSTRUCTION ACTIVITY CONDITIONS ALLOW. TRAINING/ CERTIFICATION: - - - - FIELD REQUIREMENTS SHALL BE FURNISHED BY THE CONTRACTOR. H. TEMPORARY AND PERMANENT SEDIMENTATION BASINS MUST BE DRAINED AND SEDIMENT REMOVED DATE OF TRAINING/ CERTIFICATION: 2016 BY CONTRACTOR ONCE THE SEDIMENT COLLECTED REACHES ONE HALF THE STORAGE VOLUME WITH CERTIFICATION PROGRAM: UNIVERSITY OF MINNESOTA - DESIGN OF CONSTRUCTION SWPPP 2. EROSION PREVENTION PRACTICES 72 HOURS OF DISCOVERY, OR AS SOON AS FIELD CONDITIONS ALLOW. ARDEN HILLS, MN _ CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING EROSION PREVENTION PRACTICES: I. ALL SEDIMENT DEPOSITS WITHIN SURFACE WATERS OR STORMWATER CONVEYANCES MUST BE INSTRUCTOR(S): DWAYNE STRENLUND m A. THE CONTRACTOR SHALL ATTEMPT TO PHASE ALL WORK TO MINIMIZE EROSION AND MAINTAIN ZVEGETATIVE REMOVED AND RESTABILIZED BY CONTRACTOR WITHIN 7 DAYS OF DISCOVERY OR SOONER IF IT CERTIFICATION EXPIRATION: 2018 - LU COVER TO THE EXTENT POSSIBLE. THE LOCATION OF AREAS NOT TO BE DISTURBED PRESENTS A FLOOD RISK, INCLUDING DELTAS AND STORM SEWER SEDIMENT DEPOSITS. THE MUST BE DELINEATED ON THE SITE BEFORE CONSTRUCTION BEGINS. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS REQUIRED, IF NECESSARY, FOR _---- = B. STABILIZATION ON ALL EXPOSED SOILS MUST BE INITIATED IMMEDIATELY WHENEVER CONSTRUCTION SUCH SEDIMENT REMOVAL. - a ACTIVITY HAS PERMANENTLY OR TEMPORARILY CEASED ON ANY PORTION OF THE SITE AND WILL NOT J. CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING EXISTING PAVED SURFACES CLEAN OF SEDIMENT. RESUME FOR A PERIOD EXCEEDING 7 CALENDAR DAYS, INCLUDING STOCKPILES WITH SIGNIFICANT CONSTRUCTION ENTRANCES SHALL BE CHECKED DAILY BY CONTRACTOR. IF THE ENTRANCE BECOMES w SILT, CLAY OR ORGANIC COMPONENTS. STABILIZATION MUST BE COMPLETED WITHIN 7 CALENDAR INUNDATED WITH SEDIMENT, THE ENTRANCE WILL BE CLEANED OR REPLACED AS APPROPRIATE BY DAYS. CONTRACTOR. STREETS LEADING TO AND FROM THE CONSTRUCTION ENTRANCE SHALL BE CHECKED T C. THE NORMAL WETTED PERIMETER OF ANY TEMPORARY OR PERMANENT DRAINAGE DITCH THAT DRAINS DAILY BY CONTRACTOR FOR OFF-SITE SEDIMENT TRACKING ONTO PAVED SURFACES. THESE AREAS WATER FROM A CONSTRUCTION SITE OR DIVERTS WATER AROUND A SITE MUST BE STABILIZED BY WILL BE SWEPT CLEAN OF ANY TRACKED MATERIALS BY CONTRACTOR AS SOON AS POSSIBLE AND a CONTRACTOR WITHIN 200 FEET FROM THE PROPERTY EDGE, OR FROM THE POINT OF DISCHARGE TO WITHIN 24 HOURS OF DISCOVERY AND AS DIRECTED BY THE CITY. CONTRACTOR SHALL EXTEND ANY SURFACE WATER WITHIN 24 HOURS OF CONNECTING TO A SURFACE WATER. TEMPORARY OR SWEEPING TO THE EXTREMITY OF ANY SEDIMENT TRACKING THAT OCCURS OFF-SITE. PERMANENT DITCH SWALES BEING USED AS A SEDIMENT CONTAINMENT SYSTEM DO NOT NEED TO BE STABILIZED UNTIL THEY ARE NO LONGER USED AS A SEDIMENT CONTAINMENT SYSTEM, AFTER WHICH K. CONTRACTOR SHALL BE RESPONSIBLE TO REMOVE ANY OFF-SITE SEDIMENT ACCUMULATIONS IN A MANNER AND AT A FREQUENCY SUFFICIENT TO MINIMIZE OFF-SITE IMPACTS. C100 a THEY MUST BE STABILIZED WITHIN 24 HOURS. L. ALL INFILTRATION/ FILTRATION AREAS MUST BE INSPECTED BY CONTRACTOR TO ENSURE THAT NO D. TEMPORARY OR PERMANENT ENERGY DISSIPATION AT PIPE OUTLETS MUST BE PROVIDED WITHIN 24 SEDIMENT FROM ONGOING CONSTRUCTION IS ACCUMULATING OVER THE INFILTRATION/ FILTRATION 0 HOURS OF CONNECTING TO A SURFACE WATER. m AREA. SEDIMENT ACCUMULATED OVER INFILTRATION /FILTRATION MUST BE REMOVED BY