HomeMy WebLinkAbout2017 SWPPP 2 of 4PROJECT DESCRIPTION:
E.
THE CONTRACTOR MUST DIRECT DISCHARGES FROM BMPS TO VEGETATED AREAS OF THE SITE IN
CONTRACTOR.
A STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IS NOT REQUIRED AS PART OF THE GENERAL PERMIT
ORDER TO INCREASE SEDIMENT REMOVAL AND MAXIMIZE INFILTRATION UNLESS INFEASIBLE. THE
M. CONTRACTOR SHALL PROTECT INFILTRATION/ FILTRATION AREAS FROM SEDIMENTATION AND
AUTHORIZATION TO DISCHARGE STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY UNDER THE
CONTRACTOR MUST UTILIZE VELOCITY DISSIPATION DEVICES IF NECESSARY TO PREVENT EROSION
OVER -COMPACTION. DURING EXCAVATION, SEDIMENT AND EROSION CONTROL DEVICES MUST BE
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)/STATE DISPOSAL SYSTEM (SDS)
WHEN DIRECTING STORMWATER TO VEGETATED AREAS.
UTILIZED BY CONTRACTOR TO PREVENT SEDIMENTATION AND THE AREA MUST BE STAKED OFF AND
CONSTRUCTION STORMWATER PERMIT FOR THE PROJECT, HOWEVER ALL SITE WORK SHALL FOLLOW THE
MARKED SO THAT HEAVY CONSTRUCTION EQUIPMENT WILL NOT COMPACT THE SOIL.
EA)
PERMIT GUIDELINES AND RULES.
3. SEDIMENT
CONTROL PRACTICES
N. INSPECTIONS CAN BE SUSPENDED DUE TO FROZEN GROUND CONDITIONS UNTIL FIRST RUNOFF
THE GOAL OF POLLUTION PREVENTION EFFORTS DURING PROJECT CONSTRUCTION IS TO CONTROL SOIL AND
CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING SEDIMENT CONTROL PRACTICES:
OCCURS OR CONSTRUCTION ACTIVITIES RESUME.
A R C: H I T E ; T
POLLUTANTS ON THE SITE AND PREVENT THEM FROM LEAVING THE PROJECT SITE AND FLOWING TO SURFACE
A.
CONTRACTOR MUST INSTALL ALL DOWN GRADIENT PERIMETER CONTROLS BEFORE ANY UP GRADIENT
WATERS. THE PURPOSE OF THIS SWPPP IS TO PROVIDE GUIDELINES FOR ACHIEVING THAT GOAL. THE SWPPP
DISTURBANCE BEGINS. CONTRACTOR SHALL MAINTAIN PERIMETER CONTROLS UNTIL FINAL
6. POLLUTION PREVENTION MEASURES
MUST BE KEPT ONSITE AND UPDATED AS NECESSARY DURING THE COURSE OF CONSTRUCTION TO KEEP IT
STABILIZATION HAS BEEN ESTABLISHED.
CONTRACTOR SHALL BE RESPONSIBLE FOR IMPLEMENTING THE FOLLOWING POLLUTION PREVENTION
CURRENT WITH ANY MODIFICATIONS TO THE POLLUTION CONTROL MEASURES BEING UTILIZED.
B.
CONTRACTOR SHALL PROVIDE GRADING AND BMP INSTALLATION TO LIMIT ALL SLOPES OF 3H: 1V OR
MANAGEMENT MEASURES ON THE SITE:
THIS PROJECT CONSISTS OF AN ADDITION TO THE EXISTING HOUSE AND EXPANSION OF A CONCRETE
STEEPER TO AN UNBROKEN LENGTH OF 75 FEET OR LESS.
A. THE CONTRACTOR SHALL MINIMIZE THE EXPOSURE OF ALL PRODUCTS, MATERIALS, AND WASTES
DRIVEWAY ON THE SOUTH SIDE OF NORTH SHORE DRIVE IN ORONO, MINNESOTA.
C.
IF DOWN GRADIENT SEDIMENT CONTROLS ARE OVERLOADED, THE CONTRACTOR MUST INSTALL
FROM STORMWATER WHICH MAY BE A SOURCE OF CONTAMINATION TO STORMWATER OR ARE NOT
ADDITIONAL UPGRADIENT SEDIMENT CONTROL PRACTICES OR REDUNDANT BMPS TO ELIMINATE
DESIGNED TO BE EXPOSED TO STORMWATER.
THERE IS NO STORMWATER MANAGEMENT DESIGN REQUIRED BY THE CITY OF ORONO AND THE MINNEHAHA
OVERLOADING. THE SWPPP MUST BE AMENDED TO IDENTIFY THESES ADDITIONAL PRACTICES.
B. BUILDING PRODUCTS THAT MAY LEACH POLLUTANTS MUST BE UNDER COVER (PLASTIC SHEETING,
CREEK WATERSHED DISTRICT SINCE THE PROJECT IS A RESIDENTIAL ADDITION AND HAS LESS THAN ONE
D.
TIMING AND INSTALLATION OF SEDIMENT CONTROL DEVICES CAN BE ADJUSTED BY CONTRACTOR TO
TEMPORARY ROOFS, ETC.) TO PREVENT THE DISCHARGE OF POLLUTANTS OR PROTECTED BY A
ACRE OF DISTURBED AREA. THIS PROJECT IS ALSO NOT REQUIRED TO MEET THE MPCA PERMANENT
ACCOMMODATE SHORT-TERM ACTIVITIES SUCH AS CLEARING AND GRUBBING OR VEHICLE PASSAGE.
SIMILARLY EFFECTIVE MEANS DESIGNED TO MINIMIZE CONTACT WITH STORMWATER.
STORMWATER MANAGEMENT REQUIREMENTS BECAUSE THE DISTURBED AREA IS LESS THAN ONE ACRE AND
ANY SHORT-TERM ACTIVITY MUST BE COMPLETED AS QUICKLY AS POSSIBLE AND THE SEDIMENT
C. PESTICIDES, HERBICIDES, INSECTICIDES, FERTILIZERS, TREATMENT CHEMICALS, AND LANDSCAPE
THE INCREASE IN IMPERVIOUS AREA IS LESS THAN ONE ACRE.
CONTROL PRACTICES MUST BE INSTALLED IMMEDIATELY AFTER THE ACTIVITY IS COMPLETED AND IN
MATERIALS MUST BE UNDER COVER (PLASTIC SHEETING, TEMPORARY ROOFS, ETC.) TO PREVENT THE
REGULATORY CONTEXT:
ALL CASES PRIOR TO THE NEXT PRECIPITATION EVENT.
DISCHARGE OF POLLUTANTS OR PROTECTED BY A SIMILARLY EFFECTIVE MEANS DESIGNED TO
DISCHARGE TO SPECIAL OR IMPAIRED WATERS WITHIN ONE MILE OF SITE:
E.
ALL PUBLIC AND PRIVATE STORM SEWER INLETS AND OUTLETS SHALL BE PROTECTED BY CONTRACTOR
MINIMIZE CONTACT WITH STORMWATER.
-THIS PROJECT DISCHARGES TO LAKE IN CRYSTAL
- THIS PORTION OF LAKE MITERS
WITH APPROPRIATE BMPS DURING THE WORK. THESE PRACTICES SHALL REMAIN IN PLACE UNTIL THE
D. HAZARDOUS MATERIALS, TOXIC WASTE, (INCLUDING OIL, DIESEL FUEL, GASOLINE, HYDRAULIC FLUIDS,
PIERCE PINI &
TER O THENKA
BAY IS IDENTIFIED AS AN IMPAIRED WATER ON THE MPCA'S 303(D) IMPAIRED WATERS LIST FOR MERCURY
LIST
POTENTIAL SOURCES FOR DISCHARGING SEDIMENT TO INLETS HAVE BEEN STABILIZED BY
PAINT SOLVENTS, PETROLEUM-BASED PRODUCTS, WOOD PRESERVATIVES, ADDITIVES, CURING
ASSOCIATES INC.
IN FISH TISSUE. THESE IMPAIRMENTS ARE CONSIDERED TO BE NON -CONSTRUCTION RELATED AND DO
CONTRACTOR.
COMPOUNDS, AND ACIDS) MUST BE STORED IN SEALED CONTAINERS TO PREVENT SPILLS, LEAKS OR
Consulting Civil Engineers
NOT REQUIRE ADDITIONAL BMPS AS OUTLINED IN APPENDIX A OF THE MPCA PERMIT.
F.
TEMPORARY SOIL STOCKPILES MUST HAVE SILT FENCE OR OTHER EFFECTIVE SEDIMENT CONTROLS.
OTHER DISCHARGE. RESTRICTED ACCESS STORAGE AREAS MUST BE PROVIDED TO PREVENT
SOIL STOCKPILES SHALL NOT BE PLACED IN SURFACE WATERS OR STORMWATER CONVEYANCES.
VANDALISM. STORAGE AND DISPOSAL OF HAZARDOUS MATERIALS MUST COMPLY WITH ALL STATE
ACCEPTABLE PROTECTION INCLUDES COVER OF MULCH, EROSION CONTROL MATS, OR PLASTIC
REQUIREMENTS.
PLACEMENT OF FILL IN WATERS OF THE STATE:
SHEETING.
E. SOLID WASTE MUST BE STORED, COLLECTED, AND DISPOSED IN COMPLIANCE WITH ALL STATE
-N/A
G.
ROCK CONSTRUCTION ENTRANCES OR EQUIVALENT SYSTEM MUST BE INSTALLED BY CONTRACTOR TO
REQUIREMENTS. _
DRINKING WATER SUPPLY MANAGEMENT AREA:
MINIMIZE TRACKING FROM SITE. CONTRACTOR SHALL PROVIDE STREET SWEEPING AS NECESSARY IF
F. PORTABLE TOILETS MUST BE POSITIONED SO THAT THEY ARE SECURE AND WILL NOT BE TIPPED OVER.
-N/A
BMPS ARE NOT ADEQUATE TO PREVENT SEDIMENT FROM BEING TRACKED ONTO THE STREET.
SANITARY WASTE MUST BE DISPOSED OF IN ACCORDANCE WITH ALL STATE REQUIREMENTS.
H.
CONTRACTOR SHALL PROVIDE TEMPORARY SEDIMENTATION BASINS AS REQUIRED BY THE PERMIT.
G. THE CONTRACTOR SHALL TAKE REASONABLE STEPS TO PREVENT THE DISCHARGE OF SPILLED OR
THE PROJECT STORMWATER DISCHARGE IS NOT ANTICIPATED TO IMPACT ANY OF THE FOLLOWING:
1.
CONTRACTOR MUST MINIMIZE SOIL COMPACTION AND PRESERVE TOPSOIL, UNLESS INFEASIBLE.
LEAKED CHEMICALS, INCLUDING FUEL, FROM ALL AREAS WHERE CHEMICALS OR FUEL WILL BE
MINIMIZING SOIL COMPACTION IS NOT REQUIRED WHERE THE FUNCTION OF A SPECIFIC AREA OF THE
LOADED OR UNLOADED. THE CONTRACTOR MUST CONDUCT FUELING IN A CONTAINED AREA UNLESS
-OUTSTANDING RESOURCE VALUE WATERS, TROUT WATERS, WETLANDS, CALCAREOUS FENS, PROPERTIES
SITE DICTATES THAT IT BE COMPACTED.
INFEASIBLE. THE CONTRACTOR MUST ENSURE ADEQUATE SUPPLIES ARE AVAILABLE AT ALL TIMES TO
LISTED BY THE NATIONAL REGISTER OF HISTORIC PLACES OR ARCHAEOLOGICAL SITES
J.
THE CONTRACTOR MUST PRESERVE A 50 FOOT NATURAL BUFFER OR PROVIDE REDUNDANT SEDIMENT
CLEAN UP DISCHARGED MATERIALS AND THAT AN APPROPRIATE DISPOSAL METHOD IS AVAILABLE FOR
CONTROLS WHEN A SURFACE WATER IS LOCATED WITHIN 50 FEET OF THE PROJECT DISTURBANCE
RECOVERED SPILLED MATERIALS. ALL SPILLS MUST BE CLEANED UP AND REPORTED IN ACCORDANCE
THE PROJECT STORMWATER DISCHARGE IS NOT SUBJECT TO ADDITIONAL REGULATION DUE TO ANY OF THE
LIMITS AND STORMWATER FLOWS TO THE SURFACE WATER.
WITH STATE REQUIREMENTS. DRY CLEAN UP MEASURES SHALL BE USED WHERE POSSIBLE.
FOLLOWING:
K.
IF POLYMERS, FLOCCULANTS, OR OTHER SEDIMENTATION TREATMENT CHEMICALS ARE USED ON SITE,
H. THE CONTRACTOR MUST LIMIT VEHICLE AND EQUIPMENT WASHING TO A DEFINED AREA WHEN
-OTHER FORMAL ENVIRONMENTAL REVIEWS, ENDANGERED OR THREATENED SPECIES
THE CONTRACTOR MUST COMPLY WITH THE FOLLOWING REQUIREMENTS.
COMPLETED ON THE PROJECT SITE. RUNOFF FROM THE WASHING AREA MUST BE CONTAINED IN ASEDIMENT
BASIN OR OTHER SIMILARLY EFFECTIVE CONTROLS AND WASTE FROM THE WASHING
a. THE CONTRACTOR MUST USE CONVENTIONAL EROSION AND SEDIMENT CONTROLS PRIOR TO
ACTIVITY MUST BE PROPERLY DISPOSED OF. THE CONTRACTOR MUST PROPERLY USE AND STORE
STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IMPLEMENTATION RESPONSIBILITIES:
CHEMICAL ADDITION TO ENSURE EFFECTIVE TREATMENT. CHEMICALS MAY ONLY BE APPLIED
SOAPS, DETERGENTS, OR SOLVENTS. NO ENGINE DEGREASING IS ALLOWED ONSITE.
WHERE TREATED STORMWATER IS DIRECTED TO A SEDIMENT CONTROL SYSTEM WHICH ALLOWS
1. THE OWNER AND CONTRACTOR ARE PERMITTEE(S) AS IDENTIFIED BY THE NPDES PERMIT.
FOR THE SETTLEMENT OF THE FLOC PRIOR TO DISCHARGE.
I. THE CONTRACTOR MUST PROVIDE EFFECTIVE CONTAINMENT FOR ALL LIQUID AND SOLID WASTES
2. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ON-SITE IMPLEMENTATION OF THE SWPPP, INCLUDING THE
b. CHEMICALS MUST BE SELECTED THAT ARE APPROPRIATELY SUITED TO THE TYPES OF SOILS
GENERATED BY WASHOUT OPERATIONS (CONCRETE, STUCCO, PAINT, FORM RELEASE OILS, CURING
ACTIVITIES OF ALL OF THE CONTRACTOR'S SUBCONTRACTORS.
LIKELY TO BE EXPOSED DURING CONSTRUCTION. CHEMICALS MUST BE USED IN ACCORDANCE
COMPOUNDS, AND OTHER CONSTRUCTION MATERIALS) RELATED TO THE PROJECT CONSTRUCTION
3. CONTRACTOR SHALL PROVIDE A PERSON(S) KNOWLEDGEABLE AND EXPERIENCED IN THE APPLICATION OF
-
WITH ACCEPTED ENGINEERING PRACTICES, AND WITH DOSING SPECIFICATION AND SEDIMENT
ACTIVITY. NO WASHOUT WASTES MAY CONTACT THE GROUND, AND THE CONTAINMENT MUST BE
DESIGNED SO THAT IT DOES NOT RESULT IN RUNOFF FROM THE WASHOUT OPERATIONS OR ARE
EROSION PREVENTION AND SEDIMENT CONTROL BMPS TO OVERSEE ALL INSTALLATION AND MAINTENANCE
REMOVAL DESIGN SPECIFICATION PROVIDED BY THE MANUFACTURER.
LIQUID AND SOLID WASTES MUST BE DISPOSED OF PROPERLY AND IN COMPLIANCE WITH ALL MPCA
OF BMPS AND IMPLEMENTATION OF THE SWPPP.
RULES. A SIGN MUST BE INSTALLED ADJACENT TO EACH WASHOUT FACILITY THAT REQUIRES SITE
4. CONTRACTOR SHALL PROVIDE PERSON(S) MEETING THE TRAINING REQUIREMENTS OF THE NPDES PERMIT
4. DEWATERING AND BASIN DRAINING
PERSONNEL TO UTILIZE PROPER FACILITIES FOR DISPOSAL OF CONCRETE AND OTHER WASHOUT
TO CONDUCT INSPECTION AND MAINTENANCE OF ALL EROSION PREVENTION AND SEDIMENT CONTROL BMPSWASTES.
IN ACCORDANCE WITH THE REQUIREMENTS OF THE PERMIT. ONE OF THESE INDIVIDUAL(S) MUST BE
CONTRACTOR
SHALL BE RESPONSIBLE FOR THE FOLLOWING DEWATERING REQUIREMENTS:
AVAILABLE FOR AN ONSITE INSPECTION WITHIN 72 HOURS UPON REQUEST BY MPCA. CONTRACTOR SHALL
A.
CONTRACTOR'S DEWATERING ACTIVITIES THAT HAVE SEDIMENT -LADEN DISCHARGE WATER MUST BE
PROVIDE TRAINING DOCUMENTATION FOR THESE INDIVIDUALS) AS REQUIRED BY THE NPDES PERMIT. THIS
DISCHARGED INTO A TEMPORARY OR PERMANENT SEDIMENTATION BASIN WHENEVER POSSIBLE,
7. FINAL STABILIZATION
TRAINING DOCUMENTATION SHALL BE RECORDED IN OR WITH THE SWPPP BEFORE THE START OF
OTHERWISE IT MUST BE DISCHARGED THROUGH SOME FORM OF BEST MANAGEMENT PRACTICE (BMP)
THE CONTRACTOR SHALL ENSURE FINAL STABILIZATION OF THE SITE. FINAL STABILIZATION REQUIRES THE
CONSTRUCTION OR AS SOON AS THE PERSONNEL FOR THE PROJECT HAVE BEEN DETERMINED.
BY CONTRACTOR TO LIMIT SEDIMENT FROM LEAVING THE SITE. PRIOR TO DISCHARGE, THE
FOLLOWING:
DOCUMENTATION SHALL INCLUDE:
CONTRACTOR SHALL PERFORM A VISUAL TEST TO ENSURE ADEQUATE TREATMENT IS OBTAINED IN THE
A. ALL SOIL DISTURBING ACTIVITIES ARE COMPLETE AND A UNIFORM PERENNIAL VEGETATIVE COVER
4.1. NAMES OF THE PERSONNEL ASSOCIATED WITH THE PROJECT THAT ARE REQUIRED TO BE TRAINED PER
BASIN OR BMP AND APPLY ADDITIONAL TREATMENT AS REQUIRED TO ENSURE ADEQUATE TREATMENT.
WITH A DENSITY OF 70% OVER THE ENTIRE PERVIOUS SURFACE HAS BEEN ACHIEVED, INCLUDING
PART III. F.1 OF THE PERMIT.
B.
THE CONTRACTOR SHALL DISCHARGE WATER FROM DEWATERING IN A MANNER THAT DOES NOT
STABILIZATION OF ALL DITCHES AND SWALES.
4.2. DATES OF TRAINING AND NAME OF INSTRUCTOR AND ENTITY PROVIDING TRAINING.
CAUSE NUISANCE CONDITIONS. THE DISCHARGE WATER SHALL BE DISPERSED OVER AN ACCEPTED
B. CONTRACTOR SHALL ENSURE THAT ALL PERMANENT STORMWATER TREATMENT SYSTEMS ARE
4.3. CONTENT OF TRAINING COURSE OR WORKSHOP INCLUDING THE NUMBER OF HOURS OF TRAINING.
ENERGY DISSIPATION MEASURE AND NOT ADVERSELY AFFECT THE RECEIVING WATER OR
CONSTRUCTED IN ACCORDANCE WITH THE REQUIREMENTS OF THE NPDES PERMIT.
DOWNSTREAM LANDOWNERS OR WETLANDS.
5. FOLLOWING FINAL STABILIZATION AND THE TERMINATION OF COVERAGE FOR THE NPDES PERMIT, THE
C.
IF CONTRACTOR IS USING FILTERS WITH BACKWASH WATER, THE CONTRACTOR SHALL HAUL THE
C. CONTRACTOR SHALL REMOVE ALL TEMPORARY SYNTHETIC AND STRUCTURAL BMPS.
OWNER IS EXPECTED FURNISH LONG TERM OPERATION AND MAINTENANCE (O 8v M) OF THE PERMANENT
BACKWASH WATER AWAY FOR DISPOSAL, RETURN THE BACKWASH WATER TO THE BEGINNING OF THE
STORM WATER MANAGEMENT SYSTEM.
TREATMENT PROCESS, OR INCORPORATE THE BACKWASH WATER INTO THE SITE IN A MANNER THAT
RECORD AVAILABLITY AND RETENTION:
-
DOES NOT CAUSE EROSION.
-THE CONTRACTOR SHALL MAKE THE SWPPP, INCLUDING ALL CERTIFICATES, REPORTS, RECORDS, OR OTHER
STORMWATER DISCHARGE DESIGN REQUIREMENTS:
INFORMATION OF THE PERMIT, AVAILABLE TO FEDERAL, STATE, OR LOCAL OFFICIALS WITHIN 72 HOURS UPON
THE FOLLOWING SIZING CRITERIA APPLY TO THE DESIGN OF STORMWATER TREATMENT FACILITIES. N/A
5. INSPECTIONS AND MAINTENANCE
REQUEST FOR THE DURATION OF THE PERMIT AND FOR THREE YEARS FOLLOWING THE SUBMITTAL OF THE
INDICATES NOT APPLICABLE OR NOT CONSTRUCTED AS PART OF THIS PROJECT.
CONTRACTOR SHALL BE RESPONSIBLE FOR PERFORMING THE FOLLOWING INSPECTIONS AND
NOTICE OF TERMINATION.
2465
1. TEMPORARY SEDIMENTATION BASINS: N/A
MAINTENANCE:
Remodel
2. PERMANENT WET SEDIMENTATION BASINS: N/A
A.
WHEN INSPECTIONS FIND EROSION PREVENTION AND SEDIMENT CONTROL BMPS THAT ARE
-THE CONTRACTOR SHALL MAKE THE RESPONSIBLE PERSON, TRAINED AS REQUIRED BY THIS PERMIT,
3. PERMANENT INFILTRATION/FILTRATION : N/A
NONFUNCTIONAL, ALL NONFUNCTIONAL BMPS MUST BE REPAIRED, REPLACED, OR SUPPLEMENTED
AVAILABLE ON SITE WITHIN 72 HOURS WHEN REQUESTED BY THE MPCA FOR AN ONSITE INSPECTION.
4. PERMANENT REGIONAL PONDS: N/A
WITH FUNCTIONAL BMPS WITHIN 24 HOURS AFTER DISCOVERY OR OTHERWISE IN ACCORDANCE WITH
THE NPDES PERMIT REQUIREMENTS. THE CONTRACTOR SHALL ALSO PLACE ANY ADDITIONAL EROSION
INSPECTION AND ENTRY:
5. ALTERNATIVE METHODS: N/A
CONTROL MEASURES DEEMED NECESSARY BY MPCA WITHIN 24 HOURS OF NOTICE FROM MPCA.
-THE CONTRACTOR MUST ALLOW ACCESS AS REQUIRED BY STATE REGULATIONS FOR REPRESENTATIVES OF
B.
THE CONTRACTOR MUST ROUTINELY INSPECT THE SITE ONCE EVERY 7 DAYS DURING ACTIVE
THE MPCA OR ANY MEMBER THEREOF WHEN AUTHORIZED BY IT, TO ENTER UPON THE PROJECT SITE FOR THE
SEQUENCE OF CONSTRUCTION:
CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 0.5 INCHES IN 24
PURPOSE OF OBTAINING INFORMATION, EXAMINATION OF RECORDS, OR CONDUCTING SURVEYS OR
2465 North Shore Drive
THE FOLLOWING SEQUENCE DESCRIBES, IN GENERAL, THE WORK ON THE SITE:
HOURS.
INVESTIGATIONS.
Orono, MN
1. CONTRACTOR SHALL VERIFY THAT ALL PERMITS HAVE BEEN OBTAINED AND/OR OBTAIN THE NECESSARY
C.
ALL INSPECTIONS AND MAINTENANCE CONDUCTED DURING CONSTRUCTION MUST BE RECORDED IN
PERMITS.
WRITING BY CONTRACTOR AND RETAINED WITH THE SWPPP BY CONTRACTOR. MAINTENANCE MUST BE
8. CHANGES TO SWPPP
-
COMPLETED BY CONTRACTOR IN CONFORMANCE WITH NPDES PERMIT. CONTRACTOR'S RECORDS MUST
- - -
2. CONTRACTOR SHALL PERFORM SITE INSPECTIONS, RECORD KEEPING AND RECORD RETENTION IN
NCLUDE:
-THE PERMITTEE MUST AMEND THE SWPPP AS NECESSARY TO INCLUDE ADDITIONAL REQUIREMENTS, SUCH AS
Stormwater
ACCORDANCE WITH ALL PERMITS.
a. DATE AND TIME OF INSPECTION.
ADDITIONAL OR MODIFIED BMPS, DESIGNED TO CORRECT PROBLEMS IDENTIFIED OR ADDRESS SITUATIONS
PO11UtlOri
3. CONTRACTOR SHALL INSTALL ALL PERIMETER AND DOWN -GRADIENT EROSION CONTROL AND SEDIMENT
b. NAME OF PERSON CONDUCTING INSPECTION.
WHENEVER:
Prevention
CONTROL BEST MANAGEMENT PRACTICES (BMPS), CONSTRUCTION ENTRANCES AND INLET PROTECTION
1. THERE IS A CHANGE IN DESIGN, CONSTRUCTION, OPERATION OR MAINTENANCE, WEATHER OR SEASONAL
Notes
DEVICES PRIOR TO SITE GRADING, EXCAVATION, STOCKPILING OR DISTURBING EXISTING VEGETATIVE
c. FINDING OF INSPECTION INCLUDING RECOMMENDATIONS FOR CORRECTIVE ACTION.
CONDITIONS THAT HAVE SIGNIFICANT EFFECT ON DISCHARGE. INSPECTION IS REQUIRED WITHIN 24 HOURS
COVER.
d. DETAILS OF CORRECTIVE ACTION TAKEN (DATE. TIME. PARTY COMPLETING MAINTENANCE
OF A RAINFALL EVENT GREATER THAN ONE-HALF INCH.
4. CONTRACTOR SHALL PERFORM SITE GRADING, EXCAVATION, STOCKPILING WORK IN ACCORDANCE WITH
ACTIVITIES).
2. INSPECTION OR INVESTIGATION BY SITE OPERATORS, LOCAL, STATE OR FEDERAL OFFICIALS INDICATE THE
THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP).
e. DATE AND AMOUNT OF RAINFALL GREATER THAN 0.5 INCHES IN 24 HOURS.
SWPPP IS NOT EFFECTIVE.
5. CONTRACTOR SHALL INSTALL, INSPECT, MONITOR AND MAINTAIN TEMPORARY AND PERMANENT EROSION
f. IF ANY DISCHARGE IS OBSERVED TO BE OCCURRING DURING THE INSPECTION, A RECORD OF
3. THE SWPPP IS NOT ACHIEVING THE GENERAL OBJECTIVES OF CONTROLLING POLLUTANTS OR THE SWPPP IS
CONTROL BMPS AS SHOWN ON PLANS & IN CONFORMANCE WITH NPDES PERMIT, CONTINUOUSLY DURING
ALL POINTS OF THE PROPERTY FROM WHICH THERE IS A DISCHARGE MUST BE MADE, AND THE
NOT CONSISTENT WITH THE TERMS AND CONDITIONS OF THIS PERMIT.
THE WORK. CONTRACTOR SHALL STABILIZE ALL EXPOSED SOILS NO LATER THAN 7 DAYS AFTER THE
DISCHARGE SHALL BE DESCRIBED (COLOR, ODOR, FLOATING, SETTLED, OR SUSPENDED SOLIDS,
4. THE MPCA DETERMINES THAT DISCHARGE MAY CAUSE OR CONTRIBUTE TO NON -ATTAINMENT OF ANY
CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS TEMPORARILY OR PERMANENTLY CEASED.
FOAM, OIL SHEEN, AND OTHER INDICATORS) AND PHOTOGRAPHED.
APPLICABLE WATER QUALITY STANDARDS OR THE SWPPP DOES NOT INCORPORATE THE REQUIREMENTS
6. CONTRACTOR SHALL REPLACE OR REPAIR EROSION CONTROL AND SEDIMENT CONTROL BMPS THAT ARE
g. DOCUMENTATION OF CHANGES MADE TO SWPPP.
RELATED TO AN APPROVED TOTAL MAXIMUM DAILY LOAD (TMDL).
NOT FUNCTIONING PROPERLY.
D.
IN AREAS OF PROJECT WHERE FINAL STABILIZATION IS COMPLETE INSPECTIONS CAN BE REDUCED TO
Construction
7. CONTRACTOR SHALL PERFORM SITE RESTORATION ACTIVITIES FOR PERMANENT VEGETATIVE
ONCE A MONTH. THESE AREAS SHALL BE INSPECTED BY CONTRACTOR FOR MINIMUM PERIOD OF 12
9. SWPPP CERTIFICATION:
Documents
ESTABLISHMENT.
NON -WINTER MONTHS AND WITHIN 24 HOURS OF FIRST SPRING RUNOFF OR PRIOR TO RESUMING
- THIS STORMWATER POLLUTION PREVENTION PLAN WAS PREPARED BY INDIVIDUALS) TRAINED IN
8. CONTRACTOR SHALL REMOVE SEDIMENT CONTROL DEVICES AT END OF PROJECT.
CONSTRUCTION FOLLOWING ANY WINTER STOPPAGE, WHICHEVER COMES FIRST.
ACCORDANCE WITH THE PERMIT'S TRAINING REQUIREMENTS FOR PREPARATION OF SWPPPS. INDIVIDUALS)
E.
THE CONTRACTOR IS RESPONSIBLE FOR THE INSPECTION AND MAINTENANCE OF BMPS UNTIL
PREPARING THIS SWPPP:
1. CONSTRUCTION ACTIVITY FIELD REQUIREMENTS:
ANOTHER PERMITTEE HAS OBTAINED COVERAGE, OR THE PROJECT HAS UNDERGONE FINAL
STABLIZATION AND AN NOT HAS BEEN SUBMITTED TO THE MPCA.
ALL FIELD REQUIREMENTS SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THE
PREPARED BY:
- --
NPDES PERMIT AND STORMWATER POLLUTION PREVENTION PLANSWPPP .
( )
F.
ALL EROSION CONTROL MEASURES MUST BE INSTALLED AND MAINTAINED BY CONTRACTOR
KEVIN GARDNER, P.E.
ACCORDING TO THE DETAILS INCLUDED IN THE CONSTRUCTION DOCUMENTS AND IN ACCORDANCE
, A. THE CONTRACTOR MUST IMPLEMENT THE SWPPP AND PROVIDE BMPS IDENTIFIED IN THE SWPPP IN AN
WITH THE PRODUCT MANUFACTURER'S RECOMMENDATIONS.
PIERCE PINI AND ASSOCIATES
APPROPRIATE AND FUNCTIONAL MANNER.
G.
ALL PERIMETER CONTROL DEVICES MUST BE REPAIRED, REPLACED OR SUPPLEMENTED BY THE
KEVIN@PIERCEPINI.COM°�
o B. THE CONTRACTOR SHALL RESPOND TO CHANGING SITE CONDITIONS AND IMPLEMENT/ SUPPLEMENT
EROSION PREVENTION AND SEDIMENT CONTROL MEASURES UTILIZED TO PROVIDE ADEQUATE
CONTRACTOR WHEN THEY BECOME NON-FUNCTIONAL OR THE SEDIMENT REACHES ONE-HALF THE
763-537-1311�RpNO
OF
J
HEIGHT OF THE DEVICE. CONTRACTOR SHALL REPAIR OR REPLACE DEVICE THAT IS NONFUNCTIONAL
CSN
-
PROTECTION OF DISTURBED SOILS AND ADEQUATE PREVENTION OF SEDIMENT TRANSPORT OFF-SITE.
BY THE END OF THE NEXT BUSINESS DAY AFTER DISCOVERY, OR THEREAFTER AS SOON AS FIELD
AT A MINIMUM, THE FOLLOWING STORM WATER POLLUTION PREVENTION CONSTRUCTION ACTIVITY
CONDITIONS ALLOW.
TRAINING/ CERTIFICATION:
- - - -
FIELD REQUIREMENTS SHALL BE FURNISHED BY THE CONTRACTOR.
H.
TEMPORARY AND PERMANENT SEDIMENTATION BASINS MUST BE DRAINED AND SEDIMENT REMOVED
DATE OF TRAINING/ CERTIFICATION: 2016
BY CONTRACTOR ONCE THE SEDIMENT COLLECTED REACHES ONE HALF THE STORAGE VOLUME WITH
CERTIFICATION PROGRAM: UNIVERSITY OF MINNESOTA - DESIGN OF CONSTRUCTION SWPPP
2. EROSION PREVENTION PRACTICES
72 HOURS OF DISCOVERY, OR AS SOON AS FIELD CONDITIONS ALLOW.
ARDEN HILLS, MN
_
CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING EROSION PREVENTION PRACTICES:
I.
ALL SEDIMENT DEPOSITS WITHIN SURFACE WATERS OR STORMWATER CONVEYANCES MUST BE
INSTRUCTOR(S): DWAYNE STRENLUND
m A. THE CONTRACTOR SHALL ATTEMPT TO PHASE ALL WORK TO MINIMIZE EROSION AND MAINTAIN
ZVEGETATIVE
REMOVED AND RESTABILIZED BY CONTRACTOR WITHIN 7 DAYS OF DISCOVERY OR SOONER IF IT
CERTIFICATION EXPIRATION: 2018
-
LU COVER TO THE EXTENT POSSIBLE. THE LOCATION OF AREAS NOT TO BE DISTURBED
PRESENTS A FLOOD RISK, INCLUDING DELTAS AND STORM SEWER SEDIMENT DEPOSITS. THE
MUST BE DELINEATED ON THE SITE BEFORE CONSTRUCTION BEGINS.
CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS REQUIRED, IF NECESSARY, FOR
_----
= B. STABILIZATION ON ALL EXPOSED SOILS MUST BE INITIATED IMMEDIATELY WHENEVER CONSTRUCTION
SUCH SEDIMENT REMOVAL.
-
a ACTIVITY HAS PERMANENTLY OR TEMPORARILY CEASED ON ANY PORTION OF THE SITE AND WILL NOT
J.
CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING EXISTING PAVED SURFACES CLEAN OF SEDIMENT.
RESUME FOR A PERIOD EXCEEDING 7 CALENDAR DAYS, INCLUDING STOCKPILES WITH SIGNIFICANT
CONSTRUCTION ENTRANCES SHALL BE CHECKED DAILY BY CONTRACTOR. IF THE ENTRANCE BECOMES
w SILT, CLAY OR ORGANIC COMPONENTS. STABILIZATION MUST BE COMPLETED WITHIN 7 CALENDAR
INUNDATED WITH SEDIMENT, THE ENTRANCE WILL BE CLEANED OR REPLACED AS APPROPRIATE BY
DAYS.
CONTRACTOR. STREETS LEADING TO AND FROM THE CONSTRUCTION ENTRANCE SHALL BE CHECKED
T
C. THE NORMAL WETTED PERIMETER OF ANY TEMPORARY OR PERMANENT DRAINAGE DITCH THAT DRAINS
DAILY BY CONTRACTOR FOR OFF-SITE SEDIMENT TRACKING ONTO PAVED SURFACES. THESE AREAS
WATER FROM A CONSTRUCTION SITE OR DIVERTS WATER AROUND A SITE MUST BE STABILIZED BY
WILL BE SWEPT CLEAN OF ANY TRACKED MATERIALS BY CONTRACTOR AS SOON AS POSSIBLE AND
a CONTRACTOR WITHIN 200 FEET FROM THE PROPERTY EDGE, OR FROM THE POINT OF DISCHARGE TO
WITHIN 24 HOURS OF DISCOVERY AND AS DIRECTED BY THE CITY. CONTRACTOR SHALL EXTEND
ANY SURFACE WATER WITHIN 24 HOURS OF CONNECTING TO A SURFACE WATER. TEMPORARY OR
SWEEPING TO THE EXTREMITY OF ANY SEDIMENT TRACKING THAT OCCURS OFF-SITE.
PERMANENT DITCH SWALES BEING USED AS A SEDIMENT CONTAINMENT SYSTEM DO NOT NEED TO BE
STABILIZED UNTIL THEY ARE NO LONGER USED AS A SEDIMENT CONTAINMENT SYSTEM, AFTER WHICH
K.
CONTRACTOR SHALL BE RESPONSIBLE TO REMOVE ANY OFF-SITE SEDIMENT ACCUMULATIONS IN A
MANNER AND AT A FREQUENCY SUFFICIENT TO MINIMIZE OFF-SITE IMPACTS.
C100
a THEY MUST BE STABILIZED WITHIN 24 HOURS.
L.
ALL INFILTRATION/ FILTRATION AREAS MUST BE INSPECTED BY CONTRACTOR TO ENSURE THAT NO
D. TEMPORARY OR PERMANENT ENERGY DISSIPATION AT PIPE OUTLETS MUST BE PROVIDED WITHIN 24
SEDIMENT FROM ONGOING CONSTRUCTION IS ACCUMULATING OVER THE INFILTRATION/ FILTRATION
0 HOURS OF CONNECTING TO A SURFACE WATER.
m
AREA. SEDIMENT ACCUMULATED OVER INFILTRATION /FILTRATION MUST BE REMOVED BY