Loading...
HomeMy WebLinkAboutApproved submimtted plans and spec Human Services and Public Health Department Hennepin Epidemiology and Environmental Health Epidemiology: (612) 543-5230 1011 South First Street, Suite 215 Environmental Health: (612) 543-5200 Hopkins, MN 55343-9413 FAX: (952) 351-5222 4-19-2017 APPROVED Dale Richardson, Commercial Building Service Little Acorns Daycare 2060 W Wayzata BLVD Orono, MN 55356 Regarding: Little Acorns Daycare, 2060 W. Wayzata Blvd, Orono, MN 55356 The submitted plans and specifications appear to be in general conformity with the standards of Hennepin County Ordinance Number 3 and Minnesota Rules, Chapter 4626. These plans are now approved. Although this plan has been approved, the following items detailed at the onsite consultation on 3-29-17 must be completed as discussed. • Changing Stations: o Cabinetry must be on six inch legs and follow drawings provided. o Handsinks at all changing stations must be present with soap, nailbrush, and paper towels. • All Rooms: o Must have handsinks separate from the restrooms and changing stations for food service. o A common sink for the toddler rooms and pre-k/school age room o Restrooms must have tile on walls adjacent to fixtures, tile floors, basecove, and a cleanable ceiling. o All cabinetry must be on 6 inch legs • Kitchen: o A storage room will be made into a food service approved room for future use. o FRP, Vinyl Ceiling Tile, Quarry Tile, Quarry Base Cove, and Epoxy Grout must be used as discussed. o Discussed prep surface in the kitchen space- Putting the burner on a low table and putting casters on prep tables. o The prep sink and hand sink must swap locations. Equipment Ensure that all food service equipment meets the applicable standards of construction of the National Sanitation Foundation (NSF). Only NSF, ETL-Sanitation, UL-Sanitation, CSA Sanitation or IAPMO R&T Sanitation listed equipment that bear one of the following marks is allowed: @ (Et1')01) SANITATION ��e 'AN £tit+ , SANITATION Page 2 1. Ensure that all primary food preparation surfaces (preparation tables and counters) in the food service operation meet the NSF standards, such as stainless steel or solid services like Corian® and Wilsonart®. 2. The interior and exterior of exposed wood areas of the custom fabricated cabinets must be covered with a commercial-grade pressure-applied laminated plastic. Any cutouts into cabinetry must be properly finished with plastic laminate, melamine, or grommet, no caulk or painted finishes. If a solid surface is specified, the cut outs must be finished the same as the top. 3. Ensure that there is sufficient refrigeration is to hold all readily perishable food products at 41° F or less. 4. Ensure that all refrigerated preparation tables meet the April 1998, NSF standard 7 criteria. 5. Provide specifications on an approved water heater that can provide an adequate amount of hot water during peak hot water use periods. A water heater work sheet is attached. Please calculate your hot water needs and submit the work sheet. If the water heater is electric powered, it must meet the NSF Standard 5. If the water heater is gas powered it must meet American National Standards Institute (ANSI) requirements. If the water heater is located in the food service area, it must be installed on 6 inch legs. If it is located in a mechanical room, it may be sealed to the floor. • Provide a spec sheet for the water heater. 6. Please indicate if any of the equipment is existing or used. Any used or existing equipment must meet the NSF standards, be listed, and be in "like new" condition. Ventilation/Equipment Installation 7. All equipment, including millwork cabinets, must be mounted on: casters; on legs so there is a six-inch clearance from the bottom of the equipment to the floor; or sealed to a solid masonry base. Enclosed, unfilled bases are not permitted. Small under counter dishwashers may be installed on skids for ease in movement for cleaning. Ideally all equipment should be placed on casters for ease in movement for cleaning. 8. All cooking appliances that generate excessive heat, grease, vapors, condensation, odors, or fumes must be installed under an NSF approved mechanical exhaust hood, with a 6 inch overhang of the hood on all sides. 9. Ensure that the hood and canopy construction meet the standards of the National Sanitation Foundation, the Uniform Mechanical Code, and the Minnesota Building Code covering commercial kitchen ventilation systems. 10. Provide properly installed sheets of stainless steel on the wall behind the grease producing equipment from the bottom of the hood to the top of the floor base cove. Plumbing 11. Ensure that a licensed plumber installs all plumbing according to the Minnesota Plumbing Code. Submit to Orono plumbing inspection program for review and approval prior to installation. 12. No hose can be attached to a faucet that is not equipped with a backflow prevention device. Page 3 13. Provide an adequate number of floor drains or floor sinks that are easily accessible for cleaning. Floor drains or floor sinks must be located at the front of(but still underneath) equipment or cabinetry for easy access (not midway or at the back). Ideally floor sinks would not be installed in areas under equipment or cabinetry, as they are difficult to clean. Floors must be graded toward the floor drains or floor sinks. • Ensure mop sink has tile surround and FRP on the walls for splash. 14. Check with the local municipality for their regulations regarding grease trap requirements. If a grease trap is installed, the lid should be mounted flush with the floor and it shall be accessible for cleaning. If a grease trap must be installed on top of the floor, it must be spaced away from the wall or adjacent equipment a minimum of 6 inches so that it can be cleaned around all sides. The sides of the grease trap cannot be undulating so that it can be sealed to the floor and integral base cove can be installed 15. Hand sinks, preparation sinks, and three-compartment sinks must be directly wasted. Please refer to the MN Plumbing Code. Sinks 16. Raw fruits and vegetables that will be cut or combined with other ingredients, or otherwise processed must be cleaned with water before being used. Provide a separate food preparation sink with drain boards. A second compartment, separate from the vegetable preparation sink compartment, is required for poultry/meat preparation. Ideally the sinks would be separated from each other (not side by side). Employee hand sinks, utility sinks, or utensil cleaning sinks are not considered acceptable for use as a food preparation sink. 17. Provide adequate space (12 inches) or a shield between a preparation or hand sink and an adjacent preparation table, shelving etc. to preclude contamination by splash. 18. Provide a sign directing employees to wash hands, hand cleanser, single-use towels, and a fingernail brush at all hand wash sinks located in food service, food preparation, and ware washing areas. 19. Employee hand washing sinks must be conveniently located in all food preparation, food dispensing and utensil washing areas. 20. Provide hooks or hang-up brackets at the utility sink for the storage of mops and brooms. 21. Provide a mop sink for proper disposal of mop water. 22. For hot water sanitizing, a minimum of three drying rack spaces is required. For chemical sanitizing, a minimum space for five dish racks is required. Storage 23. Adequate approved NSF shelving for the food service operation must be provided to ensure that food products, utensils, or single service articles are stored at least six inches off the floor. Nothing may be stored on the floor. 24. Provide an area for storage of employees' personal belongings that is separate from food, clean equipment, and single service supplies. Employee lockers must be wall mounted or installed on legs, so there is a 6 inch clearance from the bottom of the locker to the floor. Page 4 25. Provide an area where paperwork can be done and stored and where the computer, Fax machine, phone etc. can be located, that is separate from food, clean equipment, and single service supplies. 26. The food storage shelving used in the walk-in refrigerators must be NSF approved stainless steel, factory pre-coated epoxy or Metroseal®for example. Chrome or zinc-plated shelving without an approved factory applied hard-baked protective coating is not approved for this purpose. 27. Provide a separate storage area that is not adjacent to or above food or food service items for cleaning chemicals. Installations 28. Seal all annular openings around pipes and other conduits that pass through the walls or floor. 29. All junctures between the wall surface and the edges of attached equipment must be sealed with approved caulk/sealing compound (e.g. three-compartment sink, hand sink, etc.). 30. If conduit pipes are provided for the beverage lines, they must extend at least three to four inches above the finished floor elevation at both ends and the annular opening between the beverage lines and the conduit pipe sealed with a hard material and provided with a cleanable finish. 31. All floor mounted equipment must be: sealed in place and properly spaced to allow for cleaning; mounted on legs so there is a 6 inch clearance from the bottom of the equipment to the floor; or mounted on casters (and installed with flexible utility connections) to permit removal for cleaning. Ideally all equipment that can, should be placed on casters. 32. All countertop equipment must be easily moveable, on 4-inch legs, or sealed in place as to be easily cleanable. Room Finishes 33. Toilet rooms must have self-closing doors, adequate ventilation, hand cleanser, single use towels or hand drying devices, tissue paper and a covered waste paper receptacles. 34. All doors to the outside of the establishment must be self-closing and vermin proof. Provide door sweeps and weather stripping on all exterior doors. 35. Windows (or openings) that are able to be opened to the outside must have tight fitting screens or properly sized air curtains. If air curtains are used they must meet the NSF Standard # 37. 36. A concrete (sealed or not) finish is not approved within 3 feet of a janitor sink; in restrooms or in any food prep or service area. 37. The walls and ceilings in the food preparation, utensil washing, within 3 feet of a janitorial sink and toilet room areas must be smooth, durable, non-absorbent, and easily cleanable such as stainless steel, ceramic tile, or fiberglass reinforced panels (FRP). In areas where paint is permittable (i.e. ceilings and soffits), the finish shall be light in color, smooth, durable, and easily cleanable (e.g. high gloss enamel). 38. The floors in the food preparation, food storage, utensil washing, within 3 feet of a janitorial sink and toilet rooms must be of a smooth durable material with an integral coved base at the wall/floor junctures. Approve flooring surfaces include ceramic tile, quarry tile, and terrazzo. Tile shall be installed with an epoxy or other water-resistant grout. Page 5 39. The grout on wall tile must have a penetrating sealer applied. 40. The floor in and about three foot peripheral area of the salad bar, buffet table, or bar must be smooth, easily cleanable, and non-absorbent. Carpeting does not meet these criteria and is unacceptable. Provide a transition strip between different floor coverings (example: quarry tile to carpet). 41. If textured tile is used, it may only be installed in walk ways, not under equipment, cabinetry sinks or in walk in cooler units. 42. Perforated or fissured drop lay-in ceiling panels are not acceptable. Provide durable, washable ceiling panels, such as vinyl-clad panels. 43. Outside garbage and refuse containers, including compactors, must be stored on a smooth and non-absorbent surface. Food Protection 44. Food on display must be protected from potential contamination from coughs, sneezes, and improper handling through the installation of properly constructed and installed food shields, the use of packaged food items or other effective means of protection. 45. Suitable utensils (e.g. tongs, ladles, spatulas, scoops, single service papers, etc.) must be provided to avoid manual handling dispensed food items. Between uses of food dispensing, utensils must be stored in an appropriate manner. BARE HAND CONTACT OF READY TO EAT FOODS IS PROHIBITED. Lighting 46. Install a sufficient number of light fixtures in the food preparation and ware washing areas to provide a minimum of 70-foot candles of light at 30 inches off the floor. Provide at least 30 foot candles of light in storage rooms (AG Rules — 50 foot candles on FCS, and 20 for storage). 47. Lights over exposed food storage, food preparation, food display facilities, and utensil cleaning and storage areas must be shielded or shatter-resistant. Please note that all plans and equipment must be designed, installed and maintained according to: • Minnesota Rule, Chapter 4626 (https://www.revisor.mn.qov/rules/?id=4626 and • Hennepin County Ordinance 3 (http://www.hennepin.us/Your-government/ordinances/ordinance-30 ). For additional information about plan review requirements or questions, please contact me or review Hennepin County Construction guidelines, found here: http://www.hennepin.us/planreview. Minnesota Clean Indoor Air Act (MCIAA) Freedom to Breathe and Hennepin County Ordinance 24 48. A sign must be posted at all public entrances to the facility stating: "No Smoking." • Page 6 Note- Smoking definition includes the use of electronic cigarettes. http://www.hennepin.us/your-qovernment/ordinances/ordinance-24 49. Obtain all necessary state and local permits. 50. At least one employee of this establishment must be on site at all times who is certified through an approved food handlers' course, such as "ServSafe®". 51. Please notify me at 612-543-5218, prior to completion so a construction inspection may be scheduled. 52. An application for a food license from Hennepin County along with invoices for the remainder of the plan review fees and the 2017 license will arrive shortly. The completed application and the invoices must be submitted and paid prior to scheduling a final inspection. 53. This facility may not be constructed, remodeled or converted except in accordance with the plans and specifications as they are now approved by this Department. Please contact me for any proposed changes or additions. 54. This facility is approved to serve the menu items and volume submitted with this plan (attached) or similar. If menu, volume or scope of service changes, approval must be obtained from this department prior to change. 55. The remodeled portion of this retail food facility cannot open for business until it has been inspected and approved. 56. This establishment cannot open for business until it has been inspected and approved. 57. Food deliveries cannot be accepted until this department gives approval. This plan is approved for one year from the date of this letter. A COPY OF THIS LETTER MUST ALWAYS BE ON THE JOB SITE AND BE READILY ACCESSIBLE TO THE GENERAL CONTRACTOR. Please submit any changes to the plan and all additional required information as soon as possible. If you have any questions, feel free to call me at 612-543-5218. Thank you for your consideration and cooperation in addressing the items outlined in this letter. I shall remain available for consultation and review of your facility's construction progress. Sincerely, aut16(yrv__ Allison Malecek Senior Environmentalist cc: Debra Anderson, Supervising Environmentalist Amanda Buell, Supervising Environmentalist Roger Peitso, Orono Building Official