Loading...
HomeMy WebLinkAbout2008-P11862 - plumbing suites 100-150 PERMIT CITY-OF ORONO 2750 Kelley Parkway- PO Box 66 Permit Number: P11862 Crystal Bay, Minnesota 55323 Permit Type: Fixtures (952) 249-4600 Date Issued: 2/12/2008 SITE ADDRESS: 2060 Wayzata Blvd W Unit# Long Lake,MN 55356 PID: 34-118-23-21-0035 DESCRIPTION: Proposed Use: Commercial-Business Permit Class: Plumbing Permit Type: Fixtures Permit Sub-type(s): Multiple Fixtures DETAILS: Approved per resolution#: Separate permits required: NOTICES/REMARKS: Miscellaneous fixture-Mop Sink — S (C>0 —1 Sa FEE SUMMARY: Permit Fee: $ 98.65 Valuation: $ 7,892.00 State Surcharge Fee: $ 3.95 TOTAL FEE: S 102.60 APPLICANT: Palo Companies,Inc. OWNER: Interspace West 14208 Hwy 12 SW 2060 Wayzata Blvd W Cakato,MN 55321 Long Lake,MN 55356 THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL IMPROVEMENTS SPECIFIED AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL CITY OF ORONO ORDINANCES AND STATE OF MINNESOTA BUILDING CODE REQUIREMENTS. APPLICANT PERMITEE SIGNATURE ISSUED BY SIGNATURE Copies: 1-File(Signatures Required), 1-Applicant, 1-Monthly Reports, 1-Assessing,(If Septic, 1-Septic) Page 1 tRECEIVED FOR CITY USE ONLY City of Orono F 7 O W7 '/ dO PO.Box 66 �O�V Date Receive Permit 2750 Kelley Parkway Crystal BayMN 553 Approved By: 0 Amount$: Rt (952)249-4600, co ORONQ CITY OF ORONO—PLUMBING PERMIT (All Commercial permits must be approved by the Building Official or Inspector) GENERAL INFORMATION 1. You may apply for plumbing permits by mail or in person at the City offices. Applications will be reviewed and a permit will be issued within two working days. 2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS POSTED ON THE JOB SITE. 3. Plumbing permits may be issued ONLY to licensed plumbing contractors and to property owners residing in the dwelling. 4. When any new construction or remodeling is involved,a separate building permit must be obtained. 5. All work must be done in accordance with State Code requirements. 6. All work must be inspected and air tested before it is covered. Call(952)249-4600. (24-48 hour notice required) TYPE OF PERMIT (Check All That Apply) ❑Residential ®Commercial(Approval Required) El New ❑Additional ❑Repairs ❑Replace 0 In Accessory Structure? *You will need prior approval and may need CUP.(Per Orono City Code,Chapter 78,Article IV) Job Site/Owner Information: Site Address: 6-e -'- ' �: r� Q�'- 1 ,C- ,/'�, /S Owner: /�-7,e.LsiA, Mailing Address: fo City: Ljl -z Zip: / Home Phone: 9 S7- ///7 Alternate Phone: Contractor Information: Contractor: rl r• 6,„tieiv.k.:,es f"r. Contact Person: Li-pt-7c• Address: /% c- rz St--' State Bond#: (IRiv1 ;2'7« F1 -s53z City: t K k Zip: Expiration Date: yez; Phone: -32c' 2e-C �''-�3 Alternate Phone: 37.- ? S C?)S- ❑ Insurance—Current: 1 !fin717,---7T-7-77—'"77, . - �. 1 FIXTURE BSMT 1 S 2ND OTHER FIXTURE BSMT 1ST 2ND OTHER TYPE FL FL TYPE FL FL Water Closet Z Floor Drains Lavatory Sewer Ejector Bathroom Laundry Tray Shower Washer Kitchen Sink Water Heater Disposal Water Softener Dishwasher Wet Bar Sillcocks Miscellaneous -S r H h / LITIITTIIITIIIIII±tIIIWIIWUIU ❑ Yes,this section applies The replacement of a Residential fixture or appliance that meets all three of the following requirements: 1. Does not require modification to electrical or gas service. 2. Has a total cost of$500.00 or less;excluding the cost of the fixture or appliance: and 3. Is improved,installed or replaced by the homeowner or licensed contractor. Skip next section,if this applies; Cost of Permit $ 15.00 State Surcharge $ .50 Mail-In Fee(If Applicable) $ 1.50 Total Permit Fee $ (Permit Fees Continued On Next Page) 2 _ ! a - " Cr mit d ";L . e X E 11,,, �..irc +t)t,.,i iif,i h . ..k : € .,, i -�. If above does not apply;follow guidelines below: 1. CONTRACT PRICE *is 1.25%of contract price with a(Minimum Fee of$35.00) ' 7(. `1 x.0125$ 2c'. (contract price) (minimum$35.00) 2. STATE SURCHARGE ** Add the State Bldg Code Div. Surcharge(Minimum Fee of$.50) 2 i2 x.0005 $ 3=?5' (contract price) (minimum$ .50) 3. POSTAGE&HANDLING(Only on Mail-In Applications) $ X50 4. TOTAL PERMIT FEE(Add Lines 1-3 Above) $ /040° ■ * CONTRACT PRICE or JOB COST means the actual or estimated dollar amount charged for the permitted work including materials, labor,profit, and other fixed costs. It is the amount to be charged to the customer for the work done. If any material, equipment, labor or installations are furnished by the owner, tenant or any other party, the reasonable market value of such items must be added to the estimated cost or contract price for permit fee purposes. In the event that there is a dispute on the amount of the job cost, the City may request the submission of a signed copy of the actual contract. ■ ** The STATE SURCHARGE is .0005 of the contract price under$1,000,000 or$.50–whichever is greater. For valuations over$1,000,000 call the Building Department at(952)249-4600 for the price. sL, ..LdV6,cxr.x .u.,...,.....m— _ The undersigned hereby applies to the City for issuance of a Plumbing Permit, agrees to do all work in strict accordance with the ordinances of the City and the regulations of the State of Minnesota, and certifies that all statements made on this application are complete, true and correct. Applicant's Signature: — Date:,Y5/v,'' r 3 (1. —! de DATE p TIME CITY OF ORONO CALLED IN �/� ��O INSPECTION N TICE SCHEDULED .3:30 --- j? PERMIT NO. 1/ 'al COMPLETED /� , ADDRESS 07,0(p fri(..)-64/..-71 7./.),' drab.'" 7 � 12%l/2l., OWNER CONTR. /d/, 14._ _ i TELEPHONE NO. 14-G — c3Ro --c3g4-�/33 wN`� DESCRIPTION -L, �L�e ' --/SZ 01 FOOTING 11 Miiit NICAL RI 18 EXCAV/GRADING/FILLING Q 02 FRAMING 13 M ANICAL FINAL 19 LAKESHORE/WETLANDS C') 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT v 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP Q 09 PLUMBING 23 SEPTIC FINAL 35 HARD COVER REMOVAL v LUMBING FINAL 36 FOUNDATION/REMOVAL S OWNER/CONTRACTOR TO MEET YOU:_YES_NO Co COMMENTS: cc W CC 5 l b 1 � 2v"/ 4) 1e- 3-/---- CC ° L)rt csk.(1--G(C>C 4,t v) (V W CC Q W Z W CC LiRK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY OO ElCORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. 0 PHOTO TAKEN INSPECTOR WILL RETURN 0 STOP ORDER POSTED.CALL INSPECTOR El CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on sit-• Inspector. 1 5 White Copy/Inspector's File Canary Copy/Site Notice , �_ • MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY Division of Construction Codes and Licensing REPORT ON PLANS Plans and specifications on plumbing: Amberwoods Office Center, 2060 West Wayzata Boulevard, Orono, Hennepin County,Minnesota,Plan No. 086456 OWNERSHIP: Interspace Companies, Inc.,P.O. Box 184, Wayzata, Minnesota 55391 SUBM1FIER(S): Palo Companies,Inc., 14208 US Highway 12 Southwest, Cokato, Minnesota 55321 Plans Dated: Date Received: January 25, 2008,December 31, 2007 Date Reviewed: January 29,2008 SCOPE: This review is limited to the design of this particular project only insofar as the provisions of the Minnesota Plumbing Code, as amended, apply, and does not cover the water supply or sewerage system to which this plumbing system is connected. The review is based upon the supposition that the data on which the design is based are correct, and that necessary legal authority has been obtained to construct the project. The responsibility for the design of structural features and the efficiency of equipment must be taken by the project designer. Approval is contingent upon satisfactory disposition of any requirements included in this report. Special care should be taken to insure that the material and installation of the plumbing system are in accordance with the provisions of the Minnesota Plumbing Code. A copy of the approved plans and specifications should be retained at the project location for future reference. A set of the identified plans and specifications is being returned to Palo Companies, Inc. INSPECTIONS: All plumbing installations must be tested and inspected in accordance with the requirements of the Minnesota Plumbing Code. As specified in Minnesota Rules,part 4715.2830,no plumbing work may be covered prior to completing the required tests and inspections. Provisions must be made for applying an air test at the time of the roughing-in inspection as outlined in Minnesota Rules,part 4715.2820, subpart 2, of the code. A manometer test, as specified in Minnesota Rules,part 4715.2820, subpart 3, is required at the time of the finished plumbing inspection. It is the responsibility of the contractor/installer to notify the Minnesota Department of Labor and Industry when an installation for a state contract job, licensed facility, or project in an area where there is no local administrative authority is ready for an inspection and test. To schedule inspections, contact the state plumbing standards representative for your region, or call Jim Peterson at 651/284-5889. REQUIREMENT(S): 1. A full-size vent stack(3-inch minimum) must be provided for every building(see Minnesota Rules, part 4715.2520, subpart 1). This stack must be continuous in size from its base to its terminal and should be the most remote stack from the location where the building drain leaves the building. 2. Installation of fixtures in regards to separation from the walls and fixtures shall be in accordance with Minnesota Rules,part 4715.1220. No water closets may be set closer than 15 inches from the center to any side wall Please assure the water closets are installed accordingly. 3. The cold water line shall be at least 1-inch in size between the restroom 104 up to the wall hydrant. 4. A water distribution branch serving two tank-type water closets must be at least 3/4-inch in size (see Minnesota Rules,part 4715.3800). 5. All external sillcocks and wall hydrants must be provided with separate shut-off valves inside the building (see Minnesota Rules,part 4715.1800, subpart 7). Amberwoods Office Center nr. ;. r Plumbing Plan No. 086456 Page 2 January 29, 2008 6. Full-way valves must be provided at all locations described under Minnesota Rules,part 4715.1800, including the following locations: a. At the water service entrance to the building. b. On the discharge side of the water meter. c. On the cold water supply line to the water heater. 7. Faucets equipped with threaded hose connections must be provided with approved backflow preventers(see Minnesota Rules,part 4715.2110,DD). 8. Water supply connections to fixtures or equipment which have submerged inlets, or inlets below the spill line of the fixture or equipment,must be provided with an air gap arrangement, approved backflow preventer or backflow preventer assembly as specified in Minnesota Rules,part 4715.2000 and part 4715.2010. 9. A cleanout must be provided at or near the base of each stack(see Minnesota Rules,part 4715.1000). 10. The PVC plastic pipe material to be used for the building sewer must meet one of the following ASTM Standards: D3034,F789, D2665, or F891. The installation must comply with ASTM Standard D2321 (see Minnesota Rules,part 4715.0530). 11. If plastic pipe is used for the drain,waste and vent system: a. PVC plastic pipe shall comply with ASTM Standard D2665, D2949,F891. b. It must be installed in accordance with Minnesota Rules,part 4715.0580(F) and part 4715.0600. Above-grade horizontal runs of plastic waste and vent pipe cannot exceed 35 feet in total length. Above-grade vertical stacks constructed of plastic pipe may exceed 35 feet in total height only if an approved expansion joint is used. c. Solvent weld joints in PVC and CPVC pipe must include use of a primer which is of contrasting color to the pipe and cement(see Minnesota Rules,part 4715.0810, subpart 2). 12. The installation of cross-link polyethylene(PEX)tubing was specified for the water distribution system. If all of the following requirements cannot be met,a different material that complies with Minnesota Rules, part 4715.0520 must be used: a. The tubing system must comply with ASTM Standard F877 and F876. b. The fittings must comply with ASTM Standard F1807 or F1960. c. The system must be installed by an individual trained by the manufacturer of the particular PEX system to be installed. Certain manufacturers require installation by licensed plumbers who have been trained to install their material. d. All persons installing PEX materials shall have a card on their possession documenting completion of training by the manufacturer or his agent for the material to be installed. e. The tubing and fittings must be marked as required by the applicable standard specification and with the appropriate ASTM designations by the manufacturer. f. The installation must be in accordance with the manufacturer's installation guidelines. . 1: Amberwoods Office Center Plumbing Plan No. 086456 Page 3 January 29,2008 13. The plumbing system shall be tested in accordance with Minnesota Rules,part 4715.2820. All portions of the storm sewer system located within 10 feet of the building or water service line must be tested in accordance with Minnesota Rules,part 4715.2820. All storm sewer connections and joints shall be watertight(Minnesota Rules,part 4715.2820). 14. All plumbing shall be installed in accordance with the Minnesota Plumbing Code (see Minnesota Rules, part 4715.0320). NOTE(S): 1. The scope of this project consists of 5 new identical buildings. Installation in each building includes two restrooms finished restrooms in the lower level, four rough-ins for future restrooms, a wall hydrant, a water heater, and a mop sink. 2. This facility is served by new municipal water and sewer service connections. All of sanitary sewer and watermain in Lot No 6 is owned and maintained by the City of Orono as documented by Loucks Associates, dated January 18, 2008. Authorization for construction in accordance with the approved plans may be withdrawn if construction is not undertaken within a period of two years. The fact that the plans have been approved does not necessarily mean that recommendations or requirements for change will not be made at some later time when changed conditions, additional information, or advanced knowledge make improvements necessary. oAppro 0 I . . Tran,P.E. Pu.lic Health Engineer Plumbing Plan Review and Inspections Unit 443 Lafayette Road North St. Paul,Minnesota 55155-4343 651/284-5898 CMT:j at cc: Palo Companies,Inc.t/ Interspace Companies, Inc. Mr. Lyle Oman, Building Official File N L0 N V) ni r°r= MMU 3"VENT ' ® STACK UP J Q 11 3/4" CW UP TO FLOOR AB U C N O iZ E 0 U 0 r - O O N O FREEZE -PROOF LOCKABLE WALL HYDRANT RUN 3/4" V'=_ HW, CW & RECIRC. HW LOCATION UP TO FLOORS ABOVE - REFER TO STORAGE CAPACITY GALLONS 2/M1. REMARKS WH -1 1-1/2- WASTE DN. 20 FROM ABOVE WATER CLOSET 4 CLEAN-OUT IN 1/2 - JOISTS SPACE F-2 LAVATORY 1-1/2 1-1/2 1/2 _ 4' WASTE DN. WATER H1 F-3 FROM ABOVE 3 1i 3" WASTE ROUGH -IN 3/4 ABOVE FOR FUTURE WATER TENANT CLOSET ON FLR. ABV FLOOF C' + U PIPING i INJOIST SPACE- , - n 2' BUILDING CLEAN-OUT CLEAN-OUT IN JOISTS SPACE 4" WASTE TO— JOISTS FROM BUILDING 1 PLUMBING M1 J SCALE: 1/8" =11-031 11 OPTIONAL r ELEVATOR 11 BY OTHERS fHAkIn M I RUN 3/4" HW, CW & RECIRC. HW - UP TO FLOORS ABOVE - REFER TO 2/M1. " 1-1/2" WASTE DN.—\ FROM ABOVE `y -•_ CLEAN-OUT IN JOISTS SPACE AK' off d 4" WASTE DN. _ OPTIONAL FROM ABOVE ELEV. EQ. UY OTHERS 3WASTE ROUGH -IN FOR FUTURE WATER CLOSET ON FLR. ABV. I WATER METER FLOOR: i CO +' X i RUN PIPING IN JOIST j SPACE 1-1/2" WATER SERVICE TO BUILDING BY OTHERS PLAN - 3" VENT STACK UP 3/4" CW = UP TO FLOOR ABV. 1-1/2' WASTE DN. & 1-1/2" VENT UP— CLEAN-OUT IN JOISTS SPACE 4" WASTE STACK DN.- 3"T LEVEL 3/4' CW UP FROM BELOW. VALVE &CAP FOR FUTURE WATER CLOSET. EXTEND / 1/2" CW UP TO FLOOR --� ABOVE 3" VENT UP WASTE & VENT ELECTRIC WATER HEATER WATER HEATER NO. LOCATION SERVICE STORAGE CAPACITY GALLONS ELECTRICAL REMARKS WH -1 BASEMENT SINKS 20 115/60/1 WATER CLOSET 4 2 1/2 - F-2 PROVIDE 3/4" HW, CW & RECIRCULATING HW UP FROM BELOW W/ 1/2- VALVED & CAPPED TAKE -OFFS FOR FUTURE LAVATORY THIS FLOOR. EXTEND 1/2- HW & CW UP TO FLOOR ABOVE f "f 3 x.) : is Qol LOFT -.INE ABOVE 3" WASTE ROUGH -IN FOR FUTURE WATER CLOSET ON FLOOR ABOVE 1 2E 1 r r OPTIONAL 1` ELEVATOR rl BY OTHERS 0 C7 I) 2� PLUMBING PLAN - M1 J SCALE: 1/8"=1'-0" SUPPLY / �TE 1 PLUMBING RISER DIAGRAMS �, WA Mi NO SCALE =UTURE RECIRCULATING -IW PUMP RELIEF VALVE PLUMBING FIXTURE PIPING FIXTURE PIPE SIZE (INCHES) REMARKS NO. TYPE W. V. C. W. H.W. F-1 WATER CLOSET 4 2 1/2 - F-2 LAVATORY 1-1/2 1-1/2 1/2 1/2 F-3 JANITORS SINK 3 2 3/4 3/4 ABOVE PROVIDE 3/4' HW, CW & RECIRCULATING HW UP FROM BELOW W/ 1/2- VALVED & CAPPED TAKE -OFFS FOR FUTURE LAVATORY THIS FLOOR. EXTEND 1/2" HW & CW UP TO FLOOR ABOVE � t 3" WASTE ROUGH -IN FOR FUTURE WATER CLOSET ON FLOOR ABOVE TENANT F I 20. I IN LEVEL 1-1/2" WASTE DN. '\' & 1-1/2" VENT UPS 3" VENT STACK 1 /2" CW UP FROM BELOW. VALVE & CAP FOR FUTURE WATER CLOSET a WASTE DN.- & 4" VENT UP = I a I e, Ira mit � PROVIDE 1/2' HW & CW UP FROM BELOW. VALVE & CAP FOR FUTURE LAVATORY 4" V.T.R. 1-1/2' WASTE DN. -& 1-1/2" VENT UP 4" WASTE STACK DN. 3/4' CW UP FROM BELOW. VALVE & CAP FOR FUTURE WATER CLOSET. EXTEND 1/2' CW UP TO FLOOR ABOVE 3" VENT UP LOFT -LINE ABOVE MECHANICAL SPECIFICATIONS GENERAL The Mechanical Work includes work as indicated on the drawings to provide complete plumbing systems installations. Provide all construction engineering, supervision, labor, material and any and all items necessary for complete and functioning installations. Comply with all Owner requirements. Obtain all permits required for the Mechanical Work and arrange for inspections as required by the city Inspection Department. Pay all sales taxes, fees, permit and other costs pertaining to the Mechanical Work. Coordinate the Mechanical Work with the General Contractor and other sub—contractors. All work is to be performed in a craftsmanship manner, and except where otherwise indicated, using only new, quality materials. Do all cutting and patching necessary for the installation of the Mechanical Work. All cutting shall be done in a manner directed by the General Contractor. Patching shall match adjacent surfaces. All electrical power wiring will be furnished and installed by the Electrical Contractor. Make on operating test of the completed installations and remedy all defects disclosed as a result of the test. Guarantee all workmanship and material against defects for at least one year from the date of Owner's acceptance. PLUMBING Waste and vent piping in building above and below ground to be schedule 40 PVC DWV pipe and drainage fittings. Water piping above grade to be Type L hard drawn copper tubing and wrought copper solder fittings joined using 95-5 Bridgit solder. Short connections to fixtures and equipment may be Type L soft drawn copper. Underground water service piping shall be Type K, soft drawn seamless copper tubing. Underground branch piping shall be Type K, soft drawn or PEX. Joints will not be permitted in buried piping. Fumish and install valves required to isolote fixtures, equipment and segments of the piping systems. Valves shall be ball type. Support piping from structure with adjustable hangers. Fumish and install floor drains where indicated on the Drawings. Floor drains shall be Josom 30003—AJ, cast iron body, bottom outlet, backwater valve, nickel bronze round adjustable strainer. Furnish and install deanouts. Floor cleanouts shall be constructed with frame and cover threaded for 2" vertical adjustment, cast iron round frame and cover. Pitch horizontal waste piping 1/4' per foot where possible, but in no cost less than 1/8" per foot. Through—the—roof extensions of soil and waste stocks shall terminate 12 inches above the roof. F-1 Water Closet: American Standard "Cadet 3", 16-1/2" high floor set vitreous china, 12" rough—in, siphon jet, 1.6 GPF elongated flush tank. Seat: Olsonite 95—CC—SS, or approved equal, white solid plastic seat, open front, check hinge, for elongated bowl. Closet waste fitting with neoprene gasket. F-2 Lavatory. American Standard "Luceme", 19 5/8" x 16 3/4' x 6" deep vitreous china, self rimming sink with overflow. Chicago model 802—V336CP deck mounted, vandal resistant self—closing faucet with 0.5 GPM flow, P trop and supplies and loose key handle angle stops. Disinfect the complete water piping system in accordance with Minnesota Health Department recommended procedures. Treat the system with chlorine and flush with clean water. Open and close all affected valves during the disinfecting period. Repeat as necessary to pass required bacteriological tests. Insulate all above ground water piping with Armstrong AP Armaflex foamed tubing insulation, 3/4" thick. FIXTURE INSTALLATIONS Fixtures shall be owner furnished, set in place and property connected, complete in every detail, to soil, waste, vent and water pipes. Fixtures shall be rigid, set plumb, level and true. Furnish and install all brackets, plates, braces and/or reinforcing angles as required to support wall hung plumbing fixtures. Supporting membe-s shot[ ;)e rigidly attached to the walls and wall structures. Particular care shall be exercised in hanging fixtures, especially lavatories, to _assure rigidity and permanence. This Contractor will be held responsible for the secure mounting of lavatories on the hangers and any breakage resulting from improper installation of any fixture. Correctly faced inlets for fixtures shall be provided. Branches of sell, waste and vent pipe shall be extended as dose to fixtures as possible. Branches of vent pipes shall be graded to the trap. Fixture wastes, other than water closets and trap standard fixtures, shall be connected to waste lines with an iron ferrule and threaded pipe. Mounting heights as required by local building code w/ Jurisdiction. Provide 20 year white silicone caulk between the back edges of vitreous china fixtures and adjoining well surfaces. :.� j N 1 r OPTIONAL 1 ELEVATOR it BY OTHERS PROVIDE 1/2" HW & CW UP FROM BELOW. VALVE & CAP FOR FUTURE LAVATORY r til 4" V.T.R. 1-1/2 - -1/2" WASTE DN. ,--& 1-1/2" VENT UP ---3" VENT STACK —1/2- CW UP FROM BELOW. VALVE & CAP FOR FUTURE 4' WASTE DN. WATER CLOSET & e VENT UP Palo Drafting / Design Residential & Commercial Design & Construction Plans 14208 US Hwy 12 E. Cokato, Mn. 55321 Business: 320) 286-6133 Toll Free: 877) 517-6133 Fax: (20) 286-3230 After Hours: (320) 275-3082 Email: lehto—tim0yahoo.com DISCLAIMER: PALO COMPANIES ASSUMES NO RESPONSIBILITIES FOR THE DRAWINGS ON THIS SHEET. A CLIENT WHO PURCHASES THiS DOCUMENT IS RESPONSIBLE FOR MEETING ALL LOCAL, STATE & FEDERAL LAWS ASSOCIATED WITH TYPE OF WORK REPRESENTED ON THIS SHEET. EMPLOYEES OF PALO COMPANIES ARE NOT ARCHITECTS OR ENGINEERS AND ASSUME NO SUCH RESPONSIBILITIES. IF A CLIENT WISHES, PALO COMPANIES CAN CONTACT ARCHITECTS & ENGINEERS WHO WILL REVIEW AND CERTIFY DOCUMENTS THAT DO COMPLY WITH ALL LOCAL, STATE & FEDERAL BUILDING CODES & LAWS. THE EEM FOR SUCH DOCUMENTS ARE NOT INCLUDED IN PALO COMPANIES BIDS OR ESTIMATES. I hereby certify that this pian, specification or report was pre— pared by me or under my direct supervision and that I am a duly Licensed Master Plumber under the laws of the State of Minnesota. Edward S. Lehto Date.• 12/14/07 Reg. No.• 5693PM C"J N LO V w O LM 0 ®� > �m OCD � c a Oc�co ® CL cc�— E� "Q tV Z 0.. PROJECT 07-017 DRAWN TEL DATE 12/14/07 REVISIONS M1 SHEET 1 OF 1 ll �'� Z(o �� yza/tel Gc�