Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2000 Septic Site Plan Review
22000 Westwood Professional Services, Inc. Approximate disturbed area compaction to sob caused by vehicles driving and parking on. 14.9' Altemate Sept is - —' ,site 104 Approximate Building Elevations Lowest Floor = 90.0± Garage Floor= 98.0± Top of Foundation =98.4± Septic Site r Approximate Property Line -- - 23.8' 9,0sb#4:7/ Sb sb� i I 1 � / 21.3' _—Approximate Property Line Primary Mound Quantities 3/4"-2 1/2" clean rock for rock bed 14± cubic yards Clean Sand fill — 90± cubic yards topsoil for cover — 41± cubic yards Loamy sand for cap — 8± cubic yards Notes. - I. A void compaction of mound area before, during and after construction 2 Verify before drilling that no septic tanks or septic areas are within a 50 foot radius of proposed well location. (100 feet for shollow we//) 3. Verity before construction that no shallow wells are within 100 feet, or deep wells w/thin 50 feet of proposed septic tanks or mound area. 4. To extend the life of septic system pump septic tanks a minimum of every 2 years. 5 See attached sheets for additional construction details. 6. Soil Classified as Hayden clay loam (HcD2) 12-18X slopes, according to the U.S. Department of Agriculture soil Survey 7. Site plan prepared by or under the supervision of Bernie Miller-- Y.. P. C A. License No. 43 / 01 / /j� 't1'{,��rCSxTlTloie j ! / j edge of / ( wetland —proposed`— deeper 25.7_ � 0k welt I W 3D.6' '% IrsmrtP"M q y �a 'lt3�tt,14lg� 50 ' art 1W �@ -- OSONWOOM V Mie ee / I a Jim 13.2 q)O ' rMiMyrw,r,; 4.LHA=8V 061 'V .? 0 1 AUVIAUs d 60.4 \ o w 133� — — — ` — Oi XWON{ f–1000 aUon R1 I ast sep' tank k 1000 gallon Benchmark 20. Top of IRON ele a =100.0 77 sb#2 a —30" mope tree GRAPHIC SCALE 40 0 20 40 80 ( IN FEET ) 1 inch = 40 ft. 160 fty Location: Westwood Professional Services, Inc. c' � Lot 2, Btu 1, WOOD END ACRES, chono, 104 Marty ©rive, Suite 3 --- Minnesota. Buffalo, MN 55313 Deawn Phone: 612/682-2587 Fax: 612/682-2639 Septic System % 1150 Lyman Ave, Orono, Date UR Date: �ob# 3/24/00 20005028 �ite Plan 5028ssp.dwg Prepared for. K.C. Chermak Remak Realty Wayzata, MN r LEGENQ exist/ng Weil Soil baring Q percolation test x--- existing fence -- -- --- — existing elevation contour 92*4 existing spot e1evatio17 9.2*4 proposed spot elewtion Elevations relative and assumed ❑ Elevations relative to U. S. GS. 1929 N.G. V0 Oenotes proposed surface drainage Approximate disturbed area compaction to sob caused by vehicles driving and parking on. 14.9' Altemate Sept is - —' ,site 104 Approximate Building Elevations Lowest Floor = 90.0± Garage Floor= 98.0± Top of Foundation =98.4± Septic Site r Approximate Property Line -- - 23.8' 9,0sb#4:7/ Sb sb� i I 1 � / 21.3' _—Approximate Property Line Primary Mound Quantities 3/4"-2 1/2" clean rock for rock bed 14± cubic yards Clean Sand fill — 90± cubic yards topsoil for cover — 41± cubic yards Loamy sand for cap — 8± cubic yards Notes. - I. A void compaction of mound area before, during and after construction 2 Verify before drilling that no septic tanks or septic areas are within a 50 foot radius of proposed well location. (100 feet for shollow we//) 3. Verity before construction that no shallow wells are within 100 feet, or deep wells w/thin 50 feet of proposed septic tanks or mound area. 4. To extend the life of septic system pump septic tanks a minimum of every 2 years. 5 See attached sheets for additional construction details. 6. Soil Classified as Hayden clay loam (HcD2) 12-18X slopes, according to the U.S. Department of Agriculture soil Survey 7. Site plan prepared by or under the supervision of Bernie Miller-- Y.. P. C A. License No. 43 / 01 / /j� 't1'{,��rCSxTlTloie j ! / j edge of / ( wetland —proposed`— deeper 25.7_ � 0k welt I W 3D.6' '% IrsmrtP"M q y �a 'lt3�tt,14lg� 50 ' art 1W �@ -- OSONWOOM V Mie ee / I a Jim 13.2 q)O ' rMiMyrw,r,; 4.LHA=8V 061 'V .? 0 1 AUVIAUs d 60.4 \ o w 133� — — — ` — Oi XWON{ f–1000 aUon R1 I ast sep' tank k 1000 gallon Benchmark 20. Top of IRON ele a =100.0 77 sb#2 a —30" mope tree GRAPHIC SCALE 40 0 20 40 80 ( IN FEET ) 1 inch = 40 ft. 160 fty Location: Westwood Professional Services, Inc. c' � Lot 2, Btu 1, WOOD END ACRES, chono, 104 Marty ©rive, Suite 3 --- Minnesota. Buffalo, MN 55313 Deawn Phone: 612/682-2587 Fax: 612/682-2639 Septic System % 1150 Lyman Ave, Orono, Date UR Date: �ob# 3/24/00 20005028 �ite Plan 5028ssp.dwg Prepared for. K.C. Chermak Remak Realty Wayzata, MN r