Loading...
HomeMy WebLinkAboutPublic Hearing on Myrtlewood Neighborhood \ CITY of ORONO \, pi A Municipal Offices Street Address: tV,7,1111.10-4)7/ Mailing Address: N,, Es110 7 2750 Kelley Parkway P.O. Box 66 Orono, MN 55356 Crystal Bay, MN 55323-0066 February 10, 2009 Notice of Public Hearing on Myrtlewood Neighborhood and 850 and 875 Wayzata Boulevard West Sanitary Sewer and Water Main Improvement Project Dear Myrtlewood Neighborhood Residents, Notice is hereby given that the Orono City Council will meet in the Council Chambers, 2780 Kelley Parkway, at 7:00 p.m. on Monday, February 23, 2009 to consider a sanitary sewer and water main project for the Myrtlewood Neighborhood pursuant to Minn. Stat. 429.011 to 429.111. Such persons as desire to be heard with reference to the proposed improvement will be heard at this meeting, or written comments may also be submitted to the City. This would be an assessment project with all of the project costs assessed to the neighborhood residents. The City received petitions from 9 of the 10 Myrtlewood property owners on April 3, 2008. A summary of the petitions indicates that 9 property owners were in favor of the sewer project and 5 property owners were in favor of the water project. A Feasibility Study has been completed for this project, and a pressure sanitary sewer system is being proposed in which each property owner will be responsible for the installation, maintenance, and operation of their own grinder pump station. Previous analysis showed that a gravity sewer system to serve this neighborhood was not feasible. The feasibility study reflected the inclusion of 10 properties on Myrtlewood Road. In addition, the Study looked at providing municipal water to the 10 Myrtlewood properties. The total estimated project cost for the sanitary sewer and water project is $185,000. The estimated cost per parcel for sanitary sewer is $8,500, which includes the sewer line in the street and a service stub at the edge of the street Right of Way. The estimated cost per parcel for the water system is $10,000, which includes a water main in the street and a service stub at the edge of the street Right of Way. For the sanitary sewer system, the per parcel cost does not include the cost of installing the grinder pump station, installing the service connection from the sewer stub to the grinder pump station, or abandoning the septic system. For the water system, the estimated cost does not include any costs for the installation of the service line between the Right of Way and the home, plumbing costs or, if necessary, abandoning existing wells. Telephone(952)249-4600 • Fax(952)249-4616 www.ci.orono.mn.us - grew Myrtlewood Neighborhood Sanitary Sewer and Water Main Project February 10, 2009 Page 2 The Study also looked into the possibility of providing sewer and/or municipal water to serve properties located at 850 Wayzata Boulevard West and 875 Wayzata Boulevard West. The estimated project cost to provide sewer and water to the Wayzata Boulevard addresses is $350,000. For Myrtlewood residents the project cost can be assessed over a 15-year time period at a 6.25% annual interest rate. In addition to the sewer cost, there is a SAC fee of$2,000. This SAC fee increases on an annual basis and is payment for the additional costs of the future downstream capacity in the Metropolitan Council Sewer System. Also, the estimated property owner costs for the grinder pump station, service connection, and septic tank abandonment can range from $10,000 to $13,000 depending on the length of the service connection required. The City is currently negotiating sanitary sewer and water charges with the city of Wayzata. The agreed upon rates will be passed on to the properties served by the new sewer system. For properties with a conforming septic system,City policy allows continued use of the septic system as long it remains conforming. Connection to the sewer is required when the system becomes nonconforming, or requires major repairs or expansion. Property owners with conforming septic systems can choose not to be assessed for the project costs at this time, and. then pay a lump-sum project connection fee at the time they want to connect to the sewer. The connection fee is based on the project assessment amount updated annually for inflation. The property owner can also be assessed for the project costs and continue to use the septic system as long as it remains conforming. If there is sufficient interest in the project after the Public Hearing is held, plans and specifications will be prepared and sealed bids solicited. An assessment hearing will then be held, the project assessments approved, and a contract for project construction this summer will be awarded. The City of Orono has a Special Assessment Deferral Program available for property owners 65 years of age or older that meet specified income and assets criteria. Information on this program is available from the City upon request. The City Council shall discuss specifics related to sewer and water extensions to serve 850 Wayzata Boulevard West and 875 Wayzata Boulevard West at the public hearing. The estimated project cost of$350,000 to provide sewer and water to these two properties will be assessed to 850 and 875 Wayzata Boulevard West. Please contact me at 651-604-4863 if you have any questions. Sincerely, Tom Kello Orono City Engineer 3611823330010 3611823330015 3611823330006 Judie Anderson Jessica Brown Steven Champlin 20 Myrtlewood Rd 45 Myrtlewood Road 50 Myrtlewood Road Wayzata, MN 55391 Wayzata,MN 55391 Wayzata,MN 55391 3611823330013 3611823330009 Michael Kuruvilla Aaron Clark Bryan Freeland 760 Hunt Farm Rd. 15 Myrtlewood Rd 10 Myrtlewood Road Long Lake,MN 55356 Wayzata,MN 55391 Wayzata,MN 55391 3511823440004 3611823330011 3611823330020 OMS Properties LLC Bruce&Lori Paulson Patrick&Karen Proft Michael Kuruvilla 30 Myrtlewood Road 60 Myrtlewood Road 850 Wayzata Blvd.W. Wayzata,MN 55391 Wayzata,MN 55391 Wayzata, MN 55391 3611823330014 3611823330018 Charlie Thompson Steven&Anne Ryan Terry&Jayne Sonderup 130 West Lake Street 25 Myrtlewood Road 70 Myrtlewood Road Wayzata,MN 55391 Wayzata,MN 55391 Wayzata, MN 55391 Charles Thompson 3611823330012 3511823440005 20400 Lakeview Avenue Kevin Thompson WBW LLC Deephaven, MN 55391 90 Myrtlewood Road do Charlie Thompson Wayzata, MN 55391 433 Bushaway Rd. Wayzata,MN 55391 Brian Winges Comforts of Home • 1245 Gun Club Road White Bear Lake, MN 55110 vd 4tik, °� O O CITY of ORONO , r , Municipal Offices i r A1x ! ; #,t., S ) �� , Street Address: Mailing Address 9kE$II� 2750 Kelley Parkway P 0 Box 66 Orono, MN 55356 Crystal Bay, MN 55323-0066 April 3, 2009 Michael Kuruvilla Orono Montessori School 850 W. Wayzata Blvd. Wayzata, MN 55391 Re: Municipal Sewer& Water Service Dear Mr. Kuruvilla: The City Council has reviewed your letter requesting re-guiding of the Orono Montessori property from Single-family Rural Residential Use to Institutional Use, to allow incorporation of the property into the Metropolitan Urban Service Area (MUSA). Inclusion in the MUSA is required in order for municipal sewer to be extended to your property. Per the comments of Metropolitan Council staff in November 2007, this change would allow the property to be added to the MUSA without being part of Orono's overall residential density calculation. Therefore, the City Council has directed that this change be presented to the Metropolitan Council as an element of the Orono Comprehensive Plan Update. The Update is expected to be approved by Met Council late in 2009, which would allow for potential construction of sewer to your property during the 2010 construction season. Note that provision of just municipal water to your property does not require inclusion in the MUSA. Sewer. The cost of a sewer extension to serve your property at 850 Wayzata Boulevard is estimated by the City Engineer at approximately $66,000. Because that extension would also serve the property across from you at 875 Wayzata Boulevard if/when it develops, we would expect that some portion of the cost would be attributed to that property. However, the relative proportioning of the cost between 850 and 875 has not been determined, and 875 would have additional costs in extending the line under Wayzata Boulevard. Also, it is the City's current position that final design and installation of the sewer extension to serve both properties will not proceed at all until 875 develops (which is expected to begin in late 2009 or early 2010, but is not firm at this time). Note that the sewer system serving your property is expected to be a pressure sewer system, requiring you to construct and maintain a grinder station to discharge your effluent to the City sewer line. Water. Regarding municipal water, the City Council has authorized the City Engineer to prepare final plans and specifications for an extension of the water system to serve your property, as part of the Myrtlewood sewer& water project scheduled for the summer of 2009. The cost estimate Telephone(952)249-4600 • Fax(952)249-4616 www.ci.orono.mn.us ..- -. Michael Kuruvilla April 3,2009 Page 2 for this extension is approximately $64,000 with again some undetermined portion of the cost to be attributed to the property at 875 Wayzata Boulevard. We will in the next 4-6 weeks be providing the Council with information to assist them in determining the appropriate apportioning of costs. Cost Assessment and Additional Costs. The City normally assesses the costs of retrofitting neighborhoods with sewer and water utilities over a period of 15 years. We expect that to be the case with your extensions. Also remember that the costs of actually connecting your building to the municipal sewer or water system are not assessed, and it is the responsibility of the property owner to hire a contractor to make those connections. You should contact sewer and water contractors to determine what your connection costs will be. Additional costs that you will incur at the time of making the connections are: Sewer: Metropolitan Council Sewer Availability Charge(SAC): $2,000.00 x No. of SAC Units' City of Orono Connection Permit: $ 50.00 City of Wayzata Sewer Connection Charge2: $ 525.00 x No. of SAC Units' Water: City of Orono Connection Permit: $ 50.00 City of Orono Water Meter(1"): $ 477.70 (est.) City of Wayzata Water Connection Charge2: $1,920.00 x No. of SAC Units' ' The number of SAC units is based on expected usage and is calculated for non-residential uses by the Metropolitan Council. For Daycare uses, the property is charged 1 SAC unit for each 14 licensed students. For Church uses 1 SAC unit is charged foe each 275 seats. Under your stated potential use of approximately 100 students,the property might be charged as many as 7 SAC units. 2 The sewer and water systems serving your property will be an extension of the City of Wayzata utility system, and are therefore subject to Wayzata's connection charges Schedule. The tentative schedule for the Myrtlewood sewer and water project is to call for bids in early April; open bids in late April; hold an assessment hearing in mid-May; award a contract on May 25, 2009; construction to commence in June/July with substantial completion in September, 2009. Under this scenario, you would likely have the ability to connect to the water system in October/November of 2009. This schedule is subject to change. Please feel free to contact me at 952-249-4622 if you have any questions. Sincerely, Michael P. Gaffr Asst. City Administrator cc: City Engineer Tom Kellogg Sewer& Water Supervisor Scott Oberaigner Finance Director Ron Olson