Minnesota Wetland Conservation Act
Notice of Decision
Local Government Unit(LGU) Address
Minnehaha Creek Watershed District 18202 Minnetonka Blvd,
Deephaven,MN 55391
1. PROJECT INFORMATION
Applicant Name Project Name Date of Application
Wayzata Country Club— Wayzata Country Club Pond— Application Number
Bob Distel Phase II 1/19/2010 W10-02
0 Attach site locator map.
Type of Decision:
❑Wetland Boundary or Type ❑No-Loss 0 Exemption 0 Sequencing
® Replacement Plan 0 Banking Plan
Technical Evaluation Panel Findings and Recommendation(if any):
®Approve 0 Approve with conditions ❑Deny
Summary(or attach): Technical Evaluation Panel had no additional comments on the application.
2. LOCAL GOVERNMENT UNIT DECISION
Date of Decision: 2/25/2010
®Approved 0 Approved with conditions(include below) ❑Denied
LOU Findings and Conclusions(attach additional sheets as necessary):
The decision has been made to approve the replacement plan for the Wayzata Country Club Pond Project—
Phase II at 200 Wayzata Blvd W in Orono.The applicant has proposed to excavate 8,341 sq ft of a type 2
wetland for the expansion of the pond created under Phase I of the project in 2009. Additionally,the
applicant has proposed to abandon Mitigation Basin C which was created under Phase I. Total mitigation
required for the new wetland impacts and replacement of Mitigation Basin C is 16,682 sq ft.
Sequencing flexibility has been applied on the basis that the wetland to be impacted has been degraded and
exhibits steep side slopes,erosion,and a dominance of non-native,invasive vegetation.
Mitigation will be provided on site in the form of wetland creation and upland buffer,some of which will
come from excess wetland and buffer created under Phase I and the rest will be created concurrent to the
wetland impacts.Total mitigation proposed is 8,341 sq ft of type 2 wetland and 9,213 sq ft of upland
buffer for a total of 17,554 sq ft. A revised summary sheet is attached.
The replacement plan received by MCWD on January 19,2010,with minor revisions received February
24,2010,is approved with the conditions listed below. A$6,850 surety was provided for Phase I of the
project and will be held over to cover the Phase II work.
BWSR Forms 11-25-09 Page 1 of 3
For Replacement Plans using credits from the State Wetland Bank:
Bank Account# Bank Service Area County Credits Approved for Withdrawal
(sq. ft. or nearest.01 acre)
Replacement Plan Approval Conditions. In addition to any conditions specified by the LGU,the approval
of a Wetland Replacement Plan is conditional upon the following:
® Financial Assurance: For project-specific replacement that is not in-advance,a financial assurance
specified by the LGU must be submitted to the LGU in accordance with MN Rule 8420.0522, Subp. 9
(List amount and type in LGU Findings).
Deed Recording: For project-specific replacement, evidence must be provided to the LGU that the
BWSR"Declaration of Restrictions and Covenants"and"Consent to Replacement Wetland"forms have
been filed with the county recorder's office in which the replacement wetland is located.
0 Credit Withdrawal:For replacement consisting of wetland bank credits,confirmation that BWSR has
withdrawn the credits from the state wetland bank as specified in the approved replacement plan.
Wetlands may not be impacted until all applicable conditions have been met!
LGU Authorized Signature:
Signing and mailing of this completed form to the appropriate recipients in accordance with 8420.0255,
Subp. 5 provides notice that a decision was made by the LGU under the Wetland Conservation Act as
specified above. If additional details on the decision exist,they have been provided to the landowner and
are available from the LGU upon request.
Name Title
Becky Houdek District Technician
Signature Date Phone Number and E-mail
2/25/2010 952-471-0590 ext.226
bhoudek@minnehahacreek.org
THIS DECISION ONLY APPLIES TO THE MINNESOTA WETLAND CONSERVATION ACT.
Additional approvals or permits from local, state, and federal agencies may be required. Check with all
appropriate authorities before commencing work in or near wetlands.
Applicants proceed at their own risk if work authorized by this decision is started before the time period for
appeal (30 days) has expired. If this decision is reversed or revised under appeal, the applicant may be
responsible for restoring or replacing all wetland impacts.
This decision is valid for three years from the date of decision unless a longer period is advised by the TEP and
specified in this notice of decision.
3.APPEAL OF THIS DECISION
Pursuant to MN Rule 8420.0905,any appeal of this decision can only be commenced by mailing a petition for
appeal,including applicable fee,within thirty(30)calendar days of the date of the mailing of this Notice to the
following as indicated:
Check one:
® Appeal of an LGU staff decision. Send petition 0 Appeal of LGU governing body decision. Send
and$ fee(if applicable)to: petition and$500 filing fee to:
Eric Evenson,District Administrator Executive Director
Minnehaha Creek Watershed District Minnesota Board of Water and Soil Resources
18202 Minnetonka Blvd 520 Lafayette Road North
Deephaven,MN 55391 St. Paul, MN 55155
BWSR Forms 11-25-09 Page 2 of 3
4. LIST OF ADDRESSEES
Z SWCD TEP member: stacey.lijewski@co.hennepin.mn.us
• BWSR TEP member: lynda.peterson@state.mn.us
❑ LGU TEP member(if different than LGU Contact):
® DNR TEP member:john.gleason@dnr.state.mn.us
• DNR Regional Office(if different than DNR TEP member): Melissa.Doperalski@dnr.state.mn.us
❑ WD or WMO (if applicable):
Applicant(notice only)and Landowner(if different):
Bob Distel
Wayzata Country Club
200 Wayzata Blvd W
Wayzata,MN 55391
® Members of the public who requested notice(notice only):
Todd Ullom,MFRA-tullom@mfra.com
Christine Mattson, City of Orono-cmattson@ci.orono.mn.us
John Smyth,Bonestroo-John.Smyth@bonestroo.com
® Corps of Engineers Project Manager(notice only): Melissa.M.Jenny(aJ,usace.anny.mi1
❑ BWSR Wetland Bank Coordinator(wetland bank plan applications only)
5. MAILING INFORMATION
>For a list of BWSR TEP representatives, see: www.bwsr.state.mn.us/aboutbwsr/workareas/WCA areas.pdf
>For a list of DNR TEP representatives,see:www.bwsr.state.mn.us/wetlands/wca/DNR TEP contacts.pdf
>Department of Natural Resources Regional Offices:
NW Region: NE Region: Central Region: Southern Region:
Reg.Env.Assess.Ecol. Reg.Env.Assess.Ecol. Reg.Env.Assess.Ecol. Reg.Env.Assess.Ecol.
Div.Ecol.Resources Div.Ecol.Resources Div.Ecol.Resources Div.Ecol.Resources
2115 Birchmont Beach Rd.NE 1201 E.Hwy.2 1200 Warner Road 261 Hwy. 15 South
Bemidji,MN 56601 Grand Rapids,MN 55744 St.Paul,MN 55106 New Ulm,MN 56073
For a map of DNR Administrative Regions,see: http://files.dnr.state.mn.us/aboutdnr/dnr regions.pdf
>For a list of Corps of Project Managers,see: www.mvp.usace.army.mil/regulatory/default.asp?pageid=687
or send to: Dept. of the Army,Corps of Engineers, St.Paul District
ATTN: CO-R, 190 Fifth Street East
St.Paul,MN 55101-1638
>For Wetland Bank Plan applications,also send a copy of the application to:
Minnesota Board of Water and Soil Resources
Wetland Bank Coordinator
520 Lafayette Road North
St. Paul,MN 55155
6. ATTACHMENTS
In addition to the site locator map,list any other attachments:
® Revised summary sheet of impact and mitigation amounts
0
0
BWSR Forms 11-25-09 Page 3 of 3
Wayzata Country Club
Welland Permit Application
Pond Expansion Project
January 14,2010
2009 Wetland Permit Application
Wetland Impacts
Wetland Impacts 'Replacement Ratio 'Mitigation Required
Permitted 24,04!SF 2.25:1 54,092 SF
After-the-Fact 1,663 SF 4:1 6,652 SF
Total 125,704 SF 160,744 SF
Proposed Mitigation
NWC 'PPC 'Buffer
Mitigation Basin A 13,417 SF 9,764 SF 9,764 SF
Mitigation Basin B 10,409 SF 32,171 SF 43,844 SF
Mitigation Basin C 8,755 SF 0 5,331 SF
Total 11T27511F 141,935 SF 158,939 SF
City of Orono required upland buffer=58,886 SF
Actual Mitigation*
NWC 'PWC 'Buffer
Mitigation Basins A 18,749 SF 9,764 SF 9,764 SF
Mitigation Bashi B 17,799 SF 32,171 SF 43,844 SF
Mitigation Basin C _0 0 0
Total [36,548 SF" 141,935 SF** 53,608 SF"
*Based on wetland boundary survey completed during 2009 growing season.
**Based on removal of Mitigation Basin C from the replacement plan.
2010 Wetland Permit Application
Welland Impacts 'Replacement Ratio]Credits Required 'Excess'Wetland Credits(2009) 'New Wetland Credits(2010)
8,3411 2:011 16,682 wetland-2,975 SF(75%of 3,967 SF)16,682 SF-2,975 SF-5,809 SF=7,898 SF
buffer-2,918 SF(25%of 11,673 SF)
Proposed Mliiigation
%of Area Eligible
Type of Credit for Credit Total Area Proposed Wetland Credits Proposed
2009 Wetland Creation 75%3,967 SF 2,975 SF
2009 Upland Buffer 25%11,673 SF 2,918 SF
2010 Wetland Creation 75%7,155 SF 5,366 SF
2010 Upland Buffer 25%25,180 SF 6,295 SF
Total 17,554 SF
City of Orono required upland buffer(based on 25-foot buffer around Impacted wetland)=58,886 SF(2009)+19,081 SF(2010)=77,967 SF
Revised 2/24/2010
FEB 2 l_U1O
i j — . .
LEGEND
,.a, ; I1:::::
FRA
I r t .. .\ / + � J craw -»-00--.—•1 tet. \, i I .u swiss �>—�0—.� Wombs Frank Roos
i
Assockatts,loc.
wnne —»m»— --...
141,0111.444~14114 HP
Pyavn-r.,e..asn
- _• 4 1 I I I-r I / MUM .rw-PWI.aM>IrPgYJP.�
I' \ :I I 1, / I 1H61w1P m- -.-
i` +e +i 1 Ir i Client
�i 1 + \� i '•,In-I + + WAYZATA
1 - I I `\ \` \\ `\ 1 -
200 WOWS BUIS
I —, ! I 1 \ \ \ \ COUNTRY CLUB
I
\ I Ma.
1 \\\\\\\\\ �k`\ T11- Project
+ + y it '� PROPOSED POND
+ 1
I
a \\.(e-7)
\` \o \ ` + PHASE 2
' t ;N / \
,.;. _ ' �_ - Location
.I a.
---y j ,:.-- ..:. ►aI M --I:4;2_ PL/L-240‘\ i l ' liN+p��.� ORONO,MN
_'� °fir-.- r.... 4 . --'^----_- � -r-/-,�,-W-1, -'-- �__-__
1 �' VA .p q i ' / ,7 . I r 4Ill y .t*':-
.':V'+''''
I1 .\I\ .31----"4". I 1 i / -!`7 , \I i h —
- I y Cr: wy / r \
/ r '
„' ,/•. 1 i / \\ Certification
/ , i f,.- `r- j- i/ 1 / r I I 1 A- Pnw.msps
'' i ' I•+ \\y/y%'' +/ i/ + �I i 1 \ •i ' i .rte i i� 7. osos iisselem°mro'°iM.
/! (("1 t I '/ / // / 1 1 'Ci
( / 1 we.wb.an.r.r.wa.
4FV
1 _ I I \\ \\\ 1\\'P j 1 PRCPOjED PDJtd/ 1 i.•
�: .y.L-- Wags Mon o.P m/ILmIN
I \ ‘,._...,n„„, „„,--`\ I -NE1LAND NIPAC AREA I / / .a
/ d I cAd I / � ,.�° � / :_.
✓ Sf� �"�
AFF•Stt MOS 104/Pollt
L ^.�` •/`` 'a. ..\\\ +j\� _till/ M ,-�'•'�// +0, i„� % � j� . .4
••i g• , Summery
` /// `` �\\\�y\\IP' I //I1/�' �\_/ II '\ I /�i. t l= j0rr-nnr,Pr lana lmK m/IYmIP
n _Ar- it b.'=' \ \ .,,, �' 7. \\� e,/� t i- ..1 F10YIt10n History
_ ( 1-- - - .� �� ' �1, * / j �`J _ MPNW Is Sub rina/P.P.Is
• y�\�\�+ ;•,n� iq.,� 1 r � ----moi�--
\ . ilrilliw:, -----_,___, ______, ..._,_,iA mai lifirsiv..-,,,- .I• -,_,:, , . -
syr, / ../
Sheet Title
-%---.
/ . . I t zya"��e _ � .: SITE PLAN
l ..
...... r I J' ,-...$ i
I i ,•.
j \I I o ClI ` �/ Sheet Number Revision
r ,?' C-3.01
- Project No. WAY17692