Loading...
HomeMy WebLinkAboutRule B: Erosion Control 1 MINNEHAHA CREEK WATERSHED DISTRICT QUALITY OF WATER QUALITY OF LIFE Pursuant to Minnesota Statutes Chapter 103D, and on the basis of statements and information contained in the permit application, correspondence, plans, maps, and all other supporting data submitted by the applicant, and made a part The Minnhaha Creek hereof by reference, PERMISSION IS HEREBY GRANTED to the applicant Watershed District is named below for use and development of land in the Minnehaha Creek Watershed District. _ committed to a leadership role in protecting, Issued to: Wayzata Country Club Permit No: 10-013 improving and managing Location: 200 Wayzata Blvd W, Orono the surface waters and affiliated groundwater Purpose: Rule B: Erosion Control resources within the Date of Issuance: 2/24/2010 Date of Expiration: 2/24/2011 District,including their By Order of the Board of Managers relationships to the ecosystems of which Becky Ude District Technician they are an integral part. We achieve our mission This permit is not transferable without District approval, and is valid to the date of expiration. No activity is authorized beyond the expiration date. If the permittee through regulation, requires more time to complete the project, an application for renewal of the permit must be received by the District at least 30 days before expiration. capital projects, education,cooperative The applicant is responsible for compliance with all District Rules and for the action of their representatives, contractors, and employees. endeavors,and other Conditions: Project to be completed as described in plans submitted to the programs based on MCWD office on January 28, 2010 according to the provisions of sound science, this permit. • Wetland Conservation Act approval must be received Innovative thinking,an prior to impacting existing wetlands informed and engaged • Properly install and maintain all required MCWD Rule B, erosion control measures until the disturbed areas are re- constituency,and the stabilized • When the site is re-stabilized and the MCWD staff has cost effective use of performed a final inspection, all silt fences must be removed public funds. (Statement concerning fees for inspections, violations, etc... on following page) 18202 Minnetonka Boulevard, Deephaven,MN 55391 •Office: (952)471-0590 • Fax: (952)471-0682 •www.minnehahacreek.org MINNEHAHA CREEK 1 WATERSHED DISTRICT QUALITY OF WATER QUALITY OF LIFE Inspection/Analysis/Monitoring Fees The Minnhaha Creek A site inspection and monitoring by District staff will be performed where the Watershed District is activity involves: committed to a leadership • a commercial/industrial/multi-family residential development role in protecting, • a single family residential development greater than 5 acres or of any size if within the Minnehaha Creek subwatershed improving and managing • any alteration of a floodplain or wetland the surface waters and • dredging within the beds, banks or shores of any protected water or wetland • a violation affiliated groundwater • any project which in the judgment of the District staff should be inspected resources within the due to project location, scope, or construction techniques District,including their In these cases, the applicant shall pay to the District a fee equal to the actual relationships to the costs of field inspection of the work, including investigation of the area affected ecosystems of which by the work, analysis of the work, and any subsequent monitoring of the work, which in the case of a violation shall be at least$35. they are an integral part. We achieve our mission through regulation, Standard Fee Schedule capital projects, District professional staff $ 51.01* District interns $ 31.30* education,cooperative District clerical staff $ 46.09* endeavors,and other Consulting Senior Engineer $ contracted rate Consulting Engineer/Technician $ contracted rate programs based on District Counsel $ contracted rate sound science, Application fee $ 10.00 Copy costs $ .25 + actual staff time Innovative thinking,an Color copy costs $ 1.00 + actual staff time Audio tapes $ 20.00 each informed and engaged Watershed Plan (Paper) $ cost of production Watershed Plan CD $ 10.00 each constituency,and the CIP $ 10.00 each cost effective use of public funds. * Hourly 18202 Minnetonka Boulevard, Deephaven, MN 55391 •Office: (952)471-0590• Fax: (952)471-0682 •www.minnehahacreek.org