My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-00824 - pole barn
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
4765 Watertown Road - 31-118-23-22-0002
>
Permits/Inspections
>
1996-00824 - pole barn
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:29:38 PM
Creation date
12/23/2019 12:52:09 PM
Metadata
Fields
Template:
x Address Old
House Number
4765
Street Name
Watertown
Street Type
Road
Address
4765 Watertown Road
Document Type
Permits/Inspections
PIN
3111823220002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- - <br /> PERMIT <br /> CITY OF ORONO PERMIT TYPE: <br /> 2750 Kelley Parkway- P.O. Box 66 BUILDINci <br /> Permit Number: <br /> 008024 <br /> Crystal Bay, Minnesota 55323 Date Issued: OE/06 p3 <br /> (612) 473-7357 <br /> SITE ADDRESS: <br /> 4765 WATERTOWN RD <br /> CH <br /> P . 1 . N . : 31-118-2:3-22-0002 <br /> DESCRIPTION: <br /> POLE BARN <br /> Building Permit Type SF-ACC STRUCTURE <br /> Building Work Type ACCESSORY STRUCT <br /> UBC OccuPancY U-1 <br /> Construction Type VN <br /> • <br /> RR-1A <br /> Census Code 375 OTHER NONRES . <br /> REMARKS: <br /> SEPARATE PERMIT REQUIRED FOR ELECTRICAL (STATE) . BUILDING MUST BE LOCATED ON <br /> PROPERTY BY A SURVEYOR AT FOOTING INSPECTION . <br /> FEE SUMMARY: <br /> VALUATION $13, 465 <br /> Base Fee $212. 25 <br /> Plan Review $137 . 96 <br /> Surcharge 73 <br /> Total Fee $356 . 94 <br /> CONTRACTOR: - Applicant - ST . LIC. OWNER: <br /> NEW LEAF BUILDERS 15465500 20047617 ESTERLY DENNIS <br /> '2561 MAYFLOWER AVE 4765 WATERTOWN Rn <br /> M INNETONKA MN 55:305 ORONO MN 55359 <br /> 546-5500 473-5993 <br /> THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL IMPROVEMENTS <br /> SPECIFIED AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL CITY OF <br /> ORONO ORDINANCES AND STATE OF MINNESOTA BUILDING CODE REQUIREMENTS. <br /> L_ <br /> (4) <br /> APPLICANT/PERMITEE SIGNATURE <br /> ISSUED BY:SIGNATURE <br />
The URL can be used to link to this page
Your browser does not support the video tag.