HomeMy WebLinkAbout1993 Site Plan93803 7/117/23 SAWHORSE CONSTRUCTION
ADVANCE SURVEYING & ENGINEERING CO.
5300 S. Hwy. No. 101 Minnetonka, MN 55345 Phone (612) 474 7464 Fax (612) 474 8267
SURVEY FOR: SAWHORSE CONSTRUCTION
SURVEYED: October 21, 1993
DRAFTED: October 25, 1.993
LEGAL DESCRIPTION:
Lot 4, Block 3, FOREST ARMS, Hennepin County, Minnesota.
LIMITATIONS:
We have surveyed the above described property which the client claims to own or appears to own from various government records.
We make no representation that the cliem does in fact own the property nor that a search of the records has been made to determine
the extent and nature of his holdings. If there is any doubt concerning the accuracy of the legal description, competent legal counsel
should be retained to perform a titte search and issue a title opinion for our use in preparing the survey. We show only those
easements which the client informs us of or which we happen to become aware of through other sources. The survey shows only these
improvements which are visible and which we deem important.
STANDARD SYMBOLS & CONVENTIONS:
"o" Denotes 112" ID pipe with plastic ptug bearing State License Number 9235, set, if "o" is filled in, then
denotes found iron monument.
CERTIFICATION:
I hereby certify that this survey was prepared by me or under my direct supervision and that I am a
Professional Engineer and a Professional Surveyor under the Laws of the State of Minnesota.
Parket P.F
. ONE
& P.S.
INCH EQUALS 30 FEET
HARDCOVER CALCULATIONS:
Rock withplastic _�, 278_ sq--ft-
-House
q_ _
House 2,675 sq ft
Concrete 1,602 sq ft
Lot area 45,819 sq ft
- ,,s, r
`OQ '
C>
1'L
® ®p
R ar
yp 002 \\ --' , o�Ps�`9
.' �. -
00
-332' o•\ --e—'
v
t w o
O lz O2, o t�
1 YQ lyZJ rJ a. O't
1 O -� Ili Q J 22 Y
i
1 t- LK 3 f t2
36.2 eo o ti�.rt
g �.
try ,2• S-��v A�,pE �' '�
(� 6•
° ,
r �
DECK WITH ROCK
OVER PLASTIC CK ,11tR i`
oti o�
Cz
J 0 E
bb Roc STC'
-�- ,s �•_- oma--'-`— PSP
EXISTING 'f
DWELLING
W
0
O�
t\'yo -
Z N � _-
0
0
0
3
t SURV y l"INE
N 9 g__W _---
® 4-- 25
t �
V
co too
n
e -
A
I
- EDGE OF WATER OCTOBER 21, 1995
CHANNEL TO FOREST LAKE
K0
�
--�, -/40 �,® Pe i
F"i";il� Pt��°`'tea
jV i
mo