HomeMy WebLinkAbout2009 Storm Water Pollution Prevention PlanI�
Temporary Erosion Control and Sequencing
1. Install perimeter control fencing per the standard detail plates. No more than
600 linear feet of silt fence should be continuous and collecting at one point.
Undulate the silt fence or use "simles" or crescents of silt fence.
2. Use horizontal slope grading
3. Install erosion control around any temporary dirt stockpile areas.
4. All septic areas to be fenced off for protection. Protection to extend a
minimum of 20' outside of septic areas.
5. The contractor for the project shall inspect all erosion control BMP's after
each rainfall and repair as necessary and remove sediment from silf fences
if it reaches 1/3 capacity.
6. The contractor shall schedule his operations to minimize the amount of
disturbed area at any given time. The contractor shall limit his activities
to the grading limits as shown.
7. Remove all temporary BMP's once the site has reached final stabilization (a
uniform perennial vegetative cover with a density of 70 percent over all pervious
surface areas).
Permanent Erosion Control
1. All exposed soils on site must be stabilized with in 3 days:
a. Stabilization on slopes flatter than 4:1 consists of disc -anchored
mulch and seed; stabilization on slopes flatter than 4:1 and in areas
of concentrated flows consists of erosion blankets and seed.
2. Temporary mulch and seed is needed for exposed areas which sit fallow for
3:1 or steeper in 7 days, 3:1 to 10:1 in 14 days, and flatter than 10:1 in 21
days. Also open stockpiles need to have temporary stabilization if they are to
remain inactive for more than 7 days.
(D
c� CO
a�
EED
T-
0 0
�Z
00 U)
T-- J
W Q:
W
O O
O
0 T-
r' 0
O T-
0 99 9 TEST(
(9 5.1) '`O( r) i° HOLE98a
;N k991.0) `g.; P)
(/ L-992- (99
(9s3. .994-- $
•. � (9 2 . S
----39 -� {996.2 _ Za.s F
G'E
m F1A�R= b )
X7.0
ti
LO
Ll
1.90
LU
a� C/)
Og Z
0
H J
JW ��
Z (
f– �
CA
LU
qo,6- ZE'
STORM WATER POLLUTION PREVENTION PLAN FOR
THOMAS A. CUSICK
OF TRACT B, R. L. S. NO. 1098
HENNEPIN COUNTY, MINNESOTA
0 30 60
1201
SCALE IN FEET
X4.7 Off► of Orono
Planning & Zoning Plan Review
Site Plan Review Date: --=�
PROVED
W PROF`OSED SILT FENCE oEr
rAOVED WITH REVISIONS (see note
El DNIED
2 Staff: l�dAV/
(9 1.3
>>
�1) -(95.6) I I
CID.
QO
0 Q
\a
E I I I ft
�o k9so > , 1 I.-
- f , (961.5)
tea" Z� (�Tj) $)
tp
ogi< \ I I I �970
^�* N '969.2) ` 15
ICD
(J �A�
I
v 0 I I
66.6
AR
LJ
� 1
At �s0
- �I Ic?a�,t r-; � N X50 3'Op �r � 317 S4
;NORM WATER POLLUTION PREVENTION PLAN BEFORE AI .L. �-.. G _ ON•_ TRUCTION W 317 44 meas
3p �,� ed
1. The following storm water pollution prevention measures are shown S SID
on the plans and shall be implemented prior to construction: 3. Notification 1098
* Install silt fence around the perimeter of areas to be graded as * If sediment from the site is observed on adjacent streets or other properties,
shown on the storm water pollution plan. the contractor shall remove the sediment within 24 hours of detection or notification.
* All temporary stockpiles must have silt fence around them to trap * If sediment from the site is observed on adjacent streets or other properties, the
sediment.
* inspector shall identify the source and discharge location of the sediment and instruct
Phase grading work to minimize the duration that any disturbed soil the contractor to implement additional erosion and sediment controls at those
is exposed. locations to prevent future discharges.
* Seed and mulch must be applied within 72 hours after rough gradingis *'If building materials, chemicals, or general refuse is being used, stored, disposed
complete.
* Locate stockpiles a minimum of 50 feet from ponds and site drainage routes. of, otherwise managed inappropriately, the contractor shall correct such defects
* Remove any sediment that has been tracked onto public or private streets within hours of detection or notification.
within hours. * If excess sive sediments or debris are observed at the flared end section outfalls,
* Remove any spill of fuel, oil, or other chemical immediately upon detection. the inspector shall determine the source and discharge locations of such materials.
* Store construction materials in an orderly manner. If the discharge has occurred on the property, the contractor shatl remove the
* Repair silt fences, rock construction entrances, and other erosion and sediments and debris within 24 hours of notification and correct the source of
sediment controls as needed. such materials as directed by the inspector.
2. Storm Water Pollution Prevention After Construction
EXISTING LEGAL DESCRIPTION:
The contractor shall implement the following storm water pollution prevention Tract B, Registered Land Survey No. 1098, files of
measures after construction: Registrar of Titles, Hennepin County, Minnesota
* All distrubed areas without permanent impermeable surfaces will be
vegetated for final stabilization.
* Silt fence and other erosion and sediment control devices will be removed This survey shows the boundaries of the above described
after vegetation is established property, and the location of an existing house, porch,
* Contractor s1hall maintain a construction activity Ion with d–ntes of major
driveway, deck and oilier visible hardcover' thereon, and
grading activities, dates grading stops and spills. the proposed location of a propostru eauu iun- li uot:� 0131.
* Keep SWPPP and inspection log accessible on site.
purport to show any other improvements or encroachments.
6 : Iron rnarker found
(998.3) : Existing spot elevation, mean sea level datum
--968-- : Existing contour line
Bearings shown are based upon an assumed datum
JUDICIAL 41
—
rn
SILT FENCE
HEAVY DUTY
F
OO
EXISTIN
(V
CONCRET
...........
......0:3_.... --" --
ti
LO
Ll
1.90
LU
a� C/)
Og Z
0
H J
JW ��
Z (
f– �
CA
LU
qo,6- ZE'
STORM WATER POLLUTION PREVENTION PLAN FOR
THOMAS A. CUSICK
OF TRACT B, R. L. S. NO. 1098
HENNEPIN COUNTY, MINNESOTA
0 30 60
1201
SCALE IN FEET
X4.7 Off► of Orono
Planning & Zoning Plan Review
Site Plan Review Date: --=�
PROVED
W PROF`OSED SILT FENCE oEr
rAOVED WITH REVISIONS (see note
El DNIED
2 Staff: l�dAV/
(9 1.3
>>
�1) -(95.6) I I
CID.
QO
0 Q
\a
E I I I ft
�o k9so > , 1 I.-
- f , (961.5)
tea" Z� (�Tj) $)
tp
ogi< \ I I I �970
^�* N '969.2) ` 15
ICD
(J �A�
I
v 0 I I
66.6
AR
LJ
� 1
At �s0
- �I Ic?a�,t r-; � N X50 3'Op �r � 317 S4
;NORM WATER POLLUTION PREVENTION PLAN BEFORE AI .L. �-.. G _ ON•_ TRUCTION W 317 44 meas
3p �,� ed
1. The following storm water pollution prevention measures are shown S SID
on the plans and shall be implemented prior to construction: 3. Notification 1098
* Install silt fence around the perimeter of areas to be graded as * If sediment from the site is observed on adjacent streets or other properties,
shown on the storm water pollution plan. the contractor shall remove the sediment within 24 hours of detection or notification.
* All temporary stockpiles must have silt fence around them to trap * If sediment from the site is observed on adjacent streets or other properties, the
sediment.
* inspector shall identify the source and discharge location of the sediment and instruct
Phase grading work to minimize the duration that any disturbed soil the contractor to implement additional erosion and sediment controls at those
is exposed. locations to prevent future discharges.
* Seed and mulch must be applied within 72 hours after rough gradingis *'If building materials, chemicals, or general refuse is being used, stored, disposed
complete.
* Locate stockpiles a minimum of 50 feet from ponds and site drainage routes. of, otherwise managed inappropriately, the contractor shall correct such defects
* Remove any sediment that has been tracked onto public or private streets within hours of detection or notification.
within hours. * If excess sive sediments or debris are observed at the flared end section outfalls,
* Remove any spill of fuel, oil, or other chemical immediately upon detection. the inspector shall determine the source and discharge locations of such materials.
* Store construction materials in an orderly manner. If the discharge has occurred on the property, the contractor shatl remove the
* Repair silt fences, rock construction entrances, and other erosion and sediments and debris within 24 hours of notification and correct the source of
sediment controls as needed. such materials as directed by the inspector.
2. Storm Water Pollution Prevention After Construction
EXISTING LEGAL DESCRIPTION:
The contractor shall implement the following storm water pollution prevention Tract B, Registered Land Survey No. 1098, files of
measures after construction: Registrar of Titles, Hennepin County, Minnesota
* All distrubed areas without permanent impermeable surfaces will be
vegetated for final stabilization.
* Silt fence and other erosion and sediment control devices will be removed This survey shows the boundaries of the above described
after vegetation is established property, and the location of an existing house, porch,
* Contractor s1hall maintain a construction activity Ion with d–ntes of major
driveway, deck and oilier visible hardcover' thereon, and
grading activities, dates grading stops and spills. the proposed location of a propostru eauu iun- li uot:� 0131.
* Keep SWPPP and inspection log accessible on site.
purport to show any other improvements or encroachments.
6 : Iron rnarker found
(998.3) : Existing spot elevation, mean sea level datum
--968-- : Existing contour line
Bearings shown are based upon an assumed datum
JUDICIAL 41
—
LANDMAR
SILT FENCE
HEAVY DUTY
F
OO
00
U1 0
W01
O 00
O O
=W
M
m
00
/O-4
N
��04 -0
Z CD
s/
0
QQ��,
161CL
-'
00
J_ I
E Bp,CK L1NDE�
5ppw; T .NOR -TN �1NE
F ER DPIII MARSN
F
I
f-1
ao snr rU+ct++E*T�o Fwa amu:uu rzarnnnc wm.
z nvrnm sa*re+auw.mrt+c aiaorn+�mrr�ncetn.Trswic
ro crnumFr+r oucro via
uNn�r«a, wrr wus, sig <aa�s, erc
—
O
SILT FENCE
HEAVY DUTY
F
��
ERa1C
DESIGNED REVISION DATE DESCRIPTIONI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT SCALE
9-23-09 REVISED ADDITION SHOWN
GRONBERG & ASSOCIATES, INC. WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND 1"=30'
1
DRAWN 2 9-30-09 STORM WATER POLLUTION PREVENTION PLAN CONSULTING ENGINEERS, LAND SURVEYORS THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER AND LAND DATE
SITE PLANNERS SURVEYOR UNDER THE LAWS OF THE STATE OF MINNESOTA.
7-14-09
CHECKED 445 N. WILLOW DR. LONG LAKE, MN. 55356
JOB N0.
952-473-4141
DATE 2 T ,V MN LICENSE NUMBER- -IC _ii- 09-165
09-165
SEP d 0 2009
CITY OF ORONO