Loading...
HomeMy WebLinkAboutSeptic System -4?t, o o CITY of ORONO Municipal Offices tt, I q ' G Street Address: Mailing Address: �kESI3�¢ 2750 Kelley Parkway P.O. Box 66 Orono, MN 55356 Crystal Bay, MN 55323.0066 January 6, 1994 Mr. John Serena 4605 Watertown Road Maple Plain, Minnesota 55359 Dear Mr. Serena: Due to the extremely wet year, we realize that the required repair of your septic system may have been difficult to complete last summer. This is a reminder that the septic system repair will be required next year. A licensed septic contractor must get a permit from the City of Orono by July 15, 1994 for the repair of your septic system. The procedure for completing septic system repairs is shown below. Please contact me at the City offices if there are any questions. PROCEDURE FOR SEPTIC SYSTEM REPAIR 1. Hire a Site Evaluator/System Designer to do the soil testing and system design. 2. Submit the design to the City for approval. 3. Once the design is approved, have one or more contractors bid on the approved design. 4. The contractor you choose should then obtain a permit from the City before starting work. He will call the City for the required inspections. Sincerely, Stephen Weckman On-Site Systems Manager SW/ch Enc. Septic Report List of Septic Contractors and Site Evaluators/Designers Telephone (612) 473-7357 • FAX 473-0510 • UcDHN sGRENA 'AUG 1. 1 1993 4605 WATEFrTOVVN ROAD ORONO, MN 55359-9681 612-449-8952 FAx-449-9215 1 ]L1 )ROA 9 August, 1993 Mr.Kamil Ugerbil 2812 Benton Boulevard Minneapolis,MN 55416 Dear Kamil: Earlier today I received a visit from a member of Ostrom Construction (the builder who performed the renovation) who explained that you wanted them to examine the roof. After viewing the cedar shake locations which exhibit silicone and other waterproof caulk, he informed me that none of it had been applied during the roofs installation(ref. my letter dated 05, Aug. '93). He also told me that a portion of it had been applied by them,at your request,after a leak had developed. In addition, there is one area which is covered with what appears to be white or gray asphalt caulking compound; something which he is sure was not applied by the builder at any time. At this time I want to remind you that the thirty day period before we begin arbitration expires August 30, 1993;and you have yet to address the problems with the septic field. Si 11 `ice ohn F. Serena cc: John Watson,Esq., Siegel Brill&Partners John Pasnau;Roger Fazendin Realty Blue Lenox;Burnett Realty Curt Ostrom,Ostrom Construction Steve Weckman, Septic System Inspector,City of Orono JOHN SERENA 4605 WATERTOWN ROAD ORONO, MN 55259-9681 612-449-8952 F, x-449-9215 .$ 'AUG' 2 1993 30 July, 1993 Steve Weckman, Septic System Inspector City of Orono Municipal Offices PO Box 66 Crystal Bay,MN 55323-0006 Dear Steve: Pursuant to our telephone conversation earlier this week; we are ptoceeding with actions against the previous owner to correct the septic problems. As soon as we come to a settlement, repairs will begin. As more information becomes available I will advise you. 401-ly, na yam/ e . tJOHN BEREN, • 4605 WATERTOWN ROAD ORONO, MN 55: 59-9581 612-449-8952 RAx-449-9215 30 July, 1993 Mr. Kamil Ugerbil 2812 Benton Boulevard Minneapolis,MN 55416 Ref: 4605 Watertown Road Orono,MN 55359-9681 Dear Kamil: In the six months since my wife and I have purchased the above referenced property from you, we have discovered several major leaks in the roof, and have been informed by the City of Orono (dated 07-06-93) that we must replace the septic system within 90 days . Prior to the closing (01-29-93)you signed a Real Estate Transfer Disclosure Statement (dated 11-12-92) which indicates that the roof is less than four years old with no history of leakage; and that there has been no history of septic leakage or other problems. Since we were buying the house during winter months, we realized neither of these problems would have been immediately apparent. I questioned you specifically about the integrity of these systems, and you assured me that they were in perfect condition. Two independent roofing contractors have inspected the roof and found evidence of silicone caulk in the areas which leak,indicating prior knowledge of these conditions. Independent inspection of the septic system indicates that it had not been pumped in at least four years; and records from the City of Orono indicate that they had notified you of septic leakage as far back as 1990. In addition, Art Fries, longtime gardener for the property, states that the leakage from the septic field has been forming damp, muddy depressions in the northern lawn directly over the field for "several years". Estimates place the costs of these repairs at approximately $15,000.00 [FIFTEEN THOUSAND DOLLARS]. Please contact me within next thirty days to make arrangements for completing these repairs, or I will submit this complaint and all pertinent documentation to the Minnesota Association of Realtors for arbitration as per the purchase agreement, lines 135-148. Sig , ohn F. Serena cc: John Watson,Esq., Siegel Brill&Partners John Pasnau;Roger Fazinden Realty Blue Lenox;Burnett Realty Steve Weckman, Septic System Inspector, City of Orono✓