Loading...
HomeMy WebLinkAbout2015 Pool Site PlanLighting Ivey (18) SPJ Uplights (1) SPJ Uplight (1) Hadco Transformer / Photocell I NT �11JL CL U C,S All existing plant material $ rock in the construction area will be demoed and disposed of. Any transplantable plants will be moved t re -located at a later time. Pool company to be responsible for setting the correct grade of the pool$ concrete surfaces, Impact + Nyhro Design •Group will be responsible for any additional excavation for the retaining wall and grading of the drainage Swale. Ae recommend that the pool excavator do the additional grading $ excavation when they dig the pool will be project managed by Impact + 1 Iyhra, o Grass oeoNocopI ORONO COPY Pro os d Grade �ainage of Swale @ (-52")� (5) Glossy Black Chokeberry 0 _— Pool Equip, Pad 44") 0 Light Box Connection -ON @ (o") M @ (-44") mented Retaining Anchor Diamond �e Cut Ornamental Grass Wono 'oning Plan Review view Date: :D D WITH F- VISIONS (see notes) This landscape architectural rendering contains proprietary information and is protected unde U.S. copywright lain and may not be duplic ted / implemented without permissioH from Impact + f 1yhra design Group. 1, 1 2-(c6s, Coun*yw4t- P' w 206- 00t4Y Pwria 2,01 S - 0017(9 4= Z 0 O W a n RECEIVE® JUL 15 2015 CITY OF ORONO Powered by DynaSCAPP V S 9 Z 0 O W a n RECEIVE® JUL 15 2015 CITY OF ORONO Powered by DynaSCAPP