HomeMy WebLinkAbout2015 Pool Site PlanLighting Ivey
(18) SPJ Uplights
(1) SPJ Uplight
(1) Hadco Transformer /
Photocell
I NT
�11JL CL U C,S
All existing plant material $ rock
in the construction area will be
demoed and disposed of. Any
transplantable plants will be moved
t re -located at a later time.
Pool company to be responsible
for setting the correct grade of
the pool$ concrete surfaces, Impact
+ Nyhro Design •Group will be responsible
for any additional excavation for the retaining
wall and grading of the drainage Swale.
Ae recommend that the pool
excavator do the additional grading
$ excavation when they dig the pool
will be project managed by Impact + 1 Iyhra,
o
Grass
oeoNocopI
ORONO COPY
Pro os d Grade
�ainage of Swale @ (-52")�
(5) Glossy Black
Chokeberry
0 _— Pool Equip,
Pad 44")
0
Light Box
Connection
-ON @ (o")
M @ (-44")
mented Retaining
Anchor Diamond
�e Cut
Ornamental Grass
Wono
'oning Plan Review
view Date:
:D
D WITH F- VISIONS (see notes)
This landscape architectural rendering
contains proprietary information and is
protected unde U.S. copywright lain and
may not be duplic ted / implemented
without permissioH from Impact + f 1yhra
design Group. 1, 1
2-(c6s, Coun*yw4t- P' w
206- 00t4Y Pwria
2,01 S - 0017(9
4=
Z
0
O
W
a
n
RECEIVE®
JUL 15 2015
CITY OF ORONO
Powered by DynaSCAPP
V
S
9
Z
0
O
W
a
n
RECEIVE®
JUL 15 2015
CITY OF ORONO
Powered by DynaSCAPP