HomeMy WebLinkAbout2017 DeckLEGAL DESCRIPTION:
Lot 138, Spring Park, Hennepin County, Minnesota.
ton
qwmw
A: 11 O
LOT ARE ,780 SF
SCOPE OF WORK & LIMITATIONS:
1. Showing the length and direction of boundary lines of the legal description listed above. The
scope of our services does not include determining what you own, which is a legal matter.
Please check the legal description with your records or consult with competent legal counsel, if
necessary, to make sure that it is correct and that any matters of record, such as easements, that
you wish to be included on the survey have been shown.
2. Showing the location of observed existing improvements we deem necessary for the survey.
3. Setting survey markers or verifying existing survey markers to establish the corners of the
property.
4. Existing building dimensions and setbacks measured to outside of siding or stucco.
5. Showing and tabulating impervious surface coverage of the lot for your review and for the
review of such governmental agencies that may have jurisdiction over these requirements to
verify they are correctly shown before proceeding with construction.
6. Showing elevations on the site at selected locations to give some indication of the topography of
the site. We have also provided a benchmark for your use in determining elevations for
construction on this site. The elevations shown relate only to the benchmark provided on this
survey. Use that benchmark and check at least one other feature shown on the survey when
determining other elevations for use on this site or before beginning construction.
6. While we show a proposed location for this home or addition, we are not as familiar with your
proposed plans as you, your architect, or the builder are. Review our proposed location of the
improvements and proposed yard grades carefully to verify that they match your plans before
construction begins. Also, we are not as familiar with local codes and minimum requirements as
the local building and zoning officials in this community are. Be sure to show this survey to said
officials, or any other officials that may have jurisdiction over the proposed improvements and
obtain their approvals before beginning construction or planning improvements to the property.
7. Note that all building dimensions and building tie dimensions to the property lines, are taken
from the siding and or stucco of the building.
8. While we show the building setback lines per the City of Orono web site, we suggest you show
this survey to the appropriate city officials to be sure that the setback lines are shown correctly.
Do this BEFORE you use this survey to design anything for this site.
STANDARD SYMBOLS & CONVENTIONS:
"0" Denotes iron survey marker, found, unless otherwise noted.
LE6!ENI0
EXISTING CONTOUR
EXISTING SPOT ELEVATION
PROPOSED CONTOUR
PROPOSED ELEV,4TIOX/SPOT ELE'V4TION
DRAINAGE ARROX — FLOW
SILT FENCE/STRAW LOGS
9
945
945.5
SF
GRADING & EROSION CONTROL NOTES:
BEFORE DEMOLITION AND GRADING BEGIN
Install silt fence/bio roll around the perimeter of the construction area.
Sediment control measures must remain in place until final stabilization has been
established and then shall be removed. Sediment controls may be removed to
accommodate short term construction activity but must be replaced before the next rain.
A temporary rock construction entrance shall be established at each access point to the
site and a 6 inch layer of 1 to 2 inch rock extending at least 50 feet from the street into
the site and shall be underlain with permeable geotextile fabric. The entrance shall be
maintained during construction by top dressing or washing to prevent tracking or flow of
sediments onto public streets, walks or alleys. Potential entrances that are not so
protected shall be closed by fencing to prevent unprotected exit from the site.
DURING CONSTRUCTION:
When dirt stockpiles have been created, a double row of silt fence shall be placed to
prevent escape of sediment laden runoff and if the piles or other disturbed areas are to
remain in place for more than 14 days, they shall be seeded with Minnesota Department
of Transportation Seed Mixture 22-111 at 100 lb/acre followed by covering with spray
mulch.
A dumpster shall be placed on the site for prompt disposal of construction debris. These
dumpsters shall be serviced regularly to prevent overflowing and blowing onto adjacent
properties. Disposal of solid wastes from the site shall in accordance with Minnesota
Pollution Control Agency requirements.
A separate container shall be placed for disposal of hazardous waste. Hazardous wastes
shall be disposed of in accordance with MPCA requirements.
Concrete truck washout shall be in the plastic lined ditch and dispose of washings as
solid waste.
Sediment control devices shall be regularly inspected and after major rainfall events and
shall be cleaned and repaired as necessary to provide downstream protection.
12 Tr'ie�_ —" r/17chTTo
91. �
- _-- 75 -_
\^ '.T C'ylyl� Setback '' �^
J _ _
Flagpole-� _
d �1 Si/t Fence
ti - _ .h O', - , q 1
_ O %' Ian
V
EXiSIin, n... ,,.
MAY 3 2017
Streets and other public ways shall be inspected daily and if litter 07YToils--ha0140NO
deposited it shall promptly be removed.
If necessary, vehicles, that have mud on their wheels, shall be cleaned before exiting the
site in the rock entrance areas.
Moisture shall be applied to disturbed areas to control dust as needed.
Portable toilet facilities shall be placed on site for use by workers and shall be properly
maintained.
If it becomes necessary to pump the excavation during construction, pump discharge
shall be into the stockpile areas so that the double silt fence around these areas can filter
the water before it leaves the site.
Temporary erosion control shall be installed no later than 14 days after the site is first
disturbed and shall consist of broadcast seeding with Minnesota Department of
Transportation Seed Mixture 22-111 at 100 lb/acre followed by covering with spray
mulch.
SITE WORK COMPLETION:
When final grading has been completed but before placement of seed or sod an "as built"
survey shall be done per City of Orono requirements to insure that grading was properly
done.
When any remedial grading has been completed, sod or seeding shall be completed
including any erosion control blankets for steep areas.
When turf is established, silt fence and inlet protection and other erosion control devices
shall be disposed of and adjacent streets, alleys and walks shall be cleaned as needed to
deliver a site that is erosion resistant and clean.
835,2 20.,E `-Silt Fence
Existing Dwelling
950.9
( m
c
a
�
V
Q>
wit
I
Found
or ned
17
Q
�
�
w
m, °
S
00
`*A
**A
I
0
- - Install Rock
J
Construction
Entrance (Refer
to Notes)
-Silt Fence
I "
Site Plan Review Date: L I t''i
aPPROVED 2 s;
[APPROVED WITH REVISIONSgse6 ) 953
0 DENIED
StafF
NO COPY
DATE REVISION DESCRIPTION DWG ORIENTATION SCALE CLIENT/JOB ADDRESS I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR DATE SURVEYED: SHEET TITLE SHEET NO.
Advance
REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
9-29-16 REMOVED DECK AND ADJUSTED DRIVEWAY AREA SUPERVISION AND THAT I AM A WLY LICENSED CIVIL FEBRUARY 6,2016
5-01-17 ADDED DECKDUSTIN & CASIE KINDL ��� U LAWS OF TH STATE OF MINNESOTA. SURVEYED BY: ADVANCED SURV. PROPOSED SURVEY
Surveying &Engineering, CO. &ENGINEERING, CO.
2649 CASCO POINT ROAD Jos S. Rinke DATE DRAFTED: DRAWING NUMBER
N R S1
5300 South Hwy. No 101 52716
ORONO MN Minnetonka, Minnesota 55345 LICENSE NO. AUGUST 16, 2016 # 160775 JR
0 10' 20' Phone (952) 474-7964 August 16, 2016
Web: www.advsur.com DATE SHEET 1 OF 1