HomeMy WebLinkAbout2017 Foundation As-BuiltLEGAL DESCRIPTION:
Lots 3 and 4, Block 1, and Outlot 1, Tillson's Villa Carman.
Subject to an easement for driveway purposes over that part of Outlot 1, Tillson's Villa Carman lying
between the Southeasterly line of Blaine Avenue and the Northwesterly extension of the Northeasterly
line of Lot 2, Block 1, Tillson's Villa Carman, to the Southerly line of Lot 1, Block 1, said addition.
Together with a 15.00 foot wide perpetual easement for ingress and egress purposes lying over, under
and across part of Lot 1, Block 1, Tillson's Villa Carmen, according to the recorded plat thereof,
Hennepin County, Minnesota. The center line of said easement is
described as follows: Commencing at the most northerly corner of said Lot l; thence on an assumed
bearing of South 51 degrees 22 minutes 15 seconds West, along the northwesterly line of said Lot 1, a
distance of 44.00 feet to the point of beginning of said center line; thence South 11
degrees 18 minutes 15 seconds West, a distance of 18.39 feet; thence southwesterly, a distance of 28.21
feet, along a tangential curve, concave to the northwest, having a radius of 135.90 feet, and a central
angle of 11 degrees 53 minutes 30 seconds; thence southwesterly, a distance of 36.18 feet, along a
reverse curve, concave to the southeast, having a radius of 137.62 feet and a central angle of 15 degrees
03 minutes 46 seconds; thence South 08 degrees 07 minutes 59 seconds West, tangent to said curve, a
distance of 15.73 feet; thence southerly, a distance of 5.52 feet, along a tangential curve, concave to the
east, having a radius of 13.00 feet, and a central angle of 24 degrees 21 minutes 00 seconds; thence
South -16 degrees 13 minutes 01 seconds East, tangent to s.aid curve, a distance of 48.89 feet; thence
North 89 degrees 11 minutes 06 seconds East, a distance of 25.61 feet to an easterly line of said Lot 1
and there terminating. The said lines of said
easement shall be prolonged or shortened to terminate on said northwesterly and easterly lines of said
Lot 1.
SCOPE OF WORK:
1. Showing the length and direction of boundary lines of the above legal description. The scope
of our services does not include determining what you own, which is a legal matter. Please
check the legal description with your records or consult with competent legal counsel, if
necessary, to make sure that it is correct, and that any matters of record, such as easements, that you
wish shown on the survey, have been shown.
2. Showing the location of existing improvements we deemed important.
3. Setting new monuments or verifying old monuments to mark the corners of the property.
4. Showing elevations and contours to show the topography of the site. The elevations shown relate
only to the benchmark provided on this survey. Use that benchmark and check at least one other
feature shown on the map when determining other elevations for use on this site.
5. Showing and tabulating hard cover and area of the lot for your review and for the review of such
governmental agencies as may have jurisdiction over hard cover requirements.
6. While we show a proposed location for this home or addition, we are not as familiar with your
proposed plans as you, your architect, or the builder are. review our proposed location of the
improvements and proposed yard grades carefully to verify that they match your plans before
construction begins. also, we are not as familiar with local codes and minimum requirements as the
local building and zoning officials in this community are. Be sure to show this survey to said
officials, or any other officials that may have jurisdiction over the proposed improvements and obtain
their approvals before beginning construction or planning improvements to the property.
7. Note that all building dimensions and building tie dimensions to the property lines, are taken from
the siding and or stucco of the building.
STANDARD SYMBOLS & CONVENTIONS:
" • Denotes 1/2" ID pipe with plastic plug bearing State License Number 42379, set, unless
otherwise noted.
PROPOSED ELEVATIONS
FIRST FLOOR (FINISHED) = 956.80
TOP OF FOUND. (VARIES) = 956.55
BASEMENT FLOOR (VARIES) = 945.60
GARAGE FLOOR = 945.60
TORNADO SHELTER FLOOR = 935.60
GRADING & EROSION CONTROL NOTES:
BEFORE DEMOLITION AND GRADING BEGIN
Install silt fence/bio roll around the perimeter of the construction area.
Sediment control measures must remain in place until final stabilization has been established and then shall be
removed. Sediment controls may be removed to accommodate short term construction activity but must be
replaced before the next rain.
A temporary rock construction entrance shall be established at each access point to the site and a 6 inch layer
of 1 to 2 inch rock extending at least 50 feet from the street into the site and shall be underlain with permeable
geotextile fabric. The entrance shall be maintained during construction by top dressing or washing to prevent
tracking or flow of sediments onto public streets, walks or alleys. Potential entrances that are not so protected
shall be closed by fencing to prevent unprotected exit from the site.
DURING CONSTRUCTION:
When dirt stockpiles have been created, a double row of silt fence shall be placed to prevent escape of sediment
laden runoff and if the piles or other disturbed areas are to remain in place for more than 14 days, they shall be
seeded with Minnesota Department of Transportation Seed Mixture 22-111 at 100 lb/acre followed by covering
with spray mulch.
A dumpster shall be placed on the site for prompt disposal of construction debris. These dumpsters shall be
serviced regularly to prevent overflowing and blowing onto adjacent properties. Disposal of solid wastes from
the site shall in accordance with Minnesota Pollution Control Agency requirements.
A separate container shall be placed for disposal of hazardous waste. Hazardous wastes shall be disposed of in
accordance with MPCA requirements.
Concrete trucks must reclaim and recycle all waste concrete.
Sediment control devices shall be regularly inspected and after major rainfall events and shall be cleaned and
repaired as necessary to provide downstream protection.
Streets and other public ways shall be inspected daily and if litter or soils has been deposited it shall promptly
be removed.
LE6EYT
F,XI.STING CONTObRr
EXISTING SPOT ELAWMI0.1V
PROPOSED CONTObRr
DRAINAGE' ARROF - FLOF
SILT FE1VCL/STR4#` LOGS
TREE REfOYAL
AS—BUILT ELEVATIONS
TOP OF FOUNDATION = 956.5
TOP OF FOUNDATION = 956.0
955
X 955.5
955
of
0 A
,
09
/ -_-------
00 / - /
ok , / _ _ _/_ Instal/ Silt
Fence'' 951
9
Exis
A* Garage
WlIII M.
j Easement for ingress t _ _^ N , - 01
/ and egress.
R=13.00
L=5.52-'
1 � \
Z=2421'00" \ ++
Q;,
\ \
6" Pine
\
`V t
Cedar
25.61 �sr ���
Q \ l f0" Tree
J
/
i
/
/
I '
1
,
/
Corner of garage,'
is ,1.2 North of the
lad line. Frederick Street
N 90,'00'00" E
/
- - -'33.00
`� ,
inFloor
�-
+/a d -7
05e
Q!oP
N '
O o -
/� co N 8971 06 b
ting
t
(/) \ \ 1B" Tree _ Ex/st. e x I S
i I Q, Ret. ' -Wall ss� I j ng
7 e
r / - Install Silt \ �`SO ` \ ArO� 0" e \ 16 \ . D
Fence `, v v v �v Exist. 1 v
-Conc. Woter `°' r' _
Feature , ti
\aEosemeht for driverxoy �urposes �pe rotd o S
If necessary, vehicles, that have mud on their wheels, shall be cleaned before exiting the site in the rock
entrance areas.
Moisture shall be applied to disturbed areas to control dust as needed.
Portable toilet facilities shall be placed on site for use by workers and shall be properly maintained.
.� e5 56..�let. Wall
q�,0 `sem trr r 9- -
O o o
` lI /nsta/l Si/t �� ti
Fence �� �" Wd 116 1
q d3 5 �/`���� " �� EXISt%ng �X
� � OBJ Ret.
Install Rock ', ° '� 5 ' �� 4y X1(2 . e, �1 qo° for hot tub
�� QD Construction ',7T 5 OQ�' �o ` - 94a `"9� 2ga,��� ,e9 52d 1•Z "' X65 Cedar, Tree
Entrance `,N 76'\ 'ra Oo O�h 0
Per Notes OP .00
e.Ot
Q) 6BW- -5.
-
i
- ,► Q A (,l
IN JPO 60
J 6 p 11 pQ V � �9y �e `` - -/ � � _95-
-949
'Prop.
y`-`7i'et. Wa// �� ----------._/ .947
9 , l _948 _ - _ -- _– -
3,
If it becomes necessary to pump the excavation during construction, pump discharge shall be into the stockpile
areas so that the double silt fence around these areas can filter the water before it leaves the site.
Temporary erosion control shall be installed no later than 14 days after the site is first disturbed and shall
consist of broadcast seeding with Minnesota Department of Transportation Seed Mixture 22-111 at 100 lb/acre
followed by covering with spray mulch.
SITE WORK COMPLETION:
When final grading has been completed but before placement of seed or sod an "as built" survey shall be done
per City of Orono requirements to insure that grading was properly done.
When any remedial grading has been completed, sod or seeding shall be completed including any erosion
control blankets for steep areas.
When turf is established, silt fence and inlet protection and other erosion control devices shall be disposed of
and adjacent streets, alleys and walks shall be cleaned as needed to deliver a site that is erosion resistant and
clean.
/ n `�Propo ao - -- --� ---
- - - - — _ - -
' a� c r Sed Hca "- _� -- _Jt/l. - __94 -A-
-94
A-,
-
94707W*- .-------- _ -_. __----._ - _--944-' ,,"
�4/-------*0 �s -943
47
SF-- _-
+o '-Prop. Ret. Wa//
945
SV
ol
944- - Install Si/t J-
Fence
09,
' �' '�S r �, .►- � 0 j - _ - � — b � � � ;mss`'" / ,�, ' � /
g i / _ ! - �� . ' j9'Q
\IIIA
12" fret'
/ o"i 1500 �� �•,
` 940------ v -
Contour
-
' n
c
RECEIVED
FEB 01 2017
Advance
Surveying & Engineering, Co.
5300 South Hwy. No 101
Minnetonka, Minnesota 55345
Phone (952) 474-7964
Web: www.advsur.com
I HEREBY CERTIFY THAT THIS PLAN, SURVEY OR
REPORT WAS PREPARED BY ME OR UNDER MY
DIRECT SUPERVISION AND THAT I AM A DULY
REGISTERED LAND SURVEYOR UNDER THE LAWS
OF THE STATE OF MINNESOTA.
Wayne W. Preuh
# 43503
LICENSE NO.
FEBRUARY 1, 2017
DATE
I DRAWING ORIENTATION & SCALE
N
M M M
CLIENT NAME /JOB ADDRESS
MURP Y &
CO. DESIGN
2480 CASCO PT. RD.
ORONO, MN
DATE REVISION DESCRIPTION
12/1/20171 FOUNDATION AS—BUILT
DATE SURVEYED: OCTOBER 6, 2015
DATE DRAFTED: AUGUST 19, 2016
nl Ir -PT -ri" r -
FOUNDATION
AS -BUILT
DRAWING NUMBER
# 170035
SHEET NUMBER
S1
SHEET 1 OF 1