Loading...
HomeMy WebLinkAbout2015 As-Built�q8 60 G QR AV .01001 Ile 10001" 000, ezel 0000�1 .000, As Built Grading Plar Entry llu n C11 -Existinspigg;J, g - — 0', _z Heated J Concrete I r 0 10 20 30 40 50 FT CP OF ORO- NO —SITE PLAN C4 GRUNGPLAN lEr,APPROVED 0 APPROVED WITH REVISIONS 01 DISAPP OV BY DATE I RECEIVED DEC 18 2o15 CITY OF ORONO NOTES CRITERIUMA a SCHIMNOWSKI ENGINEUS Paul Schimnowski Criterium-Schimnowski Engineers 161 Dunbar Way, Mahtornedi, MN 55115 (651) 779-7700 r)schirnnoa_criteriurn-schimnowsVi corn 1 "I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision, and that I am a duly Licensed Professional Engineering under the laws of the State of Minnesota." Paul D Schimnowski, Reg. No. 40126 Date DescrO m - Terra orma 'DESIGN H AHN RESIDENCE SCbLE 111=201 DRAM BY D-ECKD BY DATE DATE CF PFUT iv &v 0 � 2615 - 0044-1 M-E)Ullf a LONG LAKE/ IIN Temporary Erosion Controf and Sequencing LEGAL 0[-:'_­%CRlPTlr)N OF PIRF-DAISES L lnslQfl perimeter control fencing per the stcindard detail plates. No more than The South 354�75 fee� of the Ea-st 990 feet, except tie North '150 feet of the 600 line -or feet of silt fence should be cc)nt`inuQus arid collecting CIL one point. llsimlies" c4 silt fence. East 3213A feel thfreof, of the Southeost Quarter of 'the Southwest Quarter of Uodulalke the silt fence or use or crescents el :�ection 27, Township 116 -1 North, P,-!7qe 23 i'/est of the 5th Prit cipal �Aeridian. 3install -1 slope grading Use horizonta ei -05iDn control around any ternporcry dirt stockpile areas. 4. The contractor for the project shall inspect all erosion control BK4P' S after e=h rainfall and repro it as necessary unci remove sediment from silt' Fences, Denotes Iron Marker if it rcur-hes 1/3 copacil:Y. 5. The contractor shall schedule his operatlon,5 to minimize the amount of oil Denotes Proposed Spot Elevation disturbed urea at any given time, The contractor shall ftit his activities to the QrodIng lin-iits as shown. (a — 920 Denotes Existing Contour Line 5. lemove fill ternporary efAP1 s once the site hos reached finol stabilization Liniform perennial vegetative cover with a density of 70 percent over all pervious —920 Denotes Proposed Contour Line surface ureas), Permanent Erosion Controi i. All exposed polls on site must be sl�ab`iilzed with in 3 days: j - 4:1 consists of disc—anchored . Stabilization an slopes Rottor than f L This survey intends to show the boundaries of the obove, described property. mulch and seed; stubilization on slopes flatter than 4:1 and irtl areas Gonsists of erosion blankets and seed, the loccition of an existing "hardcover", house, building, and play house, the Ifocation of ii spot 4. 1 of Concentratedfloyis Teporcry rnulch and seed is needed for exposed areas which sit fallow for m7 all visiblF-, orad the proposed location of proposed pool, to ._J:1 or steeper in 7 cloys �,i to '10:1 in 14 days, and flatter than, 10:1 in 21 'n,eed elevations, and grades thereon, It dais not purport show any other day's. Also 0[)en stocl,�,Pllle_s' to have terriporqry stabilization V they are to trilprovemients or encroachryient5. renioin inactive for mare than 7 dciys, �q8 60 G QR AV .01001 Ile 10001" 000, ezel 0000�1 .000, As Built Grading Plar Entry llu n C11 -Existinspigg;J, g - — 0', _z Heated J Concrete I r 0 10 20 30 40 50 FT CP OF ORO- NO —SITE PLAN C4 GRUNGPLAN lEr,APPROVED 0 APPROVED WITH REVISIONS 01 DISAPP OV BY DATE I RECEIVED DEC 18 2o15 CITY OF ORONO NOTES CRITERIUMA a SCHIMNOWSKI ENGINEUS Paul Schimnowski Criterium-Schimnowski Engineers 161 Dunbar Way, Mahtornedi, MN 55115 (651) 779-7700 r)schirnnoa_criteriurn-schimnowsVi corn 1 "I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision, and that I am a duly Licensed Professional Engineering under the laws of the State of Minnesota." Paul D Schimnowski, Reg. No. 40126 Date DescrO m - Terra orma 'DESIGN H AHN RESIDENCE SCbLE 111=201 DRAM BY D-ECKD BY DATE DATE CF PFUT iv &v 0 � 2615 - 0044-1 M-E)Ullf a LONG LAKE/ IIN