Loading...
HomeMy WebLinkAbout1999 Site Plan01998 Westwood Professional Services, Inc. — J Bearing are based on assumed data. O Demotes iron monument set — 9 Denotes iron monument found REVISIONS i y i 14 N�• l� t L _ � � � � 1 ` 1 i r / ��2-1�ollon pre— cast septic tanks y 1000 gallon, t V r � ump tank t'� _ v . / ( proposed 4 // f I l� bedroom home p I I I j 50 I 73.5 suggested deep ! r`118 / / { well location !x. df Property line owl r. Stackplleltest pit area d i Edge of toe 01 disturbed 21.5 S63 1�I"i ma I area ry J i� --Ease of ', ., / Septic { disturbed ;" S82 Site ( 3 f area aioQ Sol 18.6 12.7 20.950 / i s g ' 'IVC N toe of mound ON l 1O ^d __--_-•-1G2�, 1022.1 bed o SB4 rock 1022 1 Alternate X022 ' t, 585 Septic 10 -_ S86 20.� Site V - -- 2 .3 --- 5 I� , 111 . � •` l ____ ..._ 1 t \\ r Benchmark � ; �, :�:• 1t Top of rebar elev =1024.82 - r I I percolation test ho% floor = 1013.3± Proposed sod boring block = 1022.1± -- --- ----- - ex/stmg spot elevation o q Q 15.00 I EARTH WORK CAL CULA TIONS ❑/ E/evert/ons relative and assumed Tota/ soil moved = 1500-2500 Cr p Elevations relative to U. S. G S. 1929 N G" VD. I = 213 CY proposed 4 Denotes proposed surface dra/nage Net so//s moved ° d l q bedroom° home ,I I II 22.00�.14.0 00 III 000`' . on the topographic survey - Prevo/us elevat/on contour which was provided by the client. 22.00 � � 28.00 I - - I - -------------- -,7.0 .5� -- _- -1.0 A' -� 15.00 I I HOWE DE7AL NO SGALE LEGEND Q percolation test ho% floor = 1013.3± Proposed sod boring block = 1022.1± 92X4 ex/stmg spot elevation 92X4 proposed spot e%votion EARTH WORK CAL CULA TIONS ❑/ E/evert/ons relative and assumed Tota/ soil moved = 1500-2500 Cr p Elevations relative to U. S. G S. 1929 N G" VD. Soil in stockpile/ test pit area = 213 CY Denotes proposed surface dra/nage Net so//s moved = 1287 to 2287 CY Current elevat/on contour Note: The range in the total cubic yards of soil moved on the site is due to inaccuraccies found on the topographic survey - Prevo/us elevat/on contour which was provided by the client. - - L/m/t of- drstur ed_ Ods _ - Prim cry Mound Qu an ti ties t �`� `•, 3/4"-2 1/2" clean rock for rock bed - 18.5± cubic yards ' Clean Sand fill - 1601 cubic yards t topsoil for cover - 82 cubic yards Loamy sand for cap 101 cubic yards GRAPHIC SCALE 9Q—jr .'` \ ` 40 0 20 40 80 160 7 Y Exlstfng 15` ( ) culvert IN FEET t ?' 1 inch = 40 ft. ,t *t�" � ,lam / •t > � ' � �'`.� !x$y3� '`` B,4_r Is lj�ROAP. 1\• i �S L• • 84) r-- -- i-- — fi--L -_ --- ------- -- ---- Westwood MI�IMNOod Professional Services, Inc 104 Marty Drive Suite 3 Buffalo, MN 55313 612 682-2587 PROPOERTY L OCA TION: L of 7, Block 7, SA YS/DE HILL S Hennepin County, Minnesota. DESIGNED 6CM CHECKED SAG DRAWN BCM Septic System Site Plan ORONO House Elevations Proposed lowest floor = 1013.3± Proposed top of block = 1022.1± Proposed garage finish CITY OF O ONO SITE ISI' G ING PLAN t ❑ AF� ❑ D' °, , No tes.• 8Y DATE 7. Avoid compaction of mound area before, during and after construction 2. Verify before drilling that no septic tanks or sep tic areas are within a 50 foot radius of proposed well location. 100 feet for sh o//Ow well) ,3 l`erify before construction that no Sha//ow we//s are within 100 feet, or deep we//s within 50 feet of proposed septic tanks or mound area. 4. To extend the life of septic system pump septic tanks o minimum of every 2 years. 5. See attached sheets for additional construction details. 6. Soil Classified as L erdal loam (L mB) 1-4.51. slopes, according to the US Deportment of Agriculture sol/ Survey 7. Site p/an prepared by or under the supervision of Bernie Mi/ler- M.P. C.A. License No. 43 PREPARED FOR: Divere fled Construction 7010 H WY 7 SL Louie Park, Mit. DATE 12/22/96 ,10B NO .� 98EM