Loading...
HomeMy WebLinkAbout2017-01359 - adv plan review CITY OF ORONO * 2 0 1 7 - 0 1 3 5 9 2750 KELLEY PARKWAY DATE ISSUED: 10/19/2017 ORONO, MN 55356- 952 249-4600 FAX: 952 249-4616 ADDRESS 1669 NORTH FARM RD PIN 27-118-23-44-0008 LEGAL DESC THE FARM AT LONG LAKE LOT 007 BLOCK 001 PERMIT TYPE ADVANCED PLAN REVIEW PROPERTY TYPE RESIDENTIAL CONSTRUCTION TYPE ADVANCED PLAN REVIEW VALUATION $ 15,000.00 APPLICANT ADVANCED PLAN REVIEW 181.20 TOTAL 181.20 KEENAN& SVEIVEN,INC. Payment(s) 15119 MINNETONKA BLVD. CREDIT CARD 0048 181.20 MINNETONKA,MN 55345- (952)475-1229 Minnesota State License#:BUIL-7252 OWNER BEENDERS&PETER MONTGOMERIE,ANTOINETTE 1669 NORTH FARM RD LONG LAKE,MN 55356- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the State Building Code.This permit may be revoked at any time for use. n ermitee Signature Date Issued By Signature Date • PLAN REVIEW CHECKLIST FOR NEW STRUCTURES //��.JADDITIONS Address: 1,(�_WV_B1�1YL PermitNo.: L. 1 / —61J(a) Description of work: ) Date Rec'd: 0.1'L'1•f'7 Septic review by: Date Approved: Zoning review by: Date Approved: 10- 2—+11 Building review by: 'NU�I/W 0 /VV r Date Approved: Grading review by: VAI Date Approved: Zoning District: A Zoning File#: Resolution? Yes Reso#: Reso Date: Signed: Yes No Resolution / NA Zoning: LCCo((tt�Area: SF/AC Width: Structural Coverage: SF % .Stnv y ubrhitted: 0 Yes 13 No Date of Survey: Revised date(?): Landscape plan submitted? 13 Yes Landscaper: 0 No/ None proposed Proposed Setbacks: 7Fni'(Lake) Rear(Street) ( N S E W ) ( N S E W ) Other Buildings Wetland Side Side Buildina Hei ht Analysis: Distance Between First Floor and defined Top of Roof*(see"building height" (a) definition): First Floor Elevation from building plans): (b) Highest Existing ground level (per survey) or 10' above lowest ground level, (c) whichever is lower: Difference between b and (c)*: (d) d DEFINED HEIGHT *If highest existing adjacent grade is above FFE-Height is(a) -(d): (e) *If highest 4xistinadjacent grade is below FFE-Height is a + d Shoreland District MCWD Permit Average Lakeshore Setback Bluff Met? rxs 13 No Permit Number: es 0 No 0 N/A 0 Yes D INO 40 N/A—see attached Setback: Stormwater Quality Existing Proposed Overlay District Tier Hardcover Hardcover Variance Required CUP Required circle one % and sf % and sf ( E3 Yes No 13 Yes No 1 2 3 4 5 Type(s): Type(s): Updated: June 2017 z:\forms\plan review checklist 06-2017.docx Fees to be Charged YES NO Permit U Plan Review State Surcharge Investigation Fee SAC—Number of SAC Units Other(specify) S uare Footage $ per Square Foota e Basement X = $ 1s' Floor X = $ 2nd Floor X = $ Garage X = $ Estimated Construction Value: $ Orono Inspections Required Work Requiring Separate Permits V/,Footing ❑ Site ❑ lumbing ❑ Grading/Filling ❑ Poured Wall ❑ Silt Fence/Erosion Control ❑ Mechanical ❑ Fire ❑ Foundation Survey ❑ Hardcover Removal ❑ ireplace 13Water Connection ❑ Framing ❑ Other(specify) 1❑ Masonry 13 Sewer Connection ❑ Waterproofing/Drain tile ❑ Mfg. ❑ Lawn Irrigation ❑ Foundation Waterproofing ❑ Other(specify) ❑ Landscaping 'M-Framing ❑ Septic �❑ Insulation ❑ As-Built Survey Final ❑ Lathe Required State Permits ❑ Other(specify) ❑ ell Electrical REMARKS (in-house): OFFICIAL REMARKS -TO BE NOTED ON PERMIT AND INITIALLED: ❑ See Builder Acknowledgement Form �"rior to release of escrow money an as-built survey and hardcover calculations must be submitted and approved. Updated: June 2017 z:\forms\plan review checklist 06-2017.docx