Loading...
HomeMy WebLinkAboutfailing septic system CITYof ORONO ",�►� >' : r41, � -�� ,� Municipal Offices Street Address: �! Mailing Address: �9$EgH0 2750 Kelley Parkway P.O. Box 66 Orono, MN 55356 Crystal Bay, MN 55323.0066 October 21, 2002 MICHAEL J &JILL DYER 4115 WATERTOWN RD MAPLE PLAIN MN 55359 Dear Mr. Dyer: This letter is regarding the failing septic system on your property. After several inspections in the past and an inspection performed last week, it appears that your septic system is still surfacing and classified as an imminent health risk that must be replaced next spring, 2003. I sent you a letter on 11-16-01 that your drainfield was surfacing and must be repaired in the summer of 2002. That day has come and gone and your drainfield is still surfacing. If we do not receive contact with you on how you are going to address this matter by November 1,2002 we will be forced to turn this over to our attorney for prosecution. This is a very serious issue that must be addressed immediately. A failing septic system is a hazard to your family, pets and to your r_zighbors. Efforts must be made immediately to stop the surfacing of raw sewage on the surface of the ground until a new drainfield is installed. One temporary option to get you through this winter is to use your septic tanks as holding tanks. The tanks would be pumped until a new drainfield is installed next spring. This would stop sewage from going into your drain field and surfacing on the ground. Please contact me at 952-249-4600 to discuss this matter further so we can get this problem taken care of as soon as possible. Sincerely, Matt Bolterman On-Site Septic System Manager Encl: Past violation notice Telephone(952)2494600 • Fax(952)2494616 www.ci.orono.mn.us 10/30/2002 14:00 6123375858 CODY MANAGEMENT CORP PAGE 01 Jill & Michael Dyer 4115 Watertown Road Maple Plain, MN 55359 952-476-6030 October 30,2002 Matt Bolterman City of Orono P.O Box 66 Crystal Bay, MN 55323-0066 Fax: 952-249-4616 Dear Matt: Regarding your letter of October 21,2002. I apologize that my response is toward the end of your November 1 deadline. I was out of town and did not receive your letter until October 28. I was very surprised by the tone of your letter and your indication that legal action was the next recourse. Your letter seems to imply that I have done nothing to get my system repaired and that is just not so. First off,receipt of your letter of 11/16/01 was the first time I was made aware that my system was not in compliance. I took immediate action and contacted Sullivan and Atco. Even though,it had not been required,the system was pumped at that time. They told me there was nothing they could do till spring. Through them I contacted S —P Testing who agreed to evaluate my situation. ,Ater several visits S-P provided me with a design which I hand delivered to you in July. At the same time I provided a copy to a contractor recommended to me. Due to the wettest summer in recent history, he is behind and keeps assuring me that the work will be completed this year. I will forward your letter to him,but I can't dictate someone else's schedule or control the weather. Sincerely, Michael Dyer