Loading...
HomeMy WebLinkAbout2000-P03305 - ventilation PERMIT CITY OF O RO N O permit Number: 270-Kelley Parkway - PO Box 66 P03305 Crystal Bay, Minnesota 55323 Permit Type: Mechanical Permits (612) 249-4600 Date Issued: 11/21/20 SITE ADDRESS: 4115 Watertown Rd MAPLE PLAIN,MN 5 53 59 PID: 31-118-23-41-0014 DESCRIPTION: Proposed Use: Residential Permit Class: General Permit Type: Mechanical Permits Permit Sub-type(s): Ventilation DETAILS: Approved per resolution#: Separate permits required: NOTICES/REMARKS: FEE SUMMARY: Permit Fee: $ 35.00 Valuation: $ 1,500.00 State Surcharge Fee: $ 0.75 TOTAL FEE: $ 35.75 APPLICANT: B&C PLUMBING OWNER: M J DYER&J DYER 990 5TH Ave SE 4115 WATERTOWN RD HUTCHINSON,MN 55350 MAPLE PLAIN MN 55359 THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL IMPROVEMENTS SPECIFIED AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL CITY OF ORONO ORDINANCES AND STATE OF MINNESOTA BUILDING CODE REQUIREMENTS. A PLPERMITEE IGNATURE PSUED BY SIGNATURE Copies: City,Applicant,Assessor,Finance Pagel � - ko 3 CITY OF ORONO JUMLICATION FOR MECHANICAL T. Box 66 (2750 Kelley Parkway) Crystal Bay, MN 55323 GE111ERAL INFORMATION 1. _ You may apply for mechanical permits by mail or in person at the City offices. 'Applic8tio will be reviewed and a permit will be issued within 2 working days. 2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS POSTED ON THE JOB SITE. 3. Mechanical Desiens - Complete calculations, details and specifications are required for each heating, ventilation, humidification-dehumidification, and air conditioning installation including heat loss/heat gain calculation, design temperatures, equipment ratings and identification as to type, manufacturer and model. Data shall be presented on form provided. Identification of and specifications for water heating equipment shall also be provided. 4. When any new construction or remodeling is involved, a separate building permit must be 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code, 6. All work must be inspected(rough-in and final). Call 249-4600. 24-hour notice required, 7. House Heating Test Record must be submitted before final. Instructions Complete all items on this application. Compute the permit fee. Sign and date the certification. INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call 249-4600. Please check one: New ✓ Addition Rr Replace l._Residential Commercial JOB SITE: S'� Zip: Owner's Name: Telephone Number: Mailing Address: S City: Zip: Contractor's Name: xg Telephone Number: Mailing Address: �CfU S` S City: s G Zip: s^ SYSTEM DESCRIPTION HEATING SYSTEMS Quantity Make: , Model: Fuel: Flue Size: j Input BTUs: Output BTUs: CFM: r COOLING SYSTEMS Quantity: 1, Make: Model Tons: H. Power FIREPLACES Gas factory fireplace Wood burning factory fireplace with flue Wood Stove Wood stove with flue Brand Name Model No. VENTILATION No. Kitchen Exhaust ducted recirculating cfm No. 2 Bath Exhaust (must be ducted outside) cfm No. Other Fans: Locations cfm FUEL STORAGE (MUST BE APPROVED BY FIRE MARSHAL) Installation Removal Fuel oil: gallons underground inside outside LP Gas: gallons Other Gas opening PERMIT FEE CALCULATION 1. 1.25% of Contract Price* or Minimum Fee ($35.00) x .0125 $ IS-DD (contract price) 2. State Surcharge. ** Add the State Building Code Division Surcharge to each permit. x .0005 $ or $.50, whichever is greater (contract price) 3. Postage and Handling (Only mail-in applications) $ 1.50 4. TOTAL PERMIT FEE (Add lines 1-3 above) $ * CONTRACT PRICE or JOB COST means the actual or estimated dollar amount charged for the permitted work including materials,labor,profit,and other fixed costs. It is the amount to be charged to the customer for the work done. If any material, equipment, labor, or installation are furnished by the owner,tenant or any other party the reasonable market value of such items must be added to the estimated cost or contract price for permit fee purposes. In the event that there is a dispute on the amount of the job cost,the City may request the submission of a signed copy of the actual contract. ** The STATE SURCHARGE is .0005 of the contract price under$1,000,000 or $.50-whichever is greater. For valuations over$1,000,000 call the Department of Inspectional Services for the price. The undersigned hereby applies to the City for issuance of a Mechanical Permit, agrees to do all work in strict accordance with the ordinances of the City and the regulations of the Minnesota State Building Code, and certifies that all statements made on this application are complete, true and correct. Applicant's Signature: Date: 1112 Approved By: Date: