HomeMy WebLinkAbout1996-00847 - replacement septic PERMIT
CITY OF ORONO PERMIT TYPE:
2750 Kelley Parkway- P.O. Box 66 SEWER & WATER
Crystal Bay, Minnesota 55323 Permit Number: 0:047
(612)473-7357 Date Issued: -
0
C36/07/99.
SITE ADDRESS:
: 780 WATERTOWN RD
LSV
DESCRIPTION:
REPLACEMENT SYSTEM
Sewer & Water Permit Type NEW SEPTIC SYSTE
Sewer t, Water Worte Type RESIDENCE
REMARKS:
FEE SUMMARY:
Base Fee $100. 00
Surcharge ----------I—E r
Total Fee $100. 50
CONTRACTOR: - Applicant - OWNER:
SWEDLUND SEPTIC: SERVICES 5442SSSS CRAM KAY
9520 LAKE TOWN RD 3780 WATERTOWN RD
CHASKA MN 55318 ORONi i MN 55359
(61 2) 442-5855
r 3
m
THE UNDERS I GNEL. .HEREBY RETESTS PERMI,PERSS I ON 1'Q MANE THE RIS L ��NT'
SPEC tF I ED SAND TREES Tri D ALL' WORK IN STRICT COMPLIANCE W � TTY, OF
LC+RC�NCi DRUI ES AND STATS I DINE CiTA C-�tf I LD I NCa CEDER S,
APPLICANT/PERMITEE SIGNATURE ISSUED BY:SIGNATURE
s
CITY OF ORONO SEPTIC SYSTEM PERMIT APPLICATION
Box 66 (2750 Kelley Parkway)
Crystal Bay, MIN 55323
JOB SITE
ADDRESS: �] O CU'A 1 E�2-T tJ 1.-� ZA a
Occupancy Type: Residential Commercial Other
Permit Type: New or Replacement System, $100.00 100,0v
Repair Existing System, $ 50.00
(Tanks or Drainfield)
0.50 State surcharge added to above fees
`See fee schedule for non-residential permit fees
Owner's Name: eA C e A
Phone Number: Gr7 3
C�F6T� City: 0�'�'yv � tip: SS <S9
Mailing Address:
Contractor's Name: �wkd lei w S� {o-F!C� Phone Number: �(
City: d4
Mailing Address: �tio wria gsn�r� tip: 5a3iB
DO NOT MAIL PAYMENT WITH THIS APPLICATION
GENERAL INSTRUCTIONS
1. Applications for septic system permits may be mailed or submitted in person at the City
Offices; however, permits will not be mailed out. The permit must be picked up in
person at the City Offices and work must not begin unless the permit card is on the job
site.
2. Permits will be issued only to contractors holding a City of Orono Septic System
Installers License.
3. All work must be done in accordance with the approved septic system design. Design
reports are not considered approved unless accompanied by the "City of Orono Septic
System Approval" cover sheet signed by the City Inspector.
4. The following inspections will be required for all septic systems:
A. Pre-installation site inspection to include inspector, installer, and general contractor.
B. Tank installation prior to covering.
C. Drainfield trench installation prior to covering. For mounds, inspection is required
after rough-up but prior to sand placement (sand will be jar tested for silt content),
and again during pressure distribution piping installation in the rock bed. station
D. Final inspection to verify proper final cover depths and to verify e that all pump
(where required) components are functional and comply with codes.
5. Individual holding MPCA Installer Certificate shall be present during inspections. A 24-
hour notice is required for all inspections.
A >
NOTE: Applicant must initial all spaces. Fill in all appropriate blanks, check all appropriate
boxes.
1. I have received a copy of the system design including the City of Orono
Septic System Approval Cover Sheet.
2. I will be installing e following: ii
A. Tanks: _ Precast Concrete _ Other Manufacturer eller
Tank Capacities: 1) o�00 gal 2) /�F� gal. 3) leo b
B. Pump Station (if required) attachum curve &
Pump make & model Q�La /nG �. A jd m at p feet of head.
literature); system design requires � gP -- — Outside
High water alarm make & model /,,r.oF! 1 A e
electrical work to be completed by installer _�e electrician
other Inside electrical work must be completed by
electrician.
C. Treatment System: Mound
Trenches: s.f.
Depth of rock below pipe
Rock bed dimensions /0 'x 7
Drop Boxes Sand bed dimensions &'x C-O '
Distribution Box Pressure Dist. Pipe Diam. i 1 zn"
Maniford Pipe Diam. L
D. Final Cover/Topsoil to be: borrowed from site
(show location on site plan)
trucked in
The undersigned hereby applies to the City of Orono for issuance of a septic system installation
permit, agrees to do all work in strict
andccordance certrtfies thatth the ordinances of the all statements made on this lty and the
appl cation
regulations of the State of Minnesota,
are complete, true and correct.
S ignature of Applic ant: 4.DZ7
Date:
MPCA Certification No.:_
Staff Review: Approval Denial
c
Reviewer: Date:
Reason for Denial:
CITY OF ORONO
SEPTIC SYSTENI APPROVAL
"
CITY Of ® ONO
✓� w Municipal Offices
Post Office Box 66
Crystal Bay,Minnesota 55323-0066
�k
3780 Watertown Rd.
LOCATION:
Catherine Cram
OWNER:
GENERAL CONTRACTOR: Swedlund Sept'gEPTIC CONTRACTOR: Swedlund septic
SITE EVALUATOR: Swedlund Septic REPORT DATE: October 14, 1994
The City of Orono has Approved your on-site system design as of November 10 , 1994
(approved-disapproved) (date)
with the following comments:
THIS IS NOT A PERMIT. This is a design approval form which must accompany the site plan. A permit must
be issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors is
enclosed.
NOTICE TO INSTALLERS: Any changes to the approved plans and specs must have prior approval of the
Inspector (473-7357). Call for inspections 24 hours in advance.
ALI,DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain
in place until final site grading. Approval to pour footings will not be granted until the Inspections Department
has verified that primary and alternate sites are adequately protected.
NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20'
of tested drainfield sites either before or after system construction. Compaction of these areas could render them
unusable prohibiting the timely completion and or limiting the long term use of the property.
A site copy will be available at the City Offices for the septic contractor.
CITY OF RONO
By
Step en c man, On-site Sykeffis Manager
TELEPI IONE-473-7357• FAX-473-0510
' to
Swedlund
SWEDLUND
Septic
0 - `
Service
October 14, 1994
Kay Cram
3760 Watertown Road
Maple Plain, Mn. 55359
Re : Septic System Design for 3780 Watertown Road
Attached please find the septic system design for
the above mentioned property address . This design
is for a three bedroom house using 450 gallons per
day. This system will be a mound type septic
system using all the materials listed in the design.
A copy of the drawing for the system is attached .
This design meets all zoning requirements .
Sincerely,
�w
Swedlund Septic Service
Swedlund Septic Service • 9520 Laketown Road • Chaska, MN 55318 • 442-5855
STATE CERTIFIED
4tSWEDLuNDSwedlund
Septic
Service
Z_'Perc Test
Soil Boring
E Design
❑ Installation Estimate
Prepared For:
1!e/ og'g/n
oPd l
417-5 --q<,w p
Site Address:
.......................................................................................
5a :e >t ` `
Swedlund Septic Service • 9520 Laketown Road Chaska, MN 55318 442-5855
t-19
MOUND DESIGN WORKSHEET
(For Flows up to 1200 gpd)
A. FLOW D-7
Estimated r0 gpd (see pages D-7 or 1-3,4,5) 0716"7m 9CIArac Rows IN GSLL043 oA7
mumm ISP[or Onlo6NC2•
or measured gpd. KOOMFOOM I a II =
= 300 a9 1p .Cs
3 190 300 =1• .f
200 379 aun
B. SEPTIC TANK LIQUID VOLUMES ;o ;; na I
7
1090 X00 370
2vIv0 gallons (see pages C-3 or C-5) I=00 6n �« �•.
C-3
C. SOILS (refer to site evaluation) p SEPTIC TANK CAPACITIES, IN GALLONS
LgNO CA-ACM
1. Depth to restricting layer inches 'M"1 OA"°A=
SMILAX" LIMM CMAC" INSrOSAL
2. Depth of percolation tests = 17— inches t OR 1.111,11 766 1176
3. Percolation rate mpi 1011' 1090 16..
6006 1000 2260
4. Land slope %
1...011. 0000 7100
D. ROCK LAYER DIMENSIONS
1. Multiply flow rate by 0.83 to obtain required area of rock
layer: A x 0.83 =
46"U gpd x 0.83 sq. ft./gpd = .573sq. ft.
2. Select width of rock layer (10 feet or less) _ /d ft.
3. Length of rock layer = area+width =
3 7 3 sq. ft.+ _Lb ft. = 3 7 ft. Rock Bed
j•j.j.j.r r j•j•j j r•j• .j j
1',
tdth 510
E. ROCK VOLUME j'r•j•r•j•j•j•j r•jM•j•j•j•j
�-- Length
1. Multiply rock area by rock depth to get cubic feet of rock;
A 7jsq. ft. x / ft. = 3 73cu. ft.
2. Divide cu. ft. by 27 cu. ft./cu. yd. to get cubic yards;
�3 cu. ft. +27=14 cu. yd.
3. Multiply cubic yards by 1.4 to get weight of rock in tons; . .
cu. yd. x 1.4 ton/cu. yd. = LU tons.
F. ADSORPTION WIDTH
1. Percolation rate in top 12 inches of soil is Z49 mpi E-16
2. Select allowable soil loading rate from table on page E-16; AUMOALA L"CING MM CWULSY.0N=..N
(.O gpd/ft2 W."�.
N• O.Y r....1.M•
3. Calculate adsorption width ratio by dividing rock layer
..1. • Lae f.N ..N LN
loading rate of 1.20 gpd/ft2 by allowable soil loading rate;
1.20 gpd/ft2+ �bo gpd/ft2= 2 .0 y
.. •.. .... 6.72 I.N f..7
.1 •Ife e.f. .a6 ..N ..N
Check this value on page E-16.
4. Multiply adsorption width ratio by rock layer width to get
required adsorption width;
_fix 2 ft = 240ft
i
i
E-20
DOWNSLOPE DIKE WIDTH
1. If landslope is 3% or more,subtract rock layer width from
adsorption width to obtain minimum downslope dike toe
ZO ft-_/ft= /0 ft
2. Calculate mound height at edge of rock layer on downslope
side;
a. Determine depth of clean sand fill at upslope edge of rock NOU
layer: Separation V I3� feet
b. Multiply rock layer width by landslope to determine drop -
in elevation; Slope Difference 2WMRSMM-LOPetinrROCRMforM
/0 x 1 %+ 100= 7 ft ,
c. Add depth of clean sand depth of clean sand for
separation at downslope edge to depth of rock layer to
depth of soil backfill to get mound height at downslope
edge of rock layer;
ift +Jft + 1 ft+ ft $ ft
d. Enter table on page E-18 with landslope and downslope
dike ratio. Select dike multiplier of S-1 S
e. Multiply dike multiplier by downslope mound height
to get downslope dike width:� = z/ ft
g. Compare the values of step G.1 and Step G.2.f. Select the
greater of the two values as the downslope dike width;
2 I feet Ro&leyer wwth(d21
h. Calculate upslope dike width using upslope mound
height and upslope dike multiplier from page E-18; e��17::
-211 X -3. 1" /Oft Up.bpe dike width(h)
L Total mound width is the sum of upslope dike width plus Downslope dike width(e)
rock layer width plus downslope dike width;
/D ft+1Q ft+ Z/ ft= AL-ft
3. If landslope is 2.9 percent or less,basal width includes both the
upslope and downslope dike widths.
a. Calculate downslope dike width using steps G.2.a.
through G.21, feet
b. Calculate upslope dike width using upslope mound
height and dike multiplier from Page E-18;
x ft= ft
c. Add downslope dike width to upslope dike width to rock
layer width
ft+ ft + ft= ft
Vownslope Upsiope
3:1 41 5:1 6:1 7:1 3:1 41 5:1 &1 74 8:1
s elope
0 3.0 4A 51) 6.0 7.0 3.0 4.0 SA 6.0 7.0 8A
1 3.09 4.17 576 638 753 2.91 US 476 SA6 6S4 7A1
2 3.19 435 S56 682 8.14 253 370 454 536 L14 L90
3 330 454 598 732 8l6 2.75 357 435 Sm 5.79 6A5
4 3A1 476 675 7M 9.72 2A8 3AS 417 454 SA 6A6
S 353 SAO 667 857 10.77 2AI 333 4.00 4.62 519 571
.13
3US 4AI 03 SAI
� 633 1154 1S7A9 1034 � 2A2 434) 3S7 4A5.70 4M4A709 4AS
9 4.11 62S 9.09 13.04 18.92 236 L94 3AS 3.90 430 4A5
10 479 667 10.0 15.00 7333 231 256 333 3.75 412 4A4
11 4.48 7.14 11.11 17AS 30.43 276 278 323 3A1 3.95 476
12 4.69 769 1250 21.43 43.75 1 211 270 3.12 3.49 320 4A8
PRESSURE DISTRIBUTION SYSTEM
1. Select number of perforated laterals .3
2. Select perforation spacing = 3 ft.
3. Since perforations should not be placed closer than 1 ft. to
the edge of the rock layer (see p. E-14),subtract 2 ft. from the
rock layer length.
Rock layer length
- 2 ft. = 3s ft.
4. Determine the number of spaces between perforations.
Divide the length above by perforation spacing and round E-17a
down to nearest whole number.
TABLE OF PERFORATION DISCHARGES IN CPQ'
Head Perforation diameter(inches)
Length perf. spacing = 3S ft. + 3 ft. _ spaces 7/32 1!4
(3) (2) 1.0a 0.56 0.74
1.5 0.69 0.90
5. Number of perforations is equal to one plus the number of 2.ob 0.80 1.04
2.5 0.89 1.17
perforation spaces . 3.0 0.98 1.28
4.0 1.13 1.47
/ 5.0 1.26 1.65
spaces + 1 =_1 Z perforations/lateral aUse 1.0 foot of head for residential systems.
bUse 2.0 feet of head for other establishments
6. Multiply perforations per lateral by number of laterals to
get total number of perforations. E-17b
3. Z Munn IDW"WabW O( 6D p0f mmm pf Wat W
X --L- - 34 perforations. 8� .l01 '''"
laterals perfs/lateral- P tr„� 1.25 inch 1.5 inch 2.0 inch
2.5 14 18 28
7. Determine required flow rate by multiplying 3.0 13 17 26
number of perforations by flow per perforation 4.0 11 15 235
(see page E-17) 5.0 10 14 22
�¢ = z
perfs x Vm/perf gpm- E-15
"W VLD UWAM.,oo OF P,a..r D6M.R,D.$R W
8. If laterals are connected to header pipe as shown on page E-
15, select minimum required lateral diameter from table on
page E-17; enter table with perforation spacing and number
of perforations per lateral. Select minimum diameter for
perforated lateral = Z inches.
E-12
9. If perforated lateral system is attached to manifold pipe near
the center, as on page E-12, perforated lateral length and s"`'�`
number of perforations per lateral will be approximately one ��
half of that in step 8. Using these values, select min'pm
diameter for perforated lateral from page E-17 as � -0..-0m
��
inches.
PUMP SELECTION PROCEDURE
A. Determine pump capacity:
Gravity Distribution END PERFORATION OF A PERFORATED LATERAL
1. Minimum suggested is 600 gallons per hour(10 gpm)to stay ahead of �Grou cover
water use rate.
Topsoil
2. Maximum suggested for delivery to a drop box of a home system is 2,700 - -
Layer of Geolexille Fabric(or lour-
gallons per hour(45 gpm)to prevent build-up of pressure in drop box. Loomy Sand Layer arch layer of hay or Wow covered
wdh red rosin paper)
er' �or a veY"-`- Perleroti 11 orllled flonronloll
Pressure Distribution tt' r"'' i!!' -into P flex
3. a. Select number of perforated laterals /�Plus AI Least 12.10 Edge r Top y
�t Drain Field.Rocha -� ( of Rock Layer
b. Select perforation spacing= ft. P..rurutlone Located at
c. Subtract 2 ft.from the rock layer length. clean sand Layer Bottom of Lateral
yet ngt -2 ft.= ft.
OrI0lnal Soil Properly Seorified
d. Determine the number of spaces between perforations. Before Placing Sand Layer
Length perf.spacing= ft.+ ft.= spaces TABI.F.OF PERFORATION DISCFIARCES 1N GPM
e. spaces+ 1 = perforations/lateral
f. Multiply perforations per lateral by number of laterals to Head Perforation diameter(inches)
get total number of perforations. - -
- perforations. y7/32 ��'
x
s tent -
1.03 0.56 0.74
0 0.69 1.
g•
X gpm. 2. b 0.80 04
pert, gpm?-pert=
2.5 0.89 1.17
3.0 0.98 1.28
SELECTED PUMP CAPACITY gpm 4.0 1.13 1.47
5.0 1 1.26 1.65
B.Determine head requirements: aUse 1.0 foot of head for residential systems.
1. Elevation difference between pump and point of discharge. bUse 2.0 feet of head for other establishments
V feet
2. If pumping to a pressure distribution system,add five feet for pressure
required at manifold S
feet
3. Friction loss 1 Pipe Length
a. Enter friction loss table with gpm and pipe diameter. r Point of Discharge
Read friction loss in feet per 100 feet from table.
F.L._ .S t ft./100 ft of pipe Difference
b. Determine total pipe length from pump to discharge Ef___EIe,,aLion
ump
point. Add 25 percent to pipe length for fitting
loss,or use a fitting loss chart. Equivalent pipe F-18b
length-1.25 times pipe length= 1.5 inch 2.0 inch 3.0 inch
2 O x 1.25= ZZ, feet gpm Friction loss per 100 R of pipe
c. Calculate total friction loss by multiplying 10 0.69 0.20
friction loss in ft/100 ft by equivalent pipe length. 12 0.96 0.28
Total friction loss= Z S" x �,.tr�"r +1(x)=I feet 14 1.28 0.38
4. Total head required is the sum of elevation difference, 16 1.63 0.48
special head requirements,and total friction loss. 18 2.03 0.60
s
l� �1 20 2.47 0.73 0.11
43.73 1 1 0.16
+ + 5.230.23
1;11
7.90 0.30
(1) (2) (30 40 11.07 2.64 0.39
45 14.73 3.28 0.48
TOTAL HEAD -�feet 50 3.99 0.58
55 4.76 0.70
60 5.60 0.82
C. Pump selection
1. A pump must be selected to deliver at least 7 gpm (Step A)
with at least_[(0I_ feet of total head (Step B).
Sizing of Pump Station
1. Determine Surface Area T
Width
Rectan lc-Area=L x W
x�__—4,r square feet Length 1
Circle=Area=n x(Radius)
3.14 x x = square feet Radius
Other=Get Surface Area from Manufacturer a=3.14
square feet
2. Calculate Gallons Per Inch
There are 7.5 gallons per cubic foot of volume,therefore you must multiply the area
times the conversion factor and divide by 12 inches per foot to calculate gallons per inch
Area x 7.5 gpft I+12 inchs per foot
--440 x 7.5+12 =$gallons/inch
3. Calculate Gallons to Cover Pump(with 2 inches of water covering pump) Estimated Sewage Flows in Gallons per day
(Height(in)+2 inches) x gallons/inch(#2) (gpd)
(1Q+ Z )x 2 gallons Number
= 33(o$ of Type I Type It Type III Type
Bedrooms 1 V
4. Calculate Total Pumpout Volume
a. To maximize pump life select sump size for 4 to 5 pump operations per day. 3 a 0 300 218 60%
+4= ��3 of the
gpd gallons per dose 4 600 375 256 values
b. Calculate drainback 5 750 450 294 in
1. Determine total i length, Y 0 feet. 7 1050 600 370 900 525 332 X 1 I.
pipe $ n or
2. Determine liquid volume of pipe,f74 gallons per 1(X)feet. 8 1200 675 408 c,1°,ym
3. Multiply length by volume: Drainback quantity=
20 feet x17#4.gallons/100 ft._-.T—gallons.
Pipe diameter inches Gallons qr 100 fmi
c. Total pump out volume equals dose volume+drainback 4.49
/13 gallons per dose+ 3 gallons= // gallons 1.25 7.77
1.5 10.58
5. Calculate Volume for Alarm(typically 2 to 3 inches) 2 17.43
Depth(in)x gallons/inch 02)= 2.5 24.87
x 2 = gallons 3 38.4
66.1
6. Calculate Reserve Capacity(75%the daily flow)
Daily flow(see page D-7)x.75=
4S D x.75= 7 gallons
7. Calculate total gallons Reserve Capacity
gallons over pump+gallons pumpout+gallons alarm+gallons reserve capcity
#3+#4c+#5+#6
3Sli + // +r4O +-?-?7 =8& gallons Y Alm
8. Total Depth (Total gallon divided by gallon per inch) Pump On
Total Gallon(#7)+gallo /inch(#2) To 1 Pumpout Volumc
v rs' +28 _ 0 inches Pump Off
9. Float Separation Distance(equal total pumpout volume) Pump Height
Total pumpout volume 040+gallons/inch 02)
116+_8= 41 inches
PERCOLATION TEST DATA SHEET
Teat hole location �7 O ,e ,CU� Hole number 1�—?e �
Date test hole was prepared /0 Depth of hole bottom, inches.
Diameter of hole, (,11 inches.
Soil .data from test hole:
Depth, inches Soil texture
/- / Z
Method of scracchinR sidewall /I4;/S
Depth of pea-sized gravel in bottom of hole, inches.
Date and hour of initial water filling /O
Depth of initial water filling, inches above hole bottom.
Method used to maintain at least 12 inches of water depth in hole for at least
4 hours 11,E
Percolation test readings made by -SCvE ,t3 C7 on
a. M-ximum water depth above hole
/b
starting do-S--�4 ,eyo ,
(date) .m.
during test , Fj inches.
'Time Percolation
Tia►c Interval, Meat;uremcnc , Drop in water rate, Remarks
Minutes inches level , inches minutes per
inch
/W� 411 s
01 r S.r- , s ,lo
$•Jo
IS- /S' Jv
PERCOLATION TEST DATA SHEET
Teut hole location :37 '0 e;y,4 Z.4, Hole number. Ze-_22-
Date
test hole was prepared /0.4/_-74 , Depth of hole bottom, /Z inches.
Diameter of hole, _k inches.
Soil .data from teat hole:
Depth, inches Soil texture
Method of scratching sidewall -VaZ
;
Depth of pea-sized gravel in bottom of hole, inches.
Date and hour of initial water filling //—q f q•yav l01
Depth of initial water filling, / inches above hole bottom.
Nechod used to maintain ac lest 12 inches of water depth in hole for at least
4 hours
Percolation test readings made by cd on
J
o..S- qAV &cartindo a' 'b .0.7 Maximum water depth above hole
(date) .m.
during test , inches.
Time Percolation
Time Interval, Meatiuremunc , Drop in water rate, Remarks
Minutes inches level , inches minutes per
inch
0.r»
I .A -14—
.�.�-
PERCOLATION TEST DATA SHEET
Teat hole location:g 28o &(,471,,-14 Paw d Hole number hoee
Date test hole was prepared 10:41—9f _ , Depth of hole bottom, 14 inches.
Diameter of hole, �_ inches.
Soil .data from test hole:
Depth, inches oil texture
Method of scratching sidewall /1sJ4I�S
Depth of pea-sized gravel in bottom of hole, 2 inches.
Date and hour of initial water filling L& - ¢ 4!dw /).41
Depth of initial water tilling, t Z inches above hole bottom.
Method used to maintainc least 12 inches of water depth in hole for at least
4 hours 4L,
Percolation test readings made by �Wg on
q4 scartinb acRoo a. Maximum water depth above hole
(date) .m.
during test , inches.
Time Percolation
Time Interval, Meatiureaiunc , Drop in water rate, Remarks
Minutes lnchcs level, inches minutes per
inch
B. C)C)
V o � .�'� Z
°► /o
LO ICS d . .s O
r LO
z o
Lomas of Soil Borings
Location or Project 27do &111911k e_
Borings made by a4>ZO(x/'n/ Date /49-
Classification System: AASHO USDA-SCS X. Unified ; other _
Auger used (check two) : Band Y\.. or Power ; Flight or Bucket V other
Depth, Boring number L —^_ _ Dopth, Boring numher del-
in
feet Surface elevation in feet Surface elevation
b-z® n-i9,
2
/q c/ �9�j Be�✓� /A y
3 _ 3 l
C, 3 / o i;oE e ��
4
S — S —
6 — —
7 — —
8 — —
9 — —
10
End of boring at feet. End of boring at ¢ feet.
Standing water table: Standing water table:
Present at — feet of depth, Present at — feet of depth,
"- hours after boring. hours after boring.
Not present in boring hole do Not present in boring, hole ti0
Mottled soil : Mottled soil :
Observed at 21 Z feet of depth. Observed at feet of depth.
Not present in boring hole Not present in borinr hole
Lo-&s of Soil Borings
Location or Project Q 6014"&4e GpAd
Borings made by St-,EC//c/"J d Date AO- w7l-9 -r-
Classification System: AASHO USDA-SCS x Unified ; other _
Auger used (check two) : Band X or Power Flight or Bucket X: other
Depth, Boring number S -227-
_ Depth, Boring number
in
feet Surface elevation fee[in Surface elevation
D- 17
2 —
�..�►�► ��►ate
3 — 30 p1t0e, L'. l11A� —
4 — —
S — 5 —
6 — —
7 — —
8 — —
9 — —
10 — 10 —
End of boring at `i, feet. End of bor-ing at feet.
Standing water table: Standing water table:
Present at — feet of depth, Present at feet of depth,
hours after boring• hours after boring.
Not present in boring hole tiQ Not present in boring hole
Mottled soil : Mottled soil :
Observed at _Y, feet of depth. nhserved at feet of depth.
Not present in boring hole — Not present in boring hole
. � �^I -
ILL a
i
j
w
r
R �
S-7
O
�-
ovo
rn
a� J
? Ito
c z
�.
T 2L
�• , C 4 m
_J Y.
z
-V-V ?, ac x n u u fi cmto N w
110.. Ib
JIV
Ob O � N 6-1
Q c 01
1 I �
DA E T M
CITY OF ORONO CALLED IN
INSPECTION NOTICE SCHEDULED
PERMIT NO. 5C q 1 C MPLETED n
ADDRESS
OWNER CONTR.
TELEPHONE NO. >�
DESCRIPTION Ak
01 FOOTING 11 MECHANICAL RI 18 EXCAWGRADING/FILLING
y 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETIANDS
p 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
2 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UO 08 PROGRESS
v 07 DEMO--SITE 27 S 21 COMPLAINT
tQ 07 DEMO—FINAL 5 SEPTIC INSTALL 22 FOLLOW-UP
= 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
Q 10 PLUM ,, / 38 FOUNDATION REMOVAL
/
2 OWN TO MT l W: f�
cc„ COM �
cc
a �
o _ �
oz
o Z
W
cc
Q
12
i
W
W
d WORK SATISFACTORY.PROCEED ❑ PROJECT COMPLETE
W
cc ❑CORRECT WORK&PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY
W
Q ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. C PHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance.473-7357
OwnedContracto
Inspector.
White Copylinspector's File Canary CopylSite Notice
ATE TIME
CITY OF ORONO CALLED IN Z 9�
INSPECTION NO ICE SCHEDULED
PERMIT NO. D 7 COMPLETED
ADDRESS I fi57
OWNERCONTR.
TELEPHONE NO. 4`1.2
DESCRIPTION -2-L
01 FOOTING 11 MECHANICAL RI 18 D(CAV/GRADING/FILLING
rQ 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
p 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
05 FINAL 14 SEWER HOOK-UO 06 PROGRESS
v 07 DEMO—SITE 27 SEPTIC MAINT. 21 COMPLAINT
W 07 DEMO—FINAL C INSTAL 22 FOLLOW-UP
Z 09 PLUMBING RI SEFnC FINAL 35 HARD COVER REMOVAL
v 10 PLUMBING FINAL 36 FOUNDATION REMOVAL
Z OWNER/CONTRACTOR TO MEET YOU' YES_No
ti COMMENTS: Y.�,1!111v_-2!�2�-1000
W
a77 7
� _ I
J
O
O
LL
W
cc
Q
2
W
W
0:
VO a WORK SATISFACTORY:PROCEED PROJECTCOMPLETE
W
W
❑CORRECT WORK&PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY
O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. CPHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED
O INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance.473-7357
OWnedContract
Inspector.
White Copylinspector's File Canary Copy/Site Notice
4 ..
DATE TIME
CITY OF ORONO CALLED IN
INSPECTION NOT CE SCHEDULED
7/ s
PERMIT NO. o � M ETED
ADDRESS
OWNER CONTR.
TELEPHONE NO.
DESCRIPTION
01 FOOTMICi /1 MECHANICAL RI 18 EXCAV/GRADING/FIWNG
H 02 FRAMING 13 MECHANICAL FINAL 18 LAKESHOREIINETLANDS
03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
05 FINAL 14 SEWER HOOK-UO 06 PROGRESS
v 07 DEMO—SITE 27 SEPTIC MAINT. 21 COMPLAINT
W 07 DEMO--FINAL 15 SERnrJWALL 22 FOLLOW-UP
= 08 PLUMBING RISEPTIC FINAL 35 HARD COVER REMOVAL
v 10 PLUMBING FINAL 36 FOUNDATION REMOVAL
Q OWNER/CONTRACTOR T91JEET YOU: _N
y COMMENTS: ok
j
o v
a
cc
0
LL
W
cc
Q
2
W
W
cc
O
W ❑WORK SATISFACTORY.PROCEED /FS'SUE
ROJECT COMPLETE
Qc 11 CORRECT WORK 5 PROCEED CERTIFICATE OF OCCUPANCY
W
O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑PHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance.473-7357
OwnedContractorAn
Inspector.
White CopyMnspectoes File Canary CopylSlte Notice