Loading...
HomeMy WebLinkAbout2006 - P10200 - demo . PERMIT �ITY OF ORONO 2750 Kelley Parkway- PO Box 66 Permit Number: p10200 Crystal Bay, Minnesota 55323 Permit Type: Demolition (952) 249-4600 Date Issued: 8/10/2006 SITE ADDRESS: 2695 Casco Pt Rd Unit# Wayzata,MN 55391 P��� 20-117-23-23-0003 DESCRIPTION: Proposed Use: Residential Census Code 645 Permit Class: Building Permit Type: Demolition Permit Sub-type(s): Demo-Principal Structure DETAILS: Approved perresolution#: Separate permits required: NOTICES/REMARKS: Foundations/all demo debris to be removed from ground&disposed of off site per PCA regulations. Wells must be abondoned. Inspection before backfilling. FEE SUMMARY: Pernut Fee: $ 50.00 valuation: $ 0.00 State Surcharge Fee: $ 0.50 TOTAL FEE: $ 50.50 APPLICANT: Paul Thomas Homes OWNER: Maureen A Breckman 60 Crabapple Ln 2695 Casco Pt Rd Tonka Bay,MN 55331 Wayzata,MN 55391 THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL IMPROVEMENTS SPECIFIED AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL CITY OF ORONO ORDINANCES AND STATE OF MINNESOTA BUILDING CODE REQUIREMENTS. �— � �,��" �� � �—� � �__ ���Z���--�'_ '�� � APPLICANT PERMITGE SIGNA7 URE � ISSUED BY SIGNATURE Copies: 1-File(Signatures Required), I-Applicant, 1-Monthly Reports, 1-Assessing,(If Septic, 1-Septic) Page 1 . tt �(�e�(.;'�=� CITY OF ORONO APPLICATION FOR DEMOLITION PERMIT P.O. Box 66 (2750 Kelley Parkway) Crystal Bay, MN 55323 SPECIAL CONDITIONS & HOLD HARMLESS AGREEMENT General Instructions 1. You may be required to obtain other p�rmits, i.e. well abandonment, etc. 2. Work must not begin unless the pernlit card is available on the job site. 3. A 24 hour notice is required for all inspections. Call (952) 249-4600. JOB SITE ADDRESS: �' Sc a �,� `� Occupancy Type: Residential Commercial OWNER'SNAME: �� -� Phone: Mailing Address: � I J City: ���y l �'L'1�I�'RACTOR'S NAMF.: �7AJI '"�rn�,�-� ��a�r�5 Bus.No.:� (Z- Z�'o—��/G2� MailingAddress: 6 D C ���D� City: `'�' y<t SS.�I Demolition if planned by means of: manual disassembly __�heavy equipment Permits Issued: # � Well Abandonment In return for issuance of said Demolition Pennit, the undersigned owner hereby agrees as follows: 1. The structure(s) shall be kept enclosed avd/or secured until such time as demolition is complete. 2. Demolition debris will be lcept�ff adjoining property and/or the public rights-of.-way unless specific prior approval is obtained in writing for temporary use thereof. 3. Fotmdations shall be completely removed from the ground. 4. All demolition debris shall be completely disposed of off site in accordance with all applicable PCA requirements. 5. Water wells must be abandoned in accordance with State Health Department regulations. 6. Sewer and water must be disconnected at the services at the street by qualified contractors. 7. Inspection required when all debris has been removed, before backfilling. 8. Within 5 working days of superstructure removal,a final inspection shall be requested. The site shall be left clean and clear of all debris,with any excavation filled with earth level with the adjacent ground elevation (except when such excavation is to be used as part of a new building and such new building is actually under construction). 9. The undersigned owner shall and hereby does indemnify and hold harmless the City of Orono, its agents, employees and assigns from and against all claims, damages, losses or expenses,including attorney fees,against the City,its agents,employees and assigns arising out of or resulting from the demolition described herein as performed by the property owner, his employees, agents, subcontractors or assigns. 10. Septic systems must be abandoned per Minnesota Rules Chapter 7080. All septic tanks must be pumped,crushed and filled with native soils. An inspection is required after the tanlcs are pumped and before the tanks are crushed and filled. PERMIT TYPE AND FEE CALCULATION ��b50.00 - Principal Structure $30.00 - Accessory Structure 1. Subtotal of above permit requested $ � 2. State Surcharge $ .50 3. TOTAL PERMIT FEE (add lines 1-2 above) $ The undersigned hereby applies to the City of Orono for issuance of a Demolition Permit,agrees to do all work in strict accordance with the ordinances of the City and the regulations of the State of Minnesota,and certifies that all stateme s made on this application are complete,true and correct. APPLICANT'S SIGNATURE: Date: OWNER'S SIGNATURE: �' � Date: APPROVED BY: Date: �j ��U��-b (Building Ofticial) *ZONING DISCLOSU� It�Qi1IRE�? ❑ I'ES ❑ NC) * This Must Be Filled Out By Zoning Department - For Either Answer, A Zonine Official Must Sign All Applications *APPROVED��': /� L Date: � 'I4�'Jb (Zonin�OFficialj Reset Form _ , 04`'0.�0 ., Principal Dwelling Demolition Permit �"�� °' ZONING DISCLOSURE & DECLARATION �► ���°-,��. �� , � �,� ��Ho To the property owner: Demolition of the principal dwelling structure on a property may automatically terminate certain rights which may have accrued to the property by virtue of the continued existence of that building. • Rebuilding on a substandard lot of record (i.e. a lot that does not meet the zoning district required lot area or width standards) will, with few exceptions, require variance approval by the City Council, and such approval is not automatic nor guaranteed but requires that a hardship be demonstrated. • Additionally, all current zoning standards will have to be met by the new principal dwelling including setbacks, lot coverage by structures, hardcover (impervious surface), height limits, etc. • Where municipal sewer is not available, provision of two (2) sites far a conforming on-site sewage treatment system is mandatory. • Unless specifically approved by the City, all accessory structures must be removed at the time of principal dwelling demolition. This also applies to seasonal and permanent docks,which may not be re-installed until a new principal dwelling has reached the framing stage. The following information is presented for the purposes of advising the property owner ofthe implications of removal of the princi al dwelling on the property: 1. Property Address: 2695 Casco Point Rd PIN# 20-117-23-23-0003 Required Lot Area 0.5 acre Required Lot Width 100' 2. Zoning District: LR-1C Actual Lot Area 0.45 Actual Lot Width 60' Lot area variance is is not equired. Lot width varian e is/� not required. � 3. Required Setbacks: Front n/a Rear 30' Side 10' Side Street 15' Lakeshore Lot: Lake(Front) 75' Street(Rear) 30' Average Lakeshore Setba : must be met/i ot a licable. 4. Lot Coverage by Structur s: limited to 15% of lot area/do s not a I lot area>2 acres 5. Hardcover limitation • are a licable/ re not a licable. 0-75'zone= 0%allowed 75-250'zone=25%allowed 250-500'zone=30%allowed 500-1000'zone=35%allowed 6.✓ Municipal sewer is available. Municipal sewer is not available;on-site system testing and design must be provided confirming that two conforming drainfield sites are available. 7. n/a Wetland(s)present. The undersigned property owner hereby acknowledges receipt of the above information. Staff Initials �J � � �� C� , --�- roperty Owner s Signature Date Form z��—xe��sed 5-23-os (Original: Street File; Copy: Property Owner) , FROM � FAX ND. :9529550251 Aug. 10 2006 07:48AM P1 A�x Esvirann�ental Inc. June 19, 2006 Mr. Paul Vogstrom Paul Thomas Nontes 60 Crab Apple l.ane Tonka Bay, N�155S31 RE' Asbestos Building Inspection af: Fom�tr Mouse x6A6 Casco Poi�t Rvad Orono� MN 55391 Dear Mr. Voggtrom: E�closed please find the final report for the asbestos investigation and evaluation of the referenced property. This r�eport has evalus�ted th�presents of the spscified ma�erials as well as the methods and prooedures that Apex used in determining the p�sence'a at, or pofiential environmental risks associated with the referenced mafierials within the building. ff you have any questiona or require additional report copies, pleas�do nat hesitate to conxact us. We appreaate the opportunity to be of service. Sincerely, Apex Environmental, Inc. �.� J Id Erickson E�closure ,:ROM : FAX N0. :9529550251 Aug. 10 2006 07:46AM P2 Apex Environment�l Inc. ASBEST05 BUlI.DINl3 SURVEY Site: Fomter Housa 2695 Casco Point Road Orono, MN 55391 June 16. 2� Owner Cantact: Mr. Paul Vo�strom Paul Thomas Home� 64 Crab Apple Lane Tonka Bay, MN 56331 Consult,�nt: Mr. Jerald Erickson Apex Environmental inc. 88 Cedar Lane, Madison L.sike. MN 56063 Phon�: 507-340-1113 Fax: 507-243-327T Apex Project No. 6E24 FROM : FAX N0. :9529550251 Aug. 10 2006 07:48AM P3 TABLE OF CONTENTS PAG 1.O INTR4C�UCTION............................ .............. .. ..................... ..................._............... 1 1_1 PURPOSEANDSCOPE...................................................................................... 1 1.2 LIMlTA71QNS....................................................................................................... 1 2.0 METHODS AND PROCEDURES.............................................................................. 2 2.1 GENERAL SURV�(METHODS .............. .. • ---�----.................._.......................... 2 2.2 SAMP�.ING PROTOC4UMETHQDOLOGY........................................................ 3 3.0 SUMMARY QF FINOINGS.........................................................................................4 LIST OF AP�ENDIC�S Appendix A Survey Tables Inspector Credentials Laboratory Reports and Chain of Custody Forms � �'ROM : FAX N0. :9529550251 Aug. 10 2006 07:49AM P4 Asbeatoa Building Inspect�on Forrner House 2695 Cesca Point Road arono, IMN 55391 1.0 INTRODUCTION 1.1 PURPOSE AND SCOPE This report presents th� results of the envirvnmental evaluativn compfeted by Apex Environmental, Inc. (APEX) of the listed property on Juhe 16, 2006.The purpose of the environmentgi evaluation was to determine the potential praaence of asbestos within the buiidings lacated on the referenced property scheduled for remade6ng, or demolition. Mr. Erickson of APEX periormed the on-site investig�tinn and ewaluation. See Appendix A for the appropriate cert�cations. During the investigation APEX identlf;ed, sampled, and analyzed suspect or presumed Asbestos Containing Building Materials (ACBM). 1.2 LIMITATIONS Although Apex put forth a detailed and conscientious effart to identily ACBMs at the site, ceRain variables may affect the idendfication of ACBMs within a bui�ing to a signif�ant degree. Survey evaluetions w�re preformed only in exposed and/or accessible building ar�s, which were readily accessible and safe for entry. APEX did not collect samples from the roof, flr�e doors, �lectrical wi�s, insulators and/or other m�terials that may have damaged or jeoparclized the ir►tegrity of the facilities structure. The samples taken were representative af the suspect matetials, but do not preclude the presenoe of a�besb�s in other similar materia�. If ihere is a question or cbncem whether a mafieri�l oontains asbestos,Apex r�ecommends further testing ta►asc:ertain asbestos content of the suspect material. Apex report was prepared in au;onia�ce with the proposal, scope of w�ork, arrd Apex's general be►ms and condNions. No�ther warranties, represent�tions, or certifications er+e m�de. 2.0 METHODS AND PROCEDURES (3ENERAL SURVEY M�YHODS A certified inspector perForrned the buitding inspeclions atuf sampling acfivities. A walk-through survey of the tacility was first conducted to identify suspect materials and potential areaa of concem to develop a sampling strateqy. Each sample was assigned a unique sample idantification number that was written an the sampling media. GeneraNzed sample locations and analytical r�su�s are documented in the appropriate Survey Tabies in Appendix A. ' FROM : FAX N0. :9529550251 Aug. 10 2006 07:49AM P5 • �Za95 Caaco Point Road P�z Ap�x wiil s�ttempt to identify h�zardous materiais in inaccessible ereas. However, it is not feesible to scoess ail areas of a building untii dem0lition oocurs. Therefore Apex can not be heid responsible for the pr�ence of anyuch hidden materials. The demolition contractor and other contractors involved in the project shoukl sample and analyze suspect hazardaus materi�ls exposed during their a�ivities, prior to any disturbance. In eummery, alI readify ac,oessfble are8s withat the r�efcnerxxd build�gs wGre inspeCtcd for the presenoe of ACBM, and PCBs. Samples of suspect mat�er'ial� were oolleCted from random access�le areas where materiels were observed or assumed to be p�+esent. The Survey Tables in Appendix A addr+ess only those areas wher�s suspect ACBM was observed and sampled. tn general, Apex beiieves that all relevant and representative ar�as of the facility were accessed and �specc:ted. 2.2 SAMPLING PROTOCOVMETNODOLOGY ASBESTOS Suspect andlor presumed ACBM was obsen�d in the referenced building. The mater�als which were identified and sampl�d during the on-aite investigation are documented in the appropriate Sutvey Tables in Appendix A. Sampling and analysis of the suspect materials were conducted as part of the environmental evaluation prior to demolition. Apex collec�d a minimum of(1)sample Trom miscellaneous maberials(i.e. suspended ceilinp tlles,floor covering, sheet radc, adt�ives, hard plaster etc.)and a min�num of(3) samples f�om thermal and surf�cing materials(i.e., 7hermal pipe insulatian, textured oeiling materiats etc)in a random sampling acheme from varioua bcations and levels of the facility. Some building ma�terials were assumed to contain asbestos and either sampled to quanMy the proportion of asbestos, or were not sampled at all. EMSL Labs tnc, asbestos tabor�taties using polari�ed liqht micrnscopy (Pl.M) in accordance wittt AHERA analydcel protocol{EPA-600/R-93/116}analyz�d bulk ss�mples. Copies of the labaatory reports ane fncluded in Appendix A. Samples will be retained at EMSL Labs Inc. laboratory for a period af 30 days from the date af the report Samptes will then be discarded unleas other inatructions are nec:�ived from the client. Mat�eriaba that were analyzed and found to c;ontain less than 1%asbestos a� considered to be non-asbestos and witl be indicated as "Non-De�ecl�ed" on the Survey T�bles in Appendix A. FROM : FAX N0. :9529550251 Auq. 10 2006 07:49AM P6 - � 2695 C�sco Point Ro�d _ P�pe 3 The United Staied Environmental Prot�ction Agency(USEPA), the Minnesata Poliution Cwitrol Agency(MPCA), and the Minnesota Departn�ent af Health (MDH) have gensrally �opted the de�inition that a product is deemed to contain asbest�s if it conteins morQ than one percent asbestos by area. However,the�federal Oacupational Safety and Health Administration (OSHA)regulations define an ACBM as any material which contains 0.1 petcent or more a�bestos by weight. The MDH (Nancy Laplant: 651-215-0897)and the MPCA(Jadcie Deneen:651-297- 8506)can be co�tacted regarding further cfarification of their agency interpretations of ACBMs end reguletions conceming building demotition and the ACBMs observed within the site structures. 7he USEPA, MPCA, �d OSHA require nabticcation prior to building demdition�nd disp�sal of ACBM ma�erials. Cument eppNcable regulations conceming asbestos inelude the tollowin�: 40 CFR 763, Subpert E Asbestos-Containi�g Maberials in Schools/Asbeatos Hezarr! Emergency Response Act(AHERA), DecembCr 14, 1987 40 C�R 763, Subpart I Asbestos: Manufacture, Importation, Procesaing and Oishibution in Commerce PrahibRions, Final Rule, ,1u{y 20, 1989 40 CFR 61.140 National Emission Standerc! - Renovations/Demolition's (MPCA), revised November 20, 1990(NESHAPS) 29 CFR 1910.1001 Asbest03-General lndustry(OSHA) 28 CFR 1926.5$` Asbestos-Construction (ndustry(OSHA) 29 CFR 1910.134* Respiratory Protection(OSHA) MN Rules Chapter 5205.0660 MN Department of I.abor and Industry- M�intenance �nd Repair of Builtlings and Equipment MN Rules Chapter 5207.0035 MN Department of Labor and Induatry- Demdition, Restoration, Remodeling Asbestos Survey MN Rulea 4620.3p00-3700 MN Asbestos Abatement Rules MN Rutes 7�05.1554-1580 MPCA Emisaion Stendards for Asbestas MN Rules Dirisian 42 OSHA-Asbeatos ' �ROM : FAX ND. :9529550251 Aug. 10 2006 07:50AM P7 � 2696 Cagco P�nt Road . Pag�3 3.0 8UMMARY OF FINDiNG8 ASBEST05 As depided in the survey tables in Appendix A, NO Asbestos Contaf�ing Building Materiais(ACBM)w�ere found witt�in the buikiing on the referencexi property. ff during demoiitian venniculite is discover�d,worlc should stop until e determinetion is made if it c�ntains asbestos. Samples of waii or ceilin� sheetrock wailboard and plester were analyzed for asbestos con�ent. Anslyzed sample partions did not detect asbestoa content. They may remain in the building during demolition. POl.YCHLORINATEp B/PHL�NYLS(PCBs) PCBs may be fiourxi in light ballasts, smail capacitors ftwnd in old applianc�s, and transformer oils. Fiuorescent light fixtures are located within the building, the bulbs, which may contein mer�ury ahould be r�emoved and properfy disposed. The ballast from these fixtures, which may contain PCBs, should be removed arxi prope►1y disposed of be#aro discard�ng the fixtures. Apex observed no additional sources for PCBs, such es pad type dry trensformera in the buildings. MERCURY Mercury coMsining materia{s may inciude thermostats. Nuoresce�, metat halide. hiph proasure sodium, neon, mercury vapor lamps, metcury awitches,thennosta#probes, menometers, end paQes. REFRIGERANTS'/�CFCS/NCFCS RECOYERYINFORMAflON A certified technicien must recover refrigerants from refrigeration equfpment and systems in the building prior to demolition O'M7�lER ENVIftONMENTAL L/ABIUTIES Pairtt and oil cans were nat observed in the building. If you heve any quesbons or reauire additional report capies, please do not hesitate to contact us. We app�Ee the opportunily to be of senrice. Sincer+ely. Apex Environmerfteil, tnc. �,.��-��---- J ki Erickson, Inspector ' �ROM : FAX N0. :9529550251 Aug. 10 2006 07:S�M P8 , . 2695 C�sco Point Road _ Pa�e 4 APPENDIX A SURVEY TABLES The fiolbwing survey t�bles document suspect esbesbs�containing buil�ng met�e►rials identifred and semp/ed fiar analysis_ tNSPECTOR CREDENTIALS LABORATORY REPORTS d� CNAIN OF CUSTODY FQRMS ' �R� � FAX N0. :9529550251 Aug. 10 2006 07:50AM P4 • A3BESTOS 3URVEY P�,�N��„��� Building: ���r House Client: Mr. P�ul Vogstrom A��: 2696 Casco Poi�Road Insp. Date: June 16,2006 Orono,MN 55391 Inspeator: �erald E�i�kso� Evernt:+� Samplu Ms�ri�1 Desc�ipdon Quantfty gf, Re�ponsa Action Nwnber/ of ksbe�tos /GoMnments 1CAa�sHai Locl�don Mabarlal Con�ent Basement No asbes#os detec�ed 2»1 2nd flour � No �e vraNs&ceilings Sheetradc and 2504 sq ft ggbestos through out JoiM compouhd detected 1-2 f floor No None walta 8�ceilings Sheetrock and 2500 sq f� ashestos through out Joint compound deteceed 1,3 Roof Shingles-grey No None 1500 sq fk asbestos detec�ed Attic � fibergtass insulation None �� I I i i NoM NotMication of intent to pertorm a Demolition tprm(w-svu�4-2 1, doc) Revised 3100 NoHfication o�f Irrtent to Perform�Oem�tion forrn (w-sw42 Ldbc) Revised 3l00