HomeMy WebLinkAboutSurvey Correspondence I
Christine Mattson
From: Christine Mattson
Sent: Tuesday, January 23, 2018 9:27 AM Cap,
To: mathew katterhagen'
Subject: 3425 Watertown Road/#2017-01417
Matt,
As a result of the house being moved 13' to the West an updated survey was requested. Our engineer has reviewed the
survey dated 12/19/17 and has the following comments:
1. As depicted the driveway appears to encroach on the neighboring property. I recommend the applicant get an
agreement from the encroached property owner or adjust the driveway prior to paving.
2. As depicted the drainage plans appears to direct surface runoff down the gravel driveway. The previous gravel
driveway was susceptible to heavy erosion. The increased grade combined with the increased surface water
directed to it are likely to cause erosion issues for the future homeowner.
3. Surface and hardcover runoff may not be directed toward the neighboring property.
Please don't hesitate to contact us with any questions.
Christine Mattson
Planning Assistant
City of Orono
2750 Kelley Parkway i Orono I MN ; 55356 (physical address)
PO Box 66 j Crystal Bay MN 55323-0066 (mailing address)
9 952.249.4620 8 952.249.4616
E cmattson@ci.orono.mn.us www.ci.orono.mn.us
Office Hours: Monday- Friday 8 am to 4:30 pm
OUR OFFICE WILL BE CLOSED: Monday, February 19, 2018
1
Christine Mattson
From: Adam Edwards
Sent: Tuesday, December 26, 2017 1:15 PM
To: Christine Mattson
Subject: RE: 3425 Watertown Road/#2017-01417 foundation as built
Chris,
I've reviewed the subject grading plan and offer the following comments:
1. As depicted the driveway appears to encroach on the neighboring property. I recommend the applicant get an
agreement from the encroached property owner or adjust the driveway prior to paving.
2. As depicted the drainage plans appears to direct surface runoff down the gravel driveway. The previous gravel
driveway was susceptible to heavy erosion. The increased grade combined with the increased surface water
directed to it are likely to cause erosion issues for the future homeowner.
3. Surface and hardcover runoff may not be directed toward the neighboring property.
Adam
From:Christine Mattson
Sent:Thursday, December 21, 2017 8:15 AM
To:Adam Edwards<aedwards@ci.orono.mn.us>
Subject: FW: 3425 Watertown Road/#2017-01417 foundation as built
Adam,
We received an updated survey as a result of the builder/homeowner moving the house 13'to the west. Please review
and provide comments.
Thank you!
From:Christine Mattson
Sent:Wednesday, December 13, 2017 4:22 PM
To: 'mathew katterhagen'<mattkatterhasen@email.com>
Cc: Roger Peitso<rr)eitso@ci.orono.mn.us>
Subject: RE: 3425 Watertown Road/#2017-01417 foundation as built
Hi Matt,
We have reviewed and approved the foundation as-built survey. You may proceed with framing. A copy of this email
authorizing you to proceed should be kept on site with the inspection card.
Per our telephone conversation,the fouFldation as-built survey shows the house was moved 13'to the west. The side
yard setback for properties in the RR-113 zoning district is 30'. A recent code change permits properties within this
district which are non-conforming in lot width to have smaller side yard setbacks. The side yard setback can be 10%of
the non-conforming lot width, no less than 10'. The lot width is 152',which allows for a 15' setback. The new house
location meets the side yard setback at 19'-6".
Please submit an updated survey,showing the new house location and proposed grading. Don't hesitate to contact us if
you have any questions.
Christine Mattson
Planning Assistant
City of Orono
2750 Kelley Parkway I Orono MN 155356(physical address)
PO Box 66 1 Crystal Bay I MN 55323-0066 (mailing address)
9 952.249.4620 18 952.249.4616
® cmattson@ci.orono.mn.us ( -1� www.ci.orono.mn.us
Office Hours: Monday- Friday 8 am to 4:30 pm
OUR OFFICE WILL BE CLOSED: Friday, December 22,2017
Monday, December 25,2017
Monday,January 1,2018
Monday,January, 15, 2018
From: mathew katterhagen [mailto:mattkatterhaaen@email.comj
Sent:Wednesday, December 13, 2017 6:00 AM
To:Christine Mattson<CMattson@ci.orono.mn.us>
Subject: Fwd:foundation as built
---------- Forwarded message ----------
From: Trace McCoy<tracekmeyerrohlin.com>
Date: Tue, Dec 12, 2017 at 12:48 PM
Subject: foundation as built
To: mathew katterhagen<mattkatterhagenggmail.com>
Matt—
Here is a copy of the foundation as-built. The house top of foundation is one foot above what was proposed on
the Certificate of Survey and the garage foundation is about 0.5 foot lower.
Let me know if you have any questions.
2
Thanks,
Trace
Trace McCoy,LS
LAND SERVICES
708 1 st Avenue NE,#I
Buffalo,MN 55313
Ph.763.682.1781
Fax 763.682.9492
Cell 763.238.6444
www.meverrohlin.com
3