Loading...
HomeMy WebLinkAbout2011-00328 - addn/remodel/repair CITY OF ORONO PERMIT NO.: 2011-00328 2750 KELLEY PARKWAY ORONO,MN 55356- DATE ISSUED: 06/07/2011 952 249-4600 FAX: 952 249-4616 ADDRESS 2985 WATERTOWN RD PIN 04-117-23-21-0001 LEGAL DESC AUDITOR'S SUBD.NO.230 LOT 006 BLOCK 000 PERMIT TYPE ADDITION/REMODEL/REPAIR PROPERTY TYPE RESIDENTIAL CONSTRUCTION TYPE ADDN/REMODEL/REPAIR ACTIVITY 434-RESIDENTIAL VALUATION $ 110,000.00 NOTE: SEPERATE PERMITS REQUIRED: PLUMBING,MECHANICAL,SEPTIC,FIREPLACE,GRADfNG/FILL,LAWN IRRIGATION AND ELECTRICAL(STATE) ADVANCED PLAN REVIEW FEE OF$725.89 PAID APPLICANT PERMIT FEE SCHEDULE 1,116.75 BRENNAN PROPERTIES LLC STATE SURCHARGE(VALUATION) 55.00 8452 153RD PLACE SAVAGE,MN 55378- TOTAL 1,171.75 (612)616-4447 Minnesota State License#:20381410 OWNER GHERARDI,LORI 1010 WILLOW VIEW LANE LONG LAKE,MN 55356- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work — shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a er' of 180 days at any time after work has commenced. The applic s risible for assuring all required inspections are reques in nfo and with the State Building Code.This permit may be re ed at time ford a cause. Cg i / - / l Applic Permite gnature Date Iss y Signature Date SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE. 49 I City of Orono� Building Permit Application / 7/ 75_ for New Structures or Additions s� Mailing Address: Permit number: ¢,O PO Box 66 O O Crystal Bay, MN 55323-0066 Date received: Street Address:' Received by: I(�,��• 2750 Kelley Parkway Plan review fee: t9kE.14 Orono, MN 55356 Total Fee: Main: 952-249-4600 Fax: 952-249-4616 www.ci.orono.mn.us This application form must be completed in full and all required information must be submitted. Incomplete applications will be returned. (Please print) GENERAL INFORMATION: 2985 Watertown Road Job Site Address: Will this be a Parade of Homes, Remodelers Showcase Home or other Display Home? ❑ Yes El No If yes,a special event permit is required with Police Department and City Council approval 60 days prior to the event. Shuttle bus service will be required unless applicant demonstrates sufficient on-site parking is available. Non-permitted events will not be allowed. CONTRACTOR/APPLICANT INFORMATION: Name: Brennan Properties LLC State License# 20381410 Expiration Date: Phone: #612-616-4447 (office) (cell) Mailing Address: 15680 Fish Point Road SE City: Prior Lake ZIP: 55372 Contact Person: Joe Brennan Applicant is: / Homeowner (circle One) Email and/or Fax: Joe.Brennan@mchsi.com fax 952-856-5081 PROPERTY OWNER INFORMATION: Name: Lori Gherardi Phone (day): 612-670-4228 Address: 1010 Willow View Lane City: Orono ZIP: Email and/or Fax ARCHITECT/ENGINEER INFORMATION: Name: DFP Planning and Design Phone (day): 763-780-8015 Address: 9100 Baltimore St NE Suite#106 City: Blaine ZIP: Email and/or Fax: PROJECT INFORMATION: 1.Type of Project 2. Proposed Use 3.Structure Type 4.Sewage Disposal & Water Supply ❑ New Construction ®Single Family with ® Residence ®Addition attached garage ❑ Garage/Accessory Bldg. ❑ Public Sewer ❑Accessory Building ❑ Single Family with ❑ Deck ❑ Relocation detached garage ❑ Office/Commercial ❑x Private Sewer ® Other: (specify) also remodel existing ❑ Multiple Family I Condo ❑Warehouse ❑ Public ❑ Storage ❑ Public Water **Any earth movement may require ❑ Commercial ❑ Other(specify) MCWD review&permits. ❑ Industrial Q Private Well Minnehaha Creek Watershed District(MCWD) ❑ Other: (specify) 18202 Minnetonka Blvd Deephaven,MN 55391 Phone: 952-471-0590 Fax: 952-471-0682 www.minnehahacreek.or Estimated Construction Valuation (excluding land) $ $110,000 Last Updated: 4/26/2011 - 19- r STRUCTURE INFORMATION: 1.Structure Dimensions 1.Structure Dimensions(continued) 2.Type of Construction a. Length (ft.)= 58 0 Number of bedrooms= 1 ©Wood/Frame 22.4 ave ❑ Masonry b.Width (ft.) Number of garage stalls: ❑ Metal Attached= ❑ Pole Bldg. Areas in square feet Detached= ❑ ICF ❑ On-site Prefab c. Basement= ❑ Off-site Prefab d. 15`Story = ❑ Other(please specify): e.2nd Story= f. %Story = g.Total Area= 1,300 REQUIRED SUBMITTALS: All of the information must be submitted in order for your application to be processed: Not Enclosed Applicable ❑ ❑ Permit Application ❑ ❑ Proposed Building Plans ❑ ❑ MN State Energy Code Calculations and Mechanical Code Requirements Form ❑ ❑ Survey(me ting all requirements) ❑ ❑ Stormwater Pollution Prevention Plan ❑ ❑ Hardcover Calculation(s) ❑ ❑ Septic System Site Evaluation Report ❑ ❑ Access Permit ❑ ❑ Wetland Buffer Improvement Plan ❑ ❑ En ineered Plans for Retaining Walls 4 feet or above ❑ ❑ Plan Review Fee ❑ ❑ Other APPLICANT ACKNOWLEDGEMENT: • Agrees to provide all information required or requested by the Building Department; • Agrees to pay the City of Orono for engineering consultant review costs in excess of$500; • Certifies that the information supplied is true and correct to the best of his/her knowledge. The applicant recognizes that they are solely responsible for submitting a complete application being aware that upon failure to do so, the staff has no alternative but to reject it until it is complete; • Acknowledges the Escrow Agreement is completed and signed; • Understands some or all of the information that you are asked to provide on this application is classified by State law as either private or confidential. Private data is information which generally cannot be given to the public but can be given to the subject of the data. Confidential data is information which generally cannot be given to either the public or the subject of the data. Our purpose and intended use of this information is to annually update our records and records of other governmental agencies required by law. If you refuse to supply the information,the application may not be issued. • Agrees that in the event that weather or other conditions prevent the completion of an as-built survey at the time the Certificate of Occupancy is requested, a temporary Certificate of Occupancy may be issued upon receipt of a $10,000 escrow to ensure completion of the as-built survey and all site improvements. Applicant's Signature: ` Date: Last Updated: 4/26/2011 -20- 1 a 5-1-11 $rcnnan Properties LLC Joe£rcnnan 15680 fish Point Rd S£ Prior Lakc,MN 55372 2985 Watertown Road Orono, MN Interior scope of work: 1. Replace existing windows with Low E Argon 2. Replace siding with Hardi 3. Replace plumbing from meter 4. Replace electrical from panel 5. Replace furnace/ductwork 6. Relocate stairwell into basement 7. Replace all insulation, add vapor barrier 8. Interior finishing 9. Plan Review Checklist for New Structures / Additions Address/PID/ Legal: (/(/ZG Description of work: g Gl Septic review by: lei Date Approved: (0 Zoning review by: Date Approved: L- Building review by: Date Approved: 4 - (0 - 11 % Grading review by: -V, AW yt VICW Date Approved: Zoning File#: Resolution#: Resolution Date:- Zoning District Fire Department Post Office School District Zoning: Lot Area: SF/AC Width: 32'?.S'-< Depth: Zg Survey Submitted: 0 Yes 0 No Date of Survey: Proposed Setbacks: Front('Eakv) Rear(Street) ( N S E W ) ( N S E W ) Other Buildings Wetland Side Side b o t It 1 . 230 5�i.3 N/A /jM Building Defined Height: Building Peak Height: #of Stories Ok?: 0 YES FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE: FOR A BUILDING ON A SLAB FOUNDATION: START WITH the distance between the basement floor/crawl START the distance between the slab and the highest space floor and the highest roof peak,the top of WITH roof peak,the top of the cornice of a flat roof, the cornice of a flat roof,the deck line of a the deck line of a mansard roof,or the mansard roof,or the uppermost point on a round uppermost point on a round or other arch-type or other arch-type roof roof SUBTRACT half the distance between the highest window and SUBTRACT half the distance between the highest window highest roof peak of a pitched roof and hi hest roof peak of a pitched roof SUBTRACT the distance between the basement floor/crawl ADD the distance between the slab and the highest space floor and the highest existing grade within existing rade within the foundation the foundation or 10 feet,whichever is less. EQUALS Defined building height EQUALS Defined building height Lot Coverage: 0. IL SF Shoreland District MCWD Permit Received Average Lakeshore Setback Bluff 0 Yes 0 No 0 N/A 0 Yes 0 No 0 Yes �No 0 Yes 0 No 0 N/A Permit Number: Setback: Hardcover Zones Existing Proposed Variance Required CUP Required 0-75' 0 Yes 0 No 0 Yes 0 No 75-250' Type(s): Type(s): 250-500' 500-1000' REMARKS (in-house): Updated: 09/11/2009 z:\forms\plan review checklist.docx Fees to be Charged YES NO Permit Plan Review :State�Siurclnarge . :: , .„/ Investigation Fee SAC 'Num6erof.SAC:Uriits Sewer Connection )rllateronnctioln Park Fee .Srte'inspection Other(specify) IIINscellaneous=Fees': Calculated By: Square Footage $ per Square Footage Basement X = $ 1st Floor X = $ 2nd Floor X = $ Garage X = $ Estimated Construction Value: $ 11.0,00O`� Orono Inspections Required Work Requiring Separate Permits Required State Permits 0 Site 01plumbing dGrading/Filling 0 Well 0 Hardcover Removal Mechanical 0 Fire Electrical Allf'Footing eptic 0 Water Connection Poured Wall Fireplace 0 Sewer Connection 0 Foundation Survey 0 Masonry ,Lawn Irrigation 0 Radon Rock Bed Mfg. F aming 0 Other(specify) Insulation 0 As-Built Survey Final 0 Other(specify) REMARKS (in-house): Other Review: Reviewed by: Date Approved: Access:Existing: 0 YES 0 NO New: 0 YES 0 NO REMARKS (TO BE NOTED ON PERMIT AND INITIALLED BY PERSON PULLING PERMIT) Updated: 09/11/2009 zAforms\plan review checklist.docx EScheck Software Version 4. .1 Compliance Certificate Project Title: Lori and Rich Gherardi Energy Code: 2009 IECC Location: Orono,Minnesota Construction Type: Single Family Project Type: Addition/Alteration Heating Degree Days: 8037 Climate Zone: 6 Construction Site: Owner/Agent: Designer/Contractor: 2985 Watertown Road Lori Gherardi Joe Brennan Orono,MN 612-670-4228 Brennan Properties LLC 15680 Fish Point Rd SE Prior Lake,MN 55372 612-616-4447 joe.brennan@mchsi.com Compliance:3.1%Better Than Code Maximum UA:258 Your UA:250 The%Better or Worse Than Code index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. AssemblyGross Fcavitv Cont. Glazing or or D•• Perimeter U-Factor Ceiling 1:Flat Ceiling or Scissor Truss 1310 38.0 0.0 39 Wall 1:Wood Frame, 16"o.c. 1386 19.0 0.0 58 Window 1:Vinyl Frame:Double Pane with Low-E 349 0.300 105 Door 1:Glass 37 0.300 11 Master patio:Glass 33 0.300 10 Crawlspace:Masonry Block with Empty Cells 539 11.0 0.0 27 Wall height:4.0' Depth below grade:3.5' Insulation depth:3.5' Inside below-grade depth:0.5' Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2009 IECC requirements in REScheck V 'on 4.4.1 and to comply with the mandatory requirements listed i the REScheck Inspection Checklist. Nam Title Signature Date Project Notes: Architect: DFP Planning and Design Blaine,MN Project Title: Lori and Rich Gherardi _ Report date: 05/08/11 Data filename: C:\Brennan Prop LLC\Watertown\watertown.rck Page 1 of 4 CREScheck Software Version 4.4.1 NJ( Inspection Checklist Ceilings: ❑ Ceiling 1:Flat Ceiling or Scissor Truss,R-36.0 cavity insulation Comments: Above-Grade Walls: ❑ Wall 1:Wood Frame,16"o.c.,R-19.0 cavity insulation Comments: Windows: ❑ Window 1:Vinyl Frame:Double Pane with Low-E,U-factor:0.300 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break? Yes No Comments: Doors: ❑ Door 1:Glass,U-factor:0.300 Comments: ❑ Master patio:Glass,U-factor:0.300 Comments: Crawl Space Walls: ❑ Crawlspace:Masonry Block with Empty Cells,4.0'ht/3.5'bg/3.5'ext.insul!0.5'inside bg depth,R-11.0 cavity insulation Comments: Exposed earth in unvented crawl space foundations is covered with a continuous vapor retarder(less than or equal to 0.1 perm).All joints of the vapor retarder are overlapped by 6 inches and are sealed or taped with edges extending at least 6 inches up the stem wall and securely attached. Air Leakage: ❑ Joints(including rim joist junctions),attic access openings,penetrations,and all other such openings in the building envelope that are sources of air leakage are sealed with caulk,Basketed,weatherstripped or otherwise sealed with an air barrier material,suitable film or solid material. ❑ Air barrier and sealing exists on common walls between dwelling units,on exterior walls behind tubs/showers,and in openings between window/door jambs and framing. ❑ Recessed lights in the building thermal envelope are 1)type IC rated and ASTM E283 labeled and 2)sealed with a gasket or caulk between the housing and the interior wall or ceiling covering. ❑ Access doors separating conditioned from unconditioned space are weather-stripped and insulated(without insulation compression or damage)to at least the level of insulation on the surrounding surfaces.Where loose fill insulation exists,a baffle or retainer is installed to maintain insulation application. ❑ Wood-buming fireplaces have gasketed doors and outdoor combustion air. Air Sealing and Insulation: ❑ Building envelope air tightness and insulation installation complies by either 1)a post rough-in blower door test result of less than 7 ACH at 33.5 psf OR 2)the following items have been satisfied: (a)Air barriers and thermal barrier:Installed on outside of air-permeable insulation and breaks or joints in the air barrier are filled or repaired. (b)Ceiling/attic:Air barrier in any dropped ceiling/soffit is substantially aligned with insulation and any gaps are sealed. (c)Above-grade walls:Insulation is installed in substantial contact and continuous alignment with the building envelope air barrier. (d)Floors:Air barrier is installed at any exposed edge of insulation. (e)Plumbing and wiring:Insulation is placed between outside and pipes.Batt insulation is cut to fit around wiring and plumbing,or sprayed/blown insulation extends behind piping and wiring. Project Title: Lori and Rich Gherardi Report date: 05/08/11 Data filename: C:\Brennan Prop LLC\Watertown\watertown.rck Page 2 of 4 M Comers,headers,narrow framing cavities,and rim joists are insulated. (9)Shower/tub on exterior wall:Insulation exists between showers/tubs and exterior wall. Sunrooms: Sunrooms that are thermally isolated from the building envelope have a maximum fenestration U-factor of 0.50 and the maximum skylight U-factor of 0.75.New windows and doors separating the sunroom from conditioned space meet the building thermal envelope requirements. Materials Identification and Installation: Materials and equipment are installed in accordance with the manufacturer's installation instructions. Insulation is installed in substantial contact with the surface being insulated and in a manner that achieves the rated R-value. Q Materials and equipment are identified so that compliance can be determined. Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment have been provided. Insulation R-values,glazing U-factors,and heating equipment efficiency are clearly marked on the building plans or specifications. Duct Insulation: Supply ducts in attics are insulated to a minimum of R-8.All other ducts in unconditioned spaces or outside the building envelope are insulated to at least R-6. Duct Construction and Testing: Building framing cavities are not used as supply ducts. All joints and seams of air ducts,air handlers,filter boxes,and building cavities used as return ducts are substantially airtight by means of tapes,mastics,liquid sealants,gasketing or other approved closure systems.Tapes,mastics,and fasteners are rated UL 181A or UL 181 B and are labeled according to the duct construction.Metal duct connections with equipment and/or fittings are mechanically fastened.Crimp joints for round metal ducts have a contact lap of at least 1 1/2 inches and are fastened with a minimum of three equally spaced sheet-metal screws. Exceptions: Joint and seams covered with spray polyurethane foam. Where a partially inaccessible duct connection exists,mechanical fasteners can be equally spaced on the exposed portion of the joint so as to prevent a hinge effect. Continuously welded and locking-type longitudinal joints and seams on ducts operating at less than 2 in.w.g.(500 Pa). Cj Duct tightness test has been performed and meets one of the following test criteria: (1)Postconstruction leakage to outdoors test:Less than or equal to 8 drn per 100 111:2 of conditioned floor area. (2)Postconstruction total leakage test(including air handler enclosure):Less than or equal to 12 cfm per 100 ft2 pressure differential of 0.1 inches w.g. (3)Rough-in total leakage test with air handler installed:Less than or equal to 6 cfm per 100 ft2 of conditioned floor area when tested at a pressure differential of 0.1 inches w.g. (4)Rough-in total leakage test without air handler installed:Less than or equal to 4 cfm per 100 ft2 of conditioned floor area. Temperature Controls: 0 At least one programmable thermostat is installed to control the primary heating system and has set-points initialized at 70 degree F for the heating cycle and 78 degree F for the cooling cycle. Heating and Cooling Equipment Sizing: L3 Additional requirements for equipment sizing are included by an inspection for compliance with the International Residential Code. 0 For systems serving multiple dwelling units documentation has been submitted demonstrating compliance with 2009 IECC Commercial Building Mechanical and/or Service Water Heating(Sections 503 and 504). Circulating Service Hot Water Systems: Circulating service hot water pipes are insulated to R-2. Circulating service hot water systems include an automatic or accessible manual switch to tum off the circulating pump when the system is not in use. Heating and Cooling Piping Insulation: L] HVAC piping conveying fluids above 105 degrees F or chilled fluids below 55 degrees F are insulated to R-3. Swimming Pools: Lj Heated swimming pools have an on/off heater switch. 0 Pool heaters operating on natural gas or LPG have an electronic pilot light. 0 Timer switches on pool heaters and pumps are present. Project Title: Lori and Rich Gherardi Report date: 05/08/11 Data filename: C:\Brennan Prop LLC\Watertown\watertown.rck Page 3 of 4 Exceptions: Where public health standards require continuous pump operation. Where pumps operate within solar-and/or waste-heat-recovery systems. Heated swimming pools have a cover on or at the water surface.For pools heated over 90 degrees F(32 degrees C)the cover has a minimum insulation value of R-12. Exceptions: Covers are not required when 60%of the heating energy is from site-recovered energy or solar energy source. Lighting Requirements: A minimum of 50 percent of the lamps in permanently installed lighting fixtures can be categorized as one of the following: (a)Compact fluorescent (b)T-8 or smaller diameter linear fluorescent (c)40 lumens per watt for lamp wattage<=15 (d)50 lumens per watt for lamp wattage>15 and<=40 (e)60 lumens per watt for lamp wattage>40 Other Requirements: Snow-and ice-melting systems with energy supplied from the service to a building shall include automatic controls capable of shutting off the system when a)the pavement temperature is above 50 degrees F,b)no precipitation is failing,and c)the outdoor temperature is above 40 degrees F(a manual shutoff control is also permitted to satisfy requirement's'). Certificate: A permanent certificate is provided on or in the electrical distribution panel listing the predominant insulation R-values;window U-factors;type and efficiency of space-conditioning and water heating equipment.The certificate does not cover or obstruct the visibility of the circuit directory label,service disconnect label or other required labels. NOTES TO FIELD:(Building Department Use Only) Project Title: Lori and Rich Gherardi Report date:05/08/11 Data filename: C:\Brennan Prop LLC\Watertown\watertown.rck Page 4 of 4 2009 IEC Energy Efficiency Certificate Ceiling I Roof 38.00 Wall 19.00 Floor 1 Foundation 11.00 Ductwork(unconditioned spaces): 77-7777777 Glass&Door Window 0.30 Door 0.30 NA Heating&Cooling Heating System: Cooling System: Water Heater: Name: Date: Comments: 2335 Highway 36 W St. Paul, MN 55113 Tel 651-636-4600 Fax 651-636-1311 www.bonestroo.com May 30, 2011 Bonestroo Melanie Curtis Planning and Zoning Coordinator City of Orono Post Office Box 66 Crystal Bay, MN 55323 Re: 2985 Watertown Road File No. 000139-11000-1 File No. 2011-00328 Dear Melanie: We have reviewed the plans for a proposed addition to the existing home at 2985 Watertown Road. The plans are dated 5-6-11. We have the following comments with regards to engineering matters: • The plan appears to be acceptable from an engineering standpoint. • This project will disturb more than 100 CY of material. Sediment and erosion control information meeting the requirements of Orono's City Code 79-7(c)(2) must be submitted. The minimum $2000 sediment and erosion control financial security should be required of the owner for this permit. If you have any questions, please call me at(651) 604-4894 or send an email to darren.a mundsenCab bonestroo.com. Sincerely, BONESTROO Darren Amundsen Cc: Tom Kellogg Chris Mattson t� iL-T TIME V CITY OF ORONO CALLED IN INSPECTION NOTI E SCHEDULED PERMIT NO. �+-44 COMPLETED e? J�� ADDRESS L OWNER TE PHONE N0.?Q_ LgZ 29,37 CONTRACTOR DESCRIPTIONoo��� 14 ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAWGRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT v ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL v ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL OWNER/CONTRACTOR TO MEET YOU:_YES_NO Zt COMMENTS: W a 0 LL cc Q z _ je cl c4 ),), 4-iW d � UORK SATISFACTORY:PROCEED El PROJECT COMPLETE W ❑CORRECT WORK&PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on site: Inspector �� White Copy/InspectoPs File Canary Copy/Site Notice b 5� AT TIME CITY OF ORONO CALLED IN INSPECTION NOTICE SCHEDULED fi PERMIT NO. /A— MPL ED ADDRESS !7:�2 OWNER TEL ONE NO. CONTRACTO ALI DESCRIPTION ❑ FOOTING ❑ PLUMBING NAL ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI LAKESHORE/WETLANDS H ❑ FRAMING ❑ MECHANICAL FINAL O El TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT v ElDEMO-SITE ElSEPTIC MAINT El FOLLOW-UP i ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL v ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL OWNERICONTRACTOR TO MEET YOU:_YES_NO COMMENTS: cc W a J O a cc O W W cc Q 2 W Z W L ,KWORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE W ❑CORRECT WORK&PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY 00 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY Ci BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor site- Inspector: 77 White Copy/Inspector's File Canary CopylSite Notice '6 O) T TIME V CITY OF ORONO CALLED IN INSPECTION N ICE �y��7( HEDULED PERMIT NO. lI� PLETED ADDRESS OWNER TELEPHO NO. CONTRACTOR DESCRIPTION a L4 ❑ FOOTING ❑ PLUMBING FIN L ❑ EXCAV/G ING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL Q El TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT v ❑ DEMO-SITE ❑ SEPTIC MAINT ❑ FOLLOW-UP ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL v ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL OWNERICONTRACTOR TO MEET YOU:_YES_NO vOi COMMENTS: W C J O cc O W W QC Q 2 W z W QC J d W WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE ❑ RRECT WORK&PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on site: tn Inspector. White Copy/inspector's File Canary Copy/Site Notice