To: Kenneth Potts, City Attorney
From: Matt Bolterman, Orono Inspector f A. j
Date: November 17, 2004
Property Owners: Thomas Baurle
2985 Watertown Rd
Long Lake, MN 55356
Property Address: 2985 Watertown Rd
PIN: 04-117-23-21-0001
Violation: Failing septic system to surface of ground
Code violated: 58-75 (a) (3) "An ISTS found to be non-compliant because it is either failing
or prohibited, as defined in section 58-43, shall be repaired or replaced within 90 days, if
feasible,but in no case later than ten months after the date of the repair order."
Background: Inspections found this property to have a failing septic system first in 2000. We
(Orono and you) wrote letters to this individual on the following dates to get a new system
installed:
April 20, 2000 October 21, 2002 November 25, 2003 December 4, 2003 April 30, 2004
Action Requested: I would like you to send this individual a letter stating he must stop using
their failing mound and use their septic tanks as holding tanks. The tanks must be pumped when
they fill up over this winter and then a new septic system must be installed next spring(2005).
To transform the septic tanks to holding tanks they must unplug the pump so sewage is no longer
pumped to the mound and discharged to the surface of the ground They must set up a pumping
contract, approve it with the city of Orono, with a septic pumper so we know that the tanks are
being pumped over the winter. I would like to take them to court to make sure this gets done
because letters from the City and from you have not gotten the system replaced.
Telephone(952)2494600 • Fax(952)249-4616
www.ci.orono.mn.us
N � .
4 � ';fir *�,- � 1 ws•,1i-�{•
ip
O•.. Ak
Jw ;
ju
+p 4 ••'
Afta �
'41 Zb t `
It
F
kit
3
r •
� , -
•NA �[
Nh"+
;N 1 +
� � \ a 'j• 1 •�
WIN
VA
ir
00
loll '4
s i
. rt�f is .' X••.ti � tt �' 3'• } y
i
! $ � V + � r � ` •� n"c. �' .fit �tt��F .
. yam►' - .->
AA� -� `�, �1 � sem' 30 .4 � r „ ♦ -�; � �
_.�7 ''�� i Vii' { '"vf 1�R#t� �,y :r �- r e '! •'
it
y
100%0
,� C ITY of ORONO
ti Municipal Offices
ti
Street Address: Mailing Address:
xESTrI� 2750 Kelley Parkway P.O. Box 66
April 30,2004 Orono,.MN 55356 Crystal Bay, MN 55323-0066
Thomas Baurle
2985 Watertown Rd
Long Lake, MN 55356
Dear Mr. Baurle:
This letter is regarding the replacement of your failing septic system. I talked with Peterson
Company and they stated you are not contracted with them and they had no idea what I was
talking about. We need you to get a contract with a septic contractor and get a permit issued by
our office by May 15, 2004. That way we will know what company you are working with and
know that the process is in place to get the septic replaced this summer.
If you have any questions please give me a call at 952-249-4600.
Sincerely,
C�'("-- "
Matt Bolterman
On-Site Septic Manager
Telephone(952)2494600 • Fax(952)249-4616
www.cLoronomn.us
O O
CITY of ORONO
Municipal Offices
Street Address: Mailing Address:
kE13II0,- 2150 Kelley Parkway P.O. Box 66
-_
Orono, MN 55356 Crystal Bay, MN 55323-0066
To: Kenneth Potts, City Attorney
From: Matt Bolterman, Orono Inspector AA
Date: November 25, 2003
Property Owners: Raymond Maijala Thomas Baurle
4700 North Arm Dr 2985 Watertown Rd
Mound, MN 55364 Long Lake, MN 55356
Property Address: 4700 North Arm Dr & 2985 Watertown Rd
PIN: 06-117-23-23-0007 & 04-117-23-21-0001
Violation: Failure to put in mound septic system
Code violated:
Background: Inspections found both of these properties to have failing septic systems in 2002.
1 wrote both of these owners letters to install new septic systems in the spring/summer of 2003
depending on the weather conditions. Both property owners told me that they would have new
mound septic systems put in no later than the end of the summer 2003. I have talked to them and
the installer several times during the summer and they tell me that the system will be put in. The
season is now over to install mounds for 2003 and I do not even have a permit issued for the
mound and the mound is not put in yet.
Action Requested: I would like you to send this individual a letter stating he has until June
15, 2004 to install a new mound. They must also get a septic contract set up, and approved by
the city of Orono, with a septic pumper by December 15, 2003. This will ensure that the septic
tanks are pumped when they become full so they are no longer sending sewage to the drainfield.
This will turn the existing septic tanks into holding tanks and keep sewage from surfacing onto
the ground.
Telephone(952)249-4600 • Fax(952)249-4616
www.ci.orono.mmus
AF�Fi�Fo
DFS �S 2
KENNETH N. POTTS, P.A. 5101 Thimse2nAvenue CITYOFOR �3
Attorneyat Law 00ON
MINNETONKA,MINNESOTA 55345 O
TELEPHONE(952)474-4240
TELECOPIER(952)474-0987
December 4, 2003
Thomas Baurle
2985 Watertown Road
Long Lake, MN 55356
Re: Failure to Put in Mound Septic System
Dear Mr. Baurle:
Please be advised that I am the prosecuting attorney for the City of Orono. I have
been informed by Matt Bolterman, the Orono Inspector, that your property has a failing
septic system. Mr. Bolterman was promised that you would have these septic systems
put in no later than the end of the summer of 2003. The season is now over to install the
system and you have not secured a permit for the mound system. Obviously the system
can not be installed in the winter and at this time Mr. Bolterman has asked me to write to
you to let you know that you have until June 15, 2004 to install the new mound system.
Also, you must get a septic contract set up that is approved by the City of Orono and
secure a septic pump on or before December 15, 2003. I would appreciate it if you
would immediately contact Mr. Bolterman at the City of Orono to make sure that you are
in compliance with these requests. If not, I will be compelled to take action and draft a
Complaint. Once again, please contact Mr. Bolterman.
Sincerely,
Kenneth N. Potts
KNP/sb
cc: Matt Bolterman, Orono City Inspector/
CITY of ORONO
v , titin Municipal Offices
IN
G i
Street Address: Mailing Address:
2750 Kelley Parkway P.O. Box 66
—� Orono, MN 55356 Crystal Bay, MN 55323-0066
October 18, 2000
Thomas & Lou Ann Baurle
2985 Watertown Road
Long Lake, MN 55356
Dear Mr. & Mrs. Baurle:
An inspection of your septic system was conducted on October 17, 2000. During a previous
inspection, it was determined that the mound system was failing by discharging untreated sewage
to the ground surface.
The mound system has shown improvement since the previous inspection. While the mound is still
saturated, it is not discharging sewage. It is not uncommon for a mound system that was having
problems to clear up and start to function properly. The dry summer is probably one of the biggest
factors.
While the mound appears to be getting better, it not functioning at 100 percent. I recommend that
you check all water fixtures in the house to make sure that they are not leaking. The mound is
designed to handle about 450 gallons of water per day. The average person uses about 75 gallons
of water per day. I also would recommend having the tanks pumped before you leave for a long
weekend or vacation. This extensive rest time for the mound could also help make the mound
function more properly.
City staff will inspect the mound again in the spring or summer of 2001 to see how the mound is
functioning. Feel free to contact me at (952) 249-4600 if you have any questions.
Respectfull
®ris,
Pence
On-Site Systems Manager
Telephone(952)2494600 - Fax(952)249-4616
www.ci.orono.mn.us
0 0
r,
CITYof ORONO
,$A,& fY U'. titi Municipal Offices
Street Address: Mailing Address:
EggOg' 2750 Kelley Parkway P.O. Box 66
Orono, MN 55356 Crystal Bay, MN 55323-0066
October 21, 2002
THOMAS D& LOUANN BAURLE
2985 WATERTOWN RD
LONG LAKE MN 55356
Dear Mr. Baurle:
This letter is regarding the failing septic system on your property. After several inspections in
the past and an inspection performed last week, it appears that your septic system is still
surfacing and classified as an imminent health risk that must be replaced next spring, 2003. I
sent you a letter on 11-01-01 that your drainfield was surfacing and must be repaired in the
summer of 2002. That day has come and gone and your drainfield is still surfacing. If we do
not receive contact with you on how you are going to address this matter by November 1,2002
we will be forced to turn this over to our attorney for prosecution. This is a very serious issue
that must be addressed immediately. A failing septic system is a hazard to your family,pets and
to your neighbors.
Efforts must be made immediately to stop the surfacing of raw sewage on the surface of the
ground until a new drainfield is installed. One temporary option to get you through this winter is
to use your septic tanks as holding tanks. The tanks would be pumped until a new drainfield is
installed next spring. This would stop sewage from going into your drain field and surfacing on
the ground.
Please contact me at 952-249-4600 to discuss this matter further so we can get this problem taken
care of as soon as possible.
Sincerely,
Nq:tt'
Matt Bolterman
On-Site Septic System Manager
Telephone(952)2494600 • Fax(952)249-4616
www.ci.oronomn.us