Loading...
HomeMy WebLinkAbout2006-P10524 - new septic system PERMIT -CITY OF ORONO 275.0 Kelley Parkway - PO Box 66 Permit Number: P10524 Crystal Bay, Minnesota 55323 Permit Type: Septic (952) 249-4600 Date Issued: 11/2/2006 SITE ADDRESS: 2845 Watertown Rd Unit# Long Lake,MN 55356 PID: 04-117-23-21-0003 DESCRIPTION: Proposed Use: Residential Permit Class: General Permit Type: Septic Permit Sub-type(s): New Septic System DETAILS: Approved per resolution#: Separate permits required: NOTICES/REMARKS: FEE SUMMARY: Permit Fee: $ 100.00 Valuation: $ 0.00 State Surcharge Fee: $ 0.50 TOTAL FEE: $ 100.50 APPLICANT: Homestead Septic OWNER: Devean George 1108 Goldenrod Ln 13 Bridgeport Shakopee,MN 55379 Manhattan Beach,FL 90266 THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL IMPROVEMENTS SPECIFIED AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL CITY OF ORONO ORDINANCES AND STATE OF MINNESOTA BUILDING CODE REQUIREMENTS. LICANT PERNUTEE SIGNATURE I SUED BY SIGNATURE Copies: 1-File(Signatures Required), 1-Applicant, 1-Monthly Reports, 1-Assessing,(If Septic, 1-Septic) Page 1 CITY OF ORONO SEPTIC SYSTEM PERMIT APPLICATION Box 66 (2750 Kelley Parkway) Crystal Bay,Mn 55323 JOB SITE ADDRESS Occupancy Type: Residential_ Commercial Other Permit Type: New or Replacement System $100.00 VV/ Repair Existing System $ 50.00 (Tanks or Drainfield) $0.50 State surcharge added to above fees * See fee schedule for non-residential permit fees Owner's Name:-) -� t� Phone Number: Mailing Address•_2Q f� M City: Zip: 6S�o Contractor's Name: f1orl.E�� s rL- Phone Number: ys �3u Mailing Address:& 01602— X. 40L��✓`� City: 1,4L, A'410ee Zip: 5_S_3Z? ** DO NOT MAIL PAYMENT WITH THIS APPLICATION* GENERAL INSTRUCTIONS 1. Applications for septic system permits may be mailed or submitted in person at the City Offices; however, permits will not be mailed out. The permit must be picked up in person at the City Offices and work must not begin unless the permit card is on the job site. 2. Permits will be issued only to contractors holding a Minnesota Pollution Control Agency(MPCA) Septic System Installers License. 3. All work must be done in accordance with the approved septic system design. Design reports are not considered approved unless accompanied by the "City of Orono Septic System Approval" cover sheet signed by the City Inspector. 4. The following inspections will be required for all septic systems: A. Pre-installation site inspection to include inspector, installer, and general contractor. B. Tank installation prior to covering. C. Drainfield trench installation prior to covering. For mounds, inspection is required after rough up but prior to sand placement (sand will be jar tested for silt content), and again during pressure distribution piping installation in the rock bed. D. Final inspection to verify proper final cover depths and to verify that all pump stations (where required) components are functional and comply with codes. 5. Individual holding MFCAInstallers License shall be present during all inspections. A24-hour notice is required for all inspections. NOTE: Applicant must initial all spaces. Fill in all appropriate blanks and check all appropriate boxes. 1. I have received a copy of the system design including the City of Orono Septic System Approval Cover Sheet. 2. I will be installing the following: A. Tanks: Precast Concrete Other Manufacturer Tank Capacities: 1) gal. 2) gal 3) gal B. Pump Station (if required) Pump make& model (attach pump curve& literature); system design requires gpm at feet of head. High water alarm make &model Outside electrical work to be completed by installer electrician other. C. Treatment System: Trenches: s.f. Mound Depth of rock below pipe " Rock bed dimensions Ix ' Drop Boxes Sand bed dimensions Ix ' Distribution Box Pressure Dist. Pipe Diam. Manifold Pipe Diam. " D. Final Cover/Topsoil to be: borrowed from site (show location on site plan) trucked in The undersigned hereby applies to the City of Orono for issuance of a septic system installation permit, agrees to do all work in strict a ordance with ordinances of the City and the regulations of the State of Minnesota,and certifies th t all statemen made on this application are complete,true and correct. Signature of Applicant l Date: MPCA License No. C�Ds " d -------------------------------------------------------------------------------------------------------------------------- Staff Review: Approval Denial Reviewer: A/l_'eZz Date: f .0 6 Reason for Denial: Septic System Design. DM AUGUST 26,,2offi .CLQ KYLE SMrM POLAR ICE"CONSTRMTION 3P S SITE= WATERTOWN�-ROAD --1 f) 5536 HOME 5 M. 2):SIC SYSM M 1.109 .O&dervpd Lane Shakoes MN,- 5373 lTiC T OF ORONO ow rROVl8�.70RRaC?��Wiu�' •• h Yp meow"&A W" R _�Nio�bUNMrs+Niaw�io� -- WIP1111 a" ab i- bf- SWEET MAW Home wad -&W& ,Ystem Services Compkagce hwiedeEF Tank Pumping- -A-& uapirg--gyp jk� ,SkPTIC TANK PRQEILE AND ELEVATI6 It- OL m c 0CO .e i 5' CL _ ro 3 Q- 0 b x U 1 CL C CDQ f C 0 �~ f 4� F 1 � i ` ( F ® t d 4 1 AGE 16 of 17 2849 Watertown Road, Oona 15 S SITE DRAWING L,-- DALE u IS'FNN j MPGA License #583 ft aS ead Se Phone: 952 233-0Zi4_--_� XaA�blden ane Pax: 8x.-2334544 opee Lgj2 612 31 a-7887 � v, O u 00 rri ............... t s rD 14.08 --p 0 2fiA0 $ 7 CD G ` V/ m 6.54 14.92 Q t A I = 246 t ( O N fr° 014 Wll ra < '`• �� r- } 16.92 rn i 1 17.08 w ► 5.64 ` •�� \N-1 2.46 �! I k I1 1746� 0 - --:-— Y. -- —_ — ------- 1 0'fiZ ... -0 wzgPosEo SEP-TIC AREA ` 1 1 PRO ;s11e�.a ! f#GF- it�1� 4 1j 117 ——————————————————————————-- f 1 � 0 0 --- ------`------ --_---vwww emm— ----..r—__-- i f PAGE f7OL.D 'CRYSTAL BAY ROAC� 9�lfaierta�rott Read,E?rot�4 PUMP-SELECTION PROCEDURE A Pump capacity Already--determined froiwPfcE --D PAGE, line#7 .Purnp.cep"- _ 38- .. p:wPacity should-be-betweer. 20.ar4&41•-GPMt for charging.a manifold or for pumping to a gravity situation, ie, a drop box or distribution box., - B. Dila- requirements 1. between pump and,the poit.of discharge = �. 2. If pumpinT-tcr a=pressure distr,enrj: feet of head required at the rnanifotcf. If purrtpirtg to a gravity.: yrs , use zer�a feet of bead. 5- 3. Determine friction loss a. •Eriftr-ft icbon-loss table vitt gom 38 andpipe diameter- 2.0. -fRlCrt(w tow*M PLASM PPE .FL-OW-PATE *OMK41 PIPE DAMMER LOW RATE NOMIML-PtPE DMUER at GPM 4:5 2 . -3 4N GPW 15 2 3 20 2.47 0.73 041- 35- _6.W 2.06 0.30 25 3-73 1.11 X18- 40•- &81 2.64 0.39 30n. 5.23 155. t?23._. 45_ 11.07 3.28 DAB Frictibn4oss 2:5 f pe"DO fF of pipe- tr. DeteFrr�ine total pipe ler t frim p p o t ischarge point = 'Fwb Adder=to p"tpe length•at3ove_#o- rtt-W*tt figAoss = 1 a7__5_ feet pipe c. Calculate total friction loss by multiplying friction loss in ft/100 133a by equivalent pipe length B3lD:a bc" _ 2.50 X 487.54 -.equals. -,488.75 / 100 - 4.7 ft head C. Total head-required is the sum-Qfthe-ehMatiGMtffler48nce-B1 plus additional pressure for the manifold B2 plus the total friction loss 313c. -- 9:0 p4US 5.0 -phis-- 4.7 equals 18.7 ft tots[head -D. The,-Pump-regdfres 37.7 -gpm and- -48.7 -feet-of-head PAGE 9 of- 17 2849 Watertown Road, Orono SIZING- OF PUMP STATION f 1. Insert flow rate 600 -igallons per day- 2. Insert galk=per vertical inch-frorn-tank.manufacturer, 25.0 gallons per.inc h 3. CaWate--galiomta cover pump-sing--on-#- with 2 inches of water 3 in pad + 1 12 pump--hgt -2 H20 = 17.0 inches of water 17-:0 -H20 X 26 = -425 aHons to cover pump 4. CakzFlater etal-pump out voluuw a. Calculate gallons per dose based on 4 pumping intervals per day 6W ftow divided-by-4= 45Q -goo m}ger-c#ose b.. Calculate-dramback (I) D6termine lotai-pipe-lengt4- 150" Pump ptpe Mann 2).Determine liquid volume nfpipe fforn chartper`tW'feet ..PiPE-i31AWTER GALfjWfT -P%3EiWfiIETER -13ft7't00fT 435 TW 38.40 2.00 17.43 48tY 66:10' (3) Multiply length by volume divided by 100 to get drainback quantity 154:0 X 17 -equals 2644.5 1 1.00 = 26, gallons 5. Calculat�totaputx�pout vol plus drainback#4b3 1.5€1:-0- gaFlens+ 26445 .9eHo&= '176:-1- :guns pumpout volurrib 6. Calculate-votume-for alarm based-orr3-7inches and-tank--CPI 25:4 X 3= -7 valions - - 7. Calculatt-gaWns to cover pump#kpLmpaut vd[ume#5, and alarm volume#6 425 plus 176.1 plus 75.0 equals 676 gallons.YWHOUT 8. if LUG requires 75%daily flow as reserve capacity, RESERVE GAP. In re-capeoity = 458- 9 ons 9. Minirnum-pump-tank size WITHOUT-feseve-capacity-equals 676-_gallons 10. WlWmwn Vuffp tank size VATH-tee t aps teals 1126_ gallons 11. Float separation distance equals pumpout volumne#5 divided by tank gpi#2 175.1 divided 25:8 -gpr-=- 74 inches to tether float PAGE a .. ..of ..- W . 2849 Watertown Road,Orono PRESSURE DISTRIBUTION &Y&TFM 1. Select number of perforated laterals . 2. Select perforation spacing :0 3. Since-perforations-should not-be p#acW ckxm#tM 11--ft to the edge of the rock lager, subtract 2 feet from the rock layer length. - minus,2 feet = 48. - feet 4. Determine tlw-number of spaces perms Divide the length above by the perforation spacing and round down to the nearest whole number. :- 48 48 - divided 3.0 equals- -16 spaces rounded dawn = 16 5. Numbeno€-perforations is equal#o4--fie number.of-perforated spaces instep 4. 1.6 spaces plus 1 = 17 pew per lateral 6. Multi*-the perforations per lateraFby-thanumber ofIatefals to get total number of perforations. 17 X 3 -equals - 51 total Humber of perforations 7. Deterrine ttxe-required flow rate by-=> ptying4ve--number of perforations by the required perforations discharge from the.-table below. 51 perforations X ff. 4 hole discharge = 38 gpm NW38kflihl NtiftABi_R�F QUARTER MCH-PEREOR1MMS-PER REQUIRED PEREORATICM DISCHARGE •L4T-ERALTOGIIARINiTEE<10%LM9CMMGr-_VARIATI0N IN GALUMS PER MINUTE -PERF SPACING M FZET 2:i tNi PIPE 15 it•CPtPE.. 20 DISC. . =iN P t!4 IN PERF 2.S 14 1$- 2� 1.0a GM 0.74 313 43 17- = Z.Db Ole 2.04 3.3 12 W:. 2r=.: _ a, USED FOR SINGLE FAMLY HOMES 4.0 11 15 23 I b. USED FOR ALL OTHER APPLS 8.0' 10' 14 -22- 8. If-HEADER4, NPE is conn - of eras, select minimum required lateral diameter from table above with perforation spacing and number of perforations per- later Select-minimum diamete fw 1t -parfoFated-lateral. You have aelected - *spacing and perfs-per taleral -inch-minimum diameWlaterals. 9. If HEADER-PIPE is connected.to the-CE. TER-40thwlaterals, select minimum required lateral diameter from table above with perforation spacing and number of perforations per lateral:..Select minimum diameter for the perated latWal. You-have-selected 3.0 ft-spacipg and =-1.7.0 perfs per lateral -1.50 iris minimum diameter 1 PAGE- 7 of `fr. 2849 Watertown Road, Orono MOUND-CROSS SECTION i E Ei t t i t i � t Ft U -D--fke Ft'WideRockbed Ft Downslom Dike d rn au "�'v } f ' Upslope Sand Base /0 Rockbed Width ^ownslope ft 4 SandBese sand Base i otal-A Lw width 4 t I I s i i t _ : t '•�. � Ft total Sand Base W ' E` 410 Total-mound-width X -SAND FMT-PRMT' Side Side Dike Dike Total Sand Sara! San Width Width Width Feet Rockbed Sand Base Le Total Sand Length PAGE 6 of 17 2849 Watertown Road, Orono G. DOWNSLOPE BERM WIDTH (Slope< I%) 1. Ase"on width is from fel: 27- ket 2. Calculate minimum mound size: a: Determk-ie depth o€-clearf- #t-a a--edge of rock layer. . f-rom Site Eveluatkm-step C1: - 18-0- aches-lean sand b. Add depth of clean sand for separation 2a at upslope edge plus depth of rock layer-(1f.) plus depth ofwveg4ft) to-fend hght at upslope edge of rk layer: .1-8.0 -in/ 1-2. = 1.50 --4eet-a-1#-+Vt = 3.50 # upslope height c. fly upslope mound- height br4fie=mid upslope berm width: 3.50 ft 3,-4= 44.& 4eet- -bean width -- d Multiply rock layer width-D2 b)r-ImdsI G5 to determine drop in elevation.- MOO:130 feet X -0-5 %sleW= 5.-M / 100 = 0.05 feet e:- Add-depth of clean--sand fbr-slape•difference G2d at downslope edge, to the mound height at the upslope edge of the rock layer G2b, to get downslope-height- 0:05 feet + 3.50 -equals 3:6 feet do rislope height f. Multrply downslope rriound-62eheight-by 4-tcr get downslope berm width: 3.6 ft X -4 = -14 . .feet�evmskpwberm width - - g: The4nound width is the sumo the berm width G2c plus rock layer width D2 plus downslope berm width G2L 11.00 feet + 40:0 feet + 14 equals- 38 €eefwide h, DoteFmine if additiorrak-adsoFptie ; vvkltf J&required: TRUE OR FALSE 1. IfG1•Jslarger G2g addittonat adsor n-area is r red:-= G1 __. 27 cp-G2g_- _38- -- I FALSE 2.. Subtract the minim d idlir-G2g-ft m-the adsorption width'G1 to find the additional downslope area for adsorption, IF REQUIRED: ft miffs equais, ft additional a rption.area 3: Add-4/2 the add' `wal a. 2h2- apslope berm width G2c and 1t2 to the downslope berm width G2f: Upsiope berm: .-ft ~Plus equals -Doves slope berg: ft -plus- mss, i. New around width is-the-an of-the upslope-berm G2c or G2h3, if additional area req`d, &downslope berm G2f or G2h3, if add.area req`d, plus rock layer width D2: 14:0 ft plias 14 - ft- -plus - 1-0.0 ft equals. 38 k: Mound length is the sum ef-the-upslope-berm G2c and upslope berm G2c plus rock layer length D3: - 14.0 ft plus 14.0 ft pkis 438 ft equals. 78 I. -F}NAiL MOUND DJME#&IG1#7S: - -38- ft wig X 78- ft long PAGE 5... . of..... 1.7. .. 2849 Watertown Road,Orono 'MOUND DESIGN WORKSHEET For-ftowis up to IM WM A. Estimated 1 d or measured X 1.5 = gpd B. SEPTIC TANK LIQUID VOL-UI�M- _5GG6& _ C. SITE EVALUATION INFORMATION 1. -Depth of clean sand.req. "t8:U0 inches or 1.50 feet 2. t?#-Vth of-percolation tests 'i2 inches .`3. Soil Texture CL 4. -Perk.Rate- mpi -5_ -Land-Mope percent D. ROCK LAYER DIMENSION$ 1. Multiply flow rate by 0.83 to obtain required area of rock layer. 600 gpd X -$$3 " sgfggpd -498,00 ft. rock area 2. -Select width of rock layer - (6 A'if ri g$er- 5`if>i2Q) 10.I? _ eet-. 3. 44ockbed length {amal wo- 4W.W - sq.ft:'f, 410--G feet= 5Q feet E. ROCK VOLUME 1. Multiply rock area by rock depth to-get cubic feet of rock.- ,498 ack:,198 sq.-ft-X 1.0= ftDaf= 495- cubic feet 2. Divides cubic feet by 27 to-get- yards. -498 Eu.ft.-/- 27 - 1-&- ' zubicyards 3. Mu#tiply-cubic yards by 1.4 togetweight oftock in tQns: 18 cu. yd. X 1.4= - 25:5 ttons=X 10% = 32.3 tons F. ADSORPTION WIDTH 1. Percolation-rate in top 124#0- tesof soil is- 10.0- m i -Soli Texture-is town s zin factoF _2..-Selea allowable soil.loading rale from table. � - pd t sq�:ft. . -. &OILTEXRM Gt FAaTM>a.t COMSE SAM so �y Ta s sin i za. TM _ 01 Toy FMIESAND 4B0 .@D e TO IS AMMLOW 0.79 1.50 -14m aa "IAM 0.60 e 31 TO ON SiLT.LQA01 050 200 W-P31 - CLAY-LOW 4+I61 �EZ- -�9T0120 [X:AY Q24 Im $flt? s CLAY 0.20 3. Calculate adsorption width ratio-by dividing rock layer loading rate of 1.20 gpd/sq, ft. by allowable soil loading rate: 1.20 gpd1 sq.-divided-ley 0. 5- -bpd-/s% ft. equals - 2.67 4: Multiply adsorption width ratio-by-rock layerwidth to get required adsorption width: 2.67 X 40.0 -feet­. ' 26-7 -feeLadsorptionwidth PAGE 4- of 17 280 Watertown Road, Orono DESIGN- SUMMARY (Not req`d by LUG, far kWatter use) MOUND S lope is 0:5 - percent Upslope width is 14- ft Downslope width 14 ft Minimum adsorption width 27 - ft Rockbed size-is 10.0 X 5Q- ft Clean sand depth 6Einche TANKS Existing, usable 1500-2 �� STC «vim New 500& 1000 gallon - Pump tank 1500 gallon GPI for this tank is 25 gpi Pump size 38 gpm at 19- head Pump pipe diameter 2.0 inches Pump float tether.distance 7.0 hoes PRESSURE DISTRIBUTION SYSTEM No. laterals 3 Lateral length 48 ft PerF spacing- 3.0 ft rx Perferation per lateral - 17 Lateral diameter 1.5 inches Center or End Manifold feed: Center MATERIAL VOLUMES Washed rock 32.3 tons Mound sand 150.6 tons Based-on--tft sane ewer(adsorpt width X mound length) 2905 Loamy sand cap 25.8 tons Based on Ift of LS ever rockbed area. Topsoil 154 tons Based-cam-#-rneufidfoot .. . 2972 X- .8 feet 2972 PAGE 3 of 17 2849 Watertown Road, Orono CUSTOMER: Name: -ftior ICF Com Street Address: 7085 St!RAi iak Road City, State, Zip Code: Eden Praire,-MN-55344 Phones: (w) 952 345-1017 Cell Fax 952 345-4021 SITE ADDRESS: Owner AddFes.sX849--Watertow-n f43adi- City -Orono/Crystal Bay Twnshp Date of-design -Revised August 2tst, 2OW -Systern-information- ACX_ -News Replacement Type of--system .fa ck-Trench Gravelless trench XC.-- Mound- At-Grade -£mer Other Type-of establishment Newly-Built 4-Bedmrn Home Septic tarok infxmation No. &size-of-usable existing-tanks: 4500-2 Rev'd No. &-size-of-new septic tanks: Is an- r-pump used orpropceed-in-theme? Yes Is a garbage disposal used-er-prvpesedin the system? ? Pump-tank-information Size-ef-pum#ank 15M gallons 3eptmlank-capacity for thissystem I.? designed for a garbage-disposal. Site-considerations verify -Propane or natural gas lines in way? verify Under-ground electric knee in way? very. -Cable-er phone-lines-in way? verify -Bried water-fines in way? no -Existiftg septic4ank-to pump and kmpte t? no € ld-septic tanks-i&pump-acrd bury? yes Septic-tank access available? No Trees to be remov-0? y-es Difficult.tank-&-drah7field equipment .W. Variance-required? NO- - Describe: - PAGE 2 'of-- 47-- 2849 Watr<down Road,Omrw Salk P TESTING., INC even B. Schirmem -MPQA Cert.No. 627 951 Katydid Lane NE - St. Michael, MN 55376 - (763) 497-3566 FAX- (763)497-5011 State License#394 LOGS OF SOIL BOGS Galt Knappenberger 2849 Watertown Rd.] Orono, Henn. Co., MN Borings completed on 5-6-04, with a hand bucket auger. ROBING NUMBER 1- Elev.99.9 - MOTTLED SOIL AT.24" (6" into the original soil) - standing water present in boring at 35", 17-1/2 hours after the boring. 0 - 18" Fill soil-dark gray clay loam & loam 18" - 24" Original soil very dark gray.loam 5Y 3/1 24" - 32" Rusty very dark gray clay loam 5Y 3/1 -mottles 10YR 6/8 32" - 54" Rusty gray clay loam 5Y 6/1 - mottles 1 QYR 6/8 15ORM NUMBER 2- Elev.99.9- MOTTLED SOIL AT 24"(8"into the original soil)- standing water present in the boring at 35", 17-1/2 hours after the boring. 0 - 16" Fill soft -dark gray clay loam&loam 16' - 24" Original soil very dark gray loam 5Y 3/1 24" - 28" Rusty very dark gray clay loam 5Y 3/1 -mottles 10YR 6/8 28" - 48" Rusty olive gray clay loam 5Y 516-mottles 10YR 7/1,6!8 BQRIM INUNISM 3-Elev.99.5- MOTTLED SOIL AT 24"(at the original soil)- standing water present in the boring 34". 17-1/2. hours after the boring. . 0 - -2411 Fill soil- dark gray&gray clay loam 24" - 32" Rusty very dark gray loam 5Y 311 -mottles 1 QYR 6/8 32" - 36" Rusty very dark gray clay loam 5Y 3/1 - mottles 10YR 6/8 36" - 48" Rusty olive gray clay loam 5Y 5/2 - mottles 10YR 7/1,6/8 PAGE 10 of 17 2849 Watertown Road,Orono Soil borings coned. BORING NUMBER 4- Elev.99.5 - MOTTLED SOIL AT 22" (6" intq the original snit)- standing water present in the boring at M', 17-1/2 hours after the boring_. 0 - 16" Fitt soil - dark gray clay loam& loam 16" - 22" Original soil very darts gray clay loam 5Y 319 22" - .28" Rusty dark gray clay loam 5Y 4/1 -mottles 10YR 618 ?-8" - 48" Rusty olive gray clay loam 5Y 512-monies 'IOYR 711,618 BORING NUMBER 5- ev.99.8- MOTTLED SOIL AT 20"(at the original soil) - standing water present in ttie boring at 35", 17-1/2 hours after the boring. 0 - 20" Fill soil-dark gray day loam& loam 20" - 28" Original soil very dark gray loam 5Y 311 - mottles 10YR 618 28" - 34" Rusty dark gray stay loam 5Y 4/1 -mottles 10YR 618 34" - 48" Rusty olive gray clay loam 5Y 512-mottles 10YR 711,618 BORING N BER 6- Elev.99.5- MOTTLED SGML AT 24"(at the originaf soil) - standing water present in the boring at 35", 17-112 hours after the boring. 0 - 24" Fill soil -dark gray clay loam&loam 24" - 32" Original soil rusty very dark gray loam 5Y 3/1 -mettles 90YR 6/8 32" - 40" Rusty dark gray day loam 5Y 4/1 -mottles 10YR 618 4V' - 48" Rusty olive gray clay loam 5Y 5/2-mottles 10YR 7/1,6/8 PAGE 11 of- 17 2849 WaWdmn Road,Orono 2 CERTIFICATION NO.627 NATE LICENSE NO.394 PERCOLATION LATION TES`s DATA SHEET percolation test readings made by S-P T.roting,Inc, on X0-4 starting at-&41j=. Test hole beano Test hole numberA Date test hole was prepared1-fi:K Depth of hale bottom 24 inches, Diameter of hole ft inches. SOIh DATA FROM JEST DEPTH,INCHES SOIL TEXTURE 0- is" Fill dark gray ClaY ioaM& loam — 16"- 22" Rus very dark dray barn Method of scratching sidewall is tai& Depth ofgmvel.in bottom of hole is� Date and of iflitiat water filling 5-64W,1:00m Depth of inial water fitting is 12-inchsa above the hole bottom Method used to maintain at least 12 inches of water depth is bole for at least 4 hours is antamatir.siphon. Maxfimum water depth above bole bottom during test is li inches. Measurement, Drop in water level, Percolation rate, Time Time interval min inches inches minutes pff inch Remarks i 8:28 refit[ 6 8:41 8:1't 6 4 7.5 30 min 8:12 9:42 6 4 7.5 30 min 9:49 10:19 8 4 7.5 30 min Percolation rate=7 9 minutes per inch. PAGE 15 of, 17 2849 Watertown Road,Orono CERTIFICATION NO.627 STATE LICENSE NO.394 PERCOLATION.TEST DATA SHEET' Percolation test readings made by S:P Testing,Inc on 5-7-04 starling atS• Oam. Test hole locatb*+ ri_berge�,2449 Wa �rtnwn Rd, frono. Test hole number-, Date test bole waspreparedQ , Depth of hole bottam2fi inches. Diameter of hole fi inches- SUM DATA FROM 3=E101Z DEPTH,INCHES SOIL TEXTURE 0- 24" Fill dark gray&gray day loam 24"-26" Rusty very dark gray loam Method of scratching sidewall is IMI& Depth of gravel in bottom of hole is 2inches. Date and hour of initial water filling 5i%3:0ftm_ Depth of initial water filling is 12 imsbssabove the mole bottom. Method used to maintain at least 12 inches of water depth is hole fior at least 4 hours is antemade sln nom_ Maximum water depth above We bottom during test is j inches. Immurement, Drap in w9ter level, Percolation rate, Time Time interval rain inches inches minutes per inch Remarks 8:28 efill 6 8:40 9:10 6 3-318 8.9 30 min 9.13 9:43 6 3-318 8.9 30 min 5:48 10:18 6 318 8.9 30 min Percolation rate=&9ji inures per inch. PAGE 14 of 17 2849 Watertown Road, Orono CERTIRCATION NQ.627 STATE LICENSE NO.394 PERCOLATION TEST DATA SHEET Percolation test readings made by. -P-Testing,I. nc. on 5-7-04 starting at 8:3bw Test hole Ivcatiun �pg *, A �Vg �tsts - n ,�► Test hole number-Z Date test hole was prepared-SALAL Depth of hole bottom 24 inches. Diameter of hole lz inches. SAM DATA FROM'FEST R42LE DEPTH,INCHES SOIL TEX3URE 0 - 16" Fill darts gray clay loam& loam 1(r'-24" Very dark gray loam Method of scratching sidewallis lot& Depth of gravel in bottom of hole is 2 inches Date and hour of initial water filling , .3:Oftm Depth of initial water fitting is 12 inches above the hole bottom. Method used to maintain at least 12 inches ofwater depth in hole for at least 4 hours is automatic d hon_ `Maximum water depth above hole bottom during test is St inches. Measurement, Drop in water level, Percolation rate, Time Time interval miry inches inches minutes per inch Remarks 8:28 prefill 6 8:39 9:09 6 3-314 8 30 rnJn 9:14 9:44 6 3-W4 8 30 min 8:47 10:17 6 3-X4 8 3Q min 'ercolation rate & minutes per inch. PAGE 13 of 17 2849 Watertown Road,Orono CERTIFICATION NO.627 WATE LICENSE NO.394 PERCOLATION TEST DATA SHEET Percolation test readings made by S-P Tesdng, ne- on 57 -_04 starting atmmtz.. Test hole locationKnaFnP�gcr,2849 Wal rtnv4 Rd.QMna Test hole numbed., Date test hole was prepared�- Depth of hole bottom 3A inches. Diameter of hole-6 inches. SCHL DATA FROM TEST HO T. DEPTH,INCHES SOIL TENURE 0- 48" Fill dark gray clay foam & foam 18"-30" Very dark gray loam Method of scratching sidewall is lud& Depth of gravel in bottom of hole is 2.inches hate and,hour of initial water filling 5-6-04.3_, :0 u_ Depth of initial water ffiling is 12 iucb=above the hole bottom. Method used to mrakmain at least 12 inches of water depth in hole for at least 4 hours is antumntic dphen. Maximum waterer depth above hole bottom during test is fi inches. Mewwwnent. Deter in water level, Pemolation rafie, 7irrie Time interva4,min incites inches ' minutes inch Rieman 8:28 8:38 9:08 B 3 10 30 min 9:1 9:45 B 8 1Q 30 min 9:48 10:18 6 3 10 30 min Percolation rate per inch PAGE 12 of 17 2849 Watertown Road, Orono ?7,- V� (1,e DATE TIME CITY OF ORONO I CALLED IN hyo INSPECTION NOTICE SCHEDULED PERMIT NO. COMPLETED ADDRESS hJa OWNER CONTR. TELEPHONE NO. Lo f,2 .) 10 78"f(- 7 DESCRIPTION Cy_e, ' On /1fau� tj 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING 4. 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS H O 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT v 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL v 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL OWNER/CONTRACTOR TO MEET YOU:_YES_NO COMMENTS: W a eerxc D K cc W cc ICE Z! Ste—, 1)FC- 414-1'M +e. 7 — W � ' s A JVA!l AA 4 WORK SATISFACTORY:PROCEED ElPROJECT COOMPLETE�J,^ 7�-r cc Ni( W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTOTAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on site: Inspector. White CopylInspector's File Canary Copy/Site Notice