HomeMy WebLinkAbout2005-P08686 - new structure PERMIT
CITY OF ORONO Permit Number:
2750 Kelley Parkway- PO Box 66 P08686
Crystal Bay, Minnesota 55323 Permit Type: New Structure
(952) 249-4600 Date Issued: 6/6/2005
SITE ADDRESS: 2845 Watertown Rd Unit#
Long Lake,MN 55356
PID: 04-117-23-21-0003
DESCRIPTION: UBC Occupancy R3
Construction Type VN
Proposed Use: Residential Census Code 101
Permit Class: Building
Permit Type: New Structure Permit Sub-type(s): New Home-Single Family
DETAILS:
Approved per resolution#:
Separate permits required: Plumbing Mechanical Septic Fireplace Irrigation Well(state)Electrical(state)
NOTICES/REMARKS:
FEE SUMMARY: Permit Fee: $ 7,183.75 Valuation: $ 1,500,000.00
Plan Review Fee: $ 4,669.44
State Surcharge Fee: $ 700.00
TOTAL FEE: $ 12,553.19
APPLICANT: Polar ICF LLC OWNER: Devean George
MN r7O grj jh� � Oso K /� 13 Bridgeport
�-cl c iki �/�x t�f e /VN 5�3 y y Manhattan Beach,FL 90266
THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL IMPROVEMENTS SPECIFIED
AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL CITY OF ORONO ORDINANCES AND STATE OF
MINNESOTA BUILDING CODE REQUIREMENTS.
',11ZA_ a&,�a
PLIC N ERM ATURE UED BY SIGNATURE
Copies: 1-File(Signatures Required), 1-Applicant, 1-Monthly Reports, 1-Assessing,(If Septic, 1-Septic) Page 1
Total Fee: $ la SS3• I Date Received:
Entered By: Permit#: O ('
CITY OF ORONO - BUILDING PERMIT APPLICATION
All information must be submitted in full before plan review will be started.
(please print all information)
------------------------------------------------------------------------------------------------------------------------
THE APPLICANT IS: (circle one) (ED1011 CONTRACTOR
JOB SITE ADDRESS: ZS&4T WA W-D. ZIP: SS3S�
Will this be a Parade of Homes, Remodelers Showcase Home or other Display Home?
1AYes ❑ NO If yes, a special event permit is required with Police Department and City Council approval
60 days prior to the event. Shuttle bus service will be required unless applicant demonstrates
sufficient on-site parking is available. Non permitted events will not be allowed.
NAME OF OWNER: 0ever,i.l Geore, PHONE: (home) (0 a- ?4Ce -&3y 3
(work)
MAILING ADDRESS: CITY:Yyv u 14,fir- 967 ut e_
CONTRACTOR:j>ChAftAk1k -.7. PHONE: — 3&(P—93443
CONTACT PERSON: 141 „ Slonk MOBILE/PAGER: - &4 — Z183
MAILING ADDRESS: 1:5 jWjb6j22Kj CITY: jjp4pjrF_A $.ZIP:
STATE LICENSE: #�p.,. EXPIRATION DATE: W, AE
ARCHITECT/ENGINEER: JF^- Z %CV, •per"(- PHONE:
MAILING ADDRESS: !( It 3• CITY: ftN5 ZIP:
NAME: REGISTRATION: # 4341 w
TYPE OF WORK: New Addition Accessory Structure
Move Home Remodel/Alteration
PROPOSED WORK(describe in detail): N,c/ g=c*4ST4KVCMCf4 19%VMI 1T A.L—
"ON O—. SGTr Cg2hWMD.KMeN E���NLAi { l►Ib CaOC-1 A[b S YST�+IA
STORIES: Z SQ.FEET OF EACH FLOOR: Gi�dG•FI'y
NO. OF BEDROOMS: GARAGE STALLS: ATTACHED_%, DETACHED_
ESTIMATED CONSTRUCTION VALUATION(excluding land): $ I • �M
I hereby apply for a building permit and I acknowledge that the information above is complete and accurate;
that the work will be in conformance with the ordinances and codes of the City and with the State Building
Code;that I understand this is not a permit and work is not to start without a permit;and that the work will be
in accordance with the approved plan.
i
APPLICANT'S SIGNATURE:- i DATE: y 7--e�)s
31 ,��'�'z
Sec.13.04 RIGHTS OF SUBJECTS OF DATA
Subd. 1. Type of data. The rights of individual on whom the data is stored or to be stored shall be as set forth in this section.
Subd.2. Information required to be given individual.An individual asked to supply private or confidential data concerning himselfshall be
informed of (a)the purpose and intended use of the requested data within the collecting state agency,political subdivision,or statewide system;(b)
whether he may refuse or is legally required to supply the requested data;(c)any known consequence arising from his supplying or refusing to supply
private or confidential data;and(d)the identity of other persons or entities authorized by state or federal law to receive the data. This requirement shall
not apply when an individual is asked to supply investigative data,pursuant to section 13.82,subdivision 5,to a law enforcement officer.
The commissioner of revenue may place the notice required under this subdivision in the individual income tax or property tax refund
instructions instead of on those forms.
Subd.3. Access to data by individual. Upon request to a responsible authority,an individual shall be informed whether he is the subject of
stored data on individuals,and whether it is classified as public,private or confidential. Upon his further request,an individual who is the subject of
stored private or public data on individuals shall be shown the data without any charge to him and,if he desires,shall be informed ofthe content and
meaning of that data. After an individual has been shown the private data and informed of its meaning,the data need not be disclosed to him for six
months thereafter unless a dispute or action pursuant to this section is pending or additional data on the individual has been collected or created. The
responsible authority shall provide copies of the private or public data upon request by the individual subject of the data. The responsible authority
may require the requesting person to pay the actual costs of making,certifying,and compiling the copies.
The responsible authority shall comply immediately,ifpossible,with any request made pursuant to this subdivision,or within five days of
the date of the request,excluding Saturdays,Sundays and legal holidays,if immediate compliance is not possible. If he cannot comply with the request
within that time,he shall so inform the individual,and may have an additional five days within which to comply with the request,excluding Saturdays,
Sundays and legal holidays.
Subd.4. Procedure when data is not accurate or complete. An individual may contest the accuracy or completeness of publ is or private data
concerning himself. To exercise this right,an individual shall notify in writing the responsible authority describing the nature of the disagreement. The
responsible authority shall within 30 days either: (a)correct the data found to be inaccurate or incomplete and attempt to notify past recipients of
inaccurate or incomplete data,including recipients named by the individual;or(b)notify the individual that he believes the data to be correct. Data in
dispute shall be disclosed only if the individual's statement of disagreement is included with the disclosed data.
The determination of the responsible authority may be appealed pursuant to the provisions of the administrative procedure act relating to
contested cases.
DATA PRIVACY ADVISORY
In accordance with M.S. 13.04,Subd.2,"Rights of subjects of data",we would like to inform you that your request
for a permit or license from the City of Orono or any of its departments may require you to furnish certain private or
confidential information.
You are notified that:
1. The information you furnish will be used to determine your qualification for the permit or license
requested.
2. You may refuse to supply data,but refusal may require that the City deny the permit or license.
3. The information may be shared with other local, state or federal agencies to the extent necessary to
process the permit or license.
4. If your requested permit or license requires Council action to approve, some information may become
public.
5. You have certain rights under M.S. 13.04(available upon request)to review private data on yourself.
6. Your full name is required to process this application or permit.
J (k&,gr- &eo r-c; R
First Middle Last
)3 R .4
Address
City State Zip Phone
I understand my rights as stated above.
Signature
32
CHECK OFF LIST FOR ISSUANCE OF PERMITS
FOR OFFICE USE ONLY
ADDRESSOR LEGAL: Z 95y S W A-MV-1-OW u 2z00
PID:
DESCRIPTION OF WORK: Wt_,L ) k?,BS
ZO. L G REVIEW BY: ,Q DATE APPROVED: S-3i-ol-
BUILDING REVIEW BY: DATE APPROVED: S-3i
FEES TO BE CHARGED: Misc. Fees Calculated By:
PERMIT Yes No
PLAN REVIEW Yes No SEWER CONNECTION
STATE SURCHARGE Yes No WATERCONNECTION
INVESTIGATION FEE Yes No PARK FEE
SAC Yes No SITEINSPECTION
Number of SAC-Units OTHER (specify)
ZONING CHECK LIST Zoning District:
Fire Department: Post Office: School District:
Lot Area: Sq.ft. I 06,-1 22 Acres 2, L(!;' Width 2,3 j Depth
Survey Submitted: Yes W_ No Date of Survey: S• 3���
Proposed Setbacks:
Front(L-alae): 10`{ Right Side: SI.2
Rear (Street): 22.3 A Left Side: 16
Adjacent Structures: IV I od Wetland: -26 .-5
Building Height: Def. Hgt. 30 Peak Hgt. 3Y�
Lot Coverage: N
Grading: Staff Approval Date: By: Council Approval Date:
Septic: Staff Approval Date: 7• Zg -011 By: Kis .
Zoning File: # — Resolution: # Resolution Date:
Shoreland District: M6
Avg. Setback: Bluff Setback: Lot Coverage:
Existing Proposed
Hardcover: 0-75'
75-250'
250-500'
500-1000'
Hardcover Variance Required: YeDate of Council Approval:
REMARKS (in house):
BUILDING REVIEW CHECK LIST
UBC: 2. 1 CONSTRUCTION TYPE:
Sq Footage $Per Sq Ftg
Basement x = .
1st Floor x _
2nd Floor x
Garage x =
x =
TOTAL
Estimated Construction Value: $ 1,-Soo, oa a
Inspections Required: Work Requiring Separate Permits:
Site >! Plumbing Fire
Hardcover Removal _a Mechanical Water Connection
Footing X Septic Sewer Connection
of Framing _j,/ Fireplace )c Lawn Irrigation
Insulation (Masonry) Other
Wall Board k (Mfg,) _-04 Well (State Permit)
i- Final Grading/Filling _K Electrical (State Permit)
Other
REMARKS(IN HOUSE):
_------------------ -------------------------------------
REVIEW BY OTHERS: DATE:
Access: Existing New
Access Approval: Date By:
-----------------------------------------------------------
REMARKS (TO BE NOTED ON PERMIT):
8
American PolySteel Technical Data Pagel of 2
Insulating Concrete Forms for Residential and Commercial Const
IM
r . . HOME I3t11t.REF:5 COM ERCIAL `A,RCHITECT5& RLY.
OWNE95 ENCANEER5 OWNEMIJILDER
ySteel Form
ySteelLite-Deck
ti act Gallery PolySteel Form Technical Data Sheet
me Plans PRODUCT DESCRIPTION
fe Rooms
An expanded polystyrene concrete forming unit which is
s used to construct a one-piece, monolithic concrete wall
technical Date with reinforced concrete post and beam. The Forms
remain in place providing a super energy efficient
siness Opportunity concrete wall and finished with conventional interior and
ents&Expos exterior wall coverings.
4Ut�S MATERIALS OF MANUFACTURE
7
ntact Us 6 Molded expanded polystyrene (EPS), self-extinguishing, confirmi
ASTM ASTM C 578
KGs
0 Galvanized welded steel cross ties, 11-gauge minimum thickness
e Map welded in at least 40 locations.
0 22-gauge galvanized steel attachment furring strips, recessed 1/:
1-1/2"wide by 13" high (PS-3000)
1-1/2"wide by 21" high (PS-4000)
_ NOMINAL DIMENSIONS
Entire Pole 6" Form 8" Form 10"
I' roduc LIne
Glick w request a PS-3000
FREE Gp' Length 48" 48"
4
Height 16" 16" 1
VRA's Width 9.25" 11" 1
choice for the (6"core) (8"core) (10"
DotcDM
DreamH4ME
PS-4000
Length 48" 48"
Height 24" 24"
Width I 11" I 13"
(6"core) (8"core)
6
New! CONCRETE REQUIREMENTS TABLE (PDF Format)
http://polysteel.com/tech.htm 5/3/2005
Frequently Asked Questions Pagel of 3
Insulating Concrete Forms for Residential and Commercial Const
IAL
AL.W. ATT
HOME �L€lLDERS COMMERCIAL AR,CHITECT5# D.I.Y.
OW'NE E CANEER5 OWNEWBUILDER
t Steel Form
ySteel Lite-Deck
1. What is the R-Value of PolySteel?
oleoa!ler 2. How much does it cost to build with PolySteel?
e Plans 3. What kind of footings are required for-PolySteel_walls?
4. How high a PolySteel wall can you pour at one time?
fe Rooms 5. How do I attach stucco, siding or brick to_PolySteel walls?
ws 6. What makes-PolySteel better than other EPS forms?
7. How can I learn more?
ethnical Data -- -
siness O taort�anity
�n�� Iv
errts 8 Expos
about Us
ordact Us
1. What is the R-Value of PolySteel?
` s Walls made of PolySteel perform, on an average, like a wood frame w
Site Map constructed for R-30 insulation. But that's not the whole story. The Ei
R-Value performance of PolySteel consists of three factors: (1)the R-'
the expanded polystyrene, (2)the thermal stability of massive concret,
reduces the temperature fluctuations, and, consequently, the heat loa(
requirements, so common to wood-frame buildings. Finally, air leakac
(infiltration)can account for 20% to 40% of the heat load requirementE
wood-framed building. PolySteel reduces this air infiltration by 75%! ,
result, with the combined performance of the R-Value of the expa
ErTt4reoll polystyrene, the stabilizing effects of the thermal mass of the cor
I'r o d u c Ll n c and the reduced air infiltration, PolySteel walls actually perform
Glick to raquafm a as R-50, or more, in some areas of the country. We even guarante
FE GDS writing, that a homeowner will save at least 33% of their energy costs
6 construction with R-19 insulation throughout the United States.
BQB VILA`s Top of rage
choice for the
DoteOM
-,DreemHOME
2. How much does it cost to build with PolySteel?
The best way to answer this question is to compare building with Poly
the alternative construction you are considering.
• A PolySteel home will cost, on average 2%to 4% more than bL
exterior walls of a home with 2 X 6 frame construction. If the al
is 2 X 4 construction, the difference would be slightly higher.
• A PolySteel basement will cost about the same, or even less, tt
http://polysteel.com/faq.htm 5/3/2005
nup: t,Vjy0L.,.,..__..-- --- "�—
American PolySteel Technical Data Page 2 of 2
TYPICAL DESIGN VALUES
Expanded Polystyrene density 1.5 lbs./cu. ft.
Average thickness of EPS 2.4" per side (6"core); 2.5"per side
R-Value of 1.5 Ib. /cu ft EPS 4.17/inch
K-Factor of 1.5 Ib. /cu ft EPS 0.24/inch
Average R-Value Per Form 20" (See Effective R-Value)
Thermal mass with concrete 56 lbs./sq. ft. (6"core), 76 lbs./sq. i
core)
Air Infiltration Comparison 25% versus wood frame
'Effective R-value for PolySteel R26 to R30
Wall
Water absorption (volume) Less than 3% (ASTM C272)
Water Vapor 1.39 perm in.
Transmission 1.27 perms per inch
Breathability/permeability
Sound class 48 with 1/2"drywall
Fire Wall 4 hours,without the addition of any
coverings to assist in its performanc
EPS compressive strength 15-21 psi (10% deformation)
If. Concrete compressive strength 3,000 psi (typical)
Concrete pouring temperature Down to 0°F (-18° C)
kap qo*o ps Go ai c rev4- - w k.,L o u+►�e�
DAyS " btCA&C."..f-rix. e".vrrall'a 7/.L
/�/6!./ .!frviwts C4rt�s IV q a as v 14'r
CSI Specifications Code Approvals
Installation Manual Tools& Accessories
Technical Assistance Safety Information
home home owners • builders • commercial • architects & engineers
http://polysteel.com/tech.htm 5/3/2005
HARDCOVER CALCULATION WO P
SETBACKZONE: (CIRCLEONE) 0-75' 75-250' 250-500' 500-1000'
EXISTING HARDCOVER IN ZONE
A. House VIA# x fWw%e w4d SF
ength Width
x = S.F.
x = S.F.
x = SF
B. Garage x S.F.
C. Driveway x >/O =
s/o� S.F.
x 3D = L S.F.
D. Sidewalk x = S.F.
x = S.F.
E. Patio/Deck x = S.F.
x = S.F.
F. Landscape x = S.F.
Underlain x = S.F.
By Plastic x = S.F.
Or Fabric
G. Other x
S.F.
TOTAL HARDCOVER IN ZONE - S.F. A
TOTAL PROPER AREA IN ZONE, B x 100 = 9� _SF B
�•RLz9!
PROPOSED HARDCOVER IN ZONE
A. House �� x
Length - S.F.
idth
x = S.F.
x = S.F.
x = S.F.
B. Garage dL x _ �gem
7 �?® —�1/Jap S.F.
C. Driveway x S.F.
x = S.F.
D. Sidewalk �' x _ _ _ ) S.F.
x = S.F.
E Patio/Deck ago x Sb = /Do0 S.F.
x = S.F.
F. Landscape x = S.F.
Underlain x =
S.F.
By Plastic x = S.F.
Or Fabric
G. Other A11A x =
S.F.
TOTAL HARDCOVER IN ZONE - �(,,(� S.F. A
TOTAL PROPERTY AREA IN ZONE - S.F. B
A .. B _
x 100 - 3.3
23
MEMORANDUM
To: Lyle Oman, Building Official
Street File, 2845 Watertown Road
From: Mike Gaffron, Planning Director
Date: June 2, 2005
Subject: Administrative Lot Area Variance for 2845 Watertown Road
--ATTACH THIS TO BUILDING PERMIT—
The above referenced property contains approximately 2.47 acres gross area, of which
approximately 82,764 s.f. or 1.90 acres is dry buildable land(exclusive of jurisdictional wetland)
per the property owner's surveyor, Mark Gronberg. The property is zoned RR-1B Rural
Residential,requiring a dry buildable lot area of 2.0 acres.
Per Orono Zoning Code Section 78-72(b)(3) as amended by Ordinance No. 9, Third Series on
May 24, 2004, the Planning Director has the authority to grant a lot area variance if the following
conditions are met:
1. The lot area and lot width each meet at least 50%of the district standards.
(This standard is met)
2. Suitable primary and alternate septic sites are identified on the property and are protected
from future development by execution of a covenant.
(Sites are identified and approved;covenant document to be executed by owner
and filed in chain of title is attached)
3. All other zoning ordinance requirements must be met, including but not limited to the
following:
i. Setbacks (Met)
ii. Hardcover(Not Applicable)
iii. Lot coverage by structures (Met)
iv. Accessory structure requirements (Not applicable at this time)
The house has been placed 26'from the jurisdictional wetlands on the property and is therefore not
subject to the Wetland Moratorium,with the caveat that no land alterations(grade changes)within
the 26'wetland setback will be allowed.
Based on the above, an administrative lot area variance is hereby approved, subject to execution
of the covenant for protection of sewage treatment sites prior to issuance of building permit.
RESTRICTIVE COVENANT
FOR PROTECTION OF SEWAGE TREATMENT SITES
KNOW ALL MEN BY THESE PRESENTS that
(collectively, "Owners"), do hereby expressly covenant and agree to protect the approved sewage
treatment sites on the real property in Hennepin County, Minnesota, legally described as Lot 8,
Auditor's Subdivision No. 241, Hennepin County, Minnesota,per the following provisions:
The property has two Orono-approved sewage treatment sites. To protect these important sites
from inadvertent damage or destruction, Owners shall do the following:
1. Erect and maintain a clearly visible fence during construction twenty feet from the
boundary of the approved primary and alternate sewage treatment sites along all parts
of the property that are potentially accessible to vehicular traffic including cars,trucks,
delivery vehicles,earth moving equipment,etc. Said fencing shall be in place prior to
any earth-moving or construction activity on the site, and shall remain in place until
completion of construction and final landscaping of the property.
2. After completion of construction, Owners shall maintain the alternate (future) sewage
treatment site in an undisturbed manner,and not allow any excavation,filling,structures
or vehicular traffic on the alternate site, in order that the alternate site be available for
future use should it be needed.
This Restrictive Covenant shall run with the land,shall be binding upon Owners,their respective heirs,
successors and assigns, and may be terminated only upon written agreement of the City of Orono.
The undersigned Owners have read,understood and hereby agree to the terms of this resolution and on
behalf of the Owners and the Ownerss' heirs, successors and assigns,hereby agree to the recording of
this covenant in the chain of title of the property.
IN WITNESS WHEREOF,Owners have hereunto set their hands this day of ,
20
Page 1 of 2
N '
STATE OF MINNESOTA )
)ss.
COUNTY OF HENNEPIN )
This instrument was acknowledged before me this day of ,20_,by
Notary Public
THIS INSTRUMENT WAS DRAFTED BY:
City of Orono
P.O.Box 66
Crystal Bay,MN 55323
(612)249-4600
Page 2 of 2
8�1
DATE TIME
CITY OF ORONO CALLED IN
INSPECTIONNOTI E SCHEDULED
PERMIT NO. n F!;-&Y'& COMPLETED
ADDRESS ��-t- Z--t 0 c12 1
OWNER CONTR. �� �Cr><' .
TELEPHONE NO. 5 z,- O/ 7
DESCRIPTION
4 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING
Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
ti 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
v 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
v 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
OWNERICONTRACTOR TO MEET YOU: YES_NO
COMMENTS:
cc
W
C
J
O
cc
O
2
W
cc
Q
Z
W
W
d
�
/_W__1
RKSATISFACTORY:PROCEED ❑ PROJECTCOMPLETE
W RRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
BEFORE COVERING
PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the nex inspection 24 hours in advance. (952) 249-4600
Owner/Contra si
Inspector
White Copyllnspector's Flie Canary Copy/Site Notice
,��W
D T TIME V
CITY OF ORONO CA61
INSPECTION SCHEDULED •�
PERMIT NO._M1919
�(cSL7�A1
ADDRESS
OWNER CONTR.
al
TELEPHbNE NO. %J/Z1 45
C4ESCRIPTION
01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING
W FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
1) 03 O 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
v 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
Z OWNERICONTRACTOR TO MEET YOU:_YES_NO
COMMENTS:
cc
W
a
J
O
O
LL
W
Qz
Q
Z
W
Z
W
cc
O
W AeWORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
ar
W ElCORRECT WORK&PROCEED ElISSUE CERTIFICATE OF OCCUPANCY
0 El CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
C.1 BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTOTAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (952) 249-4600
Owner/Contra i
Inspector.
White CopylInspector's FI Canary Copy/Site Notice
V
DATE TIME
CITY OF ORONO CALLED IN
INSPECTION NQUC SCHEDULED -n 3-tom
PERMIT NO. 95OS69 6 COMPLETED 7-'0a_Ck�� 3-/0
ADDRESS 2 L-1 , 1 AE7 &J_N RJ
OWNER CONTR. tar 1 C
TELEPHONE NO.
DESCRIPTION
W 01 FOOTING 1
'IT 1 MECHANICAL RI 18 EXCAV/GRADING/FILLING
0. 02 FRAMING pcxJ/° 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
y0 03 INSULATION ^ 1 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z 04 WALL BD. W I"► 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
v 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
v 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
;;t OWNERICONTRACTOR TO MEET YOU:_YES_NO
2 COMMENTS:
o;
W
0.
0
Ef nt,�5e
cc
° o re
W
ac
Q
f2
Z:
W
Z
W
ac
�>WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
❑CORRECT WORK&PROCEED 1-1ISSUE CERTIFICATE OF OCCUPANCY
W
Q ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
U BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN
INSPECTOR WILL RETURN
C3STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next iinspeotiol hours inn n e. (952) 249-4600
Owner/Contractor on site:
Inspector.
White Copylinspectoes File Canary Copy/Site Notice
TIME V
CITY OF ORONO CALLED IN
INSPECTION NOTICE SCHEDULED _-7 3�
PERMIT NO. JOd 9�4024e, COMPLETED nn
ADDRESS 2��S l� /
OWNER CONTR. Zz.,ff-
TELEPHONE NO. 9�5
DESCRIPTION �(a01 FOOTING FOOTING 11 MECHANICAL RI 18 EXCAWGRADING/FILLING
Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
y 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
OWNER/CONTRACTOR TO MEET YOU: YES_NO
COMMENTS:
W
j
O
cc
O
LL
W
CC
Q
1
Z
W
z
W
Cr
O
Wcc WORK SATISFACTORY:PROCEED ElPROJECT COMPLETE
W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN
INSPECTOR WILL RETURN El CITATION ISSUED
1-1STOPORDER POSTED.CALL INSPECTOR
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the xt inspection 24 hours in advance. (J52) 249-4600
Owner/Cont site:
Inspector. £'
White Copy/Inspector's File Canary Copy/Site Notice
�DA9 TIME
CITY OF ORON CALLED IN l/
INSPECTION NOTICE SCHEDULED < <
PERMIT NO._22l) 9'&9'& COMPLETED
ADDRESS 2 X4/5 LUa r"e� �z3c�i1 4
OWNER CONTR.
TELEPHONE NO. ��` ��7
DESCRIPTION )qO
W 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING
02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
y
Q 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
Z OWNER/CONTRACTOR TO MEET YOU:_YES NO
COMMENTS:
cc
W
CL
cc
ZI Is 71;p c40
0
LL
W
rc
Q
Z
W
z
W
CC
d
W tW61<SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
W
W 11CORRECT WORK&PROCEED ElISSUE CERTIFICATE OF OCCUPANCY
Q ElCORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTOTAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR ❑ CITATION ISSUED
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (952) 249-4600
Owner/Contractor on site:
Inspector. ley /f��
White CopylInspector's File Canary Copy/Site Notice
1 DATF TIME
CITY OF ORONO CALLED IN
INSPECTION NOT CE SCHEDULED
PERMIT NO. COMPLETED
ADDRESS L. a.f+m, ;yn
OWNER CONTR. 6 (ar C F
TELEPHONE NO. S-`02 2 72'5 ('-kr:S
DESCRIPTION ,� ::fA" ,L .YQ
4 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING
Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
v 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
OWNERICONTRACTOR TO MEET YOU:_YES_NO
COMMENTS:
W
0.
o , T -; 4, c),-J p �
C�vf e cl
0
U_
W
CC
Q
z
w
LU
cc
a
ORK SATISFACTORY:PROCEED ❑ PROJECTCOMPLETE
W
❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
O ❑ CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR ❑ CITATION ISSUED
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (952) 249-4600
Owner/Contractor on site:
Inspector.
White Copy/inspector's File Canary Copy/Site Notice
/"� ; DATE TIME
CITY OF ORONO CALLED IN
INSPECTION NOT /_ SCHEDULED �Z/S/oS �'. 30
p �j
PERMIT NO. �O b & COMPLETED p
ADDRESS 28 -5 U-212< f P�4-o L,0 el
OWNER CONTR. 1,001ar- �CjC=
TELEPHONE NO. ,,cc�, �l JOZ 0 D -7 0 —7
DESCRIPTION t ra ir,i rqt
01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING
Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
y 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
v 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
OWNERICONTRACTOR TO MEET YOU:_YES_NO
COMMENTS:
ccLU
n
a
cc
O
O
cc
O
U_
W
cc
Q
1
Z
W
W
cc
d
WORKSATISFACTORY:PROCEED ElPROJECTCOMPLETE
cc
W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR ❑ CITATION ISSUED
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the ext inspection 24 hours in advance. (952) 249-4600
Owner/Con n site:
Inspector.
White Copy/Inspector' .File Canary Copy/Site Notice
I& &1A Aer
D TE TIME
CITY OF ORONO CALLED IN 1_ '0
INSPECTION NOTICE SCHEDULED l-/O- (,o 5,00
PERMIT NO. /J���� COMPLETED
ADDRESS `
OWNER CONTR.
TELEPHONE NO. Q1,2 JF0 7 0 7A.�__..
N- DESCRIPTION
01 FOOTING /MECHANICAL RI 18 EXCAWGRADING/FILLING
Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
y02'INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Zl04 D. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
v 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
v 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
OWNERICONTRACTOR TO MEET YOU:_YES_NO
COMMENTS:
cc
W
a
J c-2 K I
O
a
cc
O
k
W
cc
Q
Z
W
z
w
d
W /-"0,
RK SATISFACTORY:PROCEED L] PROJECTCOMPLETE
CC
W CORRECT WORK&PROCEED ISSUE CERTIFICATE OF OCCUPANCY
Q ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
C1 BEFORECOVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR ❑ CITATION ISSUED
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next spection 24 hours in advance. (952) 249-4600
Owner/Contra t
Inspector.
White CopylInspector's File Canary Copy/Site Notice
� � n
'l�D'r� TIME
CITY OF ORONO CALLED IN
INSPECTION NOTI SCHEDULED
PERMIT NO. �O COMPLETED A
ADDRESS
OWNER CONTR.
TELEPHONE NO. a 7S3
DESCRIPTION " `,22_/e
01 FOOTING 11 MECHANICAL RI 18 EXCAWGRADING/FILLING
Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
y 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z
04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
`96 FINAL 14 SEWER HOOK-UP 06 PROGRESS
F- 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
v 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
J 10 PLUMBING FINAL �� 36 FOUNDATION/REMOVAL
OWNER/CONTRACTOR TO MEET YOU:—4I
_NO
COMMENTS: �l
� nn
a
W
Q
If
z
W
z
W
CC
1
d
W ❑WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
Uj
W ❑CORRECT WORK&PROCEED ElISSUE CERTIFICATE OF OCCUPANCY
O��CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR 0 CITATION ISSUED
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (952) 249-4600
Owner/Contractor ite:
Inspector
Whiteopy/Inspector's File Canary Copy/Site Notice
DATE TIME
CITY OF ORONO CALLED IN
INSPECTION N TIQCE SCHEDULED /� 2 3n
PERMIT NO. ��B (0Oo COMPLETED
ADDRESS �Lit S *-0
OWNER CONTR.
TELEPHONE NO.
►-� c � c . n . ,�
DESCRIPTION
01 FOOTING 11 MECHANICAL RI 18 EXCAWGRADING/FILLING
Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
y 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z
04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
v 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
OWNER/CONTRACTOR TO MEET YOU:IYES NO
COMMENTS: L_"k +nnit l 1u 10 If'Z-�S Q
W
Q_
o IM'ti 1 �6 91 7
cc
LL. 33
LU -
QC
Q
z
W
z
W
d
W ❑WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
ac
W ❑CORRECT WORK&PROCEED ElISSUE CERTIFICATE OF OCCUPANCY
0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
C1 BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTOTAKEN
INSPECTOR WILL RETURN
ElSTOP ORDER POSTED.CALL INSPECTOR 11 CITATION ISSUED
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the nex i spection 24 hours in advance. (952) 249-4600
Owner/Contra t si e:
Inspector. Q khoi
White Copy/Inspector's File Canary Copy/Site Notice
jt7 657/,07
/,07 TIMECITY OF ORONO CALLED I a / ; m
INSPECTION NOT C SCHEDULED `�
PERMIT NO. COMPLETED
ADDRESS G LC_. fer_l flu)n
OWNER CONTR.
TELEPHONE NO. �n�� � � /G
DESCRIPTION
W 01 FOOTING 11 MECHANICAL RI 18 EXCAWGRADING/FILLING
02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
COT
O 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
v 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
OWNER/CONTRACTOR TO MEET YOU: YES NO
COMMENTS:
W
CL
� ' CAP �-I-
0
SC)t>-,f b-, LJA (I
0
LL
W
Cr
Q
z
W
Z
W
ac
d
Wac WORK SATISFACTORY:PROCEED L] PROJECTCOMPLETE
W ❑ RRECT WORK&PROCEED LXSUE CERTIFICATEOF OCC ANCY
E)CORRECT WORK,CALL FOR REINSPECTION TEMPO
V BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTOTAKEN
INSPECTOR WILL RETURN
El CITATION ISSUED
E)STOP ORDER POSTED.CALL INSPECTOR
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (J52) 249-4600
Owner/Contractor on site:
Inspector. 1 '4
White Copy/Inspector's File Canary Copy/Site Notice