Loading...
HomeMy WebLinkAboutMCWD permit MINNEHAHA `—`"'-CREEK WATERSHED DISTRICT QUALITY OF WATER QUALITY OF LIFE The Minnehaha Creek Pursuant to Minnesota Statutes Chapter 103D, and on the basis of statements and information contained in the permit application, correspondence, plans, Watershed District is maps, and all other supporting data submitted by the applicant, and made a part hereof by reference, PERMISSION IS HEREBY GRANTED to the applicant committed to a leadership named below for use and development of land in the Minnehaha Creek role in protecting, Watershed District. improving and managing the surface waters and Issued to: Amanda and Peter Vanoverbeke Permit No: 12-400 affiliated groundwater Location: 2645 Watertown Rd Orono, MN resources within the Purpose Erosion Control— Sinale Family Home District,including their Date of Issuance: 11/01/2012 Date of Expiration: 11/01/2013 relationships to the By Order of the Board of Managers ecosystems of which they are an integral part. Brandon Wisner We achieve our mission District Technician through regulation, This permit is not transferable without District approval, and is valid to the date of capital projects expiration. No activity is authorized beyond the expiration date. If the permittee requires more time to complete the project, an application for renewal of the education,cooperative permit must be received by the District at least 30 days before expiration. endeavors,and other The applicant is responsible for compliance with all District Rules and for the programs based on action of their representatives, contractors, and employees. sound science, Conditions: Project to be completed as described in plans submitted to the MCWD office on October 15, 2012 according to the provisions of innovative thinking,an this permit. informed and engaged • Properly install and maintain all required erosion control measures until the disturbed areas are re-stabilized constituency,and the . When the site is re-stabilized and the MCWD staff has cost effective use of performed a final inspection, all silt fences must be removed public funds. (Statement concerning fees for inspections, violations, etc... on following page) 18202 Minnetonka Boulevard, Deephaven, MN 55391 ®Office: (952)471-0590 9 Fax: (952)471-0682 0 www.minnehahacreel<.org Inspection/Analysis/Monitoring Fees A site inspection and monitoring by District staff will be performed where the activity involves: • a commercial/industrial/multi-family residential development • a single family residential development greater than 5 acres or of any size if within the Minnehaha Creek subwatershed • any alteration of a floodplain or wetland • dredging within the beds, banks or shores of any protected water or wetland • a violation •. any project which in the judgment of the District staff should be inspected due to project location, scope, or construction techniques In these cases, the applicant shall pay to the District a fee equal to the actual costs of field inspection of the work, including investigation of the area affected by the work, analysis of the work, and any subsequent monitoring of the work, which in the case of a violation shall be at least$35. Standard Fee Schedule District professional staff $ 57.74* District interns $ 36.44* District clerical staff $ 42.16* Consulting Senior Engineer $contracted rate Consulting Engineer/Technician $contracted rate District Counsel $contracted rate Application fee $ 10.00 Copy costs $ .25+actual staff time Color copy costs $ 1.00+actual staff time , * Hourly