HomeMy WebLinkAboutRe: wetland determination/wetland buffer Melanie Curtis
From: Mark Perry [markpe@bolton-menk.com]
Sent: Wednesday, October 31, 2012 10:37 AM co.'
To: Melanie Curtis; Christine Mattson
Cc: Robert Bean; David P. Martini
Subject: Building Permit#2012-01026, 2645 Watertown Road *. , ,
Attachments: 2645-Wetland Determination_102912.pdf; 2645-Wetland Buffer-102912.pdf; Wetland
Looking East.JPG; Wetland Looking West.JPG; 2645Watertown-Road-
Appl icationCom ments_103012.pdf C 12
Melanie, Wo
Please find attached our findings and comments regarding the above mentioned permit application. 04
1 sent you a few pictures yesterday and I have a couple more of the entire site that I will send separately.
A couple of notes on the comments—
1—I know that we discussed the item of escrow on top of the permitting fees. I don't recall that a firm decision was
made so I am including some cost for wetland delineation in the escrow amount. If you would like us to adjust this,
please let us know.
2—Because this is an estimated buffer need in lieu of final findings in the wetland delineation,the language in the
recommendation is a little different from other recommendations. We hope that this language is clear enough and
complete enough to address this type of situation. If you would like us to word it differently, let us know.
As always, let us know if you have questions.
mark
Mark L Perry, WDC
Natural Resources Specialist
Bolton & Menk, Inc.
Consulting Engineers&Surveyors
2638 Shadow Lane, Suite 200 if
r
Chaska, MN 55318
Office: 952-448-8838 ext. 2741
Fax: 952-448-8805
Cell: 612-756-3795
3+-a,4
ISD (1.26ea- ?
S-
• = BO ETON 8a- M B N K , I N C
Consulting Engineers & Surveyors
2638 Shadow Lane, Suite 200• Chaska, MN 55318-1172
Phone (952)448-8838 • Fax (952)448-8805
www.bolton-menk.com
October 31, 2012
City of Orono
Attn: Melanie Curtis
PO Box 66
Orono,Mn 55323
RE: Wetland Determination-Building Permit#2012-01026
2645 Watertown Road
Dear Melanie:
As requested,we have made a wetland determination at 2645 Watertown Road. We offer the following
observations,comments,recommendations, figures and pictures for your consideration.
1. This is a wetland determination made for the purpose of determining buffer requirements, if any. This
is not to be used in place of an approved wetland delineation. An official wetland delineation should
be completed in the spring,once the growing season starts,and submitted to the Minnehaha Creek
Watershed District(LGU)for approval,with a copy provided to the City.
2. One potential wetland was identified just south of the property boundary(see Fig 1). The potential
wetland is a shallow, narrow ditch channel. The soil directly adjacent to the ditch is not hydric and
therefore,the area outside the ditch would not qualify as wetland.
3. Based upon the assumption that there is a wetland present,the proposed construction has the potential
to adversely impact the wetland which will trigger the wetland protection ordinance requirements.
Therefore,the following should be considered:
a. This wetland is listed as a"Manage 2"wetland management class in the MCWD's Functional
Assessment of Wetlands inventory,which requires a 25 foot buffer per City code.
b. The exact extent of the buffer area cannot be determined until an approved wetland
delineation is performed. An estimate of the buffer area can be measured from the edge of the
ditch(see fig 2).
c. The proposed buffer area consists mostly of a short steep slope which has been recently
graded and stripped of vegetation. A portion of the buffer area lies within a wooded area that
is dominated by buckthorn in the understory.
d. Buckthorn is considered to be an undesirable plant and should be removed within the buffer
zone and replaced with native vegetation. MnDOT seed mix 350 is recommended for upland
buffer areas. A Vegetation Management Plan, including methods for removal and control of
any invasive plants and a schedule of native vegetation establishment, should be submitted for
review.
e. Wetland Buffer markers should be placed at the upland boundary of the buffer edge located at
lot lines and spaced a maximum 200 feet apart.
f. A$3,000 escrow should be submitted by the Owner to cover the cost of a wetland delineation
and buffer development if required but not completed by the applicant.
Please contact me if you have any questions or need additional information.
Sincerely,
BOLTON&MENK,INC.
Mark L. Perry, WDC
Natural Resources Specialist
nw
' 7
Y �
.r
s,
m
r _ ,
Watertown Rd s �., `
A
r�
F
i A
E
h �
a�
r
ANN-
44
40 11;,
e CITY OF ORONO
2645 WATERTOWN ROAD
• WETLAND DETERMINATION
Legend
u
O Sample Sites
0 Estimated Wetland
CIO 2645 Watertown Road
b0 fon-me�� Figure 1
OCTOBER,2012
MapD—.te (L:\Cha—ft WDES Bae\AKV-*Hmnepin 1.'y\mn-WOE5—Wm 1?'- - -
12/31/2009–2'A6:00 PM
Aw
_ -
k r
4 vw
I .
x r y
# • AW,Wate'6wn Rd
k a
�'
+f'
add. M1W:�
q
F �
at
4-
-A-
V
loo
N �y
i
3
ri
w m �
x
.. •' 41 T
gilt
e 0 50 100 CITY OF ORONO
Feet
2645 WATERTOWN ROAD
Legend BUFFER REQUIREMENT
•
0 EstDitch Wetland
Est-Buffer
2645 Watertown Road
GOR
bo/ton mg�� Figure 2
OCTOBER 2012
- nt u.\Chd5Yd0. 11 Bae\-1.e�4Nsrepincan�v��-nn.NVDEs Bse Ab.mO mm
i9ii aa9�z<caoPm