Loading...
HomeMy WebLinkAboutMCWD permit M EHAHA GREE pHq C9�� WATERSHED BOUNDARY Np WATERSHED DISTRICT MINI • F,D 14600 Minnetonka BoulevardFyaygc �F9SNEDS�Q Minnetonka, Minnesota 55345-1597 9FF� office:(612)939-8320 fax:(612)939-8244 LAKE MINNETONKA DISTRICT ADMINISTRATOR:Ellen B.Sones R ��dV SOTA IV R 94 BOARD OF MANAGERS: Thomas Maple,Jr.,Pres.•C.Woodrow Love•John E.Thomas Clarkson Lindley•Thomas W.LaBounty•Martha S.Hartfiel•Pamela G.Blixt 0 ON may , 1994 Permit Application No. 93-179: Applicant: Three Star Trucking 18025 Co. Road 6 Plymouth, MN 55447 Location: City of Orono, T118, R23, Sec. 33, SE 1/4 Purpose: Stormwater management plan involving construction of road and 8-lot subdivision. Dear Mr. Fischer: At the regularly scheduled December 21, 1993 meeting of the Board of Managers, the subject permit application was reviewed along with the following exhibits: 1. Permit Application 93-179 received October 7, 1993. 2. Revised drainage calculations received December 3, 1993. 3. Pond outlet design received December 3, 1993. 4. Wetland delineation report received December 3, 1993. 5. Wetland delineation data sheets received December 13, 1993. 6. Revised preliminary plat and grading plan received December 13, 1993. 7. Analysis of downstream capacity received March 15, 1994. 8. Emergency overflow detail received May 13, 1994. Action was taken approving your permit application pending receipt of Rule J fees in the amount of $569.50. Please note that due to size and complexity of certain projects, the Board requires that site inspections be conducted. In these cases, the applicant is required to pay to the District a fee equal to the actual costs of field inspection of the work, including investigation of the area affected by the work, analysis of the work, and any subsequent monitoring of zhe work. These costs are referred to as Rule J fees. The following condition shall be placed on the permit: l: rThe minimum opening elevation for a house placed on Lot 4 shall be``t elevation 1012.5 or 2 feet above the emergency overflow elevation of the northeast pond, whichever is highest. Please be advised that the project is not authorized until the above has been submitted, and you have been notified of permit issuance. Sincerely, Ellen B. Sones District Administrator EBS/cr c: Mark Gronberg, Coffin & Gronberg, Inc. Jeanne Mabusth, City of Orono