Loading...
HomeMy WebLinkAboutRe: final inspect 2335 Highway 36 W St.Paul,MN 55113 Tel 651-636-460C Fax 651.636.1311 www.bonestroo.com May 14, 2008 Bonestroo Mr. Lyle Oman Building Official City of Orono Post Office Box 66 Crystal Bay, MN 55323 Re: 2709 Walters Port Lane File No. 000139-08000-1 Plat No. 07-3333 Dear Lyle: On May 13, 2008, 1 visited the Dunkley residence at 2709 Walters Port Lane for the final inspection. At the time of the inspection the contractor was working on the following: 1. The North half of the East wall was fully complete and awaiting final inspection. Full completion includes installation of the tie-backs, 1'xl'x112" stainless steel plates and(2)3"x3"x114" painted angled-steel run longitudinally along the wall above the wafer.The contractor was unable to finish the South half of the East wall due to complications of moving equipment into the area until the back fill was complete on the North half. Therefore, I said the construction of the East wall was correct and they may proceed with backfill and finish the South half of the East wall the same as the North half. 2. The West wall, City side, was still under construction.The crew was working on the installation of the tie-backs, the stainless steel plates and the steel angle,therefore, a final inspection was not performed. The current construction and materials on site are within accordance of the plans and revisions submitted by Ulteig Engineering. I told the contractor, if they finish the remaining sections of wall in a similar fashion as the North half of the East wall, both the East and West walls will be satisfactory. In summary, the construction and materials of the East wall are correct but a final inspection of the West, wall is recommended. If you have any questions, please call me at(651)967-4567. Yours very truly, BONESTR00 OX-1t,� Brian Fleming Cc: Tom Kellogg