Loading...
HomeMy WebLinkAbout05-20-1996 Planning Commission Minutesk' • ORONO PLANNING COMMISSION MEETING VII D I i �n� UTES O IVA I&vt iv ROLL The Orono Planning Commission met on the above date with the following members Ypresent• Chair Ste rihen Peterson Can4lra Smith Dale T inµln�.:.ct F'l;Za�`eth ua:vp and Y , L , u y William Stoddard. Charles Schroeder and Janice Berg were absent. The following represented the City Staff. Building and Zoning Administrator Jeanne Mabusth and Recorder Sherry Frost. Councilmember Goetten and Mayor Callahan were present. Chair Peterson called the. meeting to nnder at 7:00 p.m. Peterson welcomed Bill Stoddard to the Planning Commission. Stoddard was recently annninted to the Commission by the Council. SCHEDULED PUBLIC HEARINGSlPUBLIC INFORMATION REVIEW ( #1) #2136 GREENFIELD CORPORATION, 180 NORTH SHORE DRIVE WEST - PRELIMINARY SUBDIVISION - 7:02 -7:40 P.M. The Affidavit of Publication and Certificate of Mailing were noted. Jim Pfennig and Laurie Lundeen were present along with surveyor, Mark Gronberg. • Mabusth reported that the property consists of 17 acres and was reviewed in a sketch plan at the March, 1996, meeting The key issue as access, and the di; #iculty of r,rovidi"S " nR 'n Y internal road to serve all six lots based on topography, location of wetlands, narrowness of 17 acre parcel and desire to preserve building sites. The road as nronosed serving lots 1; 3, and 4 would preserve the views to the south and east. The existing access at lot 6 to the south of the prntnarty nPPrIC to he eliminated as it is uncafP and Pnr.rnaches tnrnpPrty to south. A new access would be provided along the shared lot lines of lots 5 and 6. A new uvves$ ivr ivt 2 vvvu.d be iva. "Lt 375 wuth of the - interseCtion of Cc Rds 8v4 and 10 The County, Mabusth reported, has approved the locations for the two new curb cuts. Mabusth continued by reporting on the wetland areas within the property. There are designated ;ilet1wids and type 1 and 2 wetlands, ;x,hich nre not r„lecirrnaterrl ;x7etlandg and r b.. the City code but are protected under State and National laws. The applicants will be asked to file the usual protective covenants on the chain of title of each of the lots that contain these type 1 or 2 wetlands. In reviewing the hardships for not providing an internal road to serve all lots, topography and location of wetlands ..'ere noted. The need for the septic to meet the 604 slope requirement is also a concern. The internal road has been designed to provide a road outlot extension to serve property to the east when developed. • • MINUTES OF THE ORONO- PLANNING COMMISSION MEETING HELD ON MAY 20. 1996 (91 - 92136 Greenfield Corporation - Continued) Mabusth reported that all 12 septic sites tested will require mound systems. The existing residential Septic system is failing on lot 6a.nd nrima.ry and alternate sites were tested. Eleven of the sites meet the 6% slope requirement, The alternate site for lot 6 is at an 8% Onne xxThirh wnQ ntnrnrn%n -d h�r W,-A -man ThP nrnnnearl nrimary Site drips not mPPt the r. r ... r- ....w -� 75' separation from the well, but would meet the State setback. The applicant could be i d to 1. c"atte the n as11�.0 LV rt,1V t+LLLL✓ Lily YY X11, Mabusth described the variances required with the proposal. Three of the lots served at the cul -de -sac do not meet the width requirement. Applicant's surveyor noted lot 1 is surrounded by County road at the north and west, and lot 4 by the future road on that airing the east. Lot width variances, have hPen granters by the Citv in the. pact fnr the into adjacent to the. cul -de -sac. Mabusth noted that lots 2, 3, and 4 are long and narrow. 1;/Iabi:Sth asked thA (vmmicein» hn,v thin: xx,n„1r1 nh,.ciroll� d`nfine tl;° rear int lines nFtlta V UUiVii 1V YY .7 Vl,iiLi �/ ,'Ui VLL11,' V {Ai L U - V 3 parcels and protected septic sites from uses of future property owners. Peterson asked how that could be accomplished and still protect the septic sites? Mabusth Said ciune nr nlantinvc ara nnecihilitiec Nit cnnw fenr.ina was not arr.Pntahle ac it nnidd he easily removed. Mabusth said it shall be the responsibility of all three owners to know the boun},..,, »rl ,r;en Lindquist rim,'n4 Lori `{-`4i�;n »r,tat;r.» lri FYe »lam eri » ti,e rleerin L,,,+ A fol.,,nti, LLL11VJ. Lindquist asked 11 his 11V Latin 1 could VLF il1CLVt�d on. the deedd J, but A4l 1,U +11. • said property owners are not always aware of what is recorded on the chain of title. Mahnsth informed Peterson that there atP_. no plans for se_.wP_.ring the area in the near future. Mark Gronberg noted if lot 1 was built on, a mound system would be used, and would define the system. Smith noted the difficulty in defining the septic sites for lots 2, 3, and 4, especially with the need to go through a septic site area to get to the lots. She suggested the establishment of a corridor to notate inhere the septic sites would go. Mabusth asked if this would be a natural harrier? Cmith caul it nnidd he rhAineatPrs anrnc5 the two nrnnerty lines Peterson commented on the question of balance in developing the property and possible nPPrl to PliminatP a 1nt whit -h wac nntPr) during the elretnh nlan rPViPw NP nntPrl that if a lot was eliminated, it would solve the width and septic problems. Peterson said the C» »l,. -n »t i,e�,--A ti,in 'rim, I— en» rie.i „ 11 4; »n +L,e ;nm,en .i,er 4, »,Ye »4 n» ♦i,o il. p"VLLll L, VL�'V11U L1LJ iJJI{e, 11uJ rL'Jilo11L1VV VY Vll, 11V L1115 L11V 1JJUVJ VYe a co11L,.nge .+, V11 L11V 14 recommendations made by Staff. MINUTES OF THE ORONO PLANNING COMMISSION MEETING HELD ON MAY 20, 1996 • ( #1 - #2136 Greenfield Corporation - Continued) Jim Pfennig of Greenfield Corporation asked to respond. He noted that the property to the east, which is proposed to have road access from Outlot B, has an outlot access located more to the east. Regarding the septic site discussion, Pfennig said the subdivision would have an architectural review committee and covenants. He thought the first owners would have knowledge of the septic sites but did not know if that would continue with subsequent owners. Pfennig remarked concerning lot 1 and the 200' frontage on the County roads. He noted if Outlot A was extended to the west, there could be more frontage, but he did not believe it would make sense to blacktop in order to gain the 200' width. He also noted that the type 1 and 2 wetlands go up to Win elevation, which is unusual. Gronberg added that alot of the area will not be landscaped. He envisioned lawn for the areas adjacent to building sites and road but then leaving the remainder natural. Pfennig said the initial plans were to plant in alfalfa. Gronberg commented that there is a loss of 70' with Outlot B and the 50' road setback rather than a 30' side setback at east lot line. Outlot B will not benefit this development. Gronberg said he saw the development as similar to a PUD with clustering to the north, but saw no problem with the septic sites being close together as it does not interfere with • the wells. Peterson asked about easements. Mabusth said the City will asking for a bike easement along North Shore Drive and Bayside Road. The County has recently shown a comprehensive bike trail plan along North Shore Drive on the east side. The Park Commission asked for a bike trail within the drainage and utility easement. Mabusth said there is an issue with lots 5 and 6 regarding additional right -of -way. There will be a 10' easement. Mabusth said Weckman informed her the bike trail easement of 10' will not impact lots 5 and 6. The County's comprehensive plan calls for 46' of additional right -of- way and trail easement. The City will ask for only 10' of bike trail easement and no additional right -of -way adjacent to lots 5 and 6. There were no public comments. Lindquist asked what different would occur regarding width if outlot B was eliminated. Gronberg said lot 3 and 4's lot widths would be expanded. Lot lines would be moved with lot 4 to the east and lot 3 would be alittle larger. • MINUTES OF THE ORONO PLANNING COMMISSION MEETING HELD ON MAY 20, 1996 • ( #1 - #2136 Greenfield Corporation - Continued) Mabusth reported that the developer is being asked to grade the road bed in outlot B for future use for the property to the east. It is Staffs understanding that the owner of property to east does not plan to develop at this time but plans only to construct his own residence and driveway. The road bed will be seeded and grassed. Pfennig said he met with the owner and discussed the plans. He added that care would be needed in dealing with the wetlands. Gronberg informed Mabusth that he has submitted an application to the MCWD but no action has been taken. Mabusth said the sediment detention pond may have an impact on lot 4. Gronberg said this would come into play when the road was paved. Mabusth noted the occurrence of runoff from proposed drainageway along west side of Outlot B. Pfennig said he was willing to dig the pond at this time. The pond would be partially located in lot 4. Mabusth clarified that there would be a drainage pond in the northeast corner. A drainageway easement would extend from Outlot A to the pond at northwest corner. Gronberg said there are two drainage divides with drainage running to a culvert under Co Rd 19, north under Co Rd 19, and northwest through ditches to the lake. The southern drainage runs toward Lakeview Golf Course. Gronberg noted most houses will be to the • north, which is the reason the pond leads to CoRd 19 so as not to increase the runoff. He added that when the blacktop is done, there will be some additional runoff to the south. Peterson asked if the Engineer agreed with the grading plan? He suggested the sediment pond be established right away. Smith asked if there were other developments with similar situations regarding the house, septic, and wetlands, especially noting lot 4. Mabusth noted similarities with the lots in the Farm at Long Lake approved in 1978. Lindquist said that property has worked out well. Gaffron noted the lack of flexibility for the buyer of lot 4. Smith said the potential problem should be made aware to any buyers. Mabusth said the covenants will expose the problems, especially with the drainage easement over detention ponds, and protective covenants dealing with wetlands and septic. Smith said her main concern was that no future problems be created for the City and noted that the land being developed was marginal. 0 MINUTES OF THE ORONO PLANNING COMMISSION MEETING HELD ON MAY 20, 1996 0 ( #1 - #2136 Greenfield Corporation - Continued) Stoddard asked Mabusth about the City's positionreview regarding the lot width variance. Mabusth said the width was tight with the location of the road and the more restrictive road setback at east lot line of lot 4. She commented that this occurs often adjacent to cul -de -sacs. It was noted that lot 1 is surrounded by County roads. Lot 4 is adjacent to a future road_ Mabusth advised lot width is measured from access road. Mabusth said Staff is concerned with lot 4. Pfennig interjected that lot 4 is the best lot. Mabusth agreed that the development has kept the vistas open. Lindquist moved, Smith seconded, to approve Application #2136 with Staff recommendations as listed and the inclusion in the grading plan of a pond area within lot 4 and the extension of outlot A to the east. Lot width variances are recommended for approval. The covenants will delineate the septic sites along with the wetland delineation. The site plan locating access drive to serve existing residence on lot 6 must meet the 26' separation from the designated wetlands and be 20' from any septic sites. The 17' of additional right -of -way along the west boundaries of lots 1 and 2 will be for North Shore Drive only, not Bayside. Vote: Ayes 5, Nays 0. ACTION ITEMS • ( #2) #2112 RICHARD PUTNAM, 2765 CASCO POINT ROAD - AFTER THE FACT VARIANCE - PUBLIC HEARING 7:40 -7:48 P.M. The Affidavit of Publication and Certificate of Mailing were noted. The Applicant was present. Gaffron reported that the application was for an after- the -fact variance for hardcover in the replacement of an existing deck in -kind, which was built before treated wood was available. The proposal replaces hardcover when the property is already over the 25% allowable; thus, the need for the variance. Gaffron noted a resolution for a remodel from five years ago, which included an addition as well as a garage addition. It was approved as an attached garage. In reviewing the hardcover for this application, it was found that the hardcover changed from 40.2% to 44.45 %. The new survey results in an additional 400 s.f of hardcover_ The lot area on this new survey is less resulting in an increase in the hardcover calculations. Gaffron said the hardcover differences are likely due to the differing surveys and interpretations of rock walls. He noted that the patio blocks and walkway areas are necessary to this property and are as intended in the 1987 application. Gaffron; therefore_, recommends approval of the application noting the applicant has paid the after- the -fact fee and the necessity of the deck replacement. 5 MINUTES OF THE ORONO PLANNING COMMISSION MEETING HELD ON MAY 20, 1996 • ( #2 - #2112 Richard Putnam - Continued) Putnam added that the deck was falling down, and he could not wait for variance approval to receive the permit before reconstructing the deck. There were no public comments. Smith commented that if the deck had not already been replaced, the Planning Commission would look for additional areas for reduction of hardcover Gaffron said it might be argued that the deck replacement is a continuation of work that was authorized in 1987. He noted the pavers and rock walls were appropriate, and the width of the driveway was necessary. Smith asked if the replacement was part of the past resolution. Gaffron said it was not, but it could be argued that it possibly was based on the wording. Hawn moved, Lindquist seconded, to recommend approval of Application #2112 per the StatTs recommendation. Vote- Ayes 5, Nays 0_ Putnam asked to comment on the Casco Point area bringing the Commissioners attention to the plat map in Exhibit B. He noted that although the area was zoned for 1/2 acre lots, 100' minimum width, and related setbacks, only 5 or 6 of the lots on the plat meet the 100' width. Putnam said most of the lots do not meet the existing zoning codes, and he sees no • merit to the codes as they exist. He does not understand the need for applicants to request variances when the ordinances do not work for the properties on Casco Point. Putnam noted that the homes in the area are not tear downs. He said Casco Point was a diverse area, unique, and he is irritated by the social engineering caused by the bureaucracy, and the waste of time and money spent in gaining approval for such projects as his deck replacement. Putnam said others were not coming in to the City for review of projects but doing work without permits, adding that the process was not working. Smith commented about requesting reductions in hardcover and justification of existing L ardcover. Putnam said the taxes were outrageous for the area and felt people were treated poorly. He saw the issue as being a double standard between lakeshore and non - lakeshore properties. Putnam asked that the Staff be allowed more flexibility in situations such as what exists on Casco Point. Peterson said he understood the frustration. He noted the problem with property owners building more than what is allowed for the lot sizes. Putnam asked that the City tell the County to put a "throttle" on taxes. He acknowledged the job well -done by Staff in his dealings with the City in his remodeling, and asked the • Commission to address these issues as soon as possible. 6 MINUTES OF THE ORONO PLANNING COMMISSION MEETING HELD ON MAY 20, 1996 • ( #3) #2133 JOHN AND KARLA SPOONER, 1385 ORONO LANE - VARIANCES - PUBLIC HEARING 7:59 -8 :04 P.M. The Affidavit of Publication and Certificate of Mailing were noted. The Applicant, Karla Spooner, was present_ Mabusth reported that the application is for hardcover and lakeshore setback variances for improvements to a lakeside deck. The existing deck consisting of 650 s.f of hardcover would be removed, along with 37 s.f. of connecting brick walkway, and replaced with a grade level granite patio. 1'x7' step will extend from both sides, and l'x24' step will extend at the lakeside. The existing hardcover of 4,140 s.f is proposed at 3,851 s.f., for a reduction of 298 s.f in the 0 -75' setback. Mabusth noted that the property is 1.2 acres of which half is located in the 0 -75' setback. A 4'x6' cement pad is proposed being located 50' from the lake at the base of the stairs for use of outdoor cooking. The deck is 26' from the lake. The proposed patio would be 40' from the lake. The proposal would result in an overall improvement in reduction of hardcover. The applicant said they were willing to give back in hardcover to replace with what is suitable for the property. • Peterson said he saw the proposal as an improvement to the existing conditions and to the Lakeshore itself. There were no public comments. Lindquist voiced his approval of the proposal. Mabusth informed Smith that the shoreland regulations allow for stairs and pad. Spooner said the steps are not an access to lake but to replaceloose stone steps adjacent to the house. Lindquist moved, Smith seconded, to approve Application #2133 as recommended. Vote: Ayes 5, Nays 0. ( #4) #2134 ROBERT CHARLES ALBRECHT, 1810 SHADYWOOD ROAD - VARIANCES - PUBLIC HEARING 8:04 -8:26 P.M. The Affidavit of Publication and Certificate of Mailing were noted. The Applicant was present. L • MINUTES OF THE ORONO PLANNING COMMISSION MEETING HELD ON MAY 20, 1996 ( #4 - #2134 Robert Charles Albrecht - Continued) Gaffron reported that the after -the -fact request for hardcover variance was due to the construction of a 207 s.f deck to the lakeside of the residence. Gaffron said the property was originally in ownership with an adjacent lot, which was subsequently sold. Each lot now has a house with amenities. A resolution in 1984 allowed for 2775 s.f of hardcover, or 25% of the 75' -250' zone. A permit was issued in 1985 for additions to the residence subject to the use of grass pavers for the driveway resulting in a hardcover proposal of 19 %. It was found in 1991 that the driveway had been paved with asphalt and had constructed decks without approval resulting in 5080 s.f of hardcover. The 19' driveway with backup apron was approved in 1991 to eliminate the need to back up onto Co Rd 19. Work in progress was recently stopped when it was found that another deck was being constructed. Also seen was a hot tub, which is to be placed on the deck. This deck, along with different interpretations of calculations, result iii 5352 s.f of hardcover; 270 s.f iliure than what was approved in 1991. Including the area outside of the 75', there is a net increase in hardcover of 165 s.f. Landscaping proposal by Otten Bros. of landscape patio blocks result in a net increase of 54 s.f. of hardcover. The proposal is to reduce the driveway to a narrower width and leave the backup apron, resulting in a net reduction of 35 s.f in the 75 -250' zone. The lakeshore stairway, shown on the landscape plan, was rebuilt since 1991. This • additional hardcover was addressed in 1991, and the owner was informed that a permit would be required. The City also made an effort at that time to ensure that a new owner would be aware of these restrictions. The stairway is 3'x19' long with a 6'x13' landing, where 4'x4' is allowed. Gaffron said the square footage of the structure is not much more than code would allow, but since ii is after -the -fact, it is necessary to review the structure. Gaffron noted that the present owner has owned the property since 1991. The applicant, Albrecht, disputed the calculations of the hardcover. It was noted that the hardcover calculation in 1996 included the entire property, while only die 75` -250' wile was included in the calculation in 1991. Gaffron explained it was a matter of differing interpretations. Smith said the existing driveway was necessary for safety reasons. No further encroachments or hardcover were said to be allowed in the future by the Planning Commission in 1991. Smith said this was an opportunity to honor what a past Planning Commission had recommended. Lindquist commented that this application was a good example of why covenants are necessary for properties. Hawn agreed with Lindquist and Smith that no additional hardcover should be allowed. • They, along with Peterson, agreed that the backup apron was necessary for safety. 8 MINUTES OF THE ORONO PLANNING COMMISSION MEETING HELD ON MAY 20, 1996 • (#4 - #2134 Robert Charles Albrecht - Continued) Albrecht responded that, although he has owned the property since 1991, he was not aware of hardcover variances. He also noted that the proposal results in a net decrease in hardcover of 78 s.f. Peterson commented that the applicant knew that a building permit would be required to construct the deck. Lindquist said he would not have agreed to a new deck. Peterson noted that the deck is not in the 0 -75' setback. Albrecht informed the Planning Commissioners that the 1991 approval of hardcover in the 75 -250' zone of 34% was comparable to other homes in the neighborhood. Lindquist responded that there was a discrepancy in the hardcover calculation. Gaffron said the current calculation by Staff should be considered as accurate. Smith said there were no opportunities for exchanges in order to further reduce hardcover. Gaffron agreed that the stairway to the lake was necessary. Peterson reiterated that the 1991 resolution implied no more hardcover would be allowed and reconstruction of a deck would have to meet City codes. • Albrecht responded that he was informed that if he replaced the stairway and deck, board by board, he would not need a variance. Stoddard commented that a neighbor had complained that the lakeshore stair encroached on their dock. Peterson said he personally had no problem with the stairs. Hawn said approval of the deck would render the process meaningless. She did comment on the attractiveness of the deck. Albrecht asked, if he would reduce the size of the driveway, if the Commission would approve the deck. He was informed that the issue was the approval in 1991. Albrecht said owners should be made aware of variances. Lindquist informed him that this would have been done if Albrecht had followed the procedure of seeking a building permit. Smith followed this comment with noting that building permits are a trigger mechanism for discovery of necessary information. Gaffron asked the Planning Commissioners to read the notation on the inspection notice from 1991 on the building permit that the "resolution provided to new owner ". It was further noted that there is no policy requiring the City to relay this information to new buyers. • • MiNT ITES OF THE ORONO PL! -NNING COMM SSiON MEETUNG HELD) ON MAY 20- '1996 (44 - tr2134 Robert Ciiaries Al�i'eiiii - k_1 Inueu) Smith moved, Lindquist seconded, to deny approval of the after -the -fact deck. The stair landing was a.nnroved with the condition that the applicant work with Staff to meet the 90 -100 , f compliance for stair landing size Vote- Ave, 5; Na.vs 0 The annlirant xx,as inform -d that the nnrliratinn uun -idrl an to the ced-nnri ("nnril meRtina in June, it Vraa �lVte'd 1Vr the record that the Plaillling, CV1 mission was not concerned with the stairway to the lake but would like to see the Citv work with the applicant in meeting ci7e rPnnirementc O- - -- 1-'-- - - - - - - . ( #51 #2135 PAUL AND SUE HEDLUND, 1575 LONG LAKE BLVD. - VARIANCEC _ PiiRi:iC HEARING 8;28_9;12 P.M. The Affidavit of Publication and Certificate of Mailing were noted. The Annlirantc xx%ac nre.ce.nt Gaffron reported that the property in question was a 3/4 acre lot, the bulk of which is located in the 0-75' setback, with 17,600 s,f in the 0 -75' setback and 11,000 s f in the 7.5- 250's etha.ck. The house on the property is ,m311 and mostly located within the 0 -75' • SPthanl -. The SinalP rnr aaraaP en�rnn�heS intn thPr riaht_nf_xx7av GgfFrnn cnirl thPr nrn nncal to nnrrhacP the nrnnPrty is rnntinaan4 r nnrnval of the arlrlitinnS An addition Y "'Y"� ». Y »_.... ».,., Y• "Y....J b....,, .....^..YY.., is Prvpvaed to the rear, non-lakeside of the hvua�., but still Partially u1 the v -75' setback. cAi second story is also planned. The garage will be removed and replaced by a 2 -car attached garage_ Gaffron informed the Planning Commission that the variances required for this proposal are. for hardrnver, tide cetharll to the Pact, tnrnnncPd at 1 R' where 30' is req�iired, and ctrPPt &PtharL- The attanh_d garage rnnziireq a 50' gtrPet Sethark anti is prnpngnd at Gaffron said etas recon'unends a 0' setbac t the elot line The norma setbac for 1 k o l k a detached garage, when doors are to the side, is 10', which Gaffron said should be strived for. Gaffron reported that the average depth of the lot is such that there is no buildable envelope The exiting house does not meet setbacks Any upward changes results in visual impacts Gaffron said it should he noted that the height of the stn_icture he limited to ? StnrieS ifthic limit xx7aS not nlarPrl in the racnil"tinn the etnµrtiµre rnii;lrl he hiiiilt to 2_ r• ___ , to ! 12 ctnriec Ami more then 2 ctnrieS x =%^uld not fit the nPiahhnrhnnrl and xx;ni"lrl he 1' ,+; ,., , +o A letter F the ht,o - +o +1. 111sprVPV1 ,ion 1, x1Vli1 Ll-V aL1L,L,1 V1\s VVY. ! 1eLLV1 —V111 L11L,� ne1g11V V1 LV Lll%w %1rLaL 3L,"L%,U ilia opposition to allowing a side setback less than the 30' requirement. Gaffron said there rould he. mmifi- rations to changing the garage. to the nther end of the, house. io MINUTES OF THE ORONO PLANNING CO_M_MISSION MEETING HELD ON MAY 20. 1996 l45 - #21 3 5 rain aitu Sue nedluttd - C orit I itued j The hardcover in the 0 -75' setback exists at 1200 s.f. and 900 s.f in the 75 -250' zone. The nronosa.l would increase these calculations by 85 s,f in the 0 -75' "and to 1783 cf in the 75 -250' zone The overall allowed hardcover of 25% is 2724 s.f and is proposed at 306-1 s.f an inrrPacP of an»rnximatPly �2[ "►Q c f nxrPr the ailnxx�ahlP r,Y..,........... i, . Gaffron continued that this is alm a_ hh-ff F,;t-tation" The addition to the hulk of the structure would have an impact Grariiyncr Aurmlydl Alen he n- ni;ireri xxritlhin the hl,N4 im»art r b Y zone for the driveway. Gaffron said the bluff impact is minor, however, when compared to other issues involved. A main concern is with the septic system for the property. The current septic system is non - conforming and requires replacement; for which a site exists. There is; however; no available alternate site on the property for the proposed 3- bedroom house. The naighhnrhnnrl is rnrnpncPCi fnr QP�uPring but this is an unrecnlvPd kgiiP. tvTaffrnn que- gtinnPri , h_thPr the hnimp chnidd hp exnanrlPrl to 'i hacirnnmc ., i_thn „t an alternate cite �t- - --- --- r- _» .� nr .:itlrtrnlrl unni o »rrn..ol Vi YY 1i1111V it{ µi µt/f./i V Y µi Uniialiii l 4..Lr.y n -cn YzY n .n.rm....i.r.rnyrUi . Applicant, Paul Hedlund, said the property was very unusual. It is their intent to keep the home iiitavt and build vnty it a$ vppvsed tv tearuag it dery ii 'und u+ --pig v`e'er vr'ith ne`v`v' • construction. • Peterson commented on the large number of variances for the application. He noted that, although the nrnnertir desen'es to I, e n linm,- on it the nnnl;i -not m -pr„lg to vu rl: xxrith b” Staff to make it a viable proposal. Hedlund said he sees the plan as the best for the property and reiterated the purchase was contingent on City approval. Stoddard acknowledged the good design and elevations, but asked the applicant if he would consider moving the garage to the west. Sue Hedlund said the west side of the lot was steep and questioned the encroachment of the bluff area. Paul Hedlund also noted that the well was located on the west side of the property During public comments, Charles Truman, who lives across the street from this property, vniPPrl hic annrnval ofthP mmnncal NP ,aid it jxrn,ild r•.a,ice nn hardchin to the neighborhood. I1 • MINUTES OF THE ORONO PLANNING COMMISSION MEETING HELD ON MAY 20. 1996 ( #� - #2135 Paul and Sue Hedlund - Continued) Peterson noted the concern from a neighbor regarding the side setback. He agreed that the concept was good in general but was concerned with the major issue of se wering Peterson said the application should be tabled until a solution is determined. Peterson saw the need to provide a cPntir evetPm for a 2 hPdrnnm hni"eP nr wait ir;ntiI thP- eP�x�Pr iggZ P ie r- r.., resolved. Hedlund said he would prefer sewering and would not want to invest in a new +:. system Ll ,,.. ;S+ ,a ' +h +ha A F AAT TC A JepL1V JyJL Vlll if aV rr Vl t[l� YYas iii the dear iui'ure. Lllldq uljt fait{ VY; h 1,e need ltJr lY1V Vl1. amendment approval, planning, and review, it could be at least an year until any decisions wnlllci he. Marie_ Hedlund said he, could wait a year hilt w-ulci need to receive. approval of the improvements for a future time. Lindquist informed Hedlund that he saw the property as it now is, a 2 bedroom, 800 s.f. home. Lindquist said it was his opinion that this was all the land could handle. Lindquist said he would not want the applicant to wait for septic approval and then find that the imnrn�rementg could not he made -r Jeff Martineau, a Realtor with Burnet Realty, said he was representing the Albee family estate. He acknoivi d1glerl the nrl�h1PmC with centic hnt nnti-d that thie was not the nniv site in the area with no alternate site. He asked the Planning Commission to consider AQo r+: r�o.»> +n.� +fin uniqueness f 4i.o r+rrir.orh�. nr.rl.7 ., Qnn 4 altt.i111LL Lti JVld t1V11J. 1r a tineLtd noted tilt' dniqueness of tutu property t'' stud said a 800 s.f • home was not consistent with homes of the '90's. He felt the design, location, and size of the. nronerty was consistent with the, neighborhood • Peterson informed Martineau that the Commission was in the planning process of what wnlllri be allnweci for the nrnne_.rtV. HP_. agreed with Lindquist nn what milld he. cinne. with the property as a fact of reality, rather than one of marketability. Peterson said the main lss'.:e ::'as the Se.:'er HP said the application co'L:ld not :hove — ..a.d ......— an alternate YY site, which is a recent regulation, and a system which meets zoning requirements. Peterson noted that other afiencies are involved. Martineau said he was in attendance not as an agent but to represent what was good for the homeowner. He said he sees the proposal as a reasonable use of the property. Hawn said she saw the proposal and issues as very troubling. Hawn noted that the nronerty wa.s in the 2 acre zoning and was only 1 i4 size of the ren uirement She noted the fragility of the area with the bluff and the one septic site. Hawn felt it would be irreonnneihiP to tA-P this ei„hgtandarri int anti inrrPacP the hir;ildina 67. Che nnted thie property was an example of why there were building codes. 12 • MINUTES OF THE ORONO PLANNING COMMISSION MEETING HELD ON MAY 20. 1996 ( #5 - #2135 Paul and Sue Hedlund - Continued) Susan Albee said she saw the Hedlund's plan as being quite conservative. She noted that there were no homes on the north side of the lake with alternate sites Albee said the proposed septic system for the property has a 25 year guarantee. She did not believe the annlirant xxiaq aslring fnr an�rthinor i"nreacnnahle xziith the addition of one more herirnnm and an attached 2 -car garage. Albee said there was only a 10'/'0 building envelope on the property, and lies parents have hued there AM 60 years. Smith said she had no problem with the house increasing in height but with covering more of the lot with structure. The main issue with Smith was the sewering. Stoddard noted the sewer issue along with the height of the addition and encroachment into the 0 -75' setback He said there was still the issue of being 300 s.f over the hardcover limit. He asked if there could be design changes to include movement of the garage to derrease the fontprint PepPrially in light of a r.mm�laint from a neighhnr, Tt wac also noted that there was no guarantee when sewering would come to the neighborhood. Gaffron was asked about the status of the MUSA application. Gaffron said the City is working with i,ong Lake to determine capacity a.va.ilahility and make changes downstream as necessary. Once that is worked out, the Met Council will probably approve the annliratinn (iaffrnn Sair„1 cewerina was a matter of timing and riteri evamnlPC ofxI.- rr1-irntinn a -a » r._. might occur. He said he was concerned with the proposed improvements if the septic +o.,., rn11.s sy��.,�.� emu..,. Stoddard said he saw the footprint as a problem. Peterson said he had a problem with the garage. He did not wish to set any precedent by allowing a garage that near to the lot line, Sue Hedlund asked the Commission if the bluff was a major concern. Peterson said it was the leaCt rnnrP.rn of all the iCC17P.0 invnlvPd, Peterson moved, Lindquist seconded, to table Application #2135 for redesign of location of aaravP anti arrhitPntnral rPr1PCian fnr fit nn the nrnnPrty alnna xvith a cnhitinn nn hmAl a »- »a _ » » »- - » »- - a - - - -- r - -- r -- -> > - --a to handle possible future failure of the septic system. Peterson noted the possibility of hv1%.11 taiik� ii ii�.ve�$'ui y. He brvugiii the uppA. A.L UULeIIiivii Lv Lll� clean up being conducted of Long Lake Callahan said he was in favor of the tabling. He said the issue was similar to that of the ice arena tnroposal with awaiting resol,lit;nn of the aexzier:ng .slue. Callahan said he saxx7 the issue as political and was not clear whether it would be resolved favorably or in the near . future. Callahan also noted the need for an agreement to be reached with both Long Lake and Medina on sewering issues. 13 MINUTES OF THE ORONO PLANNING COMMISSION MEETING HELD ON MAY 20. 1996 i ( #5 - #2135 Paul and Sue Hedlund - Continued) Vote: Ayes 5, Nays 0. ( #6) #2137 WILLIAM AND SUSAN DUNKLEY, 2709 WALTERS PORT LANE K4RTANCES - PUBLIC HEARING 9:13-9:38 P—M. The Affidavit of Publication and Certificate of Mailing were noted. The Applicant was represented by Carl Smith. Gaffron reviewed the proposals and improvements to the Dunkley property. An addition to the house, revamning of a garage wall re.niarPmPnt of retaining walls, and a n w P.nt_rV way was approved in 1995 with revision to hardcover with removal of retaining walls that :.TPVr °v r °v »laced with »lantinge The vlLirr °vnt »ry ^v3a1 i.°i tv ''ha" ^P a deck Pn +kA grN„th c;riu Y Y b y Y vllullsv v ull ,lu. of the residence and replace it with a room with a pool spa. This addition would meet the 10' side setback but is located within the 0 -75' setback Changing the deck to the proposed enclosed structure would decrease the hardcover by 24 sT but would increase the lot rtoverag- by ztn,i, ,rP from 1 5 60l to 16 .7. 0/ The adrlitinnal ctnu- imp Alen »,,- -1 encroaches the average setback line. Gaffron noted that the homes to the north and r.,,L.. lOL t 4lr u v �t,o .,, ,,,o,+;o� Tt,o „�1 ' + „r+J,o il,,,,vlo., property, s- u',ea,+ are set 1011 back on he properties. 11.e visual .mpaCL Vl Llle Lulllile propert , with its bulk in the 0 -75' setback, would not affect the views of the other properties. Gaffron saki there may he opportunities for hard cnver reduction hilt the intensive review of the hardcover was done with the earlier application. Gaffi-on added that the driveway is A/ercr laraa nrl n�lrl hP an »tnn fnr hnMrNx r er;rtnn J b" n � Y i o eriy • Peterson commented that the applicants have done a fantastic job on replacing the retaining Aifalic and re4lnina the lalnrir�i »a YJA nnteul their rnm »fiance ::';tl: the re ^L:eSts Y �y. y `1 of the City. Letters have also been received from the neighbors approving what has already been done on the property. Peterson noted the limitations to the property but agreed that the deck needs to be removed or replaced_ He asked if the deck could be moved forward? Gaffron agreed that this could be an option and asked how it would affect the side setback variance? Carl Smith responded that the location of the spa room was best suited to the location +1, the .,"o door �,., the ie4 i V�'ltll L f./UL1V t1VV1 V L11V 1VIL Jlu V. Hawn was informed that the spa was a therapeutic need for the applicant. Hawn asked W'hy Lhe lint LUL, 1 0011, lVCated beneath the area in questmn could not be used 1L1J1 Lhe Spa. Carl Smith said that hot tub was not in good condition, and the spa was probably too large fni- that nartirlflar roam. C'Ta_ff_rnn questioned whether there was anv ingl_r, to nlaring the spa at the other end of the home? This would be a location near the master bedroom. 14 MINUTES OF THE ORONO PLANN_TNG COTMMISSION MEETING HELD ON MAY 20. 1996 (#6 - #2137 William and Susan Dunkley - Continued) When asked about hardships, Exhibit A was noted, which lists the reasons for the spa, but Gaffron said no hardshin statement was included, Exhibit R cites medical reasons for the spa. Peterson said he did not see the average lakeshore setback as a problem with this proposal, Gaffilron Suggested a possible Li litigation with screening o trees or landscaping. Carl Smith showed an visual representation of the deck along with a representation of the Cna rnnm addition_ HP_, noted that the. addition was an improvement to the Vlsllal imna('t. Hawn inquired what was being placed under the spa room. Carl Smith said this was undecided. Lindquist questioned whether this addition was too much for the property. Peterson nntPrl that the deck does need to ha replaced_ Smith nuP.q innPrl why it was not inchirled in original proposal. Hawn noted that the Commission denied a screen porch and could not ann on., A;i�nrnn�n {�n4.vnnn o »nrnL� onr� 4bie o�Ai4inn (ini� -'rnn rnm�r�rn� 4ho4 4f/�n o »� VL JVV µil�' 4a11Vi ViiVV VVLYY VVii µ f./Vi Vii µlit{ Li1iJ µitUiLLV ii, \J µiii Vii iV111µ11�Vti LLiµ1 LiiV J1lµ room was brought up at the Council_ meeting at the end of the process with the last application but was requested to he siinmitted as a. separate pro ect He added that Dale Gustafson had suggested that more of the walkway pavers could be removed. Gaffron • noted that the drive -vay is located nl..it nfthe 0 -75' ePthn L- The retaining lx7allp are necessary due to the slope of the land. Gaffron added that it could be argued that bar dvv v er LS hardvv`v'er. Siiuth vviiiiiLented, Lf th °v Screened porch VV'aS denied, an bier e were no other areas where hardcover could be reduced, the limit in lot coverage may already have been reached. There were no public comments. Lindquist moved, Peterson seconded, to approve Application #2137. Vote: Ayes 2, Lindquist, Peterson' Nays 3, Stoddard, Smitli, Ha::n �^4i ;t n failed. Gaffron asked for either another motion or reasons for denial. Stoddard noted the view. (`or) �mi4L� ooirL Lin — o i�nviL��n in 4t1n ri noinn end �hohrrno 1 --JA :�n morin PA +_nn cnirL t,µ11 Vi111Lii Jµ1U iiV YYµJ ilVfiiViV iii LiiV t1VJi Cvil µlit{ Vliµ11�,VJ VVµiti VV illµ�i V. 1 V-JI/ii the Commission would need to table the application if a redesign was done. Carl Smith asked if the height was an issue. Smith said in terms of hardcover, she could not see where reductinnc rn,j1r1 n��l lr gMith enid Che xx�as be mnrP inclined to 4mnnnrt the rr�- spa room if the visual impact was minimized by lowering it or moving it forward. Hawn Sugge+-A l .r:,, . +1,- ;A , � „�:,, , .t,o l ...,�,r lo�,ol a l;m;» ,.v +t,e 1 � JLVLl e�lpiVi 1116 LLLV LUVµ VL UJiii� LLL%, LV VV V1 LV V Vi rVVLit al1U eititiitiµLV LLLL, vISUa1 LilipacL from the lake view. Carl Smith was informed if tabled, the application could come back before the Planning Cnmm'ceinn nn Thine 17 xx':th Council revile::' nn Tiwne 2d 15 • MINUTES OF THE ORONO PLANNING COMMISSION MEETING HELD ON MAY 20. 1996 ( #6 - #2137 William and Susan Dunkley - Continued) Smith moved, Stoddard seconded, to table Application #2137 to work with landscaper in minimizing the visna) impact and take the above ideas into consideration Vote: Aves _5. Nays 0. PLANNING COMMISSION COMMENTS ( #7) OTHER ISSUES FOR DISCUSSION Hawn suggested the possibility of a Consent Agenda for the Planning Commission Meeti-r-1. Smith asked that Staff request applicants to post application notices near driveways of the residences for easier �dentahcat.on. ADDITIONAL ITEMS ( #S) PLANNING COMMISSION APPROVAL OF MINUTES OF THE APRIL 15, 1.996 MEETING • Lindquist moved, Smith seconded, to approve the Minutes of the April 15, 1996 Meeting of the Planning Commission. Vote: Ave-, 5 Nav-, 0. • ( #9) PLANNING COMMISSION TO SELECT A REPRESENTATIVE TO ATTEND THE �ITTNF 1 Q; 1996 1VIVFTTNG OF THE C OUNC11, Lindquist will attend the June 10, 1996 meeting of the Council. ADJOURNMENT Lindquist moved, Hawn seconded, to adjourn at 9:45 p.m. Vote: Ayes 5, Nays 0. Stephen Peterson, Chair Person 16