HomeMy WebLinkAbout2002-P04894 - mechanical CITY OF ORONO PERMIT
2750 Kelley Parkway- PO Box 66 Permit Number: P04894
Crystal Bay, Minnesota 55323 Permit Type: Mechanical Permits
(952) 249-4600 Date Issued: 2/13/2002
SITE ADDRESS: 385 Turnham Rd
Maple Plain,MN 55359
PID: 31-118-23-31-0006
DESCRIPTION:
Proposed Use: Residential
Permit Class: General
Permit Type: Mechanical Permits Permit Sub-type(s): Multiple Mechanical Items
DETAILS:
Approved per resolution#:
Separate permits required:
NOTICES/REMARKS:
FEE SUMMARY: Permit Fee: $ 203.85 Valuation: $ 16,308.00
State Surcharge Fee: $ 8.15
TOTAL FEE: $ 212.00
APPLICANT: Watertown Sheet Metal OWNER: Charles&Jennifer Phelps
14730 Hwy 7 385 Turnham Rd
Mayer,MN 55360 Maple Plain MN 55359
THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL IMPROVEMENTS SPECIFIED
AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL CITY OF ORONO ORDINANCES AND STATE OF
MINNESOTA BUILDING CODE REQUIREMENTS.
APPLICANT PERMITEE SIGNATURE ISSUED BY SIGNATURE
Conies: 1-File(Siknitures Required). I-AvOicant. 1-Month1y Reports. 1-Assessin¢. 1-Finance Page I
CITY OF ORONO APPLICATION FOR MECHANICAL PERMIT
Box 66 (2750 Kelley Parkway)
Crystal Bay, MN 55323
GENERAL INFORMATION
1. You may apply for mechanical permits by mail or in person at the City offices. Applications will be
reviewed and a permit will be issued within 2 working days.
2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID UNTIL
YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS POSTED ON
THE JOB SITE.
3. Mechanical Designs - Complete calculations, details and specifications are required for each heating,
ventilation, humidification-dehumidification, and air conditioning installation including heat loss/heat gain
calculation, design temperatures, equipment ratings and identification as to type, manufacturer and model.
Data shall be presented on form provided. Identification of and specifications for water heating equipment
shall also be provided.
4. When any new construction or remodeling is involved, a separate building permit must be obtained.
5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code requirements.
6. All work must be inspected (rough-in and final). Call 249-4600. 24-hour notice required.
7. House Heating Test Record must be submitted before final.
Instructions Complete all items on this application. Compute the permit fee. Sign and date the certification.
INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call 249-4600.
Please check one: New Addition Repair Replace
Residential Commercial '
JOB SITE: 3�.� T,W41,48 M 64?, Zip: S15-3!5!2
Owner's Name: ICS%Tror; ;fC-� '/r�F/moi Telephone Number:
Mailing Address: r-r T— City: 711f;A/Zip:
Contractor's Name:C[�RMxe,/me a Telephone Number:OSS 65'7 :W 7
Mailing Address: 1.417. co W City: ,r{'c l' Zip: S53 6 0
SYSTEM DESCRIPTION
HEATING SYSTEMS
Quantity: J
Make:
Model: (!-_,3,2 &I-7S
Fuel: /1/ 'T !'4_!S
Flue Size: {�', �',11< L'_,
Input BTUs: -Liz' a 0 a
Output BTUs: 'C'00
CFM: �' O
COOLING SYSTEMS
Quantity: f
Make: €,09r7 D '
Model: y<2 a
Tons:
H. Power
s
FIREPLACES
Gas factory fireplace
Wood burning factory fireplace with flue
Wood Stove
Wood stove with flue
Brand Name Model No.
VENTILATION
No. Kitchen Exhaust ducted recirculating cfm
No. Bath Exhaust (must be ducted outside) j Vic? cfm
No. Other Fans: Locations cfm
FUEL STORAGE (MUST BE APPROVED BY FIRE MARSHAL)
Installation Removal
Fuel oil: gallons underground inside outside
/ LP Gas: gallons
Other Gas opening
PERMIT FEE CALCULATION
1. 1.25% of Contract Price* or Minimum Fee ($35.00) '
Z4, -:,-0 s� x .0125 $
(co tract price)
2. State Surcharge. ** Add the State Building Code Division
Surcharge to each permit. Z- p x .0005 $
or $.50, whichever is greater (contract price)
3. Postage and Handling (Only mail-in applications) $ 1.50
4. TOTAL PERMIT FEE (Add lines 1-3 above) $ /2 " D
* CONTRACT PRICE or JOB COST means the actual or estimated dollar amount charged for the permitted
work including materials, labor,profit, and other fixed costs. It is the amount to be charged to the customer
for the work done. If any material, equipment, labor, or installation are furnished by the owner, tenant or
any other party the reasonable market value of such items must be added to the estimated cost or contract
price for permit fee purposes. In the event that there is a dispute on the amount of the job cost, the City may
request the submission of a signed copy of the actual contract.
** The STATE SURCHARGE is .0005 of the contract price under$1,000,000 or $.50 - whichever is greater.
For valuations over $1,000,000 call the Department of Inspectional Services for the price.
The undersigned hereby applies to the City for issuance of a Mechanical Permit, agrees to do all
work in strict accordance with the ordinances of the City and the regulations of the Minnesota
State Building Code, and certifies that all statements made on this application are complete, true
and correct.
Applicant's Signature:
Date:
Approved By: Date:
I�
LENNOX RESIDENTIAL COOLING DATA SHEET
JOB NAME: F S DATE ADDRESS:
OUTDOOR TEMP: INDOOR TEMP: TEMP DIFFERENCE: O°
SENSIBLE LOAD CALCULATIONS
GLASS
NO SHADE SINGLE DOUBLE TRIPLE
DESIGN TEMPERATURE DIFFERENCE
COMPASS GLASS AREA 10 15 20 25 30 35 10 15 20 25 30 35 10 15 20 25 30 35 BTUH
POINT SQ. FEET HEAT GAIN
HEAT TRANSFER MULTIPLIER
N 25 29 33 37 41 45 20 22 24 26 28 30 15 16 18 19 20 21
NE & NW 55 60 65 70 75 80 50 52 54 56 58 60 37 38 40 41 42 44
E & W 80 85 90 95 100 105 70 72 -74 76 78 80 55 56 58 59 60 62
SE & SW 70 74 78 82 B6 90 60 62 64 66 68 70 47 49 51 52 53 54
S t 40 44 48 52 56 60 35 37 39 41 43 45 26 27 29 31 32 33 /
GLASS SINGLE DOUBLE TRIPLE
INSIDE SHADE
DESIGN TEMPERATURE DIFFERENCE
COMPASS GLASS AREA BTUH
POINT SQ. FEET 10 15 20 25 30 35 1 10 15 20 25 30 35 1 10 15 20 25 30 35 HEAT GAIN
HEAT TRANSFER MULTIPLIER
N 15 19 23 27 31 35 15 17 19 21 23 25 10 12 14 16 17 19
NE& NW 35 39 43 47 51 55 30 32 34 36 38 40 22 24 26 28 30 31
E& W - 50 54 58 62 66 70 45 47 49 51 53 55 35 36 38 40 42 44
SE & SW 40 44 48 52 56 60 35 37 39 41 43 45 29 30 32 34 36 38
S 25 29 33 37 41 45 20 22 24 26 28 30 16 18 20 22 24 26
DESIGN TEMPERATURE DIFFERENCE - BTUH
DOORS
SQUARE
10 15 20 25 30 35 HEAT GAIN
HEAT TRANSFER MULTIPLIER
SOLID WOOD 6.3 8.6 10.9 13.2 14.4 15.5
SOLID WOOD *" [ 4.2 5.7 7.3 8.8 9.6 10.4
METAL URETHANE 2.6 3.5 4.5 5.4 5.9 6.4
METAL URETHANE *" 2.2 3.0 3.8 4.6 5.0 5.4
Weatherstripped or Storm
RUNNING FEET 'Z
CEILING HEIGHT X
WALLS GROSS WALL = _
WINDOWS & DOOR AREAS
NET WALL AREA
DESIGN TEMPERATURE DIFFERENCE
FRAME WALL SQUARE 10 15 20 25 30 35 BTUH
FEET HEAT GAIN
HEAT TRANSFER MULTIPLIER
NO INSULATION 3.7 5.0 6.4 7.8 8.5 9.1
R-11, 3" INSULATION 1.2 1.7 2.1 2.6 2.8 3.0
R-13, 3-1/2" INSULATION 1.1 1.5 1.9 2.3 2.5 2.7
R-13 + 1" POLYSTYRENE 0.8 1.1 1.4 1.7 1.8 2.0
R-19 + 1/2" POLYSTYRENE 0.7 1.0 1.3 1.6 1.7 1.8
DESIGN TEMPERATURE DIFFERENCE
MASONRY WALL SQUARE 15 20 25 30 35 BTUH
ABOVE GRADE FEET 10 HEAT TRANSFER MULTIPLIER HEAT GAIN
NO INSULATION 3.2 5.8 8.3 10.9 12.2 13.4
R-5, 1" INSULATION 0.9 1.6 2.3 3.1 3.5 3.8-
R-11, 3" INSULATION ' 0.5 0.9 1.3 1.6 1.8 2.0
R-19, 6" INSULATION 0.3 0.5 0.8 1.0 1.2 1.3
SENSIBLE HEAT GAIN SUBTOTAL /�
i
c/ v
Sensible Heat Gain Subtotal from Pae 1
DESIGN TEMPERATURE DIFFERENCE
CEILING SQUARE 10 15 20 25 30 36 BTUH
FEET HEAT GAIN
HEAT TRANSFER MULTIPLIER
No Insulation 14.9 17.0 19.2 21.4 22.5 23.6
R-11, 3" Insulation 2.8 3.2 3.7 4.1 4.3 4.5
R-19, 6" Insulation 1 1 1.8 2.1 2.3 2.6 2.8 2.9
R-30, 10" Insulation 1.1 1.3 1.5 1.6 1.7 1.8
R-38, 12" Insulation 0.9 1.0 1.1 1.3 1.3 1.4
FLOOR OVER SQUARE 10 DESIIGN TEMPERATURE DIFFE6 20 25 RENCE BTUH
UNCONDITIONED SPACE FEET 35 HEAT GAIN
HEAT TRANSFER MULTIPLIER
No Insulation 1.9 3.9 5.8 7.7 8.7 9.6
CARPET FLOOR-NO INSULATION 1.3 2.5 3.8 5.1 5.7 6.3
R-11, 3" INSULATION 0.4 0.8 1.3 1.7 1.9 2.1
R-19, 6" INSULATION 0.3 0.5 0.8 1.1 1.2 1.3
8-30, 10" INSULATION 0.2 0.4 0.6 0.7 0.8 0.9
FLOOR SQ FT. x Zj�p CEILING HEIGHT = CUBIC FT
INFILTRATION/
VENTILATION 0.40 CUBIC FT + 60 CFM
MECHANICAL VENTILATION CFM = FRESH AIR INTAKE
DESIGN TEMPERATURE DIFFERENCE BTUH
CFM 10 15 20 25 30 35 HEAT GAIN
HEAT TRANSFER MULTIPLIER
INFILTRATION 11.0 16.5 22.0 27.0 32.0 38.0
MECHANICAL VENTILATION O 11.0 16.5 22.0 27.0 32.0 38.0
INTERNAL HEAT GAIN BTUH HEAT GAIN
Number of People x 300 /0200
Kitchen Allowance 1.200
SENSIBLE HEAT GAIN SUBTOTAL
DUCT GAIN BTUH HEAT GAIN
R-4, 1" Flexible Blanket Insulation: ADD 15% (.15)
R-7, 2" Flexible Blanket Insulation: ADD 10% (.10)
TOTAL SENSIBLE HEAT GAIN ,;2 5
LATENT LOAD CALCULATIONS
Conditions Outdoor Wet Bulb Indoor Wet Bulb Grains
Wet 80 62.5 50
Medium 75 62.5 35
Medium Dry 70 62.5 20
Dry 65 62.5 0
Based on 75°F Indoor Dry Bulb at 50% RH.
LATENT LOAD-INFILTRATION �-
0.68 x Grains x ! 3 Infiltration CFM
LATENT LOAD-VENTILATION
0.68 x I < Grains x /5'0 Ventilation CFM 3,570
LATENT LOAD-PEOPLE
Number of People x 230
TOTAL LATENT HEAT GAIN S
TOTAL SENSIBLE AND LATENT HEAT GAIN D
NOTE: All Heat Transfer Multipliers from ACCA Manual"J" Sixth Edition and for a medium outdoor daily temperature range.
CL-841-1-7 002345 Litho U.S.A.
WWII
at i RESIDENTIAL HEATING DATA SHEET
C"' M E: f DATE a �---- --- -
8121DrESS:
'1 77'�n!)R TEMP: INDOOR TEMP: 20 TEMP. DIFFERENCE: z
- IIFSIGN TEMPEPATURE DIFFERENCE
•"nv^.o F GLASS WINDOWS SQUAR_ �'30 35 I d0� 45 S0 55 60 fi5 70 75 80 85 90 1 95 !,
FEET � _,i 1 1 5 Hrp- n s
--_ HEAT TRANSFER MULTIPLIER - -�
97 103 1 in ' R
L----- ------- - i - --- L 8 ---- - f
nr,q _ 18 a2 as 52 56 59
' --- -
--
r r - c
'1 1 4 r 9 � 73 4 3 f1-
_ i I
r -- r 9 33 .2 or 37 1n 12 4.� i 10
SOI1ARF DESIGN TEMPERATURE DIFFERENCE
GLASS DOORS30 j 35 1 40 15 50 55 60 ! 65 70 75 80 ' 85 911 ^5 }
FEET J
! j HEAT TRANSFER MULTIPLIER k
_ S5 t2 a8 55 52 69 76 83 90 197 1 104 1110 117 124 13' ¢
22 lr i 3' 3-7 10 14 1 1R 5t 55 59 62 65 7'I
--- - 2:? 3/1 3P 13 IP 53 5R 1 F3 67 1 72 77 82 8, I
^FSIGN TEMPERATURE DIFFERENCE
. cOIIARE i _
E _ 30 a�5 ^_i 4 j 50 ss 60 55 170 j 75 30 � 85 j 90 1 95
_c`
HEAT TRANSFER MULTIPLIER
31 35 1 46 51 56 62 67 72 77 82 87 42 1O7 7r
n r e��P - 0 3 `1 3n 33 36 39 42 45 47 50 53Jt
- - -- - -
27
- '-- 22 +7� 29 � 3 -10
1
_F c3 ; ' >" i 38� 15 n 5357 60 64 6F � .'
_ - - `r�SCP
r
-_1- 1-`- --�- 133 36 38
PUNNING FEET 3 ;2_ 1
r Fll_I VG AFI! HT u
`s
r,ROSS VV.AI_! a l
,^lAl_tS I
^!I"„Dn .JS f: DQi R APFA? p
E
NET WALL AREA i-- I
-. '
I
DESIC:N TEMPERATURE DIFFERENCE
�rrinnE WALI. SQUARE 30 3� a0 FEET 45 ; 50 55 60 65 70 75 80 85 90 . 95 3
.J_1 HFA ncc I
l HEAT TRANSFER MULTIPLIER
- - niT ^ -----'- r� 4. 1 : - 5 4 8 -1 n 6.7 7 7 6 t5 ^r
n R I 1 7 1 18 21 22 23
A (7)NJ -7 13.'
t �- 1 ^D 17- r r 3 n o o r
_niI r 31 � � 7 X35 28 1.7_ 46 A�9- 5.3 5Ri5,9 F3i i
8 ? 11-� 1.2.7 i.n 3.3 3.6 3 9 ^ 2 4.5 4.8 5. 4
-- -- �TvnENE ��_3 J_.• 2.8 3.0 3.3 3 G 3.8 4 a.4 4.7 e ' Q
)TOPV WALL SQUARE DESIGN TEMPERATURE DIFFERENCE
-,,/E r-nADE FEET 3 35 �n�IFuEAT�TRANSFER M�l1L.T1PLIER80 85 90 1 95 „Fn
--- -
1 --- -
- 0 33 W, 3 11 4 rr
n
I . 5. 2 6.
3r, 3 3 73
7 F 9 4
TEMPFRATURE DIFFERENCE
�O,i�e, WALL � ;OUP,T'r _ > I
i 30 F50. 55 60 65 1 70 75 80 85 90 95
r.Eir1W :RADE FEET -_�_ 44
MEAT TRANSFER MULTIPLIER
-�4 f 7 3 8 1 8.8 9�(1-3 11.0 7.0 12 z5 '3 2 - -
F 1 C,
7.
7 7
A ^I^`,_ - ---- -- - -1 - 2__, ?7 3.0 3.' l_"13_9 x.2 4.5 14.8 5.1 ; n !-7!--- s
2 n 2 4 12.6 2.8 j 3.0 13.2 34
HEAT LOSS SUBTOTAL -
y a�
Heat Loss Suhlotal from Page I
DESIGN TEMPERATURE DIFFERENCE
SQUARE
CEILING 775 �7-TF5 1 60 j 65 1 70 1 75 1 80 85 90 1 95
rEFT 10 35 dO HEAT
HEAT TRANSFER MULTIPLIER
18 2t 24 1 27 30 33 36 39 42 45 48 51 54 57
tILAT OIJ 2 6 3.1 1.1 5 9 7 4.4 d.8 5.3 2 6.6 7,0 7.5 7.9
7: A T 10 Nl1 2.6 2.9 '3.2 3.43.7 !4.0 4.0 4.2 4.5 As 5
I E 112 .31.6 1.8 2.0 2.1 2 2.
.3 5 2.6 2.8 13.n
1
2 'N,",ULATION 0.8 0.9 1.0 1.2 1 1.3 1.4 1.6 1.7 1.8 2.0 2.1 2.2 2.3 12-5
r"I-r)OR. OVER AN SQUARE DESIGN TEMPERATURE DIFFERENCE
30 35 40 1 45 1 50 55 1 60 1 75 1 80 1 95 90 1 95
'1Vrr,!')lT10?\lED SPACE FEET YEA7 cc
HEAT TRANSFER MULTIPLIER
10 11 13 14 16 17 19 21 22 24 1 25 27 28 1 30
L
2.4 2.8 3.2 3.6 d.0 4.4 �4.8 5.2 15.6 16.0 16.4 6.8 7.2 7
A T!ONj
1.6 1.8 .6 13.914.7 4.4
A71()Nl
1.1 1.3 1.5 1.7 1.8 2.0 12.2 2.4 12.6 112.8 13.0 3.1 3.3 13.5 1
SQUARE DESIGN TEMPERATURE DIFFERENCE
RASENRENT FLOOR 30 39 40 1 45 1 50 155 1 60 1 65 1 70 1 75 1 80 1 85 90 95
FEET
PEAT TRANSFER MULTIPLIER
_OOR1 1.2 t:2C 0.8 1.0 1 1.1 1 1.3 11.4 11.5 11.7 11.8 12.0 12.1 12.2 12.4 12.5 12.7
DESIGN TEMPERATURE DIFFERENCE
SI AR WITHOUT LINEA P gT!!L!
FOOT 30 35 40 j 45 1 50 1 55 1 60 1 65 1 70 1 75 1 80 85 90 2
-cr�!-rTrn SY' E'IA
1 -5-j
HEAT TRANSFER MULTIPLIER
41 14�� 1
A 2 73 77
1 1 23 125 35 1 37 1 K
f7 i I I
A71nNj 16.3 17.,l 18.11 19.4 110.511.5 12.6 13.6 14.7 15.8 16.8 17.8118.9120 01
DESIGN TEMPERATURE DIFFERENCE
(,RETE SLAB LINEAR
'"T" �FOIMFTFR. SYSTEM FOOT 3071-9 1 60 1 65 1 70 r 75 1 80 1 85 HF^7 r
HEAT TRANSFER MULTIPLIER
A-10N
57 67 75 R6 1 95 105 114 124 1133 1143 1152 162 171 19
S1.11L A-O,\j 74 1 80 86 91 97 103 109
S 1114 T 1 r)N 28 33 37 42 1 47 51 56 61 1 65 70 75 79 84 89
inf;lt,atior Inid is caIc,0atqrl only if the home is loosely cni,structpri or when window infiltration is greater !1,,-- 7
FLOOR SO FT. x CEILING HEIGHT CUBIC Fr
INFILTRATION!
NIFNTJLATIOkj 0.40 x CUBIC FT - 60 CFM
MECHANICAL VENTILATION CFM = FRESH AIR INTAKE
�ES!G
N TEMPERATURE DIFFERENCE
CFM 3 1-5( 85 0 95
0 35_L_"). -9 1) 5:]60 1 65 1 70 1 75 1 BO 85
HEAT TRANSFER MULTirLIEP
33 39 44 50 55 61 66 72 77 83 1 88 1 94 199 11051
4 AN 1 A L, F N T I L A T 10 N
ZZ2 1 33 39 44 50 55 1 61 1 66 72 77 83 1 88 1 94 1 99 11051 jyT_5-0
HEAT LOSS SUBTOTAL
--1 Blanket Insulation: ADD 151/,, (.15) Al
Rlarket Insulation: ADD 10'/o 1.101
TOTAL HEAT LOSS
1:-- T,insfp, M!jlfm!iq,s f,,)-- G,�.(-,A "J" Si0, Ecl;!i-
Heating system Evaluation
AllStreet 1AYJ✓C'
Combustion Test Equipment
Hwb g PMM
Date71910-0-27. 4
Gross Stk Temp. tS 7 •' a
Model
Net Slk Temp $F.Warm Air ❑ G.Warm Air
4! ❑ F.Hot Water O G.Hot Waiter
L✓ o larcleone► ❑ Steam ❑ Coal Converted No.of Zones
Smoke O Burner
Manuf.
Breech Draft
Model
Overfire Draft Nozzle(GPH,Mille,Spray)
Eiliciency DOMOSUC Hot Water
D ❑ Tankless ❑ Gas
Raft O Electric O Oil
�Exceuent ❑ Tankless with Booster Tank
O Good Temperature Setting
❑ Fair Tankless Sin qpm
❑ Poor Othw
COr dx0I*M Chwnber
WmterK-Factor / ! ❑ Replace ❑ Repair
❑ No Action
Agrasfal SdbnO
C ONTM*Sia11 61119.
C .- 0
Work Done By .of No.
A�e,o
Compaq
V DATE TIME
CITY OF ORONO CALLED IN
INSPECTION N TIC SCHEDULED
PERMIT NO.eQ COMPLETED —
ADDRESS S T o- 0 .
pp�
OWNER CONTR. �fif LLJ62i�//l
TELEPHONE NO. q!S �Q S�� �f 7
DESCRIPTION
01 FOOTING11 MECHANICAL RI 18 EXCAV/GRADING/FILLING
Q 02 FRAMING 1 CAL FINAL 19 LAKESHORE/WETLANDS
ti 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
v 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
i09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
v 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
OWNER/CONTRACTOR TO MEET YOU:_YES_NO
o COMMENTS:
Cz
W
D;
O
O
cc
O
LL
W
cc
Q
Z
W
W
O
O
W ❑WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
Lu
W ❑CORRECT WORK&PROCEED C1ISSUE CERTIFICATE OF OCCUPANCY
Q ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
BEFORECOVERING
PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑PHOTO TAKEN
INSPECTOR WILL RETURN ❑CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
❑INSPECTION REOUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. (952) 249-4600
Owner/Contractor on site:
•/ .
Inspector.
Y
White CopylInspector's File Canary Copy/Site Notice
'/ DATE TIME
�/
CITY OF ORONO CALLED IN
INSPECTION NO E SCHEDULED
PERMIT NO. COMPLETED
ADDRESS i 77 Ga.�L�
OWNER CONTR.
9 �a l�S—:7c2,EZ 7 �
TELEPHONE N0.
DESCRIPTION '
01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING
Q 02 FRAMING 13��CA 19 LAKESHORE/WETLANDS
y 03 INSULATION 24�1f� OEEPLACE 34 TREE REMOVAL
Z04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
v 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
OWNER/CONTRACTOR TO MEET YOU:_YES_NO
o COMMENTS:
a
J
O
cc L
O
W
cc
Q
Z
W
W
cc
O
W ORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE
ccW
❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN
INSPECTOR WILL RETURN ❑CITATION ISSUED
❑STOP ORDER POSTED.CALL INSPECTOR
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next insp ion 24 hours in advance. (952) 249-4600
Owner/Contractor on ok
Inspe6%
e Copyllnsp.tor'sFile �.rypylSite NoH..