Loading...
HomeMy WebLinkAbouthardcover calcs-1994 EXTERIOR ENVELOPE AVERAGE'U'COMPUTATION L7HIME r! 9119194 JY7iFj40VAWJW ---> COAVTRAC 0R WALDENWOOD A*m w DETERMINE WORKING SQUARE FOOTAGE OF EACH A TOTAL EXPOSED WALL AREA 2086.504 SQ.FT.X 0.110 B TOTAL ROOF►CEILING AREA 912.000 SQ.FT.X 0.026 C TOTAL FLOOR►CANT.AREA 600.000 SQ.FT.X 0.050 TOTAL EXPOSED WALL AREA 1971.000 SQ.FT. a. TOTAL WALL WINDOW AREA 174.540 SQ.FT.X 0.360 b. TOTAL DOOR AREA -6W--SQ.FT.X 0.170 c. TOTAL SLIDING GLASS DOOR AREA --SQ.FT.X 0.380 d. TOTAL FIREPLACE AREA SQ.FT,X 1.176 e. TOTAL WALL FRAMING AREA i$7.iOi5-SQ.FT.X 0.101 I. TOTAL NET WALL AREA ABOVE FLO 1519.320 SQ.FT.X 0.045 g. TOTAL RIM JOIST AREA 117.504 SQ.FT.X 0.043 TOTAL BRICK WALL AREA SQ.FT. h. TOTAL WALL MANDOW AREA SQ.FT.X 0.960 L TOTAL DOOR AREA SQ.FT.X 0.170 j. TOTAL SLIDING GLASS DOOR AREA SQ.FT.X 0.380 k. TOTAL FIREPLACE AREA SQ.FT.X 1.176 L TOTAL WALL FRAMING AREA SQ.FT.X 1.176 m. TOTAL NET WALL AREA 0.000 SQ.FT.X 1.176 n. TOTAL RIM JOIST AREA SQ.FT.X 0.046 TOTAL FOUNDATION WALL AREA SQ.FT. o. TOTAL WALL WINDOW AREA SQ.FT.X 0.380 p. TOTAL DOOR AREA SQ.FT.X 0.170 q. TOTAL SLIDING GLASS DOOR AREA SQ.FT.X 0.380 r. TOTAL FIREPLACE AREA _ SQ.FT.X 1.176 s. TOTAL WALL FRAMING AREA --� SQ.FT.X 1.176 I. TOTAL NET WALL AREA 0.000 SQ.FT.X 1.176 u. TOTAL INSULATED CONCRETE AREA SQ.FT.X 1.176 TOTAL FURRED FOUNDATION AREA SQ.FT. v. TOTAL FOUNDATION WINDOWS SQ.FT.X 0.000 w. TOTAL FOUNDATION FURRING AREP 0.000 SQ.FT.X 1.176 x. TOTAL FOUNDATION INSULATED AR 0.000 SQ.FT.X 1.176 TOTAL D TOTAL TRUSSED ROOF AREA SQ.FT. a. TOTAL ROOF WINDOWS►SKYLITES SQ.FT.X 0.000 b. TOTAL ROOF FRAMING AREA � -SQ.FT.X 0.820 c. TOTAL NET INSULATED ROOF AREA 0.000 SQ.FT.X 0.820 TOTAL VAULTED ROOF AREA 912.000 SQ.FT. d. TOTAL ROOF WINDOWSISKYIITES SQ.FT.X 0.000 e. TOTAL ROOF FRAMING AREA 91. SQ.FT.X 0.069 I. TOTAL NET INSULATED ROOF AREA 820.800 SQ.FT.X 0.024 TOTALE TOTAL CANTILEVERED AREA SQ.FT. a. TOTAL CANT FRAMING AREA 0.000 SQ.FT.X 0.917 b. TOTAL NET INSULATED CANT AREA 0.000 SQ.FT.X 0.917 TOTAL TUCKUNDER AREA 600.000 SQ.FT. c. TOTAL TUCKUNDER FRAMING AREA 60.000 SQ.FT.X 0.059 d. TOTAL NET INSUL.TUCKUNDER ARE 540.000 SQ.FT.X 0.027 TOTAL F SULOAARY MAXIIWU ACTUAL A. 22a.736 IF TOWE IN THE ACTUAL COLUMN IS D. 178. B. 28.712 LESS THAN THE TOTAL IN THE E. 26.403 C. 30.000 MAMMUM COLUMN YOU HAVE PASSE F. 18.373 TOTAL SIGNED: DATE: '7-/?I _/q ( PAOE 1 OF 4 E71303ED WALL THRU STUD R FACTOR SHEETROCK 0.460 STUD SAM — SHEE TNG 0.700 -- MNG 1.050 EXTERIOR AIR FILM 0.1w TOTAL R VALUE 9.92D U VALUE(1114) = 0.101 EXPOSED WALL THRU MISULAT UM R FACTOR 19TERM AIR FILM o.w-, SHEETROCK 0.450 INSULATION 19.000 SHEATHING --x'700 SIDING 1.060 EXTERIOR AR FILM TOTAL R VALUE 2Z060 U VALUE(1114) 0.046 BRICK WALL THRU STUD R FACTOR WTEMRWRLM -- _ SHEETROCK STUD SHEATHING _ BRICK OR STONE EXTERIOR AIR FILM - 0.17F T.Mv U VALUE(11R) = 1.176 BRICK WALL 7MRU 943t11.ATHM R FACTOR NTEFM AIR FLM u� SHEETROCK 0.000 INSULATION SHEE n-IING O.0 BRICK OR STONE EXTERIOR AIR FILM TOTAL R VALUE -UMF U VALUE(1J1) 1.176 FOUIMDATUM WALL THRU STUD R FACTOR INTERIOR AIR FILM O.W SHEETROCK(OPT.) STUD SHEATHING SIDING EXTERIOR AIR FSM U VALUE(11R) = 1.176 FOUNDATION WALL THRU RAMPLATION R FACTOR INTERIOR AP F;LM o.m- SHEETROCK(OPT.) 0.000 INSULATION SHEATHING �dQO SIDING EXTERN AIR FILM U VALUE(1111) = 1.176 THRU M JOIST WISDMG R FACTOR INTERIOR AIR FlNr— 0.600 NSLA AT ON 19.000 1-1/2'WOOD 1.690 SHEATHING 0.700 SIDING 1.050 EXTERIOR AIR FILM �i70 U VALUE(11R) 0.043 PAGE 2 OF 4 T W RIM JOIST WNBRhX OR STONE R FACTOR INSULATION 19.000 1-117 WOOD 1.890 SHEATHING 0.000 BRICK OR STONE 0.000 EXTERIOR AIR FILM 0.17tF - 7 U VALUE(11R) = 0.096 THRU INSULATED CONCRETE FOUNDATION&FIREPIACE R FACTOR 94MFIOR AIR FEW— 0.680 INSULATION(OPT.) CONCISE WALL EXTERIOR AIR FIJI 0.17F TOTAL R VAEM 0.060 U VALUE(11R) 1.176 FURRED FOUNDATION WALL THRU STUD R FACTOR INTERIOR AIR FILM —� SHEETROCK(OPT.) STUD CONCRETE WALL — SDI NG EXTERIOR AIR FILMTOTAL R VALLE 0.860 U VALUE(11R) = 1.176 FURRED FOUNDATION WALL THRU INSULATION R FACTOR INTERIOR AIR FLM o.m- SHEETROCK(OPT.) 0.000 INSULATION CONCRETE WALL WW SIDING --�w EXTERIOR All FILM TOTAL R VALUE 0.850 U VALUE(11R) = 1.176 WINDOW U FACTOR 2 PANE 1 LOWLE 0.360 BASEMENT WINDOW U FACTOR 2 PANE 1 LOW-E DOOR U FACTOR 0.170' PATIO DOOR U FACTOR 2 PANE I LOWS TRUSSED ROOF THRU FRA WOG R FACTOR SHEETROCK CEILING MEMBER INSULATION STILL AIR FILM Z-.9w TOTAL RVi41:UE-_ IMF U VALUE(1111) = 0.920 TRUSSED ROOF THRU INSULATION R FACTOR INTERIOR AIR FILM 0.61(y- SHEETROCK 0.000 INSULATION STILL All FILM —-0..6l - TOTAL R VALUE -E U VALUE(1111) = 0.820 VAULTED ROOF THRU FRAMING R FACTOR EXTERIOR AIR FILM 0.1m ROOFING 0.940 PLYWOOD 0.700- SHEET INSULATION RAFTER 11.9w SHEETROCK 0.4w INTERIOR AIR FILM 0.61V -- —fid U VALUE(11R) = 0.089 PAGE 3 OF 4 VAULTED ROOF THRU INSULATION R FACTOR EXTERIOR AIR FILM UT/lu- ROOFING 0.940 PLYWOOD 0.700 SHEET INSULATION 0.000 INSULATION 36.000 SHEETROCK am- INTERIOR AIR FILM 0.610 TOTAI R VALUE 4o.870 U VALUE(1111) = 0.024 SKYLTI'E U FACTOR 2 PANE / LOW-E THRU CAMTNEVER FRAMMIG R FACTOR wwrEWRAP-nm 0.90 FINISH FLOORING UNDERLAYMENT SUBFLOOR FLOOR JOIST SOFFIT PLYWOOD EXTERIOR AIR FSATOTAE A VALUE 1.090 U VALUE(11R) 0.917 THRU CAKTREVER MISMATION R FACTOR AIR FILM O.W FINISH FLOORING 0.000 UNDERLAYMENT � - SUBFLOOR 0.000 INSULATION SOFFIT PLYWOOD 0:00D EXTERIOR AI;FILM 0.1 TOTAL A VALUE 1.090 U VALUE(11R) 0.917 THRU TUCKtR DER FRAMWG R FACTOR INTERIOR AIR FILM _ _ FINISH FLOORING 2.080 UNDERLAYMENT SUBFLOOR o.w FLOOR JOIST ll.w 518'SHEETROCK O.W STILL AIR FILM 0.920 U VALUE(11R) = 0.059 THRU TUCKtONDER MStMLATION R FACTOR NTEFM AIR FILM o.w FUSH FLOORING 2.080 UNDERLAYMENT 0.940 SUBFLOOR 0.940 INSULATION 30.000 518'SHEETROCK - .w STILL L AIR FILM 0.920 TOTAL R VAME 35.m U VALUE(1111) = 0.027 PAGE 4 OF 4