Loading...
HomeMy WebLinkAbout2012-00589 - new structure w CITY OFORONO * 2012 - 00589 * 2750 KELLEY PARKWAY DATE ISSUED: 07/18/2012 ORONO,MN 55356- (952)249-4600 FAX: (952)249-4616 ADDRESS 125 TURNHAM RD PIN 31-118-23-43-0018 LEGAL DESC UNPLATTED 31 118 23 LOT MB BLOCK MB PERMIT TYPE NEW STRUCTURE PROPERTY TYPE RESIDENTIAL CONSTRUCTION TYPE SINGLE FAMILY ACTIVITY 101-SINGLE FAMILY HOUSES,DETACHED VALUATION $ 463,000.00 NOTE: SEPERATE PERMITS REQUIRED:PLUMBING, MECHANICAL,SEPTIC,FIREPLACE,GRADING,LAWN IRRIGATION,WELL (STATE),ELECTRICAL(STATE) NOTE: AS BUILT SURVEY REQUIRED PRIOR TO CERTIFICATE OF OCCUPANCY ISSUANCE. INITIAL: Vi v NOTE: BE AWARE,IN THE EVENT WEATHER OR OTHER CONDITIONS PREVENT THE COMPLETION OF AN AS-BUILT SURVEY AT THE TIME THE CERTIFICATE OF OCCUPANCY IS REQUESTED,A TEMPORARY CERTIFICATE OF OCCUPANCY MAY BE ISSUED UPON RECEIPT OF A$10,000 ESCROW TO ENSURE COMPLETION OF THE AS-BUILT SURVEY AND ALL SITE IMPROVEMENTS. INITIAL:.,g -SEE ATTACHED CONDITIONS OF APPROVAL �G -SEE ATTACHED CITY ENGINEER COMMENTS -REVISED SURVEY(COMBINED SURVEY&GRADING PLAN)TO BE SUBMITTED PRIOR TO FRAMING APPLICANT PERMIT FEE SCHEDULE 3,234.75 MASTERPIECE HOMES STATE SURCHARGE(VALUATION) 231.50 127 EAST COUNTY RDC TOTAL 3,466.25 LITTLE CANADA,MN 55117- (651)484-3244 Minnesota State License#: 1435 OWNER ROCHEL,ANTHONY&SURYA 125 TURNHAM RD MAPLE PLAIN,MN 55359- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the State Building Code.This permit may be revoked at any time or due cause. Applicant Perrnit&Signature Date Issued By Stature Date SEPARATE PERMITS REQUIRED FOR WORK OTHER AN DESCRIBED AB E. City of Orono Building Permit Application for New Structures or Additions ,( Mailing Address: Permit number: a0/ —�.! (f/ t/ 0PO Box 66 \ Crystal Bay, MN 55323-0066 Date received: —4s—/ Received by 7 a. Street Address: 2750 Kelley Parkway d Plan review fee: 44 W4104 9 Orono, MN 55356 D/ -O Total Fee: Main: 952-249-4600 Fax: 952-249-4616 Nww;,c;l,;_orono_;m'1,L1; � y L.D This application form must be completed in full and all required information must be submitted. Incomplete applications will be returned. (Please print) GENERAL INFORMATION: Job Site Address: 125 Turnham Road Will this be a Parade of Homes, Remodelers Showcase Home or other Display Home? ❑ Yes ® No If yes, a special event permit is required with Police Department and City Council approval 60 days prior to the event. Shuttle bus service will be required unless applicant demonstrates sufficient on-site parking is available. Non-permitted events will not be allowed. CONTRACTOR/APPLICANT INFORMATION: y, Name: Masterpiece Homes, Inc ` Q/�, State License# BC 0 014 3 5 Expiration Date: 3/31/2014 Phone: 651-484-3244 (office) 612-363-3022 (cell) Mailing Address: 127 East County Road C City: Little Cana7l&. 55117 Contact Person: Howard Viaen Applicant is: Contract r / Homeowner (circle One) Email and/or Fax: 651-484-7723 PROPERTY OWNER INFORMATION: Name: Anthony and Surya Rochel Phone(day): 612-812-8252 Address: 929 Portland Ave Shite #307 City: Min-neapolJg ZIP:F)c,anQ Email and/or Fax ARCHITECT/ENGINEER INFORMATION: Name: Masterpiece Homes, Inc . Phone (day): 651-484-3244 Address: 127 East County Road C City: Little CanaciP: 55117 Email and/or Fax: Gt-P-\rPz 27Ca�ma�tPri er�hnmP�mn nnm PROJECT INFORMATION: 1.Type of Project 2. Proposed Use 3.Structure Type 4.Sewage Disposal& Water Supply New Construction Single Family with [23 Residence ❑Addition attached garage ❑ Garage/Accessory Bldg. ❑ Public Sewer ❑Accessory Building ❑ Single Family with ❑ Deck ❑ Relocation detached garage ❑ Office/Commercial Private Sewer ❑ Other: (specify) ❑ Multiple Family/Condo ❑Warehouse ❑ Public ❑ Storage ❑ Public Water "`Any earth movement may require ❑Commercial ❑ Other(specify) MCWD review&permits. ❑ Industrial Private Well Minnehaha Creek Watershed District(MCWD) ❑Other: (specify) 18202 Minnetonka Blvd Deephaven,MN 55391 Phone: 952-471-0590 Fax: 952-471-0682 Estimated Construction Valuation (excluding land) $ 463 000 STRUCTURE INFORMATION: 1.Structure Dimensions 1.Structure Dimensions(continued) 2.Type of Construction a. Length(ft.)= Number of bedrooms= 4 [3 Wood/Frame b.Width(ft.)= Number of garage stalls: ❑ Masonry Areas in square feet Attached= 3 ❑Metal El Pole Bldg. c. Basement= 1495 Detached= El ICF d. 151 Story = 1495 ❑On-site Prefab e.2"d Story= 1912 ❑Off-site Prefab f. '/2 Story = ❑Other(please specify): g. Total Area= 4902 REQUIRED SUBMITTALS: All of the information must be submitted in order for your application to be processed: Not Enclosed Applicable ❑ Permit Application Ex ❑ Proposed Building Plans [:K ❑ MN State Energy Code Calculations and Mechanical Code Requirements Form Ex ❑ Survey(meeting all requirements) ❑ Ex Stormwater Pollution Prevention Plan ❑ IR Hardcover Calculation(s) IX ❑ Septic System Site Evaluation Report ❑ CK Access Permit iff Ex Wetland Buffer Improvement Plan ❑ Engineered Plans for Retaining Walls 4 feet or above 4x ❑ Plan Review Fee ❑ ❑ Other: APPLICANT/OWNER ACKNOWLEDGEMENT: • Agrees to provide all information required or requested by the Building Department; • Agrees to pay the City of Orono for engineering consultant review costs in excess of$500; • Certifies that the information supplied is true and correct to the best of his/her knowledge. The applicant recognizes that they are solely responsible for submitting a complete application being aware that upon failure to do so, the staff has no alternative but to reject it until it is complete; • Acknowledges the Escrow Agreement is completed and signed; • Understands some or all of the information that you are asked to provide on this application is classified by State law as either private or confidential. Private data is information which generally cannot be given to the public but can be given to the subject of the data. Confidential data is information which generally cannot be given to either the public or the subject of the data. Our purpose and intended use of this information is to annually update our records and records of other governmental agencies required by law. If you refuse to supply the information,the application may not be issued. • Agrees that in the event that weather or other conditions prevent the completion of an as-built survey at the time the Certificate of Occupancy is requested, a temporary Certificate of Occupancy may be issued upon receipt of a$10,000 escrow to ensure completion of the arllau,t survey and all site improvements. Applicant's Sin ��.�— �.��� Date: � Owner's Signature: Date: V tie( �� Plan Review Checklist for New Structures / Additions Address/ PID/ Legal: Description of work: N�Gv '�t17✓Y'�� Gtr O(�`' Septic review by: Date Approved: Zoning review by: Date Approved: Building review by: Date Approved: -7 - I-1 Grading review by: --Irate Approved: Zoning File* Z' Resolution#: ( 17 Resolution Date: Z- Zoning District Fire De artmentPost Office School District r?_1 A- :::�:i I - I Zoning: Lot Area: SF/AC Width: Depth: Surrey Submitted: *Yes 0 No Date of Survey: 64 Vet/ Proposed Setbacks: F,�Qnt (Lake) Rear(Street) S E W ) ( NJi E W ) Other Buildings Wetland �1-- Side de AZh/Z f Y Building Defined Height: Building Peak Height: #of Stories Ok?AYES 1 _ WE �7f 7 FOR A BUILDING WITH ABASEMENT OR CRAWL SPACE: v(�1 ✓"! 1 .v FOR A BUILDING ON A SLAB FOUNDATION: START WITH the distance between the basement floor/crawl START the distance between the slab and the highest space floor and the highest roof peak,the top of WITH roof peak,the top of the cornice of a flat roof, the cornice of a flat roof,the deck line of a the deck line of a mansard roof, or the mansard roof,or the uppermost point on a round uppermost point on a round or other arch-type or other arch-type roof roof — SUBTF half the distance between the highest window and SUBTRACT half the distance between the highest window l/ highest roof peak of a pitched roof and highest roof peak of a pitched roof Cl SU RA T the distance between the basement floor/crawl ADD the distance between the slab and the highest space floor and the highest existing grade within existing rade within the foundation the foundation or 10 feet,whichever is less. EQUALS I Defined building height EQUALS 92fined building height Lot Coverage: SF Shoreland District MCWD Permit Received Average Lakeshore Setback Bluff, 0 Yes 0 No 0 N/A 0 Yes No 0 Yes No 0 Yes 0 No N/A Permit Number: Setback: Hardcover Zones Existing Proposed Variance Required UP Re uired 0-75' 0 Yes o 31 Yes 0 No 75-250' Type(s): Type( 250-500' Ve ra l tc(hti�G�-e 500-1000' 1 REMARKS (in-house): Vl�� VlJ -0 Updated: 09/11/2009 z:\forms\plan review checklist.docx Fees to be Charged YES NO ,Permit Plan Review f State'Surcharge Investigation Fee t/ SAG-Number of SAC'Units Sewer Connection Water'Connection Park Fee r� SitIs I 08CUOn v Other(specify) v' -"Miscellaneous Fees Calculated By: Square Footage $ per Sq are Footage Basement X = $ 1" Floor X = $ 2nd Floor X = $ Garage X = $ Estimated Construction Value: $ `A(o3p()Uy 0o Orono Inspections Required Work Requiring Separate Permits Required State Permits 0 SitePlumbing 0 Grading/Filling 3eWell 0 Hardcover Removal Mechanical 0 Fire Electrical Footing Septic 0 Water Connection Poured Wall Ar Fireplace 0 Sewer Connection �F undation Survey 0 Masonry )2( Lawn Irrigation adon Rock Bed ,K Mfg. ,W Framing 0 Other(specify) Insulation s-Built Survey inal Other(specify) oV fk� REMARKS (in-house): Other Review: Reviewed by: Date Approved: Access:Existing: 0 YES 0 NO New: 0 YES 0 NO A_gMARKS (TO BE NOTED ON PERMIT AND INITIALLED BY PERSON PULLING PERMIT) �E��rt� ►J�t nvn�� C- jam- 64OW Jt ENCS SlED 90 CAWBI WD S Updated: 09/11/2009 i,v z:\forms\plan review checklist.docx �t !' ORONO coyVERSA-LOK® r Retaining Wall Systems Solid Solutions' Design Calculations for Rochel Residence 11/2/2012 Orono, MN ( L/ V. �a V'N Designed by: Anthony Rochel,PE 48419 ®R VERSA-LOW Retaining Wall Systems Solid Solutions' Design Memorandum Proiect Information Units: English Project name: Roche[ Residence Reinforcement:Versagrid Batter:3"/24"or 7° Project Location:Orono, MN Design: Rankine-w/Batter(modified soil interface) Cap Units:3 5/8"Caps Max Height:6'3 5/8" Approximate Quantities(does not include waste): Wall Units:Standard Wall Length: 25' Wall Area: 135 sf(includes cap area) Cap area:6 sf Reinforcement:Versagrid VG3 Reinforcement Area:31.7 sy Design Parameters: Soil Properties: Reinforced 28 Onsite silty clay Retained 28 Onsite silty clay Foundation 28 Onsite silty clay Design Load 50 psf Dead Load 0 psf Backslope 5° oho �g� 1� I�ti SXR i O r a� �g Y 31 fi` {a �t � N o () RETAINING WALL ' 125 7URNHAM RD. ROCHEL CONSTRUCTION PLAN g ORONO, MN 55359 HOWSI TE ��„ �•,,,,,b•,,,,+,�, DRAINAGE AGGREGATE W� �;, • Z PERF. DRAIN PIPE W ® '�..ya!'i?l ,,i"e�" ;'�w7,6�=�'•.. v it amsrt.urm +•�• 7 O �N o.a•ow I-.--�-1-.a• VERSA-TUFF PIN LJ S��` l o►ansos VFa• r+rr OPEN JOINT AT ®• OFwue raga 40 FT. CENTERS " ;• WRQ Rom°�p� DRAIN DETAIL SCALE: NONE 0) ® NOTE: FOR STRAIGHT WALLS, ALTERNATE A-CAP AND B-CAP L \ • FOLLOW GEOSYNTHETIC GRID MANUFACTURER'S INSTALLATION INSTRUCTIONS AND SPECIFICATIONS • GEOGRID LENGTH AND ELEVATION PLACEMENT SHALL g BE DETERMINED BY WALL DESIGN ENGINEER A-CAP B-CAP ti 0 GEOSYNTHETIC INSTALLATION DETAIL SCALE: NONEN O SPLIT SIDE OF CAP '� AND STANDARD UNIT RANDOMLY STAGGER VERTICAL JOINTS DA Tc d:..:y:a,•5'r yrv�2•�'�a"{..N;:•:<�la.f f.'j�.rw-,.s`�S+w U' .-,:nii�;:�. RANDOMLY STAGGER `�aS':';) ', '>:�,1 .' .. Vx��,:.. r.c,;:. >..�� .y:,,�h."• .. FINISHED GRADT VERTICAL JOINTS a• P: w Y p Y�.S!'�::t,�a.•:ij..vy.i.y.2y�;`�.'y'!,t'N',:t,�P){ ��.ifu,:�iP�'f:•):. LINE •kN..;�`...c <".oi'.:.;k^�'c r.:".:S:i,l:;%Lc v.';":, ;"w.t :. ,;,z'i% -'' '{: i `"',1;`i;: .i ,": :r;;: ;`•?P,i::' .c.t, CAPPING DETAIL—PROFILE STEP AT TOP OF WALL • .. Y'i.'.:. rel,•;;,. v.,P::: 'nl�°•�, • ...� : :. ." .::� SCALE: NONE z/ �R::'::i'i�i ...7'i :�'�•',,i'�;�:�:�::1+�Z4„t;. •.'. ..ti+'�"' !1 •,•.� ,y,. ). ,y:^ii!:a�i �:;?.i:w,it':. `:?:jt is FILTER FABRIC GRANULAR LEVELING III=III III I I III. y �,i. •r i��l AD 6" THICK -III-III=�=1 I f=ll <., . ...- r•:'..f ��I!! I III—III I I—III— I=I( I—IEXISTING STRUCTURE II III-I I-III—II ' BURY ONE ADDITIONAL FULL UNIT MIN. UNDISTURBED SOIL NOTE: • LIMIT CHANGES IN BASE ELEVATION [n TO 6” PER STEP TO AVOID ° • a.~ DIFFERENTIAL SETTLEMENT • STEP AS NEEDED TO MINIMIZE NOTE: Z BURIED UNITS AND MAINTAIN MINIMUM SEE NOTE . AT ABUTMENT, ALTERNATE FULL UNIT WITH HALF Z Q REQUIRED EMBEDMENT UNIT EVERY OTHER COURSE Q • START AT FIXED POINTS AND WORK INTO MIPOU F� PART OF WALL W STEPPING BASE DETAIL • SDO NOT TRUCTURES VERSA-LOK UNITS TO OTHER SCALE: NONE WALL ABUTMENT DETAIL SCALE: NONE VERSA-LOK RETAINING WALL DESIGN Retaining Wall Systems Solid Solutions:- Project olutions'Project Name: Rochel Residence Project Location: Orono, MN Design Method: Rankine-w/Batter(modified soil interface) Design Parameters: Soil Parameters deg c psf Y psf Reinforced fill: 28 0 120 Retained Zone: 28 0 120 Foundation Soil: 28 0 120 Reinforced Fill Type: Silty Clay Unit Fill: Crushed Stone, 1 inch minus Minimum Design Factors of Safety: Sliding: 1.50 Pullout: 1.50 Uncertainties: 1.50 Overturning: 2.00 Shear: 1.50 Connection: 1.50 Bearing: 2.00 Bending: 1.50 Design Preferences: Tult RFcr RFd Rid LTDS FS To/ Ci Cds VG3 3435 1.54 1.10 1.08 1878 1.50 1252 0.80 0.80 Analysis: Unit Type: Standard Wall Batter: 7° Leveling Pad: 6"Crushed Stone Embedment(min): 6" Wall Height: 6.3' Surcharge: 50 pcf Results: Sliding Overturn Bearing Factors of Safety 3.05 8.42 10.76 Calculated Reinf. Allow Peak Pullout Reinforcing: Layer Height Lenath Tension Type Tension Conn. FS 3) 4.50 5.50 174 VG3 1252 632.9 1.9 ok 2) 2.50 5.50 289 VG3 1252 652.5 4.7 ok 1) 0.50 5.50 307 VG3 1252 672.1 9.8 ok SPECIFICATION FOR SEGMENTAL RETAINING WALL SYSTEMS PART 1: GENERAL 1.01 Description A. Work shall consist of furnishing materials, labor,equipment and supervision to install a segmental retaining wall system in accordance with plans and specifications and in reasonably close conformity with the lines, grades,design and dimensions shown on plans or established by Owner or Owner's engineer. 1.02 Reference Standards A. Segmental Retaining Wall Units 1. ASTM C 140- Sampling and Testing Concrete Masonry Units 2.ASTM C 1372—Standard Specification for Dry-Cast Segmental Retaining Wall Units B. Geosynthetic Reinforcement 1. ASTM D 4595—Standard Test Method for Tensile Properties of Geotextiles by the Wide-Width Strip Method 2. ASTM D 5262—Standard Test Method for Evaluating the Unconfined Tension Creep and Creep Rupture Behavior of Geosynthetics 3.ASTM D 5321 —Standard Test Method For Determining the Coefficient of Soil and Geosynthetic or Geosynthetic and Geosynthetic by Direct Shear Method 4.ASTM D 5818 - Standard Practice for Exposure and Retrieval of Samples to Evaluate Installation Damage of Geosynthetics 5.ASTM D 6706—Standard Test Method for Measuring Geosynthetic Pullout Resistance in Soil C. Soils 1.ASTM D 698—Standard Test Method for Laboratory Compaction Characteristics of Soil Using Standard Effort 2. ASTM D 2487—Standard Practice for Classification of Soils for Engineering Purposes 3. ASTM D 422—Standard Test Method for Particle-Size Analysis of Soils 4. ASTM D 4318—Standard Test Method for Liquid Limit,Plastic Limit and Plasticity Index of Soils 5. ASTM G 51—Standard Test Method for Measuring pH of Soil for Use in Corrosion Testing D. Drainage Pipe 1 1.ASTM F 758—Standard Specification for Smooth-Wall Polyvinyl Chloride(PVC) Plastic Underdrain Systems for Highway,Airport or Similar Drainage 2.ASTM F 405—Standard Specification for Corrugated Polyethylene(PE)Pipe and Fittings E. Engineering Design 1. "NCMA Design Manual for Segmental Retaining Walls,"Third Edition F. Where specifications and reference documents conflict,the Wall Design Engineer shall make the final determination of applicable document. 1.03 Submittals A. Materials Submittals: The Contrac tAall sut6t manufacturers'certifications two weeks prior to start of work stating that the SkW unl1w find geosynthdkic reinforcement meet the requirements of Section 2 of this specification. B. Design Submittal: The Contractor shall submit two sets of detailed design calculations and final retaining wall plans for approval at least two weeks prior to the beginning of wall construction.All calculations and drawings shall be prepared and sealed by a professional Civil Engineer(P.E.)—(Wall Design Engineer)experienced in SRW design and licensed in the state where the wall is to be built. 1.04 Delivery,Storage and Handling A. Contractor shall check materials upon delivery to ensure that the specified type and grads of materials have been received and proper color and texture of SRW units have been received. B. Contractor shall store and handle materials in accordance with manufacturer's recommendations and in a manner to prevent deterioration or damage due to moisture, temperature changes, contaminants,corrosion, breaking, chipping or other causes. C. Contractor shall prevent excessive mud,wet concrete, epoxies and similar materials that may affix themselves from coming in contact with materials. D. Contractor shall protect materials from damage; no damaged material shall be incorporated into the segmental wall. E. Geosynthetic shall be protected from UV exposure and the protective covering on geosynthetic shall remain until immediately before installation and shall be stored at temperatures above-10 degrees F. PART 2: MATERIALS 2 2.01 Segmental Retaining Wall Units A. SRW units shall be machine formed,Portland cement concrete blocks specifically designed for retaining wall applications. SRW units currently approved for this project are: B. Color of SRW units shall be _ Grey C.Finish of SRW units shall be weathered split-face. A weathered split-face is a straight-face unit that is mechanically finished to create rounded corners and edges similar in appearance to naturally-worn stone or cobbles. D. SRW unit faces shall be of straight geometry. E. SRW unit height shall be 6 inches. F. SRW units shall provide a minimum weight of 120 psf wall face area. G. SRW units shall be solid through the full depth of the unit. H. SRW units shall have a depth(front face to rear)to height ratio of 2:1, minimum. I. SRW units shall be capable of being erected with the horizontal gap between adjacent units not exceeding 1/8 inch. J. SRW units shall be interlocked with connecting pins that provide 3/4-inch setback from unit below(yielding a 7-degree cant from vertical). K. SRW units shall be sound and free of cracks or other defects that would interfere with the proper placing of the unit or significantly impair the strength or permanence of the structure. Any cracks or chips observed during construction shall fall within the guidelines outlined in ASTM C 1372. L. Concrete SRW units shall conform to the requirements of ASTM 1372 and have a minimum net average 28 days compressive strength of 3000 psi. Compressive strength test specimens shall conform to the saw-cut coupon provisions of ASTM C 140. M. SRW units' molded dimensions shall not differ more than+ 1/8 inch from that specified, as measured in accordance with ASTM C 140. This tolerance does not apply to architectural surfaces, such as split faces. 2.02 Segmental Retaining Wall Unit Connection Pins A. SRW units shall be interlocked with VERSA-Tuff connection pins. The pins shall consist of glass-reinforced nylon made for the expressed use with the SRW units supplied. 3 2.03 Geosynthetic Reinforcement A. Geosynthetic reinforcement shall consist of high-tenacity PET geogrids,HDPE geogrids, or geotextiles manufactured for soil reinforcement applications. The type, strength and placement of the geosynthetic reinforcement shall be determined by procedures outlined in this specification and the NCMA Design Manual for Segmental Retaining Walls(3rd Edition 2009) and materials shall be specified by Wall Design Engineer in their final wall plans and specifications. The manufacturers/suppliers of the geosynthetic reinforcement shall have demonstrated construction of similar size and types of segmental retaining walls on previous projects. The geosynthetic type must be approved one week prior to bid opening. Geosynthetic types currently approved for this project are: VERSA-Grid Geogrids B. The type, strength and placement of the reinforcing geosynthetic shall be as determined by the Wall Design Engineer,as shown on the final, P.E.-stamped retaining wall plans. 2.04 Leveling Pad A. Material for leveling pad shall consist of compacted sand, gravel, or combination thereof (USCS soil types GP,GW, SP, & SW)and shall be a minimum of 6 inches in depth. Lean concrete with a strength of 200-300 psi and 3 inches thick maximum may also be used as a leveling pad material. The leveling pad should extend laterally at least a distance of 6 inches from the toe and heel of the lowermost SRW unit. 2.05 Drainage Aggregate A. Drainage aggregate shall be angular, clean stone or granular fill meeting the following gradation as determined in accordance with ASTM D422: Sieve Size Percent Passing 1 inch 100 3/4 inch 75-100 No. 4 0-60 No. 40 0-50 No. 200 0-5 2.06 Drainage Pipe A. The drainage collection pipe shall be a perforated or slotted PVC,or corrugated HDPE pipe. The drainage pipe may be wrapped with a geotextile to function as a filter. 4 B. Drainage pipe shall be manufactured in accordance with ASTM F 405 or ASTM F 758. 2.07 Reinforced Backfill Soil A. The reinforced soil material shall be free of debris. Unless otherwise noted on the final, P.E.-sealed,retaining wall plans prepared by the Wall Design Engineer,the reinforced material shall consist of the inorganic USCS soil types GP,GW, SW, SP, SM, meeting the following gradation, as determined in accordance with ASTM D422: Sieve Size Percent Passing 1 inch 100 No. 4 20-100 No. 40 0-60 No. 200 0-35 B. The maximum particle size of poorly-graded gravels(GP)(no fines) should not exceed 3/4 inch unless expressly approved by the Wall Design Engineer and the long-term design strength (LTDS) of the geosynthetic is reduced to account for additional installation damage from particles larger than this maximum. C. The plasticity of the fine fraction shall be less than 20. D. The pH of the backfill material shall be between 3 and 9 when tested in accordance with ASTM G 51. 2.10 Geoteztile Filter A. Drainage geotextile shall consist of geosynthetic specifically manufactured for use as a preamble soil filter that retains soil while still allowing water to pass throughout the life of the structure. The type and placement of the geotextile filter material shall be as required by the Wall Design Engineer in their final wall plans and specifications. PART 3: DESIGN PARAMETERS 3.01 Soil A. Onsite soils (silty clay with no organics)to be used as retained soil, foundation soil,and reinforced soil. Foundation soil and reinforced soil shall be proof-rolled and compacted to 95%standard Proctor density and inspected by the Owner's Geotechnical Engineer prior to placement of leveling pad materials. B. Should the actual soil conditions observed during construction differ from those assumed for the design, design shall be reviewed by the Wall Design Engineer at the Owner's Geotechnical Engineer's direction. 5 3.02 Design A. The design analysis for the final, P.E.-stamped retaining wall plans prepared by the Wall Design Engineer shall consider the external stability against sliding and overturning, internal stability and facial stability of the reinforced soil mass, and shall be in accordance with acceptable engineering practice and these specifications. The internal and external stability analysis shall be performed in accordance with the "NCMA Design Manual for Segmental Retaining Walls, P Edition' using the recommended minimum factors of safety in this manual. B. External stability analysis for bearing capacity, global stability, and total and differential settlement shall be the responsibility of the Owner and the Owner's Geotechnical Engineer. The Geotechnical Engineer shall perform bearing capacity, settlement estimates, and global stability analysis based on the final wall design provided by the Wall Design Engineer and coordinate any required changes with the Wall Design Engineer. C. While vertical spacing between geogrid layers may vary, it shall not exceed 2.0 feet maximum in the wall design. D. The geosynthetic placement in the wall design shall have 100% continuous coverage parallel to the wall face. Gapping between horizontally adjacent layers of geosynthetic (partial coverage)will not be allowed. PART 4:CONSTRUCTION 4.01 Inspection A. The Owner or Owner's Engineer is responsible for verifying that the materials supplied by the Contractor meet all the requirements of the specification. This includes all submittals for materials and design, qualifications and proper installation of wall system. B. Contractor's field construction supervisor shall have demonstrated experience and be qualified to direct all work at the site. 4.02 Excavation A. Contractor shall excavate to the lines and grades shown on the project grading plans. Contractor shall take precautions to minimize over-excavation. Over-excavation shall be filled with compacted infill material,or as directed by the Wall Design Engineer,at the Contractor's expense. B. Contractor shall verify location of existing structures and utilities prior to excavation. 6 Contractor shall ensure all surrounding structures are protected from the effects of wall excavation. Excavation support, if required, is the responsibility of the Contractor. 4.03 Foundation Preparation A. Following the excavation, the foundation soil shall be examined by the Owner's Engineer to assure actual foundation soil strength meets or exceeds the assumed design bearing strength. Soils not meeting the required strength shall be removed and replaced with infill soils, as directed by the Owner's Geotechnical Engineer. B. Foundation soil shall be proof-rolled and compacted to 95%standard Proctor density and inspected by the Owner's Geotechnical Engineer prior to placement of leveling pad materials. 4.04 Leveling Pad Construction A. Leveling pad shall be placed as shown on the final,P.E.-sealed retaining wall plans with a minimum thickness of 6 inches. The leveling pad should extend laterally at least a distance of 6 inches from the toe and heel of the lowermost SRW unit. B. Granular leveling pad material shall be compacted to provide a firm, level bearing surface on which to place the first course of units. Well-graded sand can be used to smooth the top 1/4 inch to 1/2 inch of the leveling pad. Compaction will be with mechanical plate compactors to achieve 95%of maximum standard Proctor density (ASTM D 698). 4.05 SRW Unit Installation A. All SRW units shall be installed at the proper elevation and orientation as shown on the final,P.E.-sealed wall plans and details or as directed by the Wall Design Engineer. The SRW units shall be installed in general accordance with the manufacturer's recommendations. The specifications and drawings shall govern in any conflict between the two requirements. B. First course of SRW units shall be placed on the leveling pad. The units shall be leveled side-to-side, front-to-rear and with adjacent units, and aligned to ensure intimate contact with the leveling pad. The first course is the most important to ensure accurate and acceptable results. No gaps shall be left between the front of adjacent units.Alignment may be done by means of a string line or offset from base line to the back of the units. C. All excess debris shall be cleaned from top of units and the next course of units installed on top of the units below. D. Two VERSA-Tuff connection pins shall be inserted through the pin holes of each upper- course unit into receiving slots in lower-course units.Pins shall be fully seated in the pin slot below. Units shall be pushed forward to remove any looseness in the unit-to-unit connection. 7 E. Prior to placement of next course,the level and alignment of the units shall be checked and corrected where needed. F. Layout of curves and corners shall be installed in accordance with the wall plan details or in general accordance with SRW manufacturer's installation guidelines. Walls meeting at corners shall be interlocked by overlapping successive courses. G. Procedures C.through F. shall be repeated until reaching top of wall units,just below the height of the cap units. Geosynthetic reinforcement, drainage materials, and reinforced backfill shall be placed in sequence with unit installation as described in Section 4.06, 4.07 and 4.08. 4.06 Geosynthetic Reinforcement Placement A. All geosynthetic reinforcement shall be installed at the proper elevation and orientation as shown on the final P.E.-sealed retaining wall plan profiles and details, or as directed by the Wall Design Engineer. B. At the elevations shown on the final plans,(after the units, drainage material and backfill have been placed to this elevation)the geosynthetic reinforcement shall be laid horizontally on compacted infill and on top of the concrete SRW units,to within 1 inch of the front face of the unit below. Embedment of the geosynthetic in the SRW units shall be consistent with SRW manufacturer's recommendations. Correct orientation of the geosynthetic reinforcement shall be verified by the Contractor to be in accordance with the geosynthetic manufacturer's recommendations. The highest-strength direction of the geosynthetic must be perpendicular to the wall face. C. Geosynthetic reinforcement layers shall be one continuous piece for their entire embedment length. Splicing of the geosynthetic in the design-strength direction (perpendicular to the wall face) shall not be permitted. Along the length of the wall, horizontally adjacent sections of geosynthetic reinforcement shall be butted in a manner to assure 100%coverage parallel to the wall face. D. Tracked construction equipment shall not be operated directly on the geosynthetic reinforcement. A minimum of 6 inches of backfill is required prior to operation of tracked vehicles over the geosynthetic. Turning should be kept to a minimum. Rubber-tired equipment may pass over the geosynthetic reinforcement at slow speeds (less than 5 mph). E. The geosynthetic reinforcement shall be free of wrinkles prior to placement of soil fill. The nominal tension shall be applied to the reinforcement and secured in place with staples, stakes or by hand tensioning until reinforcement is covered by 6 inches of fill. 4.07 Drainage Aggregate and Drainage Material Placement 8 A. Drainage aggregate shall be installed to the line, grades and sections shown on the final P.E.-sealed retaining wall plans. Drainage aggregate shall be placed to the minimum thickness shown on the construction plans between and behind units(a minimum of 1 cubic foot for each exposed square foot of wall face unless otherwise noted on the final wall plans). B. Drainage collection pipes shall be installed to maintain gravity flow of water outside the reinforced-soil zone. The drainage collection pipe shall be installed at the locations shown on the final construction drawings. The drainage collection pipe shall daylight into a storm sewer or along a slope,at an elevation below the lowest point of the pipe within the aggregate drain. Drainage laterals shall be spaced at a maximum 50-foot spacing along the wall face. 4.08 Backfill Placement A. The reinforced backfill shall be placed as shown in the final wall plans in the maximum compacted lift thickness of 8 inches and shall be compacted to a minimum of 95%of standard Proctor density(ASTM D 698)at a moisture content within 4%to+3%points of optimum. The backfill shall be placed and spread in such a manner as to eliminate wrinkles or movement of the geosynthetic reinforcement and the SRW units. B. Only hand-operated compaction equipment shall be allowed within 3 feet of the back of the wall units. Compaction within the 3 feet behind the wall units shall be achieved by at least three passes of a lightweight mechanical tamper,plate, or roller. C. At the end of each day's operation,the Contractor shall slope the last level of backfill away from the wall facing and reinforced backfill to direct water runoff away from the wall face. D. At completion of wall construction,backfill shall be placed level with final top of wall elevation. If final grading,paving, landscaping and/or storm drainage installation adjacent to the wall is not placed immediately after wall completion,temporary grading and drainage shall be provided to ensure water runoff is not directed at the wall nor allowed to collect or pond behind the wall until final construction adjacent to the wall is completed. 4.09 SRW Caps A. SRW caps shall be properly aligned and glued to underlying units with VERSA-LOK adhesive, a flexible,high-strength concrete adhesive. Rigid adhesive or mortar are not acceptable. B. Caps shall overhang the top course of units by 3/4 inch to 1 inch. Slight variation in overhang is allowed to correct alignment at the top of the wall. 4.10 Construction Adjacent to Completed Wall 9 A. The Owner or Owner's Representative is responsible for ensuring that construction by others adjacent to the wall does not disturb the wall or place temporary construction loads on the wall that exceed design loads, including loads such as water pressure,temporary grades, or equipment loading. Heavy paving or grading equipment shall be kept a minimum of 3 feet behind the back of the wall face. Equipment with wheel loads in excess of 150 psf live load shall not be operated within 10 feet of the face of the retaining wall during construction adjacent to the wall. Care should be taken by the General Contractor to ensure water runoff is directed away from the wall structure until final grading and surface drainage collection systems are completed. END OF SECTION 10 ORONO COP Building Permit 2012-00589 SUPPLEMENTAL CONDITIONS 1. Council approval of the site grading is based on Resolution 6117. Any amendments to the plan which are not in conformity with City codes will require further Planning Commission and City Council review. 2. All fill being used on the site shall meet the City's definition of clean fill. The City Engineer shall be allowed to inspect any fill being brought to the site prior to it being placed. 3. The applicants shall work with the City Engineer and/or Willie Gibbs(Septic Manager)to locate and install protection around the potential septic areas to insure they are not impacted and compacted during the fill activities. The protection fencing must be inspected and approved by the City prior to any land disturbing activities. 4. The applicants shall confirm with the City Engineer acceptable hours of operation, and provide documentation on the route being used by trucks to bring fill to the site (if applicable). 5. If fill is being brought to the site,the City Engineer shall inspect the roadways prior to and following completion of the work to determine whether unnecessary impacts have occurred. The applicant shall be responsible for the repair to the roadways for any adverse impacts. 6. On July 13, 2012,the City Engineer reviewed the condition of the driveway and CMP culvert. a. The CMP culvert under the driveway is in poor conditions,with holes rusted through the top of the pipe as documented by the attached photos. The culvert should be replaced as part of this project, matching existing size and elevations. b. The condition of the driveway and Turnham Road has been documented with digital photos. A few minor ruts and riffles have been noted on the shared gravel driveway. Minor expansion cracking and a few areas of alligator crackling have been noted on Turnham Road.The applicant should be required to review existing conditions and confirm the City's documentation through an initial condition walkthrough. After construction is complete,the City Engineer shall review the condition of the driveway and Turnham Road, and any damage shall be addressed by the applicant. c. The applicant/contractor shall notify the City 48 hours prior to required inspections. 7. Construction shall follow the survey and plans as submitted or as required to be updated by the City Engineer. 8. The existing home on the property shall be removed prior to issuance of a certificate of occupancy for the new home. Owner/Applicant Signature New Construction Energy Code Compliance Certificate Per N1101.8 Building Certificate.A building certificate shall be posted in a permanentlyvisible location inside Data Certatcate Posted the building. The certificate shall be completed by the builder and shall list infaratation and values of components listed in Table NI 101.8. I COMM. NO. Malling Address of the Dwelling or Dwelling Unit City 210124 125 Turnham Rd Orono Name of Residential Contractor MN t.kc a Number Masterpiece Homes, Inc . BC001435 THERMAL ENVELOPE RADON SYSTEM Type:Check All That Apply X Passive(No Fan) w th Active 1 Wirh fan and monometer or other sysrem moniroring device) r ° o U v q m u U cU w LU Insulation Location Z 9 S m 8 m E z IcCI a l0ther Please Describe Here Below Entire Slab Foundation Wall Type in location:interior exterior or integral Perimeter of Slab on Grade Rim Moist(Foundation) 19 Ix I Type in location:interior e*erior or integral Rim Joist Wo Floor+) 19 X I Type in location:interior exterior or integral Wall 19 X Cdling,not 44 X Ceiling,vaulted 44 X Bav Windows or cantilevered areas Bonus room over garage Describe other insulated areas Wfindows 8 Doors Heating or Cooling Ducts Outside Conditioned Spaces Average U-Factor(excludes skylights and one door)t!: 0.30 Not applicable,all ducts located in conditioned space Solar Heat Gain Coefficient(S HOC): 032 El 21 1R-vaiue MECHANICAL SYSTEMS Make-up Air Select Type Appliances Heating System Domestic Water Heater Cooling System X Not required per meth,code Fuel Type Geothermal Gas Geothermal lPassive Manufacturer GeoComfort Triangle tube GeoComfrot Powered interlocked with exhaust device. Model GCT072 S010110 GCT072 Describe: Input in 6 TONS Capacity is 1110,000 output in 6 TONS Other,describe: Rating or Size STUS! Gallons Tons: Heat Loss: 90.707 Heat Gain: 38233 Location of duct or system: Structure's Calculated AFUE or COP 4.35 SEER: 21.45 EER HSPF% Mechanical room Calculated 43,143 El'licicacv coati load: CFrn's "round duct OR Mechanical Ventilation System "metal duct Describe any additional or combined heating or cooling systems if installed:(e.g.two furnaces or air Combustion Air Select a Type ource heat pump with gas back-up furnace): X Not required per meth,code Selecif Type Passive Heat Recover Ventilator(HRV) Capacity in elms: Low: High: Other,describe: Energ Recover Ventilator(ERV)Capacity in cfms: Low: 80 High: 1193 Location of duct or system: Continuous exhausting fans)rated capacity in efts: Location of fan(s),describe: Cfm's Capacity continuous ventilation rate in cfms: "round duct OR Total ventilation(intermittent+continuous)rate in cfrns: 150 "metal duct Load Short Form COPY Job: EMUMASSMANN Date: Dec.30th 2011 GEOTXE-AL f YECIA.ICAL Entire House By: Jon B. • • on For: Rochel Residence, Masterpiece Homes 125 Turnham Road, Orono, MN Deslan Information Htg Clg Infiltration Outside db(°F) -22 97 Method Simplified Inside db (°F) 68 75 Construction quality Tight Design TD (°F) 90 22 Fireplaces 0 Daily range - M Inside humidity(%) 30 45 Moisture difference (gr/Ib) 31 57 HEATING EQUIPMENT COOLING EQUIPMENT Make Enertech Manufacturing LLC. Make Enertech Manufacturing LLC. Trade GEOCOMFORT Trade GEOCOMFORT Model GT060 Cond GT060 AHRI ref no.3000398 Coil AHRI ref no.3000398 Efficiency 3.29 COP Efficiency 19.41 EER Heating input 46178 Btuh Sensible cooling 47913 Btuh Heating output 46178 Btuh Latent cooling 20534 Btuh Temperature rise 26 IF Total cooling 68447 Btuh Actual air flow 1643 cfm Actual air flow 1643 cfm Air flow factor 0.022 cfm/Btuh Air flow factor 0.047 cfm/Btuh Static pressure 0.50 in H2O Static pressure 0.50 in H2O Space thermostat Load sensible heat ratio 0.88 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Main Lvl Zone p 2418 36339 25394 800 1190 Basement Zone p 2418 21464 12455 472 584 Garage Zone p 1080 16856 0 371 0 Entire House d 5915 74659 35070 1643 1643 Other equip loads 16048 2414 Equip. @ 1.02 RSM 38233 Latent cooling 4911 TOTALS 5915 90707 43143 1643 1643 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 1 ft 2072-Jun-19 153 wrlhtsoPage I 9 Right-Suite®Universal 8.0.18 RS000282 Page ACCA ...y Documents,Wrightsoft HVAC\Master Piece Homes-McClearen.rup Calc=MJ8 Front Door faces: a r :# r� y ." ��.: � � ra�! :mss . Building Analysis Job: g Y Date: Dec.30th 2011 j MM YMN Entire House By: Jon B. GEOTHERMAL Project • • For: Rochel Residence, Masterpiece Homes 125 Turnham Road,Orono, MN Design Conditions Location: Indoor: Heating Cooling Minneapolis-St. Paul, MN, US Indoor temperature (°F) 68 75 Elevation: 837 ft Design TD (°F) 90 22 Latitude: 45 ON Relative humidity(%) 30 45 Outdoor: Heating Cooling Moisture difference (gr/Ib) 31.2 56.8 Dry bulb(°F) -22 97 Infiltration: Daily range(°F) - 19 ( M ) Method Simplified Wet bulb(OF) 78 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 • Component Btuh/ft2 Btuh %of load Walls 5.9 27248 30.1 Glazing 44.2 23964 26.5 Doors 30.0 9174 10.1 Ceilings 2.0 7055 7.8 Floors 0 0 0 Infiltration 1.9 7029 7.8 Ducts 0 0 Piping 9285 10.3 Humidification 0 0 Ventilation 6764 7.5 ' Adjustments 0 Total 1 1 90519 100.0 Component Btuh/ft2 Btuh %of load W Walls 0.8 3821 10.2 Glazing 42.0 22769 60.7 Doors 2.1 650 1.7 Ceilings 0.9 3070 8.2 Floors 0 0 0 Infiltration 0.1 550 1.5 Ducts 0 0 Ventilation 1649 4.4 Internal gains 4210 11.2 Blower 765 2.0 Adjustments 0 Total 1 1 37483 100.0 a Latent Cooling Load=4911 Btuh Overall U-value=0.059 Btuh/ft2-°F Data entries checked. Wrl h150ft 2012-Jun-1915:37:30 ,4 Right-Suite®Universal 8.0.18 RS000282 Page 1 ACCA` ...y Documents\W rightsoft HVAC\Master Piece Homes-McClearen.rup Calc=MA Front Door faces: Component Constructions Job. * MASSMANN p Date: Dec.30th 2011 9EUTNfNYA fYECNNIC l Entire House By: Jon B. Project Inf• • For: Rochel Residence, Masterpiece Homes 125 Turnham Road, Orono, MN Design Conditions Location: Indoor: Heating Cooling Minneapolis-St. Paul, MN, US Indoor temperature(°F) 68 75 Elevation: 837 It Design TD (°F) 90 22 Latitude: 450N Relative humidity(%) 30 45 Outdoor: Heating Cooling Moisture difference(gr/Ib) 31.2 56.8 Dry bulb(°F) -22 97 Infiltration: Daily range(°F) - 19 ( M ) Method Simplified Wet bulb(°F) - 78 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/fti°F ftz'F/Btuh Btuh/ft- Btuh Btuh/ft' Btuh Walls 12E-Osw:Frm wall,stucco ext,1/2"wood shth,r-19 cav ins, 1/2" n 149 0.068 19.0 6.39 952 1.69 252 gypsum board int fnsh,2"x6"wood frm ne 269 0.068 19.0 5.58 1498 0 0 e 453 0.068 19.0 6.39 2892 1.69 765 se 222 0.068 19.0 5.72 1272 0.29 65 s 336 0.068 19.0 6.39 2148 1.69 568 sw 66 0.068 19.0 5.87 387 0.60 40 w 485 0.068 19.0 6.39 3100 1.69 820 nw 475 0.068 19.0 5.70 2708 0.25 120 all 2455 0.068 19.0 6.09 14958 1.07 2629 15A1 1-Oocw-6:Bg wall,heavy dry or light damp soil,empty core,2'x4" n 189 0.057 0 6.56 1240 0.58 109 wood int frm,concrete block wall,r-11 cav ins,10"thk,1/2"gypsum ne 204 0.057 0 6.56 1336 0.58 117 board int fnsh a 576 0.057 0 6.56 3778 0.58 332 se 38 0.057 0 6.56 250 0.58 22 s 335 0.057 0 6.41 2142 0.50 168 sw 38 0.057 0 6.56 250 0.58 22 w 473 0.057 0 5.46 2582 0.09 42 nw 108 0.057 0 6.56 712 0.58 63 all 1961 0.057 0 6.27 12291 0.45 875 Partitions 12C-Osw:Frm wall,stucco ext,r-13 cav ins,2'x4"wood frm 183 0.091 13.0 0 0 1.73 318 Windows 4A5-2ov:2 glazing,cir low-e outr,argon gas,vnl frm mat,cir innr, 1/4" n 40 0.470 0 44.2 1767 16.2 647 gap, 1/8"thk a 99 0.470 0 44.2 4374 39.3 3886 s 15 0.470 0 44.2 663 24.8 371 s 17 0.470 0 44.2 729 24.8 408 sw 15 0.470 0 44.2 644 35.7 521 w 100 0.470 0 44.2 4418 39.3 3926 w 42 0.470 0 44.2 1856 39.3 1649 w 124 0.470 0 44.2 5486 39.3 4874 w 42 0.470 0 44.2 1856 39.3 1649 nw 37 0.470 0 44.2 1642 29.0 1078 all 530 0.470 0 44.2 23434 35.8 19010 1 2012-Jun-19 15:37:30 RCCA wrightsoft- Right-Suite®Universal 8.0.18 RS000282 Page 1 y Documents\Wrightsoft HVAC\Master Piece Homes-McClearen.rup Calc=MJ8 Front Door faces: 4A5-2ov:2 glazing,clr low-e outr,argon gas,vnl frrn mat,clr innr, 1/4" w 12 0.470 0 44.2 530 45.1 542 gap,1/8"thk;bay Doors 11 G0:Door,wd pnl type a 25 0.540 0 50.8 1244 18.3 449 11 N0:Door,ovhd mtl,eps core type se 240 0.350 8.7 28.7 6888 0 0 11 P0:Door,mtl pur core type nw 20 0.290 10.5 23.8 486 0 0 n 20 0.290 10.5 27.3 557 9.85 201 all 41 0.290 10.5 25.5 1042 4.92 201 Ceilings 16B-44ad:Attic ceiling,asphalt shingles roof mat,r-44 ceil ins,5/8" 3316 0.022 44.0 1.98 6571 0.85 2825 gypsum board int fnsh 234 0.022 44.0 2.07 484 1.04 244 all 3550 0.022 44.0 1.99 7055 0.86 3070 Floors 45BO:Radiant panel,concrete basement slab,gypsum overpour 3498 0 0 0 0 0 0 C l Wrhtsoft` 2012-Jun-19 15:37:30 9 Right-Suite®Universal 8.0.1 B RS000282 Page 2 �'� ...y Documents\W rightsoN HVAC\Master Piece Homes-McClearen.rup Calc=MJ8 Front Door faces: Project Summa Job t 1 MASSMANN 1 rY Date: Dec. .30th 2011 OEOENENMAL E MECNNNiCX Entire House By: Jon B. Project • • For: Rochel Residence, Masterpiece Homes 125 Turnham Road,Orono, MN Notes: Design Information Weather: Minneapolis-St. Paul, MN, US Winter Design Conditions Summer Design Conditions Outside db -22 OF Outside db 97 OF Inside db 68 of Inside db 75 of Design TD 90 OF Design TD 22 of Daily range M Relative humidity 45 % Moisture difference 57 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 74659 Btuh Structure 35070 Btuh Ducts 0 Btuh Ducts 0 Btuh Central vent(140 cfm) 6764 Btuh Central vent(140 cfm) 1649 Btuh Humidification 0 Btuh Blower 765 Btuh Piping 9285 Btuh Equipment load 90707 Btuh Use manufacturer's data n Rate/swing multiplier 1.02 Infiltration Equipment sensible load 38233 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 0 Structure 2278 Btuh Ducts 0 Btuh Heating Cooling Central vent(140 cfm) 2633 Btuh Area(ft2) 4835 4835 Equipment latent load 4911 Btuh Volume (ft3) 28098 28098 Air changes/hour 0.10 0.05 Equipment total load 43143 Btuh Equiv.AVF(cfm) 47 23 Req.total capacity at 0.70 SHR 4.6 ton Heating Equipment Summary Cooling Equipment Summary Make Enertech Manufacturing LLC. Make Enertech Manufacturing LLC. Trade GEOCOMFORT Trade GEOCOMFORT Model GT060 Cond GT060 AHRI ref no.3000398 Coil AHRI ref no.3000398 Efficiency 3.29 COP Efficiency 19.41 EER Heating input 46178 Btuh Sensible cooling 47913 Btuh Heating output 46178 Btuh Latent cooling 20534 Btuh Temperature rise 26 of Total cooling 68447 Btuh Actual air flow 1643 cfm Actual air flow 1643 cfm Air flow factor 0.022 cfm/Btuh Air flow factor 0.047 cfm/Btuh Static pressure 0.50 in H2O Static pressure 0.50 in H2O Space thermostat Load sensible heat ratio 0.88 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. .� �y wri htSoft° 2012-Jun-1915:37:30 1 9 Right-Suite®Universal 8.0.18 RS000282 Page 1 ACC;A ...y Documents\Wrightsoft HVAC\Master Piece Homes-McClearen.rup Calc=MJ8 Front Door faces: Job: *iM N AED Assessment Date: Dec.30th 2011 ` aMTME6 YECaI Entire House By: Jon B Project Inf• • For: Rochel Residence, Masterpiece Homes 125 Turnham Road,Orono, MN Design Conditions Location: Indoor: Heating Cooling Minneapolis-St. Paul, MN, US Indoor temperature(°F) 68 75 Elevation: 837 ft Design TD (°F) 90 22 Latitude: 45 ON Relative humidity(%) 30 45 Outdoor: Heating Cooling Moisture difference (gr/Ib) 31.2 56.8 Dry bulb(°F) -22 97 Infiltration: Daily range(°F) - 19 ( M ) Wet bulb(°F) - 78 Wind speed (mph) 15.0 7.5 Test forAdequate Exposure Hourly Glazing Load 26, 24,00 22, 20,00 18, m 16,00 s 14 12,0 10,00 8,00 6, 4,00 2,00 0 8 9 10 11 12 13 14 15 16 17 18 19 20 Hw of Day /HouM /Average I AED a,a Maximum hourly glazing load exceeds average by 48.7%. House does not have adequate exposure diversity(AED), based on AED limit of 30%. AED excursion: 3218 Btuh (PFG - 1.3'AFG) Wrl ht:soft° 2012-Jun-1915:37:30 9 Right-Suite®Universal 8.0.18 RS000282 Page 1 ACCIN ...y Documents\W rightsoft HVAC\Master Piece Homes-McClearen.rup Calc=MJ8 Front Door faces: Right-J®Worksheet Job: MASSMANN Date: Dec.30th 2011 Entire House By: Jon B. 1 Room name Entire House Main Lvl Zone 2 Exposed wall 569.3 ft 215.3 It 3 Ceiling height 9.2 ft d 9.1 It p 4 Room dimensions 5 Room area 5915.0 ft2 2417.5 ft2 Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft2-°F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Et h) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 Vj1 12E-Osw 0.068 n 6.39 1.69 189 149 952 252 189 149 952 252 �C 4A5-20v 0.470 n 44.18 16.19 40 0 1767 647 40 0 1767 647 W 15A11-Oocw-6 0.103 n 6.56 0.58 189 189 1240 109 0 0 0 0 W 12E-Osw 0.068 ne 5.58 0.00 269 269 1498 0 0 0 0 0 11 W 15A11-Oocw-6 0.103 ne 6.56 0.58 204 204 1336 117 0 0 0 0 Vj/ 12E-Osw 0.068 a 6.39 1.69 576 453 2892 765 576 453 2892 765 {�(p 4A5-2ov 0.470 a 44.18 39.26 99 0 4374 3886 99 0 4374 3886 11G0 0.540 a 50.76 18.33 25 25 1244 449 25 25 1244 449 W 15A11-Oocw-6 0.103 a 6.56 0.58 576 576 3778 332 0 0 0 0 tn 12E-0sw 0.068 se 5.72 0.29 462 222 1272 65 38 38 244 65 --D 11N0 0.350 se 28.70 0.00 240 240 6888 0 0 0 0 0 W 15A11-Oocw-6 0.103 se 6.56 0.58 38 38 250 22 0 0 0 0 W 12E-0sw 0.068 s 6.39 1.69 351 336 2148 568 351 336 2148 568 I-G 4A5-20v0.470 s 44.18 24.75 15 0 663 371 15 0 663 371 ocw-6 15A11-O 0.103 s 6.41 0.50 351 335 2142 168 0 0 0 0 4A5-2ov 0.470 s 44.18 24.75 17 0 729 408 0 0 0 0 1q/ 12E-0sw 0.068 sw 5.87 0.60 81 66 387 40 38 24 151 40 L-G 4A5-2ov 0.470 sw 44.18 35.70 15 0 644 521 15 0 644 521 W 15A11-Oocw-6 0.103 sw 6.56 0.58 38 38 250 22 0 0 0 0 12E-0sw 0.068 w 6.39 1.69 639 485 3100 820 639 485 3100 820 4A5-2ov 0.470 w 44.18 45.14 12 0 530 542 12 0 530 542 4A5-2ov 0.470 w 44.18 39.26 100 0 4418 3926 100 0 4418 3926 4A5-2ovd 0.470 w 44.18 39.26 42 0 1856 1649 42 0 1856 1649 15A 11-Oocw-6 0.103 w 5.46 0.09 639 473 2582 42 0 0 0 0 �-!G' 4A5-2ov 0.470 w 44.18 39.26 124 0 5486 4874 0 0 0 0 T 4A5-2ovd 0.470 w 44.18 39.26 42 0 1856 1649 0 0 0 0 L►/ 12E-0sw 0.068 nw 5.70 0.25 533 475 2708 120 108 71 456 120 L�_(p 4A5-2ov 0.470 nw 44.18 29.00 37 0 1642 1078 37 0 1642 1078 11130 0.290 nw 23.78 0.00 20 20 486 0 0 0 0 0 W 15A11-Oocw-6 0.103 nw 6.56 0.58 108 108 712 63 0 0 0 0 P 12C-0sw 0.091 - 0.00 1.73 204 183 0 318 204 183 0 318 11 PO 0.290 n 27.26 9.85 20 20 557 201 20 20 557 201 C 16B-44ad 0.022 1.98 0.85 3316 3316 6571 2825 2236 2236 4623 2825 C 16C-44al 0.022 2.07 1.04 234 234 484 244 234 234 484 244 F 4580 n/a 0.00 0.00 3498 3498 0 0 0 0 0 0 6 c)AED excursion 1 3218 2627 Envelope loss/gain 67441 30310 32744 21913 [13 a) Infiltration 7029 550 3594 421 b) Room ventilation 0 0 0 0 Internal gains: Occupants @ 230 7 1610 2 460 Applianceslother 2600 2600 Subtotal(lines 6 to 13) 74659 35070 36339 25394 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 74659 35070 36339 25394 15 Duct loads 0% 01/6 0 0 0% 0% 0 0 Total room load 74659 350701 36339 25394 Air required(cfm) 1643 16431 1 800 1190 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. �A-Pk wrilghtsc ft- 2012-Jun-19 15:37:30 Right-Suite®Universal 8.0.18 RS000282 Page 1 y Documents\Wrightsoft HVAC\Master Piece Homes-McClearen.rup Calc-MJ8 Front Door faces: t 1 MAWMMN Right-J® Worksheet Job: ° •w°- -� Entire House Date: Dec.30th 2011 By: Jon B. 1 Room name Basement Zone Garage Zone 2 Exposed wall 238.0 ft 115.9 ft 3 Ceiling height 9.0 ft p 10.0 ft p 4 Room dimensions 5 Room area 2417.5 ft2 1080.0 ft2 Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft2-1F) (Btuh/ft2) or perimeter (ft) (Bt h) or perimeter (ft) (Btuh) Heat FC001 Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 12E-Osw 0.068 n 6.39 1.69 0 0 0 0 0 0 0 0 L---Ci 4A5-2ov 0.470 n 44.18 16.19 0 0 0 0 0 0 0 0 W 15A11-Oocw-6 0.103 n 6.56 0.58 189 189 1240 109 0 0 0 0 W 12E-Osw 0.068 ne 5.58 0.00 0 0 0 0 269 269 1498 0 11 W 15A11-Oocw-6 0.103 ne 6.56 0.58 204 204 1336 117 0 0 0 0 12E-Osw 0.068 a 6.39 1.69 0 0 0 0 0 0 0 0 4A5-2ov 0.470 a 44.18 39.26 0 0 0 0 0 0 0 0 11 GO 0.540 a 50.76 18.33 0 0 0 0 0 0 0 0 W 15A11.Oocw-6 0.103 a 6.56 0.58 576 576 3778 332 0 0 0 0 yJ 12E•Osw 0.068 se 5.72 0.29 0 0 0 0 424 184 1027 0 l-D 11N0 0.350 se 28.70 0.00 0 0 0 0 240 240 6888 0 W 15A11-Oocw-6 0.103 se 6.56 0.58 38 38 250 22 0 0 0 0 Val 12E-Osw 0.068 s 6.39 1.69 0 0 0 0 0 0 0 0 t-G 4A5-2ov 0.470 s 44.18 24.75 0 0 0 0 0 0 0 0 Val 15A11-Oocw-6 0.103 s 6.41 0.50 351 335 2142 168 0 0 0 0 L--G 4A5-2ov 0.470 s 44.18 24.75 17 0 729 408 0 0 0 0 WJ 12E-0sw 0.068 sw 5.87 0.60 0 0 0 0 42 42 237 0 t-G 4A5-2ov 0.470 sw 44.18 35.70 0 0 0 0 0 0 0 0 w 15A11-Oocw-6 0.103 sw 6.56 0.58 38 38 250 22 0 0 0 0 V 125-0sw 0.068 w 6.39 1.69 0 0 0 0 0 0 0 0 4A5-2ov 0.470 w 44.18 45.14 0 0 0 0 0 0 0 0 4A5-2ov 0.470 w 44.18 39.26 0 0 0 0 0 0 0 0 4A5-2ovd 0.470 w 44.18 39.26 0 0 0 0 0 0 0 0 15A11-Oocw-6 0.103 w 5.46 0.09 639 473 2582 42 0 0 0 0 4A5-2ov 0.470 w 44.18 39.26 124 0 5486 4874 0 0 0 0 4A5-2ovd 0.470 w 44.18 39.26 42 0 1856 1649 0 0 0 0 12E-Osw 0.068 nw 5.70 0.25 0 0 0 0 424 404 2252 0 4A5-2ov 0.470 nw 44.18 29.00 0 0 0 0 0 0 0 0 11130 0.290 nw 23.78 0.00 0 0 0 0 20 20 486 0 W 15A11-Oocw-6 0.103 nw 6.56 0.58 108 108 712 63 0 0 0 0 R - 12C-Osw 0.091 - 0.00 1.73 0 0 0 0 0 0 0 0 L-D 11 PO 0.290 n 27.26 9.85 0 0 0 0 0 0 0 0 C 168-44ad 0.022 1.98 0.85 0 0 0 0 1080 1080 1948 0 C 16C-44a1 0.022 2.07 1.04 0 0 0 0 0 0 0 0 F 4580 n/a 0.00 0.00 2418 2418 0 0 1080 1080 0 0 6 c)AED excursion 3370 0 Envelope loss/gain 20361 11176 14336 0 12 a) Infiltration 1103 129 2520 0 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 5 1150 0 0 Appliances/other 0 0 Subtotal(lines 6 to 13) 21464 12455 16856 0 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 21464 12455 16856 0 15 Duct loads 0% 0% 0 0 0% 0% 0 0 Total room load 21464 12455 16856 0 Air required(cfm) 1 1 472 584 1 371 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrilghtsoft` Right-Suite®Universal 8.0.18 RSU00282 2012-Jun-19 1 P3a7g:e 2 `��� ...y Documents\W rightsoft HVAC\Master Piece Homes-McClearen.rup Calc.MJ8 Front Door faces: Loads for Multiple Orientations Job: 1 MASSMMN Date: Dec.30th 2011 • GEOTHERMAL E MECHANICAL Entire House By Jon B. Project • • For: Rochel Residence, Masterpiece Homes 125 Turnham Road,Orono, MN Design Conditions Location: Indoor: Heating Cooling Minneapolis-St. Paul, MN, US Indoor temperature(°F) 68 75 Elevation: 837 ft Design TD (°F) 90 22 Latitude: 45 ON Relative humidity(%) 30 45 Outdoor: Heating Cooling Moisture difference(gr/lb) 31.2 56.8 Dry bulb(°F) -22 97 Infiltration: Daily range(°F) - 19 ( M ) Wet bulb(°F) - 78 Wind speed(mph) 15.0 7.5 Front Door North Northeast East Southeast South Southwest West Northwest Sensible Load(Btuh) 38233 32298 27218 32255 35179 33571 29742 36607 Latent Load(13tuh) 4911 4911 4911 4911 4911 4911 4911 4911 Total Load(Btuh) 43143 37209 32128 37165 40090 38481 34652 41518 Heating AVF(cfm) 1643 1371 1137 1369 1503 1429 1253 1568 Cooling AVF(cfm) 1643 1371 1137 1369 1503 1429 1253 1568 Building Orientation Cooling Load 50000-- 4000 L m T 0 3000 0 0 20000-- 10000-- 0 00010000 N NE E SE S SW W NW Direction Front Door faces Current Orientation: Front Door faces North Highest Cooling Load: Front Door faces North Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2012-Jun-19 15:37:31 wrightsoft` Right-Suite®Universal 8.0.18 RS000282 Page 1 ACCK y Documents\W rightsoft HVAC\Master Piece Homes-McClearen.rup Calc=MJ8 Front Door faces: Load Multizone Summary Report Job 1 MAMMMN Date: Dec.sots 201 i GEO ENFA YAL f YECNYICAL By: Jon B. Infiltration Summary Heating Cooling ZONE NAME Volume ACH AVF HTM Volume ACH AVF HTM ft3 Cfm Btuh/ft2 ft3 Cfm Btuh/ft2 Main Lv1 Zone 22054 0. 10 36 1 .9 22054 0.05 18 0 .2 Basement Zone 6044 0. 11 11 1.9 6044 0. 05 5 0 .2 Garage Zone 10800 0. 16 29 2.2 0 0. 11 0 0 Entire House 28098 0 . 10 47 1.8 28098 0 . 05 23 0 .2 Load • AVF Summary ROOM NAME Area Htg load Clg load Htg AVF Cl-AVF ftz Btuh Btuh Cfrn Cfrn Master WIC 96 1683 426 37 20 Master Suite 391 5702 4647 125 218 Living Room 378 4607 4720 101 221 Kitchen 313 2288 2437 50 114 Dining 182 5478 3455 121 162 Master Bath 170 3867 2128 85 100 ML Stairs 104 2536 1714 56 80 Foyer 231 2836 1425 62 67 Office 204 3633 2019 80 95 ML Bath 54 557 157 12 7 Mud Room 171 1447 626 32 29 Laundry 124 1705 1640 38 77 Main Lvl Zone 2418 36339 25394 800 1190 Bedroom 2 307 3703 2647 81 124 Bedroom 3 256 2861 1193 63 56 BL Stairs 99 955 84 21 4 BL Bath 50 318 28 7 1 Family Room 630 5546 6219 122 291 Crafts Room 339 3919 1917 86 90 Utility 388 3526 312 78 15 Wet Bar 63 127 11 3 1 Basement Hallway 286 509 45 11 2 Basement Zone 2418 21464 12455 472 584 Garage 1080 16856 0 371 0 Garage Zone 1080 16856 0 371 0 Entire House 5915 74659 35070 1643 1643 wri htsoft 2012-Jun-1915:37:33 9 Right-Suite®Universal 8.0.18 RS000282 Page 1 y Documents\Wrightsoft HVAC\Master Piece Homes-McClearen.rup Calc.MA Front Door faces: N Mein Level 1 71.1m M�tC .8 ctm p Oxxrq ��G9tlIRti��9 tlm .irirq.9e0m iy �1 u2_Im �ttt WFlt i,,.m IIY�ctm I I.�:ttlry m-.as - royx i(1:tm Mtd Rppm t10 dm MLS lurs bL 3t ctm ML M" Job ut m t \ I Job#: Scale: 1 : 188 Performed by Jon B. for: Page 1 Rochel Residence Right-Suite®Universal 125 Turnham Road 8.0.18 RS000282 Orono,NIN 2012-Jun-19 15:37:39 ...ster Piece Homes-McClearen.rup k' N Basement �a Fank R pn (. 9 BeCrtfan] B.-HaM V Bl Balli 9l Slar N'19ar01 81y 01 Job#: Scale: 1 : 188 Performed by Jon B. for: Page 2 Rochel Residence Right-Suite®Universal 125 Turnham Road 8.0.18 RSU00282 Orono,MN 2012-Jun-19 15:37:39 ...star Piece Homes-McClearen.rup -3 sc't- DATE TIME CITY OF ORONO av S��cA 7 J INSPECTION NOTICE c�7� / PERMIT NO.OSQ 1 91 COMPLETED ADDRESS � .� L Ln-�( G�- OWNER TES H E NO. ���c1d�'Z�54� CONTRACTO , V DESCRIPTION ❑ FOOTING ❑ PLUMBING FIN L ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL 1 ❑ LAKESHORE/WETLANDS h ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS ElFINAL ElSEWER HOOK-UP ❑ COMPLAINT ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL v ElPLUMBING RI ElSEPTIC FINAL ElFOUNDATION/REMOVAL OWNERICONTRACTOR TO MEET YOU:_YES_NO COMMENTS: Qc W a J O cc O LL W Q 2 W Z W cc OW 4NORK SATISFACTORY-PROCEED ❑ PROJECT COMPLETE CC W ❑CORRECT WORK&PROCEED ElISSUE CERTIFICATE OF OCCUPANCY O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY C1 BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN 11STOP ORDER POSTED.CALL INSPECTOR El CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspectio24 hours in advance. (952) 249-4600 Owner/Contractor on site't,�") r Inspector. 1 White Copy/Inspector's File Canary Copy/Site Notice C1��► � D TIME CITY O Or RONO / I CALLED IN A INSPECTION NOTICE p SCHEDULED PERMIT NOoZ�I.�-� gI=OMPLETED ADDRESS lz - OWNER TELEPHONE CONTRACTOR DESCRIPTION ��'�/ ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS ElFINAL ElSEWER HOOK-UP El COMPLAINT ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP i ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL v ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL OWNER/CONTRACTOR TO MEET YOU:_YES_NO v0, COMMENTS: W C J O O U. W cc Q 2 W Z W cc Wj )(WORK SATISFACTORY:PROCEED 13PROJECT COMPLETE W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY 0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN 11STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED ❑INSPECTION REQUIRED.CALLTO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on site: Inspector. White CopylInspector's File Canary Copy/Site Notice DA E CITY OF ORONO CALLED IN TIME INSPECTION NOTSCHEDULED y PERMIT NO.0 01ICE 005, COMPLETED ADDRESS OWNER TELEPHONE NO`407/'� 65��9�� CONTRACTO �� 3Z DESCRIPTION tw ❑ FOOTING ❑ PLUMBING FI L ❑ XCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI LAKESHORE/WETLANDS h ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS ElFINAL ElSEWER HOOK-UP El COMPLAINT v ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL v ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL OWNERICONTRACTOR TO MEET YOU:_YES_NO COMMENTS: W a J O Cc O W W Cc Q Z W Z W Cc 11 W,rm.�pIORKSATISFACTORY.PROCEED ❑ PROJECT COMPLETE wW ❑CORRECT WORK&PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY C1 BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 OwnedContractor on ite: Inspector. A r1 T White Copyllnspectoes File Canary Copy/Site Notice A ✓ TIME V CITY OF ORONO CALLED IN 4?-DF INSPECTION NOTICE SCHEDULED _Z—�-� PERMIT NO. ���a -�d S COMPLETED ADDRESS IRS � /e� OWNER TELEP/ qNE NO.6/Z 6_-":3'5 2987 CONTRACTORaS�P9F>e—^te� gym' DESCRIPTION E)ecL r dT, ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI El LAKESHORE/WETLANDS h ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS ElFINAL ElSEWER HOOK-UP El COMPLAINT v ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL v ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL OWNER/CONTRACTOR TO MEET YOU:_YES_NO vOi COMMENTS: W a _ cc O U. W cc Q f2 2 W z W Qc O W ��ORK SATISFACTORY:PROCEED ❑PROJECT COMPLETE U W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY OO ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTOTAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on site: en Inspector. White Copyllnspector's File Canary Copy/Site Notice d/bAT TIME V CITY OF•RON• CALLED IN L/ INSPECTIO IC SCHEDULED ;�D PERMIT N —EO Sg COMPLETED ADDRESS ZR 5 Q-y1't OWNER TELEPHONE NO. CONTRACTOR01, f >; DESCRIPTION 1 ❑ FOOTING ElPLUMBING FINAL EIEXCAV/GRADING/FILLING LL Q ❑ POURED WALL El MECHANICAL RI ElLAKESHORE/WETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT v ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL Z OWNERICONTRACTOR TO MEET YOU:_YES_NO COMMENTS: oc W Q_ QC 2 Cr O LL W cc Q z W W CC WW fl'WZ8,KK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE Uj W 11CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY 0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. 11 PHOTO TAKEN INSPECTOR WILL RETURN ElSTOP ORDER POSTED.CALL INSPECTOR 11 CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on site: Inspector. White Copylinspector's File Canary Copy/Site Notice Q E TIME CrfY OF ORONO CALLED IN ` INSPECTION NOTICE SCHEDULED PERMIT NO. OMPLETED ADDRESS OWNER TELEPHONE NO. CONTRACTOR DESCRIPTION ❑ FOOTING ❑ PLUMBING FINAL p EXCAV/GRADING/FILLING Q El POURED WALL ElMECHANICAL RI El LAKESHORE/WETLANDS h ❑ FRAMING ❑ MECHANICAL FINAL p TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS ❑ FINAL ElSEWER HOOK-UP El COMPLAINT v ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP i ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL Z OWNERICONTRACTOR TO MEET YOU:_YES_NO R COMMENTS: W a cc J O cc O LL W cc Q 12 Z W z W rc O W RK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE DW ❑ RRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY 0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contragorpri,siOf te: Inspector. White Copylinspector's File Canary Copy/Site Notice S_� DATE TIME CITY OF ORONO CALLED IN 12-1,9-12- INSPECTION NOTICE SCHEDULED /2- / 2- -/2— PERMIT PERMIT NO. '�/­2--LV5E�ICOMPLETED 717_11vk;L ADDRESS OWNER TELEPHONE NO. CONTRACTOR DESCRIPTION XA2- W ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAWGRADING/FILLING mT ❑ POURED WALL El MECHANICAL RI ❑ LAKESHORE/WETLANDS y Q [I FRAMING El MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS El FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT v ❑ DEMO-SITE ❑ SEPTIC MAINT ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL v ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL Q OWNERICONTRACTOR TO MEET YOU._YES_NO n � o COMMENTS: �� T penC Q 1-1-0 (N M.►#i^ CAI,-+t( W ((e d ac 0 cc stiffsti- W oe zt LU (4z)-<1 Se Uj Lij W K SATISFACTORY:PROCEED El PROJECT COMPLETE U #4008 CORRECT WORK&PROCEED /ISSUE CER E OF OCCUPANCY 0 El CORRECT WORK,CALL FOR REINSPECTION TEMPORARY_jLFA. C1 BEFORECOVERING PERMANENT ��JJ 7 ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN a INSPECTOR WILL RETURN El CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on site: Inspector. L'j 1 S White Copy/Inspector's File Canary Copy/Site Notice Planning . Zoning Department Memo To: Finance Department From: Christine Mattson, Planning Assistant CC: Street File Date: October 28, 2013 GIU 101-22205 Re: Escrow Refund Building Permit#2012-00589 pertaining to 125 Tumham Road is complete. A final certificate of occupancy was issued on October 16, 2013; therefore please refund $10,000 to the property owner,Anthony& Surya Rochel. The following is attached: • Email from Bolton &Menk indicating no unbilled WIP on this project • Email from Campbell Knutson indicating no unbilled WIP on this project • Original signed escrow agreement • Copy of cash register receipt showing escrow amount received Mail to: Anthony&Surya Rochel 125 Tumham Road Maple Plain, MN 55359 wAstreet files\tumham rd\125\escrow refund memo 2012-00589.doc Christine Mattson From: David Martini [davidma@bolton-menk.com] Sent: Wednesday, October 23, 2013 1:03 PM To: Christine Mattson Subject: RE: WIP I don't believe we have any time for these projects. Thanks. David P. Martini, P.E. Bolton & Monk, Inc. P: (952)448-8838 ext. 2458 M: (612) 756-4315 email: davidma(a)_bolton-menk.com From:Christine Mattson [mailto:CMattson@ci.orono.mn.us] Sent:Wednesday,October 23,2013 12:57 PM To:'Sherry Charboneau'; David Martini Subject:WIP Hello Please let me know if you have any unbilled WIP for the following. Thanks! Applicant Address Building Permit# Land Use# Rochel,Anthony&Surya 125 Turnham Road 2012-00589 Maple Place LLC 1579 Maple Place 2102-00547 Rezabek,AI 4185 Bayside Road 2013-00557 Olson, Michael&Jennifer 1860 Fox Street 2012-01177 Landsource, LLC 1535 Minnie Ave 2013-00112 Nafstad, Erik 1370 Cherry Place 2012-00853 Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway 1 Orono MN j 55356(physical address) PO Box 66 �, Crystal Bay MN '; 55323-0066(mailing address) 9 952.249.4620 8 952.249.4616 ® cmattson@ci.orono.mn.us i -1� www.ci.orono.mn.us Office Hours: Monday- Friday 8 am to 4:30 pm This email has been scanned by the Symantec Email Security.cloud service. i Christine Mattson From: Sherry Charboneau [SCharboneau@ck-law.com] Sent: Wednesday, October 23, 2013 2:50 PM To: Christine Mattson Subject: RE: WIP Hey Christine, We have no unbilled WIP for the matters listed below. Did you ever see the commercial with the camel walking through the office??? It is HUMP day! I think it is so funny! Have a great Wednesday. Sherry Sherry L. Charboneau Legal Assistant CAMPBELL KNUTSON P.A. 1380 Corporate Center Curve•Suite 317•Eagan,MN 55121 It(651)234-6230•Fax:(651)452-5550 ®scharboneauCa ck-law.com•www.ck-law.com From: Christine Mattson [mailto:CMattson(&ci.orono.mn.usl Sent: Wednesday, October 23, 2013 12:57 PM To: Sherry Charboneau; David P. Martini Subject: WIP Hello Please let me know if you have any unbilled WIP for the following. Thanks! Applicant Address Building Permit# Land Use# Rochel,Anthony&Surya 125 Turnham Road 2012-00589 Maple Place LLC 1579 Maple Place 2102-00547 Rezabek,Al 4185 Bayside Road 2013-00557 Olson, Michael&Jennifer 1860 Fox Street 2012-01177 Landsource, LLC 1535 Minnie Ave 2013-00112 Nafstad, Erik 1370 Cherry Place 2012-00853 Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway Orono MN 155356(physical address) PO Box 66 Crystal Bay ` MN E 55323-0066 (mailing address) 2 952.249.4620 1 A 952.249.4616 ® cmattson@ci.orono.mmus -2� www.ci.orono.mn.us 1 TEMPORARY CERTIFICATE OF OCCUPANCY ESCROW AGREEMENT Orono Building Permit#2012-00589 AGREEMENT made this 2-D day of DeCeMbelt-, 20 IZ by and between the CITY OF ORONO, a Minnesota municipal corporation ("City") and Anthony& Surya Rochel ("Owners"). Recitals 1. Construction of the new residence located at 125 Turnham Road the ("Subject Property"),legally described as the South 265 feet of the West Quarter of the Northeast Quarter of the Southwest Quarter of the Southeast Quarter of Section 31, Township 118 North, Range 23 West of the 5th Principal Meridan. Also, the South 265 feet of the East Half of the West Half of the Northeast Quarter of the Southwest Quarter of the Southeast Quarter of Section 31, Township 118 North, Range 23 West of the 5th Principal Meridan in Orono, Hennepin County Minnesota, is the subject of building permit application #2012-00589 has been completed. 2. Winter conditions currently prohibit completion of exterior improvements, final grading, and vegetation establishment. An as-built survey cannot be accurately conducted at this time. 3. Owners request the City issue a temporary certificate of occupancy ("TCO") to the Owners so that the Owners may occupy the new residence. 4. The City will issue a TCO only if the Owners establish an escrow to ensure completion of exterior improvements, continuation of erosion control and submittal of an as-built survey to the City. NOW THEREFORE,THE PARTIES AGREE AS FOLLOWS: 1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow Agreement, the Owners have previously deposited $2,500 and shall deposit an additional $7,500 to bring the escrow total to $10,000 with the City. All accrued interest, if any, shall be paid to the City to reimburse the City for its cost in administering the escrow account. 2. PURPOSE OF ESCROW. The purpose of the escrow is to assure completion of any exterior improvements, final grading, establishment of vegetation as well as guarantee reimbursement to the City for all out-of-pocket costs the City has incurred (including planning, engineering, in excess of $500, or legal consultant review) or will incur in reviewing the plan. Eligible expenses shall be consistent with expenses the Owners would be responsible for under a building permit application. The escrow will also guarantee reimbursement to the City for all out-of-pocket costs the City has incurred to assure that the work is completed in accordance with the Stormwater Pollution Prevention Plan and the provisions of Orono City Code Chapter 79. The financial security may also be used by the City to eliminate any hazardous conditions associated with the work and to repair any damage to public property or infrastructure that is caused by the work (including planning, engineering, or legal consultant review) associated with building permit #2012-00589 if compliance with the approved building permit is not accomplished. 3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in turn send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners' receipt of bill. 4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make payment to the City within the timeframe outlined in#3 above, shall issue a Stop Work Order until the Owners pay all expenses invoiced pursuant to#3. The City may draw from the escrow account without further approval of the Owners to reimburse the City for eligible expenses the City has incurred. 155441 5. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shall be returned to the Owners when the review has been completed and written notification is received from the Owners requesting the funds. 6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible expenses incurred by the City exceed the amount in escrow, the City shall have the right to certify the unpaid balance to the subject property pursuant to Minn. Stat. §§415.01 and 366.012. 7. ACCESS TO SUBJECT PROPERTY. The Owners hereby grant to the City, its agents, employees, officers and contractors, the right to enter upon the subject property for the specific purpose of inspecting and completing any exterior improvements, final grading, establishment of vegetation and the restoration of the subject property should the Owners not complete the work by the specified dates. CITY: CITY OF ORONO OWNERS: By: rL Its:611r 'C v ' NMI WON' 155441 Per 96 466E + \50t.,± 2 « \SW w \ 3984; VEA ; VEA ! wq R\ iz > - \ . !&x 6/i&� ---'50/. CITY OF ORONO * 2 0 1 2 - 0 1 2 6 6 2750 KELLEY PARKWAY DATE ISSUED: 12/21/2012 ORONO, MN 55356- (952) 249-4600 FAX: (952) 249-4616 ADDRESS : 125 TURNHAM RD PIN : 31-118-23-43-0018 LEGAL DESC : UNPLATTED 31 118 23 LOT MB BLOCK MB PERMIT TYPE ESCROW FEE-APPLICANT PROPERTY TYPE RESIDENTIAL CONSTRUCTION TYPE ESCROW FEE-APPLICANT NOTE: ESCROW FOR TEMPORARY CERTIFICATE OF OCCUPANCY ON NEW HOME PERMIT#2012-00589,PAID BY OWNER: ANTHONY&SURYA ROCHEL CK#39848 APPLICANT ESCROW FEE-APPLICANT 7,500.00 ROCHEL,ANTHONY& SURYA TOTAL 7,500.00 125 TURNHAM RD MAPLE PLAIN,MN 55359- OWNER ROCHEL,ANTHONY&SURYA 125 TURNHAM RD MAPLE PLAIN,MN 55359- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the State Building Code.This permit may be revoked at any time for due cause. Applicant Permitee Signature Date Issued By Signature Date SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE. DEMOLITION PERMIT 2012-00590 and BUILDING PERMIT 2012-00589 ESCROW AGREEMENT AGREEMENT made this 18 day of July , 20 14 by and between the CITY OF ORONO, a Minnesota municipal corporation ("City")and Tony&Surya Rachel("Owners"). Recitals 1. An application for a demolition and building permit has been filed for the principal structure located at 125 Turnham Road("Subject Property") legally described as EXISTING LEGAL DESCRIPTIONS ( To Be Combined) The South 265 feet of the West Quarter of the Northeast Quarter of the Southwest Quarter of the Southeast Quarter of Section 31, Township 118 North. Range 23 West of the 5th Principal Meridian. ALSO The South 265 feet of the East Half of the West Half of the Northeast Quarter of the Southwest Quarter of the Southeast Quarter of Section 31, Township 118 North, Range 23 West of the 5th Principal Meridian. 1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow Agreement, the Owners shall deposit$2,500 with the City. All accrued interest, if any, shall be paid to the City to reimburse the City for its cost in administering the escrow account. 2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City for all out-of-pocket costs(including planning, engineering, or legal consultant review)the City has incurred to assure that the erosion control measures are installed and maintained so the property complies with the provisions of Orono City Code Chapter 79. The financial security may also be used by the City to eliminate any hazardous conditions associated with the work and to repair any damage to public property or infrastructure that is caused by the work. If compliance with the approved Land Disturbance Permit is not accomplished within the allowable time period, the City may bring the project into compliance by use of the security. 3. RIGHT OF ENTRY. The Owners hereby grant the City, its agents,employees,officers and contractors the right to enter the property to perform all work and inspections deemed appropriate by the City in conjunction with the required erosion control measures, including but not limited to constructing or completing any and all of the agreed upon improvements should the Owners' contractor not complete those improvements by the date specified herein. 3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in tum send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners' receipt of bill. 4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make payment to the City within the timeframe outlined in#3 above, shall issue a Stop Work Order until the Owners pay all expenses invoiced pursuant to #3. The City may draw from the escrow account without further approval of the Owners to reimburse the City for eligible expenses the City has incurred. 5. CLOSING ESCROW. Any remaining amount of the financial security deposited with the City for faithful performance of the plans and specifications and any related remedial work will be released after the completion and inspection of all such measures and the establishment of final stabilization for the Subject Property. 6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible expenses incurred by the City exceed the amount in escrow, the City shall have the right to certify the unpaid balance to the subject property pursuant to Minn.Stat. §§415.01 and 366.012. CITY R NO OW RS: By: Its: Internal�Jse Na Urlg�natoinanfepartmenf: CQ =toSxreeile k r ` Cit of �`o Parkway Kelley 952_249-4600 Orono MN 95356 peceipt No: 3.0072% Jul 18, 2012 Masterpiece Hones .00 previous Balance: Permits125 turnham Rd 5M•00 101-MM Deferred Rev-Developer Deposit 5D0.00 Total: heck No: 39523 500.00 Payor: MasterpieceNomes 5DO'00 Total Rpp Change Tendered: .00 07/18/2012 02:5" CITY OF ORONO * 2012 - 00685 * 2750 KELLEY PARKWAY DATE ISSUED: 07/18/2012 ORONO, MN 55356- (952)249-4600 FAX: (952)249-4616 ADDRESS : 125 TURNHAM RD PIN : 31-118-23-43-0018 LEGAL DESC : UNPLATTED 31 118 23 : LOT MB BLOCK MB PERMIT TYPE ESCROW FEE-TIED TO BUILDING PERMIT PROPERTY TYPE RESIDENTIAL CONSTRUCTION TYPE ESCROW FEE-TIED TO BUILDING PERMIT NOTE: ESCROW TIED TO BUILDING PERMIT#2012-00589&DEMO PERMIT#2012-00590 APPLICANT ESCROW FEE-BUILDING 500.00 MASTERPIECE HOMES TOTAL 500.00 127 EAST COUNTY RD C LITTLE CANADA,MN 55117- (651)484-3244 Minnesota State License#: 1435 OWNER ROCHEL,ANTHONY&SURYA 125 TURNHAM RD MAPLE PLAIN,MN 55359- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the State Building Code.This permit may be revoked at any ti rge fqr due cause. //JV/51-! 7/ / u l 1 2- Applicant Applicant Permit Signature Date Issued Bignature Date SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED AB E. DEMOLITION PERMIT 2012-00590 ESCROW AGREEMENT AGREEMENT made this day V"`� , 20 1y by and between the CITY OF ORONO, a Minnesota municipal corporation("City's and Tony&Surya Rochel("Owners"). RecRale 1. An application for a demolition permit has been filed for the principal structure located at 125 Turnham Road("Subject Property")legally described as EXISTING LEGAL DESCRIPTIONS ( To Be Combined) The South 265 feet of the West Ouarter of the Northeast Quarter of the Southwest Ouarter of the Southeast Quarter of Section 31, Township 118 North, Range 23 West of the 5th Principal Meridian. ALSO The South 265 feet of the East Half of the West Half of the Northeast Quarter of the Southwest Quarter of the Southeast Quarter of Section 31, Township 118 North, Range 23 West of the 5th Principal Meridian. 1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow Agreement, the Owners shall deposit$2,000 with the City. All accrued interest,If any,shall be paid to the City to reimburse the City for Its cost in administering the escrow account. 2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City for all out-of-pocket costs (including planning, engineering, or legal consultant review)the City has incurred to assure that the erosion control measures are installed and maintained so the property complies with the provisions of Orono City Code Chapter 79. The financial security may also be used by the City to eliminate any hazardous conditions associated with the work and to repair any damage to public property or infrastructure that is caused by the work. If compliance with the approved Land Disturbance Permit is not accomplished within the allowable time period, the City may bring the project into compliance by use of the security. 3. RIGHT OF ENTRY. The Owners hereby grant the City,its agents,employees,officers and contractors the right to enter the property to perform all work and inspections deemed appropriate by the City in conjunction with the required erosion control measures,including but not limited to constructing or completing any and all of the agreed upon improvements should the Owners'contractor not complete those improvements by the date specified herein. 3. MONTHLY BILLING. As the City receives consultant bills for incurred costs,the City will in tum send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners'receipt of bill. 4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make payment to the City within the timeframe outlined in#3 above, shall issue a Stop Work Order until the Owners pay all expenses invoiced pursuant to #3. The City may draw from the escrow account without further approval of the Owners to reimburse the City for eligible expenses the City has incurred. 5. CLOSING ESCROW. Any remaining amount of the financial security deposited with the City for faithful performance of the plans and specifications and any related remedial work will be released after the completion and inspection of all such measures and the establishment of final stabilization for the Subject Property. 6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible expenses incurred by the City exceed the amount in escrow, the City shall have the right to certify the unpaid balance to the subject property pursuant to Minn.Stat.§§415.01 and 366.012. CITtOOR ONOBy: IeternAl Uae 0ely: 10 r(IriginW.be�i'inrsraeetet�ne�t; �4- to 8teaat�k 4 lit' Relae -460(, a5 f'Y ndPC2 Wiles �YP/1C�tFfi wlance: f�k pitE .00 ct"�-•t1�gi+ s��Yzhaid Rd ,000.f)c, cFP!"Y�'rePy-,PYr iCBT' .I}Pp,cit Tot Chart:Check _ pavol-, c,000, �4?atF"�7is'CP #fir. ; , Total CITY OF ORONO * 2012 - 00591 * 2750 KELLEY PARKWAY DATE ISSUED: 06/27/2012 ORONO, MN 55356- (952) 249-4600 FAX: (952) 249-4616 ADDRESS 125 TURNHAM RD PIN 31-118-23-43-0018 LEGAL DESC UNPLATTED 31 118 23 LOT MB BLOCK MB PERMIT TYPE ESCROW FEE-APPLICANT PROPERTY TYPE : RESIDENTIAL CONSTRUCTION TYPE : ESCROW FEE-APPLICANT NOTE: THIS$2,000 ESCROW IS TIED TO DEMOLITION PERMIT#2012-00590-PD BY MASTERPIECE HOMES-CHECK 39472 APPLICANT ESCROW FEE-APPLICANT 2,000.00 MASTERPIECE HOMES TOTAL 2,000.00 127 EAST COUNTY RD C LITTLE CANADA,MN 55117- (651)484-3244 Minnesota State License#: 1435 OWNER ROCHEL,ANTHONY&SURYA 125 TURNHAM RD MAPLE PLAIN,MN 55359- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the State Building Code.This permit may be revoked at any time for due cause. / / l dl?l Applicant Permitee Signature Date Issue y Signature Date SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE. Permit14 4 01 PO PiN P'entvt C 2012-00589 Update address Permit Address: 125 Tumham Rd r Main PIN Address r Additional PIN Address General I Fees Inspections(10) I Notes Applicant Detail CO Detail Sey_Inspection Type inspector Date Status H Fee Rei + 2 Poured Wag WGIB 81312012 P Y 0 • 3- Foundation Survey B14 Framing MCUR 1112612012 P 0-- —_ + 4_ Radon Prevention Inspection -- — - +, 5 Framing --- --- WGIB 9125126,1—.2 -P----, 0 1w 6 -- Insulation _ WGIB912712012 PY 0 As-Bt Survey - - JSTR 1 011 51201 3 P 0 - -- - — - - 8 Final _ WGIB 12112/2012 P Y 0 9 Wetland Buffer CMAT 1011512013 P Y 0 • 1fl Erosion Control WGIB 1211212fl12 Y 0 Add Near Delete