Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2012-00953 - mechanical
CITY OF ORONO * 2 0 1 2 - 0 0 9 5 3 2750 KELLEY PARKWAY DATE ISSUED: 09/25/2012 ORONO, MN 55356- (952)249-4600 FAX: (952) 249-4616 ,j DDRESS 125 TURNHAM RD fN 31-118-23-43-0018 EGAL DESC UNPLATTED 31 118 23 LOT MB BLOCK MB ERMIT TYPE MECHANICAL(>$500) ROPE'RTY TYPE : RESIDENTIAL CONSTRUCTION TYPE : MECHANICAL-MULTIPLE teALUATION : $ 33,555.00 OTE: (1)GEOCOMFORT-GST072-ELECTRIC-60,000 INPUT-60,000 OUTPUT- 1,800 CFM �)BRYANT-MODEL 986TAD6008OV21-L.P.FUEL-2"FLUE-80,000 INPUT-76,000 OUTPUT- 1,800 CFM GEOCOMFORT COOLING SYSTEM-GST072-6 TON )KITCHEN EXHAUST-6"DUCT-300 CFM D BATH EXHAUST-80 CFM W-BALANCE HRV-200 CFM fi APPLICANT MECHANICAL 419.44 ASSMANN,GEOTHERMAL&MECH '944 Q6TH STREET STATE SURCHARGE MECH(VALUATION) 16.78 !MMERMAN,MN 55398 TOTAL 436.22 53)416-5066 OWNER *EOCHEL,ANTHONY&SURYA ". .5 TURNHAM RD ;APL'?PLAIN,MN 55359- AGREEMENT AND SWORN STATEMENT ie work for which this permit is issued shall be performed according to e approved plans and specifications,applicable City approvals,and the ate Building Code. This permit is for only the work described and does 0A grant permission for additional or related work which requires separate #;rmits.'All provisions of laws and ordinances governing this type of work tt all be compied with whether or not specified herein.This permit will pire add become null and void if construction authorized is not mmenped within 180 days of the date of issuance,or if construction is .spended for a period of 180 days at any time after work has commenced. I.#applicant is responsible for assuring all required inspections are aueste3 in c fo a with the State Building Code.This permit may be ¢:voke i due cause. licant tYnrtee Si nature D ` pp g ate lsgugr By Signature Date SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE. T � � FOR CITY USE ONLY City of Orono Gj P.O.Box 66 Datc Rcceivcdr © 2750 Kelley Parkway Crystal Bay,MN 55323 Approved By: Amount$: Phone(952)249-4600 Fax(952)2494616 CITY OF ORONO-MECHANICAL PERMIT (All Commercial permits must be approved by the Building Official or Inspector and/or Fire Marshall) GENERAL INFORMATION 1. You may apply for mechanical permits by mail or in person at the City offices. Applications will be reviewed and a permit will be issued within two working days. 2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS POSTED ON THE JOB SITE. 3. Mechanical Designs—Complete calculations,details and specifications are required for each heating,ventilation,humidification-dehumidification,and air conditioning installation including heat loss/heat gain calculation,design temperatures,equipment ratings and identification as to type,manufacturer and model. Data shall be presented on form provided. 4. When any new construction or remodeling is involved,a separate building permit must be obtained. 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code requirements. 6. All work must be inspected(rough-in and final). Call(952)249-4600. (24-48 hour notice required) 7. House Heating Test Record must be submitted before final. TYPE OF PERMIT Check All That Apply) AResidential ❑Commercial(Approval Required) NN New ❑Additional ❑Repairs ❑ Replace Job Site/Owner Information: Site Address: /,7-5 !3,*"n 11c4 c Owner: osk-__�uc /�7r'�tS Mailing Address: lag City: LIQ 60-pdm Zip: C_- 1�� Home Phone: `7$V Alternate Phone: Contractor Information: Contractor:4109 7F0i � llr�s� eQContact Person: -TexaU" M Address: . 77 / ��rl�� State Bond#: &fflm l City: �-/4 y�� ;�.+.� c�� Zip:,W�3Expiration Date: IL* 5 A Phone: /?e'j -S % Alternate Phone: Insurance-Current: 1 PDF Created with deskPDF PDF Writer- Trial :: http://www.docudesk.com r MECHANICAL SYSTEMS BEING INSTALLED Note: All Geothermal Systems will now require a Site Plan&Review by our Building Official. IS THIS GEOTHERMAL? XYes ❑No HEATING SYSTEMS Quantity: Make: Model: ST 07A 9fl nooRnv.1,.f Fuel: P Flue Size: VOYUL Input BTUs: Output BTUs: coo CFM: OG COOLING SYSTEMS Quantity: Make: a�f Model: 7-0 Tons: H. Power FIREPLACES <Factory Fireplace Brand Name: ❑ Burning Fireplace Stove Model No.: Stove with Flue/Masonry VENTILATION No. Kitchen Exhaust �e p duct recirculating cfm ❑ No. Bath Exhaust(must have 4ct outside) cfm ❑ No. �_ Other Fans: Locations cfm FUEL STORAGE (Must be approved by Fire Marshall if proposing to abandon tank in place.) ❑ Installation ❑ Removal Fuel Oil: gallons ❑ Underground ❑Inside ❑Outside LP Gas: gallons Other: GAS LINE ONLY ❑ Outdoor Grill ❑ Other/List What&Where: 2 PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com PERMIT FEE CALCULATION(S) BASED OFF -2002 STATE STATUE ❑ Yes,this section applies The replacement of a Residential fixture or appliance that meets all three of the following requirements: 1. Does not require modification to electrical or gas service. 2. Has a total cost of$500.00 or less;excluding the cost of the fixture or appliance:and 3. Is improved, installed or replaced by the homeowner or licensed contractor. Skip next section,if this applies; Cost of Permit $ 15.00 State Surcharge $ 5.00 Mail-In Fee(If Applicable) S 2.00 Total Permit Fee $ PERMIT FEE CALCULATION(S)—JOBS OVER$500.00 If above does not apply;follow guidelines below: 1. CONTRACT PRICE *is 1.25%of contract price with a(Minimum Fee of$50.00) 33,555.00 x.0125 $ JIM ,gI (contract price) (minimum$50.00) 2. STATE SURCHARGE 33,555,00 x.0005 $ //0,'7tf (contract price) 3. POSTAGE&HANDLING(Only on Mail-In Applications) $ 4. TOTAL PERMIT FEE(Add Lines 1-3 Above) $ 7—;Iw. p� ■ * CONTRACT PRICE or JOB COST means the actual or estimated dollar amount charged for the permitted work including materials,labor,profit,and other fixed costs. It is the amount to be charged to the customer for the work done. If any material, equipment, labor or installations are furnished by the owner, tenant or any other party, the reasonable market value of such items must be added to the estimated cost or contract price for permit fee purposes. In the event that there is a dispute on the amount of the job cost, the City may request the submission of a signed copy of the actual contract. MECHANICAL PERMIT APPLICATION AGREEMENT The undersigned hereby applies to the City for issuance of a Mechanical Permit, agrees to do all work in strict accordance with the ordinances of the City and the regulations of the State of Minnesota, and certifies that all statements made on this application are complete, true and correct. Applicant's Signature: ...- Date: Reset m PDF Created with deskPDF PDF Writer - Trial :: http://www.docudesk.com RETROEF ' MASSMANNPROPERTY LAYOUT GEOTHERMAL & MECHANICAL DATE 27944 96th St Zimmerman MN 55398 P: 763.389.0376 F: 763.389.0386 www.MassmannGeothermal.com PROPOSED RETROFIT LAYOUT FOR: NAME > 'y� rU PHONE ADDRESS I `J :;T�d o"ri' ha M i� YEAR HOUSE BUILT _ TOTAL S0.FT.OF HOUSE Please use the below graph to sketch the layout of your property. Include house,trees, landscaping,well, septic location, city water&sewer lines if known,and any other significant structures on your land. Include all measurements and the direction your front door faces. Please also answer the questions on the enclose' s feet so we'll be able to give you an accurate estimate. CA SCALE: 1/4"_ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 15k 16 17 11_1%-2-Q_21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 (\, Ho o E$S4 7 � 8 r 9 �n 10 11 1213 TI X,; 14 15 16 � 17 19 20 21 22 23 �.✓y 24 25 Load Short Form Job: Date: Dec 27th,2011 Entire House By: Jason Massmann Project • • For: Masterpiece Homes 127 County Road C, Little Canada, MN Phone: 651-484-3244 Design Information Htg Clg Infiltration Outside db(°F) -21 97 Method Simplified Inside db(°F) 72 75 Construction quality Tight Design TD (°F) 93 22 Fireplaces 0 Daily range - M Inside humidity(%) 30 45 Moisture difference(gr/Ib) 35 57 HEATING EQUIPMENT COOLING EQUIPMENT Make Enertech Manufacturing LLC. Make Enertech Manufacturing LLC. Trade GEOCOMFORT Trade GEOCOMFORT Model GT060 Cond GT060 AHRI ref no.3000398 Coil AHRI ref no.3000398 Efficiency 3.29 COP Efficiency 19.5 EER Heating input 46178 Btuh Sensible cooling 48015 Btuh Heating output 46178 Btuh Latent cooling 20578 Btuh Temperature rise 35 OF Total cooling 68592 Btuh Actual air flow 1222 cfm Actual air flow 1222 cfm Air flow factor 0.019 cfm/Btuh Air flow factor 0.046 cfm/Btuh Static pressure 0.50 in H2O Static pressure 0.50 in H2O Space thermostat Load sensible heat ratio 0.96 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Garge Zone p 672 0 0 0 0 Main Zone p 1707 25106 11038 480 505 Lower level Zone p 1317 10060 3741 193 171 Bonus Zone p 384 7501 2719 144 124 Upper Zone p 1522 21210 10551 406 483 Entire House d 5602 63877 26088 1222 1222 Other equip loads 4093 0 Equip. @ 1.01 RSM 26479 Latent cooling 1076 TOTALS 5602 67970 27555 1222 1222 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft° 2012-Sep-2507.02:24 9 Right-Suite®Universal 8.0.18 RS000282 Page 1 ...mal\My Documents\Wrightsoft HVAC\Master Piece Homes Rochel.rup Calc=MJ8 Front Door faces: Buildin Analysis Job: g l Date: Dec 27th,2011 Entire House By: Jason Massmann -Proiect Information For: Masterpiece Homes 127 County Road C, Little Canada, MN Phone: 651-484-3244 - • Conditionsi Location: Indoor: Heating Cooling Minneapolis/St. Paul, MN, US Indoor temperature(°F) 72 75 Elevation: 837 ft Design TD (°F) 93 22 Latitude: 45°N Relative humidity(%) 30 45 Outdoor: Heating Cooling Moisture difference(gr/Ib) 34.6 57.1 Dry bulb (°F) -21 97 Infiltration: Daily range (°F) - 19 ( M ) Method Simplified Wet bulb (°F) - 78 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 • Component Btuh/ft' Btuh % of load /�°-� Walls 5.7 31590 46.5 / Glazing 40.4 16414 24.1 Doors 17.3 5262 7.7 �.. Ceilings 1.8 3891 5.7 Floors 0.4 1067 1.6 Infiltration 1.2 5653 8.3 Ducts 0 0 Piping 4093 6.0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 67970 100.0 Component Btuh/ft2 Btuh % of load Walls 1.2 6626 25.4 Glazing 33.9 13778 52.8 Doors 6.3 1911 7.3 Ceilings 1.1 2399 9.2 ° Floors 0.3 720 2.8 Infiltration 0.1 655 2.5 Ducts 0 0 Ventilation 0 0 Internal gains 0 0 Blower 0 0 Adjustments 0 Total 26088 100.0 -- Latent Cooling Load = 1076 Btuh Overall U-value= 0.078 Btuh/ft2-°F Data entries checked. V1/I 1 flt SOfY 2012-Sep-25 07:02:24 9 Right-Suite®Universal 8.0.18 RS000282 Page 1 ...mal\My Documents\Wrightsoft HVAC\Master Piece Homes Rochel.rup Calc=MJ8 Front Door faces: Component Constructions Job: Date: Dec 27th,2011 Entire House By: Jason Massmann • - Information For: Masterpiece Homes 127 County Road C, Little Canada, MN Phone: 651-484-3244 Design Conditions Location: Indoor: Heating Cooling Minneapolis/St. Paul, MN, US Indoor temperature(°F) 72 75 Elevation: 837 ft Design TD(°F) 93 22 Latitude: 450N Relative humidity(%) 30 45 Outdoor: Heating Cooling Moisture difference(gr/Ib) 34.6 57.1 Dry bulb(°F) -21 97 Infiltration: Daily range(°F) - 19 ( M ) Method Simplified Wet bulb(°F) - 78 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ft'--°F ft?°FBtuh Btuw Btuh BtuhM2 Btuh Walls 12E-Osw:Frm wall,stucco ext,1/2"wood shth,r-19 cav ins, 1/2" n 898 0.068 19.0 5.69 5111 1.51 1355 gypsum board int fnsh,2'x6"wood frm ne 61 0.068 19.0 6.31 387 1.67 103 e 850 0.068 19.0 5.13 4360 1.36 1156 se 64 0.068 19.0 6.31 406 1.67 108 s 990 0.068 19.0 5.28 5225 1.40 1385 sw 102 0.068 19.0 6.31 643 1.67 170 w 895 0.068 19.0 5.80 5193 1.54 1377 all 3860 0.068 19.0 5.52 21326 1.46 5653 15B-2s3c-4:Bg wall,light dry soil,concrete wall,r-2 ins,10"thk n 60 0.121 2.0 14.2 849 1.27 76 e 52 0.121 2.0 14.2 736 1.27 66 w 52 0.121 2.0 14.2 736 1.27 66 all 164 0.121 2.0 14.2 2321 1.27 208 15B13-4wc-6:Bg wall,light dry soil,2'x4"wood int frm,concrete n 189 0.046 17.0 4.84 914 0.34 64 wall,r-2 ins,r-13 cav ins,8"thk ne 45 0.046 17.0 4.84 218 0.34 15 e 342 0.046 17.0 4.84 1654 0.34 115 se 45 0.046 17.0 4.84 218 0.34 15 s 288 0.046 17.0 4.84 1393 0.34 97 sw 51 0.046 17.0 4.84 246 0.34 17 w 282 0.046 17.0 4.43 1249 0.09 27 all 1242 0.046 17.0 4.74 5891 0.28 349 Partitions 12C-Osw:Frm wall,stucco ext,r-13 cav ins,2'x4"wood frm 243 0.091 13.0 8.44 2052 1.71 416 Windows 4A5-2ov:2 glazing,clr low-e outr,argon gas,vnl frm mat,clr innr, ne 29 0.470 0 43.6 1250 28.8 825 1/4"gap, 1/8"thk a 155 0.470 0 35.2 5452 31.5 4878 se 26 0.470 0 43.6 1119 35.5 910 s 36 0.470 0 43.6 1570 24.5 882 w 125 0.470 0 43.6 5452 39.0 4878 w 36 0.470 0 43.6 1570 39.0 1405 all 406 0.470 0 40.4 16414 33.9 13778 2012-Sep-25 07:02:24 WrightSOftRight-Suite®Universal 8.0.18 RS000282 Page 1 mal\My DocumentslWrightsoft HVAC\Master Piece Homes Rochel.rup Calc=MJ8 Front Door faces: Doors 11 GO:Door,wd pnl type n 200 0.540 0 0 0 0 0 e 21 0.540 0 50.1 1052 18.2 382 w 42 0.540 0 50.1 2105 18.2 764 w 42 0.540 0 50.1 2105 18.2 764 all 305 0.540 0 17.3 5262 6.26 1911 Ceilings 166-44ad:Attic ceiling,asphalt shingles roof mat,r-44 cell ins,5/8" 2194 0.022 44.0 1.77 3891 1.09 2399 gypsum board int fnsh Floors 19C-Ocscp:Flr floor,frm flr,6"thkns,carpet flr fnsh,tight crwl ovr, 205 0.368 11.0 2.25 462 0.52 107 r-11 wall insul 19C-19cscp:Flr floor,frm fir,6"thkns,carpet flr fnsh,r-2 ext ins, 384 0.049 30.0 1.58 605 0.37 140 r-19 cav ins,tight crwl ovr,r-11 wall insul 41 BO:Radiant panel over basement,3/4"ply subflr,Omega heat 1317 0 0 0 0 0.36 473 xfer plates 43BO:Radiant panel over room,3/4"ply subflr,Omega heat xfer 672 0 0 0 0 0 0 plates 2012-Sep-25 07:02:24 Wrightsoft` Right-Sufte®Universal 8.0.18 RS000282 Page 2 ...mal\My Documents\Wrightsoft HVAC\Master Piece Homes Rochel.rup Calc=MJ8 Front Door faces: Pro ect Job: Summary 1 'J Date: Dec 27th,2011 Entire House By: Jason Massmann Proiect Information For: Masterpiece Homes 127 County Road C, Little Canada, MN Phone: 651-484-3244 Notes: Desicin Information Weather: Minneapolis/St. Paul, MN, US Winter Design Conditions Summer Design Conditions Outside db -21 OF Outside db 97 OF Inside db 72 OF Inside db 75 OF Design TD 93 OF Design TD 22 OF Daily range M Relative Humidity 45 % Moisture difference 57 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 63877 Btuh Structure 26088 Btuh Ducts 0 Btuh Ducts 0 Btuh Central vent(0 cfm) 0 Btuh Central vent(0 cfm) 0 Btuh Humidification 0 Btuh Blower 0 Btuh Piping 4093 Btuh Equipment load 67970 Btuh Use manufacturer's data n Rate/swing multiplier 1.01 Infiltration Equipment sensible load 26479 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 0 Structure 1076 Btuh Ducts 0 Btuh Heating Cooling Central vent(0 cfm) 0 Btuh Area (ft') 4930 4930 Equipment latent load 1076 Btuh Volume(ft') 34250 34250 Air changes/hour 0.10 0.05 Equipment total load 27555 Btuh Equiv.AVF(cfm) 57 29 Req.total capacity at 0.70 SHR 3.2 ton Heating Equipment Summary Cooling Equipment Summary Make Enertech Manufacturing LLC. Make Enertech Manufacturing LLC. Trade GEOCOMFORT Trade GEOCOMFORT Model GT060 Cond GT060 AHRI ref no.3000398 Coil AHRI ref no.3000398 Efficiency 3.29 COP Efficiency 19.5 EER Heating input 46178 Btuh Sensible cooling 48015 Btuh Heating output 46178 Btuh Latent cooling 20578 Btuh Temperature rise 35 OF Total cooling 68592 Btuh Actual air flow 1222 cfm Actual air flow 1222 cfm Air flow factor 0.019 cfm/Btuh Air flow factor 0.046 cfm/Btuh Static pressure 0.50 in H2O Static pressure 0.50 in H2O Space thermostat Load sensible heat ratio 0.96 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2012-Sep-25 07:02:24 wri htsofRight-Suite®Universal 8.0.18 RSU00282 Page 1 ...mal\My Documents\Wrightsoft HVAC\Master Piece Homes Rochel.rup Calc=MJS Front Door faces: AED Assessment Job: Date: Dec 27th,2011 Entire House By: Jason Massmann Pr9ject Information For: Masterpiece Homes 127 County Road C, Little Canada, MN Phone: 651-484-3244 Desi• n Conditions Location: Indoor: Heating Cooling Minneapolis/St. Paul, MN, US Indoor temperature(°F) 72 75 Elevation: 837 ft Design TD (°F) 93 22 Latitude: 45°N Relative humidity(%) 30 45 Outdoor: Heating Cooling Moisture difference (gr/Ib) 34.6 57.1 Dry bulb (°F) -21 97 Infiltration: Daily range(°F) - 19 ( M ) Wet bulb (°F) - 78 Wind speed (mph) 15.0 7.5 Test for Ade(q_Me Exposure Diversity Hourly Glazing Load 19,000 16,000 14,000 12,000 m R 10,000 u 8,000 6,000 4,000 2,000 0 8 9 10 11 12 13 14 15 16 17 18 19 20 Hour of Day Hourty A—P AED limit Maximum hourly glazing load exceeds average by 21.0%. House has adequate exposure diversity (AED), based on AED limit of 30%. AED excursion: 0 Btuh wri htsoft' 2012-Sep-2507:02:24 9 Right-Suite®Universal 8.0.18 RS000282 Page 1 mal\My Documents\Wrightsoft HVAC\Master Piece Homes Rochel.rup Calc=MJ8 Front Door faces: Loads for Multiple Orientations Job: Date: Dec 27th,2011 Entire House By: Jason Massmann Project Information For: Masterpiece Homes 127 County Road C, Little Canada, MN Phone: 651-484-3244 Design Conditions Location: Indoor: Heating Cooling Minneapolis/St. Paul, MN, US Indoor temperature(°F) 72 75 Elevation: 837 ft Design TD(°F) 93 22 Latitude: 45°N Relative humidity(%) 30 45 Outdoor: Heating Cooling Moisture difference(gr/Ib) 34.6 57.1 Dry bulb(°F) -21 97 Infiltration: Daily range(°F) - 19 ( M ) Wet bulb(°F) - 78 Wind speed (mph) 15.0 7.5 Front Door North Northeast East Southeast South Southwest West Northwest Sensible Load (Btuh) 26479 24765 21593 24738 26187 24542 21537 24716 Latent Load (Btuh) 1076 1076 1076 1076 1076 1076 1076 1076 Total Load (Btuh) 27555 25841 22669 25814 27263 25618 22613 25792 Heating AVF (cfm) 1222 1143 997 1142 1209 1133 994 1141 Cooling AVF (cfm) 1222 1143 997 1142 1209 1133 994 1141 Building Orientation Cooling Load 30000 25000-- -' L 7 v 20000 0 0 J O1 15000 76g U 6 10000-- 5000-- 0 000050000 N NE E SE S SW W NW Direction Front Door faces Current Orientation: Front Door faces North Highest Cooling Load: Front Door faces North Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft° 2012-Sep-250r02:25 9 Right-Suite®Universal 8.0.18 RS000282 Page t ...mal\My Documents\Wrightsoft HVAC\Master Piece Homes Rochel.rup Calc=MJ8 FrontDoor faces: Load Multizone Summary Report Job: Date: Dec 27th,2011 By: Jason Massmann Infiltration Heating Cooling ZONE NAME Volume ACH AVF HTM Volume ACH AVF HTM ft3 cfm Btuh/ft' W cfm Btuh/ft' Garge Zone 0 0 0 0 0 0 0 0 Main Zone 13803 0.09 20 1.3 13803 0.04 10 0.2 Lower level Zone 3293 0.09 5 1 .3 3293 0.05 2 0.2 Bonus Zone 3456 0.17 10 1 .3 3456 0.09 5 0.2 Upper Zone 13698 0.10 22 1 .3 13698 0.05 11 0.2 Entire House 34250 0.10 57 1.3 34250 0.05 29 0.2 • . • and AVF Summary ROOM NAME Area Htg load Clg load Htg AVF Clg AVF ftZ Btuh Btuh cfm dm Garage 672 0 0 0 0 Garge Zone 672 0 0 0 0 Family Room 224 3747 2617 72 120 Dinette 99 2460 725 47 33 Kitchen 247 1907 1048 36 48 Craw Space 195 2816 272 54 12 Mudroom 195 3366 1153 64 53 Dining 182 3335 1849 64 85 Foyer 174 2338 1069 45 49 Stairs 91 0 0 0 0 Living Room 180 1103 227 21 10 Sitting Room 120 4035 2078 77 95 Main Zone 1707 25106 11038 480 505 Lower Level 1317 10060 3741 193 171 Lower level Zone 1317 10060 3741 193 171 Bonus Room 384 7501 2719 144 124 Bonus Zone 384 7501 2719 144 124 Upper Hall 293 2206 942 42 43 Upper Stairs 91 186 101 4 5 Bath #4 45 574 151 11 7 Bedroom #4 140 2686 1359 51 62 Upper Bathj 77 800 220 15 10 Bonus Stairs 88 1489 373 29 17 Bedroom #3 132 1843 1316 35 60 Bedroom #2 132 1843 1316 35 60 Master Bath 126 2738 1426 52 65 Master W.I.0 98 683 210 13 10 Master Bedroom 300 6161 3138 118 143 Upper Zone 1522 21210 10551 406 483 Entire House 5602 63877 26088 1222 1222 2012-Sep-25 07:02:27 wrig Itsoft` Right-Suite®Universal 8.0.18 RS000282 Page l mal\My Documents\Wrightsoft HVAC\Master Piece Homes Rochel.rup Calc=MJ8 Front Door faces: DA TIME CITY OF ORONO CALLED IN Z INSPECTION NOTICE SCHEDULED PERMIT NO. 1 J-F-Z X42 53COMPLETED ADDRESS zO 5 OWNER TE HONE NO CONTRACTOR -aV1 DESCRIPTION ❑ FOOTING ❑ PLUMBING FI ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS h ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT v ❑ DEMO-SITE ❑ SEPTIC MAINT ❑ FOLLOW-UP i ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL J ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL OWNER/CONTRACTOR TO MEET YOU:_YES_NO ti COMMENTS: W a J O a Cc O W W QC Q 2 W Z W cc A RK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE cc W ❑CORRECT WORK&PROCEED ElISSUE CERTIFICATE OF OCCUPANCY O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY C1 BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on site: Inspector. White Copyllnspectoes File Canary Copy/Site Notice dlz� - /��,pA�� TIME CITY OF ORONO CALLED IN INSPECTION NOTICE SCHEDULED Z-/� -/Z oT_117j PERMIT NOab/o� -10'�-O COMPLETED /} ADDRESS OWNER TEL HON NO. CONTRACTOR 05 � DESCRIPTION Lij ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAWGRADING/FILLING U. Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL Q ❑ TREE REMOVAL Z El INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT ❑ DEMO-SITE ❑ SEPTIC MAINT ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL v ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL OWNER/CONTRACTOR TO MEET YOU:_YES_NO COMMENTS: Cr W W 0 CC 0 U_ W CC Q Z W W cc Z) 0 Uj ❑WORK SATISFACTORY:PROCEED I OJECT COMPLETE W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY OO ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN 11 CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (J52) 249-4600 Owner/Contractor on s' : Inspector. White Copy/Inspector's File Canary Copy/Site Notice