Loading...
HomeMy WebLinkAbout2014-00862 - pool CITY OF ORONO 11111111111111111111111111111111111111 111111M * 2 0 1 4 - 0 0 8 6 2 2750 KELLEY PARKWAY DATE ISSUED: 09/09/2014 ORONO, MN 55356- (952)249-4600 FAX: 952 249-4616 ADDRESS : 200 TRUFFULA TR PIN : 33-118-23-44-0039 LEGAL DESC : MEADOW WOOD POND LOT 005 BLOCK 001 PERMIT TYPE ACCESSORY STRUCTURE PROPERTY TYPE RESIDENTIAL CONSTRUCTION TYPE POOL-IN GROUND ACTIVITY 329-STRUCTURES OTHER THAN BUILDINGS VALUATION $ 28,500.00 NOTE: SEPARATE PERMITS REQUIRED: MECHANICAL AND ELECTRICAL(STATE) TE: ARY AND ALTERNATE SEPTIC SITES SHOULD BE PROTECTED DURING CONSTRUCTION PROJECTS. INITIAL: PRIOR TO RELEASE O ES W MONEY,AN AS-BUILT SURVEY MUST BE SUBMITTED AND APPROVED. ALL DISTURBED AS MUST BE RE V EGETATED. INITIAL: NOTE: BUILDING PLAN G PERMIT APPLICATOIN REQUIRED FOR CONSTRUCTIN OF DETACHED ACCESSORY STRUCTURE,DECK AND STAIRS: INITIAL: APPLICANT PERMIT FEE SCHEDULE 456.00 STATE SURCHARGE(VALUATION) 14.25 ADAMS,MR.&MRS. TOTAL 470.25 200 TRUFFULA TR LONG LAKE,MN 55356- Payment(s) CREDIT CARD 4730 470.25 OWNER ADAMS,MR.&MRS. 200 TRUFFULA TR LONG LAKE,MN 55356- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requeste ' nfo ce with the State Building Code.This permit may be revo at t' e u cause. _ViteqWature Dat Issued By Si ature Date City of Orono 414 � Building Permit Applications+ for a Swimming Pool OAj Mailing Address: Permit number: 0?4�y�OD l VO PO Box 66 Crystal Bay, MN 55323-0066 Date received: Street Address: Received by: C%A y 2750 Kelley Parkway Plan review fee: Xo `qty ESHD Total Fee: ��� Orono, MN 55356 07o1V,�0p kV Main: 952-249-4600 Fax: 952-249-4616 www.ci.orono.mn.us This application form must be completed in full and all required information mus be submitted. Incomplete applications will be returned. (Please print) GENERAL INFORMATION: Job Site Address: ) TIR CONTRACTOR/APPLICANT INFORMATION: Name: a �5 e0 s State License# A.1 ,t Expiration Date: Phone: ::2 6 3 " & 2 —4'3 ti 3 Fax: -7 63 r_ Address: I t 05�1' L ro-fyO Of N U/ r'+ Contact Person: <f'g�c.� Email: ,Ntj PROPERTY OWNER INFORMATION: ' /� �(,�C�— Name: 0'l -t ,S • 4' QG!'Ihl Phone (day): (,at 2 r 2. 3 'l ^ Y � Mailing Address: 7:, _��14 Email and/or Fax: &J— ENGINEER INFORMATION: Name: of Phone: '�- (� SlawAddress: r V'V 1 It Email: r( Jr WVV tJ1/V V� � PROJECT INFORMATION: �U�V 1. Pool Dimensions: 4.Accessory to: i i X f feet Single Family 2. Heated? El Multiple Family/Co yes ❑ no ❑ Public 3. Excavated materials will be: ❑ Commercial removed from site ❑ Industrial &used on site ❑ Other: (specify) ❑ Other: (specify) l3 Total Cubic Yards Estimated Construction Value Packet Last Updated: 03129/13 Page 19, REQUIRED SUBMITTALS: All of the information must be submitted in order for your application to be processed: Not Enclosed Applicable ❑ ❑ Permit Application ❑ ❑ Plan Review Fee ❑ ❑ Pool Plans ❑ ❑ Survey includes grading plan) ❑ ❑ Hardcover Calculation Worksheets ❑ ❑ Erosion Control Plan or copy of MCWD Permit ❑ ❑ Septic System Certification ❑ ❑ Wetland Buffer Improvement Plan ❑ ❑ Escrow& Escrow Agreement ❑ ❑ Other ❑ ❑ Other ❑ ❑ Other ❑ ❑ APPLICANT ACKNOWLEDGEMENT: • Agrees to provide all information required or requested by the Planning&Building Departments; • Understands, if applicable, an as-built survey and as-built hardcover cover calculations, are required to be submitted after the project is complete (including final grading and landscaping) prior to refunding the escrow; • Certifies that the information supplied is true and correct to the best of his/her knowledge. The applicant recognizes that they are solely responsible for submitting a complete application being aware that upon failure to do so, the staff has no alternative but to reject it until it is complete; • Some or all of the information that you are asked to provide on this application is classified by State law as either private or confidential. Private data is information which generally cannot be given to the public but can be given to the subject of the data. Confidential data is information which generally cannot be given to either the public or the subject of the data. Our purpose and intended use of this information is to annually update our records and records of other governmental agencies required by law. If you refuse to supply the information,the permit may not be issued. Applicant's Signature: Date: Owner's Signature Date: Packet Last Updated: 03/04/13 Page 20 of 21 FLAN REVIEW CHECKLIST FOR NEW STRUCTURES / ADDITIONS Address/Permit Numb Description of ork: y (� Septic re ' by: UOut Kai O atepprove Zoning review by: VCAA Date Approved: 'V. Building review by: Date Approved: Grading review by: VOID �Bpar N Date Approved: Q' "L((1 " Zoning District: _d.y Zoning File#: Reso#: Reso Date: Zoning: Lot Area: SF/AC Width: Lot Coverage: SF _% Survey Submitted: Xyes 0 No Date of Survey: •Z.rJ• ( Revised date(?): Proposed Setbacks: " r� Front(Lake) Rearpeeet) ( N S E W ) ( N S � W ) Other Buildings Wetland Side Side 13s'' talo' Fes' W HPI'' � 59` 4vii-CpN-d- Defined Height: Peak Height: FFE: FFE minus 6 feet= (Existing Contour) Perimeter(linear feet)= 50%= #of Stories_ Ok? DYES FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE: CV.' The distance between the lowest ��n/r QQ _ AB FOUNDATION' START WITH proposed floor(of the basement or craw space)and the highest point of the roof. The distance between the top of slab and If ou have a... C ` the highest point of the roof. A1C\cl If you have a... •y GABLE OR HIPPED ROOF(no WV GABLE OR HIPPED ROOF(no windows): Subtract half the windows): Subtract half the distance distance between the highest point between the highest point of the roof of the roof to the low point of the to the low point of the corresponding SUBTRACTION corresponding gable or hipped roof _,,vry gable or hipped roof (BASED ON ROOF GABLE OR HIPPED ROOF(with (BASED ON GABLE OR HIPPED ROOF(with TYPE) windows): Subtract half the ROOF TYPE) windows): Subtract half the distance distance between the top of the between the top of the highest highest window and the highest window and the highest point of the point of the roof roof • ALL OTHER ROOF TYPES(flat, • ALL OTHER ROOF TYPES(flat, mansard,etc):No subtraction. mansard,etc):No subtraction. ADDITION Add the distance between the top of slab SUBTRACTION Subtract the distance between the (BASED ON and the highest existing grade adjacent to (BASED ON EXISTING basement/crawl space floor and the EXISTING the foundation. GRADES) highest existing grade adjacent to the I GRADES foundation OR 10 feet(whichever is less). EQUALS Defined building height EQUALS Defined building height Shoreland District MCWD Permit Received Average Lakeshore Setback Met? Bluff Yes 0 No 0 N/A 0 Yes No O Yes No �� , � 0 Yes 0 No /A Permit Number: -`AR Setback: Stormwater Quality Existing Proposed Variance Required CUP Required Overlay District Tier Hardcover Hardcover 0 Yes No 0 Yes No Type(s): Type(s): Updated: January 2013 v:\forms\plan review checklist 2013.docx REMARKS (in-house): Fees to be Charged YES NO Permit ° , f Plan Review Investigation Fee ZN 0, of Other(specify) Square Footage $per Square Footage Basement X = $ 1$`Floor X = $ 2nd Floor X = $ Garage X = $ Estimated Construction Value: $ Orono Inspections Required Work Requiring Separate Permits Required State Permits 0 Site 0 Plumbing 0 Grading/Filling 0 Well D Hardcover Removal W Mechanical 0 Fire Electrical J"Footing 0 Septic 0 Water Connection 0 Poured Wall 0 Fireplace 0 Sewer Connection 0 Foundation Survey 0 Masonry 0 Lawn Irrigation 0 Radon Rock Bed 0 Mfg. 0 Framing 0 Other(specify) 0 Insulation 0 As-Built Survey fir Final 0 Wetland Buffer 0 Other(specify) REMARKS (in-house): Other Review: Reviewed by: Date Approved: Access: Existing: 0 YES 0 NO New: 0 YES 0 NO OFFICIAL REMARKS-TO BE NOTED ON PERMIT AND INITIALLED ®Tr YYd(d If- d1kJrAtU *Ce SAQ �ShDV & kekd� r�r`p loY dfl YeAQW1 VWW&I anffi-bUN- brn *rav9d A I MuthQN arco,-s WjJ* Jdaat:e;�: Z! vAforms\plan review checklist 2013.docx hl fm�� a�plroafi�- KRUIrrd- foy om�►uc� Of d XA d 0�Vt�n/ Corn nor Alar SWIMMING POOLS AND HOT TUBS y Planning & Zoning Department 952-249-4620 F c` vvvvw.ci.orono.mn.us �gkFs x o � LOCATION The hot tub or pool basin must be at least 10 feet from the house (including a deck) and 10 feet from any other structure. It may not be placed in a drainage, utility or similar easement. Non-lakeshore lots A pool or hot tub may not be placed closer to the street than the house. On a corner lot this requirement applies to the narrower street frontage regardless of which frontage the front of the house faces or the address of the house. Setbacks for a hot tub or ool with a basin of less than 750 square feet Zoning District Interior Side Street Side* Rear _R-1A 10' 35' 10' R-1 B 10' 15' 10' LR-1 A 10' 50' 10' LR-1 B 10' 35' 10' LR-1 C or LR-1 C-1 10' 15' 10' RR-1 A 10' 100' 10' RR-1 B 10' 50' 10' Setbacks for a pool with a basin of 750 to 1,000 square feet -Zoning District Interior Side Street Side* Rear _R-1A 15' 35' 15' _R-113 15' 15' 15' LR-1A 15' 50' 15' LR-1 B 15' 35' 15' LR-1 C or LR-1C-1 15' 15' 15' RR-1 A 15' 100' 15' RR-1 B 15' 50' 15' Setbacks for pool with a basin of more than 1,000 square feet -Zoning District Interior Side Street Side* Rear _R-1A 30' 35' 15' R-1 B 30' 30' 15' LR-1 A 30' 50' 50' LR-1 B 30' 35' 30 LR-1 C or LR-1C-1 30' 30' 30' RR-1 A 50' 100' 100' RR-1 B 30' 50' 50' *This setback applies to unimproved street right of ways as well as to improved streets. Special setbacks and approval apply to a "through lot" (a lot with a street to both the front and back.) Contact the Planning and Zoning Department for more information. Last Updated: January 2014 This is an information sheet. Every effort has been made to insure the accuracy of the information contained herein; however, if any information is not consistent with provisions of the City Code, the Code provisions will prevail. Page 1 of 4 Property address: �� i /,,^u��u�k ��4�.( D�O''° Inspector initials/Dat I05 (mnHdd�yyyy) 1. Impact on Public Health—Compliance component#1 of 5 Compliance criteria: Verification method(s): System discharges sewage to the ❑Yes (:] No ❑ Searched for surface outlet round surface. ❑ Searched for seeping in yard/backup in home System discharges sewage to drain ❑Yes ❑ No ❑ Excessive ponding in soil system/D-boxes tile or surface waters. ❑ Homeowner testimony(See Commentvuxplenation) System causes sewage backup into ❑Yes ❑ No ❑"Black soil"above soil dispersal system dwelling or establishment. ❑ System requires"emergency"pumping Any"yes"answer above indicates the ❑ Performed dye test system is an imminent threat to public ❑ Unable to verify(See Commentvrxplanabon) health and safety. ❑Other methods not listed(See Comments;Explanatbn) Com ments/Explanation: 2. Tank Integrity—Compliance component#2 of 5 Compliance criteria: Verification method(s): System consists of a seepage pit, ❑Yes allo ❑ Probed tank(s)bottom cesspool,drywell,or leaching pit. ❑ Examined construction records Seepage pits meeting 7080.2550 may be ❑ Examined Tank Integrity Fort(Attach) compliant it allowed in local ordinance. Sewage tank(s)leak below their [I Yes Jallo ❑Observed liquid level below operating depth designed operating depth. Examined empty(pumped)tanks(s) If yes,which sewage tank(s)leaks: ❑ Probed outside tank(s)for"black soil" Any "yes"answer above Indicates the ❑ Unable to verify(See CornmenisoExplena6m) system is failing to protect groundwater. ❑Other methods not listed(See CommentwExplanabon) Comments/Explanation: �aksorvully mak -+ane obsGtJa+ions in}u�ie -E-io,�s,ter- Loncl�s�a,� -�1' " 1�,u abo�Q_ Corvti�l�a�1Ce, Co►'►��o>1en->�- Z of rj cr ti� 1 G�Z Co{f2CJ C69TI FI014 10 AJ -�vs l ILSs M Avt- l�o- },� K�c , ,%-6- \kc}; , I r>L AA PC i4 0 i Z 3. Other Compliance ConGttions-Compliance component#3 of 5 a. Maintenance hole covers are damaged,cracked,unsecured,or appear to be structurally unsound. ❑Yes' ❑No ❑Unknown b. Other issues(elecbical hazards,etc.)to immediately and adversely impact public health or safety. ❑Yes* ❑No ❑Unknown *System is an imminent threat to public health and safety. Explain: c. System is non-protective of ground water for other conditions as determined by inspector. ❑Yes" ❑No 'System is failing to protect groundwater. Explain: www.pca.state.mn.us " 651.296.6300 " 800-657-3864 TTY 651-282.5332 or 800-657-3864 • Available in alternative formats wq-wwists4-31 • 3116112 Page 2 of 3 CITY OF ORONO P.O. Box 66 Crystal Bay, MN 55323 SEPTIC TANK PUMPOUT REGISTRATION Company: 4'-a cr '-e wPr7 Date: & -:2�— Address: ova Tv-hula tea, 1 Gallons Pumped: Are Tanks Water Tights? `i�e S Sanitary Disposal Site: G( czf t/-r-tea fires i- 9-", Signature. 4 (Co tractor) This registration slip must be returned to the City offices within 14 days of pumping. Melanie Curtis From: Robert Bean [bobbe@bolton-menk.com] Sent: Tuesday, August 26, 2014 2:11 PM To: Melanie Curtis Subject: 2014-00862 -200 Truffula Trail Melanie, I have completed review of the Building Permit application package for the proposed improvements at 200 Truffula Trail. Following are my comments for your consideration: 1. The siltfence should be installed and inspected by the City prior to any work. The contractor must provide minimum 24 hour notice prior to inspection. 2. The applicant may be required to obtain Minnehaha Creek Watershed District (MCWD)approval and permitting for their Erosion Control Rule. A copy of any approved permits or confirmation that no permit is required should be submitted prior to any land altering activities. If you have any questions or comments, please contact me to discuss. Thanks, Robert E. Bean,Jr, P.E. LEED Green Assoc. Water Resources Engineer Bolton & Menk, Inc. Consulting Engineers&Surveyors 2638 Shadow Lane, Suite 200 Chaska, MN 55318 P:(952)448-8838,ext 2892 F:(952)448-8805 email: bobbe@bolton-menk.com www.bolton-menk.com This email has been scanned by the Symantec Email Security.cloud service. For more information please visit http://www.symanteccloud.com I MEMORANDUM DATE: 20 August 2014 TO: Dave Martini & Bob Bean, Consulting City Engineers FROM: Melanie Curtis RE: 200 Truffula Trail/Building Permit#2014-00862 Please review the enclosed information for an in-ground swimming pool permit and patio. There are also other proposed improvements noted on the survey such as a deck/stair, pool shed/building, sport court, and multiple patio areas. Please review as if all are proposed as the applicant isn't clear and we only have a permit for the pool —so far. Please provide comments by or before August 28tH Please let me know if you need additional information or if you have any questions on the attached information. Thank you, Melanie Curtis From: Melanie Curtis Sent: Wednesday, August 27, 2014 9:43 AM To: 'Adams, Donald W-WAYZATA MN' Cc: Andrew Mack; Christine Mattson; 'Mark Gronberg' Subject: RE: 200 Truffula Attachments: Zoning Permit Application 2014.pdf; Building Permit Application for New Structures—Application ONLY 2013.pdf Thank you for clarifying about the escrow; did you sign an escrow agreement form? You submitted a pool permit application. The attached application form should be used to install new hardcover. You will check the no fee hardcover box as well as the $50 minor land alteration box. I will need to revise your escrow agreement if you have already submitted one. If not, I can use the one I previously attached and include all permit numbers. The permit required for the stairs and building will be the Building Permit application. Melanie Curtis 9 952.249.4627 H mcurtis@ci.orono.mn.us From: Adams, Donald W - WAYZATA MN [mailto:donald_adams@ml.com] Sent: Wednesday, August 27, 2014 9:22 AM To: Melanie Curtis Cc: Andrew Mack; Christine Mattson; 'Mark Gronberg' Subject: RE: 200 Truffula Melanie Thanks for the update. I have already handed in my escrow. You cashed my check on 8-15. So you are saying we need a separate permit for the fire pit, sport court and golf green? I know we will need one for the stairs and storage building. Please confirm. Thanks Don -----Original Message----- From: Melanie Curtis [MCurtiskci.orono.mn.us] Sent: Wednesday, August 27, 2014 08:58 AM Central Standard Time To: Adams, Donald W - WAYZATA MN Cc: Andrew Mack; Christine Mattson; 'Mark Gronberg' Subject: RE: 200 Truffula Don It is not necessary to meet with our engineer. He completed his review yesterday; I've attached his comments. We will continue with our review now. I do still need clarification as to what exactly is being proposed at this time as your survey identifies a number of separate projects, some requiring separate permits. The permit application form submitted at this time only reflects construction of a pool. It is my intent that the remaining"proposed" improvements identified on the survey will be redlined (crossed out) and not permitted as part of this permit. 1 Don From: Melanie Curtis [mailto:MCurtis(a)ci.orono.mn.us] Sent: Friday, August 22, 2014 9:31 AM To: Adams, Donald W - WAYZATA MN Subject: RE: 200 Truffula Thanks, have a nice weekend. Melanie Curtisg' 952.249.4627M mcurtisOci.orono.mmus From: Adams, Donald W - WAYZATA MN [mailto:donald adamsOml.com] Sent: Friday, August 22, 2014 9:28 AM To: Melanie Curtis Subject: RE: 200 Truffula Melanie, Sounds like a great plan. I will visit with Gronberg today. Thanks, Don From: Melanie Curtis [mailto:MCurtis@ci.orono.mn.us] Sent: Friday, August 22, 2014 9:27 AM To: Adams, Donald W - WAYZATA MN Subject: 200 Truffula In the meantime Don, I would recommend you review your plans with Gronberg keeping in mind the City's survey standard sheet(attached) which outlines all of the minimum necessary information for permitting review. I note that your survey has partial detail (topography) or is missing some of this information (septic tanks, etc). Perhaps the most timely response would be to have Gronberg add the missing information. Melanie Curtisg 952.249.4627® mcurtis@ci.orono.mn.us From: Adams, Donald W - WAYZATA MN [mailto:donald adams@ml.com] Sent: Friday, August 22, 2014 9:18 AM To: Melanie Curtis Subject: RE: RE: Thanks From: Melanie Curtis [mailto:MCurtis@ci.orono.mn.us] Sent: Friday, August 22, 2014 9:17 AM To: Adams, Donald W - WAYZATA MN Cc: Christine Mattson; Andrew Mack; markg@gronbergassoc.com Subject: RE: RE: Andrew is our Community Development Director, not the City's engineer. I will contact our engineer this morning to get an update on his review status. 3 Melanie Curtisg 952.249.4627® mcurtis@ci.orono.mn.us From: Adams, Donald W - WAYZATA MN [mailto:donald adams@ml.com] Sent: Friday, August 22, 2014 9:04 AM To: Melanie Curtis Cc: Christine Mattson; Andrew Mack; markg@gronbergassoc.com Subject: RE: RE: Melanie, Thanks for the update on the hot tub. Andrew, is there any chance you could complete our plan review today? I would like to know if Gronberg needs to update my survey. Thanks, Don From: Melanie Curtis [mailto:MCurtis(a)ci.orono.mn.us] Sent: Thursday, August 21, 2014 2:15 PM To: Adams, Donald W - WAYZATA MN Cc: Christine Mattson; Andrew Mack; markg@gronberciassoc.com Subject: RE: RE: He still has the plans under review. Please see the attached. Your property is located in the RR-1b zoning district. Melanie Curtis® 952.249.4627® mcurtis(Ebo.orono.mmus From: Adams, Donald W - WAYZATA MN [mailto:donald adams@ml.com] Sent: Thursday, August 21, 2014 10:21 AM To: Melanie Curtis Cc: Christine Mattson; Andrew Mack; markgOgronbergassoc.com Subject: RE: RE: Melanie, Can you please let me know what your surveyor said regarding our survey. I would like to let Gronberg know as soon as possible if they need to redo it. Curious if you can tell me if there are any restrictions on how close a hot tub can be to our house. I want to make sure the spot we are looking at installing it follows regulations. Thanks, Don From: Melanie Curtis [mailto:MCurtis@ci.orono.mn.us] Sent: Tuesday, August 19, 2014 10:02 AM To: Adams, Donald W - WAYZATA MN Cc: Christine Mattson; Andrew Mack Subject: RE: RE: 4 Don Our survey standard sheet (attached) outlines all of the minimum necessary information for permitting review. Obviously all of this information isn't needed for every type or scale project. However, your survey has partial detail (topography) or is missing some of this information (septic tanks, etc). Our engineer will take a look at this to see if it is sufficient for our review and we will let you know, otherwise speak with your surveyor about providing the missing/incomplete information. Melanie Melanie Curtisg 952.249.4627M mcurtis@ci.orono.mmus From: Adams, Donald W - WAYZATA MN [mailto:donald adams@ml.com] Sent: Tuesday, August 19, 2014 9:42 AM To: Melanie Curtis Cc: Christine Mattson; Andrew Mack Subject: RE: RE: Melanie, Should I request that another survey be done by Gronberg or will the one I gave you be sufficient? Thanks for your help on moving this forward! Don From: Melanie Curtis [mailto:MCurtis@ci.orono.mn.us] Sent: Tuesday, August 19, 2014 9:40 AM To: Adams, Donald W - WAYZATA MN Cc: Christine Mattson; Andrew Mack Subject: RE: RE: Don The survey reflects a portion of existing topography (not the full site) and some proposed grading around proposed improvements: sport court, pool and patio areas, pool building, proposed deck&stairs with proposed patio beneath, and a hot tub under the porch. Three separate patio areas are shown as proposed. There is a label which states"septic tank" but it is not specifically indicated. The survey is dated 07/25/14. It will be given to our engineer today for his review and comments, as well as our septic system inspector for his review. Melanie Curtisg 952.249.4627E mcurtis@ci.orono.mn.us From: Adams, Donald W - WAYZATA MN [mailto:donald adams@ml.coml Sent: Tuesday, August 19, 2014 9:07 AM To: Adams, Donald W - WAYZATA MN; Melanie Curtis Subject: RE: RE: Melanie, Please let me know about the survey I gave to you. If the copy I provided,did not show our different improvements, I will request another one and bring it to you today. Thanks, 5 Don From:Adams, Donald W - WAYZATA MN Sent: Monday, August 18, 2014 4:14 PM To: 'Melanie Curtis' Cc: Adams, Donald W - WAYZATA MN Subject: RE: RE: Melanie, Our survey I provided I thought showed all of our proposed grading plans and improvements. Please look again at the surveys to confirm this is what you are looking for. It should also show our entire property. I spoke to Mark Gronberg he confirmed it was done based on what you are looking for. Yes,we will apply for the deck under a differ permit request. We are not sure if we will do the steps this year or next depending on how long it takes to get our pool permit. We are only having a slab installed for storage building.We will have another permit request when we build this structure.There will not be a bathroom. Please keep us in touch on what you find about our survey. I will request another one if needed. Thanks, Don From: Melanie Curtis [mailto:MCurtis@ci.orono.mn.us] Sent: Monday, August 18, 2014 3:55 PM To: Adams, Donald W - WAYZATA MN Cc: Christine Mattson; Andrew Mack Subject: RE: Don I would use that timing as a guideline. Also, I just glanced at your survey. If you're proposing all of those improvements they will all (including putting green) should be shown on a proposed grading plan. The existing site topography is only shown for a portion of the property. This should be revised on the survey to show the entire site and all proposed improvements. Do you have deck/stair plans? A separate building permit is required. Also, is a pool building proposed? If so a separate permit will also be required for this. Will there be a bathroom in this building? Thanks — Melanie Melanie Curtisg 952.249.4627® mcurtis@ci.orono.mmus From:Adams, Donald W - WAYZATA MN [mailto:donald adams@ml.com] Sent: Monday, August 18, 2014 3:42 PM To: Melanie Curtis Cc: Christine Mattson; Andrew Mack; Adams, Donald W - WAYZATA MN Subject: Melanie, Thanks for getting back to me.So you are saying 5-6 weeks from August 8th? Does September 12-19 sound right? I want try and put together a schedule for my contractors. 6 Yes, pool, cement slab for sports,cement patios, new stairs for our deck (we are not building an extra deck),and storage shed. We are also considering a golf green. Do you need anything else from me? I forwarded the tank certificate and pump form to her(I have reattached just in case you don't have them). Please let me know so I can give you everything you need. I have already provided 3 copies of our survey to Christine. I appreciate you getting back to me so soon. Enjoy your evening! Don From: Melanie Curtis [mailto:MCurtis@ci.orono.mn.us] Sent: Monday, August 18, 2014 3:24 PM To: Adams, Donald W - WAYZATA MN Cc: Christine Mattson; Andrew Mack Subject: RE: Don -Thanks for your email. 2 weeks sounds a little optimistic considering the volume of permits we have currently but I haven't yet been involved with the review. I think our building permit turnaround is sitting around 5-6 weeks (estimated) if grading and zoning reviews are involved; both of which are required for your project(s). I peeked at your file when I received your email and it looks like you have several different project elements proposed on your survey— pool, sport court, patios, deck, pool building, etc. are all of these currently proposed? Please clarify about the type and number of project elements. Thank you — Melanie Melanie Curtis Direct 952.249.4627 Planning &Zoning Office 952.249.4620 Email: mcurtis(fti.orono.mn.us Website: www.ci.orono.mn.us Summer Office Hours: May 19 through August 29, 2014 Monday through Thursday: 7:30 am to 5 pm& Fridays: 7:30 am to 11:30 am From:Adams, Donald W - WAYZATA MN [mailto:donald adams@ml.com] Sent: Monday, August 18, 2014 3:11 PM To: Melanie Curtis Cc: Adams, Donald W - WAYZATA MN Subject: Hello Melanie, My name is Don Adams and I live on 200 Truffula Trail. I stopped by on August 8`h and gave my pool permit application to Christine Mattson. I asked her how long she said it would take to get approval and she said it would take around 2 weeks. Please give me an update on when you think we will get approval. I have to schedule our pool installer and landscape guy and would like to give them notice on when they should be ready to start. Your help would be greatly appreciated. 7 Melanie Curtis From: Adams, Donald W-WAYZATA MN [donald_adams@ml.com] Sent: Tuesday, August 19, 2014 9:07 AM To: Adams, Donald W-WAYZATA MN; Melanie Curtis Subject: RE: RE: Melanie, Please let me know about the survey I gave to you. If the copy I provided, did not show our different improvements, I will request another one and bring it to you today. Thanks, Don From: Adams, Donald W - WAYZATA MN Sent: Monday, August 18, 2014 4:14 PM To: 'Melanie Curtis' Cc: Adams, Donald W - WAYZATA MN Subject: RE: RE: Melanie, Our survey I provided I thought showed all of our proposed grading plans and improvements. Please look again at the surveys to confirm this is what you are looking for. It should also show our entire property. I spoke to Mark Gronberg he confirmed it was done based on what you are looking for. Yes,we will apply for the deck under a differ permit request.We are not sure if we will do the steps this year or next depending on how long it takes to get our pool permit. We are only having a slab installed for storage building.We will have another permit request when we build this structure.There will not be a bathroom. Please keep us in touch on what you find about our survey. I will request another one if needed. Thanks, Don From: Melanie Curtis [mailto:MCurtis@ci.orono.mn.us] Sent: Monday, August 18, 2014 3:55 PM To: Adams, Donald W - WAYZATA MN Cc: Christine Mattson; Andrew Mack Subject: RE: Don I would use that timing as a guideline. Also, I just glanced at your survey. If you're proposing all of those improvements they will all (including putting green) should be shown on a proposed grading plan. The existing site topography is only shown for a portion of the property. This should be revised on the survey to show the entire site and all proposed improvements. Do you have deck/stair plans? A separate building permit is required. Also, is a pool building proposed? If so a separate permit will also be required for this. Will there be a bathroom in this building? 1 Thanks— Melanie Melanie Curtis W 952.249.4627 1Z mcurtis(@ci.orono.mn.us From: Adams, Donald W - WAYZATA MN [mailto:donald adams(a)ml.com] Sent: Monday, August 18, 2014 3:42 PM To: Melanie Curtis Cc: Christine Mattson; Andrew Mack; Adams, Donald W - WAYZATA MN Subject: Melanie, Thanks for getting back to me.So you are saying 5-6 weeks from August 8`h? Does September 12-19 sound right? I want try and put together a schedule for my contractors. Yes, pool,cement slab for sports,cement patios, new stairs for our deck(we are not building an extra deck),and storage shed. We are also considering a golf green. Do you need anything else from me? I forwarded the tank certificate and pump form to her(I have reattached just in case you don't have them). Please let me know so I can give you everything you need. I have already provided 3 copies of our survey to Christine. I appreciate you getting back to me so soon. Enjoy your evening! Don From: Melanie Curtis [mailto:MCurtisaci.orono.mn.us] Sent: Monday, August 18, 2014 3:24 PM To: Adams, Donald W - WAYZATA MN Cc: Christine Mattson; Andrew Mack Subject: RE: Don -Thanks for your email. 2 weeks sounds a little optimistic considering the volume of permits we have currently but I haven't yet been involved with the review. I think our building permit turnaround is sitting around 5-6 weeks (estimated) if grading and zoning reviews are involved; both of which are required for your project(s). I peeked at your file when I received your email and it looks like you have several different project elements proposed on your survey— pool, sport court, patios, deck, pool building, etc. are all of these currently proposed? Please clarify about the type and number of project elements. Thank you — Melanie Melanie Curtis Direct 952.249.4627 Planning &Zoning Office 952.249.4620 Email: mcurtis(fti.orono.mn.us Website: www.ci.orono.mn.us Summer Office Hours: May 19 through August 29, 2014 Monday through Thursday: 7:30 am to 5 pm & Fridays: 7:30 am to 11:30 am 2 From: Adams, Donald W - WAYZATA MN [mailto:donald adamscd)ml.com] Sent: Monday, August 18, 2014 3:11 PM To: Melanie Curtis Cc: Adams, Donald W - WAYZATA MN Subject: Hello Melanie, My name is Don Adams and I live on 200 Truffula Trail. I stopped by on August 8th and gave my pool permit application to Christine Mattson. I asked her how long she said it would take to get approval and she said it would take around 2 weeks. Please give me an update on when you think we will get approval. I have to schedule our pool installer and landscape guy and would like to give them notice on when they should be ready to start. Your help would be greatly appreciated. Thanks, Don This message, and any attachments, is for the intended recipient(s) only, may contain information that is privileged, confidential and/or proprietary and subject to important terms and conditions available at http•//www.bankofamerica.com/emaildisclaimer. If you are not the intended recipient, please delete this message. This message, and any attachments, is for the intended recipient(s) only, may contain information that is privileged, confidential and/or proprietary and subject to important terms and conditions available at http://www.bankofamerica.com/emaildisclaimer. If you are not the intended recipient, please delete this message. This message, and any attachments, is for the intended recipient(s) only, may contain information that is privileged, confidential and/or proprietary and subject to important terms and conditions available at http://www.bankofamerica.com/emaildisclaimer. If you are not the intended recipient, please delete this message. 3 )jz-, TE TIM CITY OF ORONO CALLED IN INSPECTION NOTIC�l �SCHEDULED PERMIT NO. �`�J COMPLETED ADDRESS �200 T OWNER TELEPH NO. CONTRACTOR DESCRIPTION 4 'FOr ly ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING Q ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ PROGRESS ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT Q ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP _ ❑ AS BUILT-SURVEY ❑ SEWER HOO -UP ❑ HARD COVER REMOVAL v ❑ DEMO-SITE VIC I� ALL ❑ FOUNDATION/REMOVAL OWNERICONTRACTOR TO MEET YOU: ES NO COMMENTS: W a 2 J IQ O W cc !� Q LZ 2 W W j d WORK SATISFACTORY:PROCEED EJ PROJECT COMPLETE az ❑CORRECT WORK&PROCEED O ISSUE CERTIFICATE OF OCCUPANCY W 0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. p PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR Ll CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on site: Inspector. White Copyllnspectoes File Canary Copy/Site Notice DATE TIME CITY OF ORONO CALLED IN INSPECTION NOTICE SCHEDULED PERMIT NO. /�� ���� COMPLETED ADDRESS OWNER TELEPHONE NO. CONTRACTOR DESCRIPTION mm / !'-/n G� W ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL Q ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING O ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION Q ❑ FRAMING ❑ MECHANICAL FINAL ❑ PROGRESS ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT v FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP ❑ AS BUILT-SURVEY ❑ SEWER HOOK-UP ❑ HARD COVER REMOVAL ❑ DEMO-SITE ❑ SEPTIC INSTALL ❑ FOUNDATION/REMOVAL Z OWNERICONTRACTOR TO MEET YOU:_YES_NO ti COMMENTS: W a 0 onk �/l-ecr�� Cosi d��1L� ° W e cc Q 2 W z W cc J d W ❑WORK SATISFACTORY:PROCEEDROJECT COMPLETE W ❑CORRECT WORK&PROCEED ❑ ISSUECERTIFICATE OF OCCUPANCY ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR L]CITATION ISSUED ❑INSPECTION REQUIRED-CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contra on site: Inspector. White Copyllnspector's File Canary CopylSite Notice Planning Zoning • Department -------------------------------- emo To: Finance Department From: Christine Mattson, Planning Assistant CC: Street File Date: December 28, 2015 GIL: 101-22205 Re: Escrow Refund Building Permit Numbers 2014-00862 & 2014-00967 pertaining to 200 Truffula Trail are complete. Please refund$2,500 to the property owner, Don Adams. The following is attached: • Original signed escrow agreement • Copy of cash register receipt showing escrow amount received Mail to: Don Adams 200 Truffula Trail Long Lake, MN 55356 wAstreet filesWuffula traM200escrow refund 201400862&2014-00967.doc x z 1 i ZONING PERMIT ESCROW AG EEMENT Permit# 'Qol 33*-60N2 AGREEMENT made this day of , 2 , by and between the CITY OF ORONO, a Minnesota municipal corporation "City")and ("Owners"). Recitals �uil ing permit application has been filed for a zoning permit for a property located at 2G the ("Subject Property"), legally described as JaV5, Wkerldy�It�Od �I Hennepin County Min esota. 2. Owner requests the City to review this application. 3. The City will commence its review of the application and incur costs associated with said review only if the Owner establishes an escrow to ensure reimbursement to the City of its costs. NOW THEREFORE,THE PARTIES AGREE AS FOLLOWS: 1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow Agreement, the Owners shall deposit $ 2,got) with the City. All accrued interest, if any, shall be paid to the City to reimburse the City for its cost in administering the escrow account. 2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City for all out-of-pocket costs the City has incurred (including planning, engineering or legal consultant review) or will incur in reviewing the plan. Eligible expenses shall be consistent with expenses the Owners would be responsible for under a zoning permit application. The escrow will also guarantee reimbursement to the City for all out-of- pocket costs the City has incurred to assure that the work is completed in accordance with the Stormwater Pollution Prevention Plan and the provisions of Orono City Code Chapter 79. The financial security may also be used by the City to eliminate any hazardous conditions associated with the work and to repair any damage to public property or infrastructure that is caused by the work (including planning, engineering, or legal consultant review) associated with permit #_Zplg'—OO�Ito7 if compliance with the approved zoning permit is not accomplished. `11- 2014-00*L 3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in turn send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners' receipt of bill. 4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make payment to the City within the timeframe outlined in#3 above, shall issue a Stop Work Order until the Owners pay all expenses invoiced pursuant to #3. The City may draw from the escrow account without further approval of the Owners to reimburse the City for eligible expenses the City has incurred. 5. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shall be returned to the Owners when the review has been completed and written notification is received from the Owners requesting the funds. 6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible expenses incurred by the City exceed the amount in escrow, the City shall have the right to certify the unpaid balance to the subject property pursuant to Minn.Stat. §§415.01 and 366.012. CITY: CITY OF ORONO O ER: By: Ok Afitu Its: [internal Use Only: G Original to Planning Department D Copy to Street File Updated: January 2014 BUILDING PERMIT ESCROW AGREEMENT Orono Building Permit# 2b14-00W2. AGREEMENT made this 1 day of , 20A, by and between the CITY OF ORONO, a Minnesota municipal corporation ("City")and Qh *- SFE-Ilk A"W13 ("Owners"). Recitals 1. A building permit application has been filed for Qn Ih -Qlftt 00 ` located at -DUB k illi I I the ("Subject Property"), legally described as Lvi' �i icx 1C. W a CIGW Pond`-Hennepin County Minnesota. 2. Owner requests the City to review this application. 3. The City will commence its review of the application and incur costs associated with said review only if the Owner establishes an escrow to ensure reimbursement to the City of its costs. NOW THEREFORE,THE PARTIES AGREE AS FOLLOWS: 1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow Agreement, the Owners shall deposit$2,500 with the City. All accrued interest, if any, shall be paid to the City to reimburse the City for its cost in administering the escrow account. 2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City for all' out-of-pocket costs the City has incurred (including planning, engineering, in excess of$500, or legal consultant review)or will incur in reviewing the plan. Eligible expenses shall be consistent with expenses the Owners would be responsible for under a building permit application. The escrow will also guarantee reimbursement to the City for all out-of-pocket costs the City has incurred to assure that the work is completed in accordance with the Stormwater Pollution Prevention Plan' and the provisions of Orono City Code Chapter 79. The financial security may also be used by the City to eliminate any hazardous conditions associated with the work and to repair any damage to public property or infrastructure that is caused by the work (including planning, engineering, or legal consultant review) associated with building permit #W+-00V-P1- if compliance with the approved building permit is not accomplished. 3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in turn send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners' receipt of bill. 4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make payment to the City within the timeframe outlined in #3 above, shall issue a Stop Work Order until the Owners pay all expenses invoiced pursuant to #3. The City may draw from the escrow account without further approval of the Owners to reimburse the City for eligible expenses the City has incurred. 5. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shall be returned to the Owners when the review has been completed and written notification is received from the Owners requesting the funds. 6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible expenses incurred by the City exceed the amount in escrow, the City shall have the right to certify the unpaid balance to the subject' property pursuant to Minn. Stat. §§415.01 and 366.012. CITY: CITY OF OI-ONO O ER: B / y: ,.-Z-1 Its: Packet Last Updated: 0329/13 Page 21 of 21 CITY OF ORONO 2750 KELLEY PARKWAY * 2 7 1 4 - 0 0 8 6 1 DATE ISSUED: 08/1)/2014 ORONO, MN 55356- 952 249-4600 FAX: (952)249-4616 ADDRESS 200 TRUFFULA TR PIN 33-118-23-44-0039 LEGAL DESC MEADOW WOOD POND LOT 005 BLOCK 001 PERMIT TYPE : ESCROW FEE-TIED TO BUILDING PERMIT PROPERTY TYPE RESIDENTIAL CONSTRUCTION TYPE ESCROW FEE-TIED TO BUILDING PERMIT NOTE: TIED TO BUILDING PERMIT 2014-0086'x. APPLICANT ESCROW FEE-BUILDING 2,500.00 ADAMS,MR.&MRS. Payment(s) TOTAL 2,500.00 200 TRUFFULA TR CHECK 6894 2;500.00 LONG LAKE,MN 55356- OWNER ADAMS,MR.&MRS. 200 TRUFFULA TR LONG LAKE,MN 55356- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the State Building Code.This permit may be revoked at any time for due cause. Applicant Permitee Signature Date Issued B gnature Date • r i City of Orono, 2750 Kelley Parkway 852_249-4600 Grono MN 55356 Receipt No: 3.011516 Aug 11, 2014 Donald Adams Previous Balance: .00 Permits 2014-00861 200 Truffula 2,500.00 Tr 101-22205 Deferred Rev-Developer Deposit Permits 2014-00860 200 Truffula 296.40 Tr 101-34410 Plan Check/Site Exam Fees----- --------- Total: 2,796.40 Check 2,796.40 Check No: 6894 Payor: Donald Adams 2,796.40 Total Applied: -_ -_----_--- Change Tendered: 00` 08/11/2014 12:58PM