October 12, 1998
Mr. Roger Olson
RKO Builders
3134 130th Ave N.W.
Coon Rapids Minnesota 55448
Mr. Roger Olson
RKO Builders
12360 Yucca Street N.W.
Coon Rapids Minnesota 55448
Re: 125 Truffula Trail, Orono
Dear Mr. Olson:
This is in response to your letter of October 1, 1998. In your letter you quoted a sentence from the
certificate of occupancy. "Building substantially conforms to the requirements of the ordinance of
the City." However Uniform Building Code Section 109.1 states:
"Issuance of a certificate of occupancy shall not be construed as an approval of a violation
of the provisions of this code or of other ordinances of the jurisdiction. Certificates
presuming to give authority to violate or cancel the provisions of this code or other
ordinances of the jurisdiction shall not be valid."
Therefore the City feels outstanding code violations are still your responsibility to correct.
The crack in the front stoop has reappeared after your repair and has extended now
through the foundation. I would be happy to meet your structural engineer on site to
discuss the issue.
- I contacted the State Building Code Division to discuss the patio door installation.
They confirmed that it is not a building code issue.
I inspected the property on 10-8-98 and found numerous areas that lack caulking.
The City will deal with the mechanical contractor on issues related to their permit.
Telephone (612) 473-7357 9 FAX 4734510
Roger Olson, Rko Builders
October 12, 1998
Page 2
The roof vents are somewhat obstructed but where installed per code.
The septic system on this property has been inspected by the City several times since
the system installation. Due to saturated soils at the base of the mound, we asked
you to regrade the yard to drain surface water away from the mound as well as the
septic tanks. The work was completed and some of the excess soil was placed at the
base of the mound because it was a low spot in the yard which collected drainage
water. Recent inspections of the system indicate that it is functioning property.
The homeowner claims that the system is not compliant and must be replaced. As
per my previous letters,the system may not be sized to the exact dimensions on the
system designs, but it does appear to meet the minimum standards set forth in the
Minnesota Rules,Chapter 7080 and the Orono Municipal Code. It may be beneficial
to add more sand to the base of the mound, but it could also be a detriment as the
sand and topsoil must be carefully matched to the existing materials and the addition
must be given time to settle prior to heavy doses of sewage being added in these
areas. As the system is functioning properly and meets the City and State standards,
we recommend no changes be made to the system at this time.
Therefore, the only issues for you to correct are the front stoop and the chalking. These must be
corrected before 10-26-98 to prevent legal action. If you have any questions please feel free to
contact me at my office.
S' rel ,
Lyl Oman
Building Official
LO/jlg
cc: Bruce L. Vang,Field Inspector
Steve Weckman, On-Site System Manager
Mike&Lori Ame, 125 Truffula Trail, Orono, MN 55356
encl: Uniform Building Code 109.1
Letter from Masonry Contractor
10-8-97 letter from City of Orono signed by Roger Olson
1994 UNIFORM BUILDING CODE 108.5.2-109.2
prior to inspection.All materials for the foundation shall be on the job,except where concrete is
ready mixed in accordance with U.B.C.Standard 19-3,the concrete need not be on the job.Where
the foundation is to be constructed of approved treated wood,additional inspections may be re-
quired by the building official.
108.5.3 Concrete slab or under-floor inspection. To be made after all in-slab or under-floor
building service equipment,conduit,piping accessories and other ancillary equipment items are in
place,but before any concrete is placed or floor sheathing installed,including the subfloor.
108.5.4 Frame inspection. To be made after the roof,all framing,fire blocking and bracing are in
place and all pipes,chimneys and vents are complete and the rough electrical,plumbing,and heat-
ing wires,pipes and ducts are approved.
108.5.5 Lath or gypsum board inspection. To be made after all lathing and gypsum board,inte-
rior and exterior,is in place,but before any plastering is applied or before gypsum board joints and
fasteners are taped and finished.
108.5.6 Final inspection. To be made after finish grading and the building is completed and ready
for occupancy.
108.6 Special Inspections. For special inspections,see Chapter 17.
108.7 Other Inspections. In addition to the called inspections specified above,the building offi-
cial may make or require other inspections of any construction work to ascertain compliance with
the provisions of this code and other laws which are enforced by the code enforcement agency.
108.8 Reinspection. A reinspection fee may be assessed for each inspection or reinspection
when such portion of work for which inspection is called is not complete or when corrections called
for are not made.
This subsection is not to be interpreted as requiring reinspection fees the first time a job is rejected
for failure to comply with the requirements of this code,but as controlling the practice of calling for
inspections before the job is ready for such inspection or reinspection.
Reinspection fees may be assessed when the inspection record card is not posted or otherwise
available on the work site,the approved plans are not readily available to the inspector,for failure to
provide access on the date for which inspection is requested,or for deviating from plans requiring
the approval of the building official.
To obtain a reinspection,the applicant shall file an application therefor in writing on a form fur-
nished for that purpose and pay the reinspection fee in accordance with Table 1-A or as set forth in
the fee schedule adopted by the jurisdiction.
In instances where reinspection fees have been assessed,no additional inspection of the work will
be performed until the required fees have been paid.
SECTION 109—CERTIFICATE OF OCCUPANCY
109.1 Use and Occupancy. No building or structure shall be used or occupied,and no change in
the existing occupancy classification of a building or structure or portion thereof shall be made until
the building official has issued a certificate of occupancy therefor as provided herein.
EXCEPTION:Group R,Division 3 and Group U Occupancies.
Issuance of a certificate of occupancy shall not be construed as an approval of a violation of the
provisions of this code or of other ordinances of the Jurisdiction.Certificates presuming to give au-
thonty to violate or cancel the provisions of this code or other ordinances of the jurisdiction shall not
be valid.
109.2 Change in Use. Changes in the character or use of a building shall not be made except as
specified in Section 3405 of this code.
1-9
i
C O N S r R U C T / O N / N C .
141 Depot Drive,Wotonia,Minnesoto 55387 612-442-9767 fox 442-4499
October 1, 1998
Roger Olson
RKO Builders
3134 130th Ave N.W.
Coon Rapids, MN 55448
Dear Roger,
I met with Mr. & Mrs . Mike Arne on September 29th, to inspect their
front stoop at 125 Truffula in Orono.
It is evident that there is a structural problem that needs to be
corrected. We were instructed by you to pour the stoop around the
wood post. You instructed your brick contractor to place his brick
work atop the concrete porch. Both of these procedures are used
many times successfully, but are not recommended practice.
I feel that it is fair that the three of us share in the cost of
removal and replacement of the stoop and whatever brick corrections
are required, to either brace and add to the bottom of the brick
columns, or completely remove and rebuild the brick work. Mr. Arne
indicated that this worst case scenario would cost approximately
$4000.00
Please contact me as soon as possible to align this solution
B t Regards
i Knodt
cc:Mr. & Mrs. Mike Arne