HomeMy WebLinkAbout1999-011260 - htg/ac/vent PERMIT -
CITY OF ORONO PERMIT TYPE:
` 2750 Kelley Parkway - P.O. Box 66 ."H MEC N i t*"f
Crystal Bay, Minnesota 55323 Permit Number:
Date Issued:
(612) 473-7357
SITE ADDRESS: T
fRi"'IFFULA CR
C.H
T hi
DESCRIPTION:
i jJ4 ATIN =y,:TEt1: FLI_!E S IZ_ C+1'r FUDE1.-
s- NATURALG S
MCIEL
i U T i'J T , ii is INPUT
raTR:' �,,::_iNF)_€ TTf_it,j f` ii M4,&.*F t:AT�ih° �,�; Mi1�i�L � T�;�#r,:F.
�'Etl'Is Tr.Ff-I
REMARKS:
FEE SUMMARY:
c,a• � Fe= .114 . r•-! t"1n � IN __.____ _�_���a3
•JuI 3-! I• � '._'�_= ... q�7��'s:min f L,3�•.•;.1 '. :-•`
._
}� v •9+�i4 'tiri i
CONTRACTOR: - ; op i i z a. t. - OWNER:
CHIT f Lid INC .4789c 83 A . ►:,is VELs `t1EMT
t"1 0 I NA MN =,4t:! W'-iY•=ATA [IN 5 5:_9 i
THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL IM'R�J,' E T :
SPECIFIED AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL IT'S OF
ORONO ORDINANCE`.; AND S 1"A i E OF M I NNEso,€A BUILDING CODE REV I RE TENT J
APPLICANT,PERM ITEE SIGNATURE ISSUED BY:SIGNATURE �,
CITY OF ORONO APPLICATION FOR NIECHANRb�Il M
Box 66 (2750 Kelley Parkway)
Crystal Bay, NIN 55323 FEB 12 1999
GENERAL INFORMATION CITY OF ORONO
1. You may apply for mechanical permits by mail or in person at the City offices. Applications will be
reviewed and a permit will be issued within 2 working days.
2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID
UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS
POSTED ON THE JOB SITE.
3. Mechanical Designs - Complete calculations, details and specifications are required for each heating,
ventilation, humidification-dehumidification, and air conditioning installation including heat loss/heat gain
calculation, design temperatures, equipment ratings and identification as to type, manufacturer and model.
Data shall be presented on form provided. Identification of and specifications for water heating equipment
shall also be provided.
4. When any new construction or remodeling is involved, a separate building permit must be obtained.
5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code
requirements.
6. All work must be inspected (rough-in and final). Call 473-7357. 24-hour notice required.
7. House Heating Test Record must be submitted before final.
Instructions Complete all items on this application. Compute the permit fee. Sign and date the certification.
INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call 473-7357.
Please check one: New Addition Repair Replace
Residential Commercial
JOB SITE: L�O7(�FIA Zip:
Owner's Name: '5� v O" Telephone Number: y 7 3
Mailing Address: _ o -s'o City: �61�_ 'u Zip; -
Contractor's Name: D, itEL NC— Telep one Number: ? -
Mailing Address: g o Lff 2 City: F L Zip: 5 �.3�
SYSTEM DESCRIPTION
HEATING SYSTEMS '
Quantity:
Make:
Model: 58WA Voq
Fuel: �j-6;43
Flue Size: "
Input BTUs: OGD
Output BTUs: 7/,060
CFM: I�GDD
COOLING SYSTEMS
Quantity:
Make: (L«7Z
Model:
Tons: 3
H. Power
WOOD BURNING EQUIPMENT
Wood stove with flue
Wood combination or add-on
Factory fireplace with flue
Factory Fireplace (s) Freestanding .Masonry
Wood Stove (s) Franklin, other
Brand Name Model No.
Mfgr's Min., Clearances, side rear min. flue dia.
VENTILATION
No. Kitchen Exhaust r/ducted recirculating !� cfm
No. Bath Exhaust (must be ducted outside) 5Z cfm .
No. Other Fans: Locations cfm
FUEL STORAGE (MUST BE APPROVED BY FIRE MARSHAL)
Installation Removal
Fuel oil: gallons underground inside outside
LP Gas: gallons
Other Gas opening
PERMIT FEE CALCULATION
1. 1.25% of Contract Price* or Minimum Fee ($35.00) Q
0'— . x .0125 $ ��•
(contract price)
2. State Surcharge. ** Add the State Building Code Division S
Surcharge to each permit. -'f(J 3 — x .0005 $
or $.50, whichever is greater (contract price)
3. Postage and Handling (Only mail-in applications) $ 1.50 _
4. TOTAL PERMIT FEE (Add lines 1-3 above) $ �
* CONTRACT PRICE or JOB COST means the actual or estimated dollar amount charged for the permitted
work including materials, labor, profit, and other fixed costs. It is the amount to be charged to the
customer for the work done. If any material, equipment, labor, or installation are furnished by the owner,
tenant or any other party the reasonable market value of such items must be added to the estimated cost
or contract price for permit fee purposes. In the event that there is a dispute on the amount of the job cost,
the City may request the submission of a signed copy of the actual contract.
** The STATE SURCHARGE is .0005 of the contract price under $1,000,000 or $.50 - whichever is
greater. For valuations over $1,000,000 call the Department of Inspectional Services for the price.
The undersigned hereby applies to the City for issuance of a Mechanical Permit, agrees to do
all work in strict accordance i e ordinances of the City and the regulations of the Minnesota
State Building Code, and c Mies t all state ents made on this application are complete, true
and correct. /
Applicant's Signatur : Date:
i
Approved By: _ Date: lb'
RHVAC-Residential 8 Light Commetclai HVAC Lbada Program Elita aat'twaro be0loptrmant,ihe.
Ditter,Inc. 2-9-s9 A T 1360loprmnt
Hamel,MN 55340-9691 page 2
Project Summary
Project: A&T Development Company: Ditter Inc. Cooling & Heating
Client: A&T Development Representative: Doug Bjork
Address: 40 Truffla Trail Address: 820 Tower Drive
City: Orono, MN. City: Hamel, MN. 55343
Phone: Phone: 478-9558
Fax: Fax: 478-2426
Comment:
Design Data
Project Name: A&T Development
Reference City: Minneapolis, Minnesota
Daily Temperature Range: Medium
Latitude: 44 Degrees
Elevation: 834 Feet
Elevation Sensible Adj. Factor: 1.000
Elevation Total Adj. Factor: 1.000
Outdoor Outdoor Indoor Indoor Grains
Dry Bulb Wet Bulb Rel.Hum. Dry Bulb Difference
Winter: -20 N/A N/A 72 N/A
Summer: 95 75 50% 75 36
Check Figures
Total Building Supply CFM: 1154 CFM per square foot: 0.769
Square feet of room area: 1,500 Square feet per ton: 562.591
Building Loads
Total heating required with outside air: 66,103 Btuh 66.103 MBH
Total sensible gain: 24,636 Btuh 82 %
Total latent gain: 5,372 Btuh 18 %
Total cooling required with outside air: 30,008 Btuh 2.501 Tons(based on sensible + latent)
2.666 Tons (based on 77% sensible capacity)
Notes
Calculations are based on 7th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
Tuesday,February 09,1999