HomeMy WebLinkAbout1999-011524 - new septic PERMIT
CITY OF ORONO PERMIT TYPE:
2750 Kelley Parkway- P.O. Box 66WA
4Lj ,
Crystal Bay, Minnesota 55323 Permit Number:Date
_
612 473-7357 Date Issued: �- ���'�
SITE ADDRESS:
t:
DESCRIPTION:
� 7.ej Permit Type { ._e f 4
.s?� r :�wi .F•�1' lsi{ {t'�:: !yp* F:F:_;j%Ft;{i:F
REMARKS:
i+i��?4y'_ '( —�'L iii l it .ilf= ;t`;_ =;^:{i is A.'j 'i JE+`I . 4�{I T t{�_�+_sT PERF,� 1+!_ d s �_� = — j�f 11
_ _ _ T 4'_� •E•H
1 :-:_�t F ) �p H I i:r !;r[. _! }Y:i'•j l:i? tC E•:i `i`EY �'�=�r1 C E; C f AND 1 d � _0 [)j?';:'-: T(•3 A 1-
FEE SUMMARY:
Trjt-t1 __—__-- =t_{ mac`{
CONTRACTOR: - ' l i w?;t. - _,T • i z: . OWNER:
1 ° is rel'? t'I`•?t ': !_T f!'4�7 _ _f [v_ {1 V=1 t_:•!_! iJ `I I
C f s - - - --
G,
- `,
THE UNDERSIGNED HEREBY REQUE S rS PERMISSION TO MAKE TNIE REAS.. 110ROVEMENTS '
SPECIFIED AND AGREE'-; TO DO ;ALL W rF,`K� IN STR-ICT COMPLIANCE WITH_,ALL CITY OF"
ORONO ORDINANCES AND :k TA T E- QF MINNESOTA BUILDING CODE' RE(;'V'f€i MEET
L_
APPLICANT/PERMITEE SIGNATURE ISSUED BY:SIGNATURE
V
CTI'Y OF ORONO SEPTIC SYSTEIMPER1tiIITAPPLICATION
Box 66 (2750 Kelley Parkway)
Crystal Bay, Nh t 55323 =
JOB SITE ADDRESS:
Occupancy Type: Residential`_
Commercial Other
Permit Type: New or Replacement System, $100.000
Repair Existing System, $ 50.00
(Tanks or Drainfeld)
0.50 State surcharge added to above fees
'"See fee schedule for non-residential permit fees
Owner's Name: ("D- I r PhoneN ber:
IVla fling Address: - S X _ 1 City: * gyp: 55
Contractor's Name. -�f---- PhoneN
lylailing Address: 2 5 City-. p:
DO NOT 11MIL pAYN-JENT NVITH THIS APPLICATION
C'ENERAL h STRUCTIONS
is s permits be mailed or submitted in person at the City1, Applications for sept system p may
Offices; however, permits will not be.mailed out. The permit must be picked up in
person at the City Offices and work must not begin unless the permit card is on the job
site.
2
• Permits will be issued only to contractors holding a City of Orono Septic System
�
Installers License.
be done in accordance with the approved septic system design. Desig
3. All work must n
reports are not considered approved unless accompanied by the City of Orono Septic
System Approval" cover sheet signed by the City Inspector.
4. The inspections will be required for all septic systems: d actor.
A. Pre-installation site inspection to include inspector, installer, an general contr
B. Tank installation prior to covering. Q inspection is required
C. Drainfneld trench installation prior to covering. For mounds, insp
after rough-up but prior to sand placement (sand will be jar tested for silt conteLl
and Final-inspection
during pressure distribution piping installation in trock bed
• station
D. al inspection to verify proper final cover depths and to verifythat all pump
(where required) components are functional and comply with codes.
5. Individual holding WCA Installer Certificate shall be present during inspections: A 24-
hour notice is required for all inspections.
NOTE: 'Applicant must initial all spaces. Fill is all appropriate blanks, check all appropriate
boxes.
1. I have received a copy of the system design including the City of Orono
Septic System Approval Cover Sheet.
.2. I will be'installing the following: '
A. Tanks: precast Concrete Other Manufacturer
Tank Capacities: 1).L�1 gal. 2) /006 gal. 3)X75 gal..'
B. Pump Station (if required)
Pump make & model (attach pump curve &
literature); system design requiresgpm at _j:1-- feet of head.
High water alarm make & model Outside
• ' electrical work to be completed by installer electrician
other Inside electrical work must be completed by
electrician.
C. Treatment System:
Trenches: _ s.f. - Mound
Depth of rock below pipe Rock bed dimensions /b 'x Com'
Drop Boxes Sand bed dimensions /,x 9� -
Distribution Box Pressure Dist.,Pipe Dram. "
Maniford Pipe Diam. "
D. Final Cover/Topsoil to be: borrowed from site
(show location on site plan)-
trucked in
The undersigned hereby applies to the City of Orono for issuance of a septic system installation
permit, agrees to do all work in strict accordance with the ordinances of the City and the
regulations of the State of Minnesand c 'f
t
are complete, true and correct: es ata all statements made on this application
�F �
SignacureofApplica �-•� �� ti�Date:_ ��—/�22
MPCA Certification No.: -
Staff Review: Appr v Denial
Reviewer:
. Date:
Reason for Denial:
r .
SITE EVALUATION REPORT
FOR ROBERT F. SUESS
IN THE WEST HALF OF THE SE 1/4 of' SEC. 33-118-23
HENNEPIN COUNTY, MINNESOTA
9-4-91
On August 26-27 , 1991 two lots were tested for septic systems
in the areas shown on the attached drawing . .Both lots had fairly .. ,
good percolation rates but possible high seasonal water tables
which would require that pressure mound systems be used.
Lot 1 had an average percolation rate of 12 . 5 minutes per
inch while Lot 2 had an average rate of 15 . 8 minutes„ per inch.
Once plans are available for a proposed house, a complete
system design will be needed. Soil boring and percolation data
follow. If any other information is needed, please contact me.
Sincerely,
PERCOR, INC.
Mark S . Gronberg
.'_.. . ..
PERCOLATION TEST DATA SHEET B-39
Test hole location X0,YT. f0657 (ICGT /) Hole number Lv
Ti
�-' Date test hole was prepared_, - � ) Depth of hole bottom, inches.
Diameter of hole, �_ inches.
Soil data from test hole:
Depth, inches Soil texture
I3L� cl: L oAM
/4 �� /8,�. C3►PD Cv/V G L I�,t .L.0�}/�1
Method of scratching sidewall
Depth of pea-sized gravel in bottom of hole, inches.
Date and hour of initial water filling g- 2y/
Depth of initial water filling,
_ inches above hole bottom.
Method used to maintain at least 12 inches of water depth in hole for at least
4 hours
Percolation test readings made by AQP /L/ �� /� ,,�,� �;��
on
S'-?7 - 9/ starting at a.m.Maximum water depth above hole bo n;
(date) to
p t
during test, inches.
Time
Percolation
colaY
tion
Time Interval, Measurement, Drop in water rate, '
Remarks '
Minutes inches level, inches miYiutes 'per
inch
& L
N S
A.
d -- c 1/0 212-
12
It 11
Percolation rate_ minutes per inch-:-- .•
B-39
PERCOLATION TEST DATA SHEET
Test hole location Apv -. f HErf .e"or /
Hole number 1dz��
Date test hole was prepared g-7 G- Depth of hole bottom,-/�— inches.
Diameter of hole, —�— inches.
Soil data from test hole:.
Depth, inches Soil texture
Method of scratching sidewall -s-�,,� �,c&
Depth of pea-sized gravel in bottom of hole, inches.
Date and hour of initial water filling f -2 L - y 2 5"f0 M
Depth of initial water filling, G _ inches above hoNle bottom. J
Method used to maintain at least 12 inches of water depth in hole, for at least
4 hours - - /-
Percolation test readings made by p ON 6,e ,-'ti 1 fkl' on
�".27- / starting at -2 a.m.
(date) g —m. Maximum water depth above hole boFtoin
during test, inches.
Time .Percolation
Time Interval, Measurement, Drop in water rate, Remarks
Minutes inches level', inches minutes per
inch...
1022
. i
r
D , S r J 11
ILS21 1 1' 1 17i*
r 7 ! ► I ^
12. 22
► . It �t
Percolation rate = _ minutes per inch.,
B-3.9
PERCOLATION TEST DATA SHEET
Test hole location fyt(:_rf
�-' Date test hole was prepared S--2/__a �_� Depth of hole bottom,_ inches.
Diameter of hole, 4_ inches.
Soil data from test hole: "
Depth, inches /Soil texture'.
Z�Pv
Method of scratching sidewall
Depth of pea-sized gravel in bottom of hole, inches.
Date and hour of initial water filling
Depth of initial water filling, inches above hole bottom. !
Method used to. maintain at least 12 inches of water depth in-hole for at least
4 hours k:!/C/ ILL
Percolation test readings made by n,1+ fr ,/'zi, on,
starting at .- g /�, Maximum"water depth above hole bottom
(date) m.
during test, 12 inches.
Time Percolation
Time Interval, Measurement, Drop in water rate, Remarks
Minutes inches level, inches minutes per
inch
P.SOOL
2310r �
Percolation rate = minutes per inch.
B-39
PERCOLATION TEST DATA SHEET
Test hole location jw' r (tce' �, tio]�e; number L� -/ � ��-Li
� < Date test hole was prepared - ZDepth of hole bottom,
16 inches.
Diameter of hole, inches.
Soil data from test hole:
Depth, inches Soil.-texture.
0 ' 12Lie.-K 4- o0el
Method of scratching .sidewall SG/lA CII £/e
Depth of pea-sized gravel in bottom of hole, 2 inches.
Date and hour of initial water filling '
Depth of initial water filling, lG inches attove• hole bottom.
Method used to maintain, at least 12 inches of water depth in hole for at least .
4 hours
Percolation test readings made by L!O/1I (rf r Alf j'CR 11 on
9 ' 27" 9/ starting at Q :J ='=-.+ Maximum' water' depth above hole bottom
(date) S
during test, Q inches. '
Time Fercolation
Time Interval, Measurement, Drop in water r.4te, , Remarks
Minutes inches level, inches minutes per
inch
1. L
Q r� r
1 � 1 7 C r r
1 � 1 ►
Percolation rate 21 2 minutes per inch.
B-39
PERCOLATION TEST DATA SHEET
Test hole location ,QOB�� yaefJ' (tor )
Hole. number Lp7- /VL �'•
�- ' Date test hole was prepared Q- 2 (�- 9 1 Depth of hole bottom, 12 inches...
Diameter of hole, _ inches.
Soil data from test hole:
Depth, inches Soil texture
i1M t.
Method of scratching sidewall
Depth of pea-sized gravel in bottom of hole, inches.
Date and hour of initial water filling --�(a - �l/ aS PI/I ,
Depth of initial water filling, / 8 inches, above hole bottom.
Method used to maintain at least 12 inches of water' depth in hole for at least..
4 hours
�f, LL
Percolation test readings made by -Do" raewb t R�- on
Aa
starting at Maximum water depth above hole b'' +om
(date) —p:m.
during test, / inches.
Time P.ercolecibn
Time Interval, Measurement, Drop in water rate, Remarks
Minutes inches level, inches minutes per
inch
14
� L
01► N 73re
Percolation rate = . 1. 3 9 minutes per inch.
B-39
PERCOLATION TEST DATA SHEET ^'
Test hole location /fqr, f 4i:ff LLa r �) Hole number--/— vl
Date test hole was-prepared Depth of hole bottom _ inches.
Diameter of hole, __' inches.
Soil data from test hole:
Depth, inches Soil texture
lo Am
Method of scratching sidewall
Depth of pea-sized gravel in bottom of hole, 2 inches.
Date and hour of initial water filling -,k-2G
Depth of initial water filling,
/ 6 inches above hole bottom.
Method used to maintain at least 12 inches of water depth in hole for at least .
4 hours RL f / L /
Percolation test readings made by _12p/V 5-K0AiL/f'G-. . on
a.m.
$--2� - Cf 1 starting at C'� ...�� Maximum water depth above hole bottom
(date) m.
during test, / inches.
Time Percolation
Time Interval, Measurement, Drop in water rate, Remarks
Minutes inches level, inches minutes, per
inch
2 lot
L..
� l
D 11 / 2
1LJ
I 1 ) I 2 11
Percolation rate = minutes per inch.
Logs of Soil Borings 1i_1S
Location .or Project lad 7-, J'u E.r r �ear' /
Borings made by 1 ,� ':a. — Date --- --
Classification System: AASHO USDA-SCS Unifi-ed other
:Auger used (check two) : Hand ( or Poorer Flight.,,.. . ,,._ox. Bucket ; other
Depth, Boring, number'4o7- Dopth, Boring. number
in Surface elevation r in Surface elevation
feet feet
n --- -- ------ o
0A tj
?Rowlu e-LAY Load Li To ak, e-LA
tj
&M 20 8R,cL, toAM
3 — 3 ---
f140TA11n' LT, &,CL L#JM CLAY" cohm
4 — 4 CobRSG SAND' 4 —
5 — 5 --
6 — G —
7 — 7 —
8 — g
End of boring at _— feet. End of bgring a,t . , feet.
Standing water table: Standing water table: 4
Present at feet of depth, Present at feet of- depth ,
hours after boring. hours after borim,-
Not present in boring hole �—. Not present 'in bor.ins! hole
Mottled soil : Mottl'cd soil:
Observed at ?' 'r feet of depth. Observed at"
- Z_� feet of det�th. I
110t present in boring, hole _ tiot present in borim, hole I
Obsurvations and comments' Observations_and cotmnonts:
Logs of Soil Borings li-lII
Location ,or Project hdlg, .IfGr elf r
13orinps made by ��L67--kON, — __--- nate -
Classification System: AASHO USDA-SCS _—; Unified other
;. Duper used (check two) : Hand yam, or Power Flight T, or Bucket other
t... .
Depth, Boring, number ' j�� _ Depth, Boring number
in Surface elevation in
feet feet Sur,fac'e -elevation _.--
n --- - ---
QL.�cK
1 _ y c-L Lo w
CL4
..—
lo.411 —
1.04113
8A QIP,CL, L,odly
4 — GREY IL81P, Ct LaAh 4
— 6 _
7 — 7
8 — 8 —
End of boring at feet. End of•• bo"rinn at feet.
Standing water table: Standing.. water table: -
Present at feet of depth, Present at " feet of. depth ,
hours after boring. hours after horinR.
hot present in boring hole _. Not present 'in bor.in�! hole
c I
Mottled soil : Mottled soil:
Observed at 2-5 feet of depth. Observed at `"'Feet- of depth. •. I'
vot present in boring hole Not present in boring hole
Observations and comments: Observations•and comments:
.i
SEPTIC SYSTEM INFORMATIQN--/
STREET ADDRESS
LOT ' BLOCR SUBDIVISION
MONTH AND YEAR TESTING DONE
ITEMS ALREADY COMPLETED 3,Ah,ez I alfev-naj�, da2a�4- 21d
dd Z and
S
S
'4�A 4v L2�efj
0V� a Q
e s) sly
NEED TO COMPLETE BEFORE ISSUING BUILDING PEIRMIT
OBORINGS
OPERC TESTS
SYSTEM DESIGN
SITE PLAN O�1'\ 24il= oo r-\
L/
O OTHER
OCOMMENTS
DATE THIS SHEET FILED
SUBDIVISION FILE NO.
---
EV- Com/ DATE TIME
CITY OF ORONO CALLED IN
INSPECTION NOTICE SCHEDULED
PERMIT NO. COMPLY ED 1
rad J �Ik / T ,.or•�
ADDRESS -rz:J .
OWNER CONTR. Y`
TELEPHONE NO. 412- 7 -1 /0
DESCRIPTION en47G
01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING
U4_ 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
h
O 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
07 DEMO-SITE 27 SEP 21 COMPLAINT
07 DEMO-FINAL EPTIC I 22 FOLLOW-UP
09 PLUMBING RI 2 IC FINAL 35 HARD COVER REMOVAL
v 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
OWNERICONTRACTOR TO MEET YOU-_YES_NO
COMMENTS:
ar
cc i
cc
ULCr
C
a"lip YI
Z
W
W
a
LU RK SATISFACTORY.PROCEED ❑ PROJECT COMPLETE
cc
W /❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR ❑ CITATION ISSUED
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance.473-7357
Owner/Contract e•
Inspector.
White CopyllnspectoPs File Canary Copy/Site Notice
DATE TIME
CITY OF ORONO CALLED IN
INSPECTION NOTICE SCHEDULED
PERMIT NO. C MPLETED VOCY
ADDRESS
OWNER CONTR.
TELEPHONE NO.
DESCRIPTION
eo-0-9/n kV
01 FOOTING 11 MLWANICAL Rif 18 EXCAWGRADING/FILLING
Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
y 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
07 DEMO-SITE 27 SEPTI INT. 21 COMPLAINT
07 DEMO-FINAL TIC INST 22 FOLLOW-UP
09 PLUMBING RI PTIC FINAL 35 HARD COVER REMOVAL
v 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
OWNERICONTRACTOR TO MEET YOU: YN NO
y COMMENTS:
cc
W
a
0
W
Q
Z
W
W
VORKSATISFACTORY:PROCEED 11PROJECTCOMPLETE
RRECT WORK&PROCEED ElISSUE CERTIFICATE OF OCCUPANCY
❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
OU BEFORE COVERING
PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR
❑ CITATION ISSUED
❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the neo t inspection 24 hours in advance.473-7357
OwnerlContra
Inspector.
White opylinspector's File Canary CopylSite Notice
D�1T IME
CITY OF ORONO CALLED IN �-�jp
INSPECTION.NOTICE SCHEDULED
PERMIT NO. zg� MPLET
ADDRESS
OWNER CONTR.
TELEPHONE NO. _—L
DESCRIPTION
4 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING
Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
y 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
07 DEMO-SITE 27 SEPTI T. 21 COMPLAINT
v 07 DEMO-FINAL PT IC INSTAL 22 FOLLOW-UP
i09 PLUMBING RI 23 SEPTI 35 HARD COVER REMOVAL
v 10 PLUMBING FINAL.,. 36 FOUNDATI N/REMOVAL
Z OWNERICONTRACTOR TO MEET YOtb_YES�O
COMMENTS:
W
cc -49
C �
J
O
W
cc
Q
Z
W
Z
W
CC
LU WORK SATISFACTORY.PROCEED ❑ PROJECTCOMPLETE
rc
W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
0 El CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTOTAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR
❑CITATION ISSUED
❑INSPECTION REQUIRED.CALLTO ARRANGE ACCESS.
Call for the next 1 spection 24 hours in advance.473-7357
Owner/Contractor
f
Inspector.
White Copylinspector's File Canary Copy/Site Notice
DATE d TIME
CITY NO CALLED IN 1-1 felm
INSPECTION
NOTICE SCHEDULED
PERMIT NO. /l COMPLETED
ADDRESS
OWNER CONTR.
TELEPHONE NO.
DESCRIPTION 1
01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING
Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
y 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
07 DEMO-SITE 21 COMPLAINT
v 07 DEMO-FINAL LL 22 FOLLOW-UP
09 PLUMBING RI 23 S 35 HARD COVER REMOVAL
v 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
Z OWNERICONTRACTOR TO MEET U:_YES NO n(J l
to COMMENTS:
LU
CL
J �-
O
c 7
O
W
W
W
Q
Z
W
Z
W
Z3
O
W ❑WORK SATISFACTORY.PROCEED /PROJECT COMPLETE
cc ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY
W
O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
0 BEFORE COVERING PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN
INSPECTOR WILL RETURN
❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the n t'nspection 24 hours in advance.473-7357
Owner/Contractor s
Inspector.
White CopylInspector's File Canary CopylSite Notice