HomeMy WebLinkAbout2004-P08217 - mechanical .,iT� OF ORONO PERMIT
Permit Number:
2750 Kelley Parkway- PO Box 66 P08217
Crystal Bay, Minnesota 55323 Permit Type: Mechanical Permits
(952) 249-4600 Date Issued: 11/22/2004
SITE ADDRESS: 1335 Tonkawa Rd
Wayzata,MN 55391
PID: 08-117-2342-0011
DESCRIPTION:
Proposed Use: Residential
Permit Class: General
Permit Type: Mechanical Permits Permit Sub-type(s): Multiple Mechanical Items
DETAILS:
Approved per resolution#:
Separate permits required:
NOTICES/REMARKS:
Also air cleaners,humidifiers,venting,air exchanger
FEE SUMMARY: Permit Fee: $ 337.50 Valuation: $ 27,000.00
State Surcharge Fee: $ 13.50
TOTAL FEE: $ 351.00
APPLICANT: Vogt Heating&Air Conditioning OWNER: James D Render
3260 Gorham Ave 1315 Tonkawa Rd
St.Louis Park,MN 55426 Wayzata,MN 55391
THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL IMPROVEMENTS SPECIFIED
AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL CITY OF ORONO ORDINANCES AND STATE OF
MINNESOTA BUILDING CODE REQUIREMENTS.
APP ANT PERMITEE SIGNATURE JUEDBYSI NATURE
Conies: 1-File(Sienitures Required), 1-Applicant, 1-Monthlv Reports, 1-Assessine, 1-Finance Page 1
t
CITY OF ORONO APPLICATION FOR MECHANICAL PERMIT
Box 66 (2750 Kelley Parkway)
Crystal Bay, MN 55323
GENERAL INFORMATION
1. You may apply for mechanical permits by mail or in person at the City offices. Applications will be
reviewed and a permit will be issued within two working days.
2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID
UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS
POSTED ON THE JOB SITE.
3. Mechanical Designs -Complete calculations, details and specifications are required for each heating,
ventilation,humidification-dehumidification, and air conditioning installation including heat loss/heat
gain calculation, design temperatures, equipment ratings and identification as to type,manufacturer and
model. Data shall be presented on form provided. Identification of and specifications for water heating
equipment shall also be provided.
4. When any new construction or remodeling is involved, a separate building permit must be obtained.
5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code
requirements.
6. All work must be inspected (rough-in and final). Call(952)249-4600. 24-hour notice required.
7. House Heating Test Record must be submitted before final.
Instructions
Complete all items on this application. Compute the permit fee. Sign and date the certification.
INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call
(952) 249-4600.
Please check one: New ❑ Addition ❑ Repair ❑ Replace ❑ Residential ❑ Commercial
JOB SITE: Tan Zip: 553t��
Owner's Name: Phone Number:
Mailing Address: City: Zip:
Contractor's Name: ( Phone Number: 4o -�p7�0
Mailing Address: City: �- Zip:
1
. t
SYSTEM DESCRIPTION
HEATING SYSTEMS
Quantity: Q
Make: �1.
Model: c(o-ia xA- AAV�U�,53)3XA
Fuel: c�s
Flue Size:
Input BTUs:
Output BTUs: lD
CFM:
COOLING SYSTEMS
Quantity:
Make:
Model: ��' L
Tons: ?
H.Power 1' n
FIREPLA Ese.�� ("1 tC C PLIJI,�j J7 �VP C1� PV V-5 �pC,t`v:
GAS LINE ONLY
❑ Gas factory fireplace ❑ Installing a Gas Line Only
❑ Wood burning factory fireplace with flue
❑ Wood Stove
❑ Wood stove with flue
Brand Name Model No.
VENTILATION � X 6 o a(o A{� ` (
No. Kitchen Exhaust duct recalculating cfm
No.—Z Bath Exhaust(must have duct outside) cfm
No. O er Fans: Locations cfm
FUEL STORAGE (MUST BE APPROVED BY FIRE MARSHAL)
❑ Installation or ❑ Removal
❑ Fuel oil: gallons ❑ underground ❑ inside ❑outside
❑ LP Gas: gallons
❑ Other Gas opening
2
r '
rt.
`Y
PERMIT FEE CALCULATION(S)
2002 State Statute ❑ Yes This Section Applies
The replacement of a Residential fixture or appliance that meets all three of the following requirements:
1) Does not require modification to electrical or gas service.
2) Has a total cost of$500.00 or less; excluding the cost of the fixture or appliance:
and
3) Is improved, installed or replaced by the homeowner or licensed contractor.
Skip next section; Cost of Permit $ 15.00
State Surcharge $ .50
Mail-In Fee $ 1.50
If above does not apply, follow guidelines below:
1. Contract Price* is .0125% of job with a Minimum Fee of($35.00)
- x .0125 $ 331.5
(contract price) (minimum$35.00)
2. State Surcharge. ** Add the State Building Code Division a Minimum Fee of(S .50)
Cx�
x .0005 $ 13.S
(contract price) (minimum$.50)
3. Postage and Handling (Only mail-in applications) $ 1.50
4. TOTAL PERMIT FEE (Add lines 1-3 above) $ 551-W
*CONTRACT PRICE or JOB COST means the actual or estimated dollar amount charged for the permitted work including
materials,labor,profit,and other fixed costs.It is the amount to be charged to the customer for the work done.If any material,
equipment,labor,or installation is furnished by the owner,tenant or any other party the reasonable market value of such items
must be added to the estimated cost or contract price for permit fee purposes.In the event that there is a dispute on the amount of
the job cost,the City may request the submission of a signed copy of the actual contract.
**The STATE SURCHARGE is.0005 of the contract price under$1,000,000 or$.50-whichever is greater.For valuations over
$1,000,000 call the Department of Inspectional Services for the-price.
The undersigned hereby applies to the City for issuance of a Mechanical Permit,agrees to do all work in strict accordance with
the ordinances of the City and the regulations of the Minnesota State Building Code,and certifies that all statements made on this
application are complete,true and correct.
Applicant's Signature: A dva i— rRa Date: /
Approved By: Date:
3
.:..::..:...::::.:��.:;>. ...........................::.:::.:.:::::::::.:::::,.::.::,.:::,.:....:.•::?;?.::>:.::.:..::?::?.::t.>:t4»:L:.:.>::?t::: ,:.�::::.::?•;:•:;:•:::::-:::?::•:;:-i:.:-:i:?::?:•i;•i:-:.i:.i:?;•i;.i:.:;:::.::?:::::<•>:-i:.i:?•i;:::•:>:<?•i:••�.y�,,y�
.....� ��::::::....:::.::::................. �.�:::.::::::.:::•:::;:•:::•:::-:::.::.>:.::.::.::-:::::::::::::�:::::i::::.:?•:•:;;•;>:::?•isc:;:.:.:.>:.i:.:-:-i:.:.:;•:?:•::-:::::::::::.::::...::::.:::..:.
Project Report
Pro'ect F-l�•
ename: C:�Elite�Rhvacw�ProjectslRender Residence.rhv
Project Title: Render Residence
Designed By: Jim Vogelsberg
Project Date: Wednesday,June 16,2004
Company Name: Vogt Heating &Air Conditioning
Company Representative: Jim Vogelsberg
Company Address: 3260 Gorham Ave
Company City: Saint Louis Park, Mn 55426
Company Phone: 952-929-6767
Company Fax: 952-929-1764
Company E-Mail Address: jim.vogelsberg@serviceexperts.com
.:...................................
. ..........
Reference City: Minneapolis, Minnesota
Daily Temperature Range: Medium
Latitude: 44 Degrees
Elevation: 834 ft.
Altitude Factor: 0.970
Elevation Sensible Adj. Factor: 1.000
Elevation Total Adj. Factor: 1.000
Elevation Heating Adj.Factor: 1.000
Elevation Heating Adj.Factor: 1.000
Outdoor Outdoor Indoor Indoor Grains
Dry Bulb Wet Bulb Rel.Hum Dry Bulb Difference
Winter: -16 0 0 72 0
Summer: 89 73 50 75 34
. ............
.,, r:::4:. ..:. .. ..:.: .f./.::..�:.::,.::.:::.:::::::.::::.!:.rr::::::<:??:::::.ter::r•::•1:.:i•.:•:::::::::.....:.........Fr......................................r.....:..:...
r .: •... .:..F...:....:.....:.r..........,..:!r:r::.:�. :........:..ir.r...........!.r.r.i.:.,....:.:...........i................ .......r................
... ............... ...........
................. .........., ..... .r.....:..... .............::.;'::..n1..r ... ...,........r. r,4%::^:ii:fiii;tii;'%:�:ii fiii:i
.����` :v" v:l.::.:....r .,F.....rr............. Fr........f... .::/..:1.:...-�?:.::.::;......:'4y}:?'4 ./..
::nom w::::::::•:::....... ...::..::::+•:w,?•::.:.......v......, :.::
r..::w::::::.4::::::.;•.:::::::........:. !..r.::::::........./..........:l.............,.:i:4::i;•;4::......rn......:.. •::;.r....n,::::::::r•
.........................:::rn�::i:.?4i1:•iii;;:rrr.:??:v:w::::::::::::::.�:::::n�::
xii::•:}::::•4.iii.'4 i/..:roti?
:...... r........�.::::4iw:::::v::::::•,;f..::»4r.•:::r:,r:::::::.w:::r.•x::J..,:,::,:::,..r.......... ..:.....r:.�::•::.�::::•F?:•:::?4:v:;:::+414:::•:•:::-iiiii:?4i..............
Total Building Supply CFM: 2,608 (2.5 AC/hr) CFM Per Square ft.: 0.365
Square ft. of Room Area: 7,142 Square ft. Per Ton: 1,14D
:.::....................:.....::;.;.;;;:;?4;:-;:-;:-:;-:;;?-:??.i:-::•i;;i i:-;:-ii:??-i.iii:•ii:•;:-;;:.;:.;»::>:;:::>;;::>::»:<::<>»>:<:::>::>:<:»>:<:»>:<:»:<:<x?;>«:::>::>::>::»::>::»»:»:>;>::>:<:»:;:»>:::<:><:>::::;:<:;>><:»::>:<::::<:>:>«:<:::::>>::>::r:::r::>:::::<:><> M::::<::;:<:::»:<:::>::<:<::::<:::<<:
Total Heating Required With Outside Air: 138,243 Btuh 138.243 MBH
Total Sensible Gain: 56,386 Btuh 85 %
Total Latent Gain: 10,271 Btuh 15 %
Total Cooling Required With Outside Air: 66,656 Btuh 5.55 Tons (Based On Sensible+ Latent)
6.27 Tons(Based On 75% Sensible Capacity)
.. .. .:.::.rF: r.......:...:.........:...:,:,rrr:._r::.,?•.•::r::.•f:..::::::::..:::r::.r.,c::.:r:::.�.�...:......... ..................................... .................. .......... ...............:....r.:•i::.:?:?ii::::::r::::.::;:1:.:?::4:
... ...... ... .
.:'�, ..fi:r....�•:::::rJ.-ii.:ii,J.:::v::4'f..iiiii'i1�?..iiy i1.i14ii}S:i::::?-;•:irii:�/..:Jfr:r.�::.r._.:v..:..............................
l ,.;.......f...:::..:::::Fv:.�::.F.::.i.:N••;F.::-v-.:.�v:.�::.�::v::::yr,:.... ..:.............:.......................n........l..F..rr............................................ .... ........r..
ilii::.F::::?::?i:?;f,.{?:ii.{i+:.�:..n:�::.�:.•: ,3.v:i:r:v:::::-:v:;:�v:;?w:::-l-.-:•:::%.r...... r..:,:lw::........... .. ...........:.r.
...... .:...r..r................r..::::::::::::rw:::.�::::iii:??4iiiii:•iiiii:•i:•iii:tihiiiiiiiiiiiiii}i::4:•ii:•ii::??;i};?4i:•i}i:•iii:•ii:4i••i}:4iii:4ii:4;4,:.:4iii:•i?iii::-:iiiiiiiiii:•?iii�ii::.
Calculations are based on 7th edition of ACCA Manual J. .
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
".;• :>:>:<:::�i::z:>:c-::zz;>;: :;:::�;::?:>:::::::z:>:>:::z:;::::<z>;::»>:>::s>>»:»!»>:>:»::;::»::»>:>r;. :�:::::.::..::.:.::....:.:::.:r...r::{{:.ii:;:.:�:i'<::;::,�::�:.::z::<:?.z;:-;:!;z::x:::.iz::::<:::z::z::::;:
System 1 Room Load Summary
.v:•v::-.:.r,.::.�:: r:ii:is ii:i:4iii}i:iii::4:4:iiiiii:v:•:^:}ii:!::i::::v,:.:::::-:v:.�:::.�:::....�.:::::::.�.:..�::::::............................................. .. ..
::-:!•�:i'r'r.%:iii:;.y,,.r:::ry.,».,..................:.:.::::.�::::
/...... ........... ............... ....f..»v.v .....:.r..n........ ..r».......... :.err:::;...... :»:::::::. ..................... ........�::::::::.r�::::
•:::::.r-:;•:':!•:.:�.,.:J•iiiiiiYii:?::�iiyy:•}i'riY4'4:!•:!.i-{:•::::v::::::::::'vii i:4ii .. ::r.:�:::: ....... ::.�::...: ..... .�::::: ............ ........r:::-: ........ JA....
'.!!w::::: .. .......... :. .}iiiii ri::•: :::.yw:
..................................................................
v:::::::.�. :::nor•.�::::........................:..............:...........:..:.. ....v �. �r'i%iiiii!
................ ................... ......... .::::::::. v::::v.i..1[�' v?r{'!.f{?••'" ilii{iiS'..:,.: .::.
....................:......................:::r. ................ ....... .. � ..........�. .::. ,!!!!??.:?i.' }!iii: Jiilir�il..-:
.. ...nom::: ...... ....... ................!.::�:�•
J : •••......::yr:rr::»:::::::::::::::•i'•ii:•:r iiii;:i hiiii:4iiii'::?::::.}iiiii iii:{•iii:•:ilii:i:.:iiiiiiiiiiiii::::•............"::•.�:::.�•............ ----i-
r:::rn�::::::J..v..--l..r......./......:?-::.�:;r:iii:•ii:•Y-::v:n:•n::•:.�:.�:::::::::::v::.:::•...:::.�::n:v.{!!-:ii:4::::::.:::J::: :r.�.w:.�::: »:::::r{r?.i::i::.iirv:r:::::::.:f!{•i:{�?'{r:{:?ii:i:.ii:•:•iiii:iiiii:}iiiii:•iiii'ri:4ii:•iii:�iii:i{•iiii:
:::::::::::!::: .....................f.?h:4:•iii'ri::'•i:iiiii;{.::.:::::.�::v:.:�.�:::::::::..;..v::::.�:.�.:�:....::::............... ..............................n....
....::::»:.. %. :.:....... .. ....... v:r:::r. .. ... ......... .'::.;•.r•.i:;:i;:!•i. :...�v:::::iii: !'4i'f.9ii.'•i:.iii%?:iiiii}i:•iiii::..:;:•::.:
iii: .: n.....•:��•.•,r.-..v�{i:�::YfJ::i:!iiii:.�••:•.�::.:: .Y�::y:..: - :rr::.yiJ: i
:ii;:ii'.... .ih;!!!: .:.r,vr: .;?. •iii:•iii:•
.......:/....n..:...n....r.....:J.:,�i.�::::y::.......;, n.
............. F......,...:.::.::v..:;.. ........:.....�...........:...�i:::::: �iiiii'•ii!i!'... .:::::: .•
:::•;n•w;...i.........r..::......:. �...,t.....r.....
r.r.:J•:•. hw;;.i v::.ii:i::•:••:::::.�:::::.:�i•i:J.!!!•i'4iii;v:4:•i:•}yi;iry............................................................. ................r..........................
f.•ii: -:::v:::::::::v.......... ....:....... .................:........................... r. ...................
.:v:'-..i:.i'::•!: ..r....:.�:::::.�::nv.�::::r::::::::::.:i':::r:::::::::.�•i:4iiiii••%i:4:.::
iii -.'-"-i:ii ..;:.�:::y�':y.:�:{;ii:4'4:^i:ii:{•ii:!-:i:?i:W:�:ii'{.iiiii:.. •}iiiii:. ..:::. {..::�4' .: :::::::::. •�:::::::::..::..... .. .:::::: .::.:::v::::::: ..::v::vn :; :.. ... ::.............
... .. ... ..... b�'••:::::.: i :::S:r.:v,•i'La ! r. wrr... :}::ij!,�ii:. �t
...... {•;;:.;:.;:-:-iii;ii.<:.ii:.;;:-;:.;i':��:::r:::._:::.r........................... ............... ...:..:...................................
..
-Zone 1- :!,.::::::::::,.r::::::::.::::::::::..::.::::::.::::.:::::::::::::::::,:.:!.::•{.i:.:{.;:-i:.;:.:i:.i:{.:•iii;::.::.:•;;:.i:.::.;:.
1 Bedroom 1 232 3,255 55 1-6 373 1,564 589 73 1.00 73 73
2 Bath 1 126 1,206 21 1-6 84 350 0 16 1.00 16 16
3 Study/Stairs 247 4,167 71 2-6 292 2,445 200 115 1.00 115 115
4 Bedroom 2 232 2,711 46 1-6 355 1,489 542 70 1.16 81 70
5 Stairs/Hall 126 1,628 28 1-6 95 398 0 19 1.00 19 19
6 Room/Closet 468 6,747 115 1-6 388 1,625 82 76 1.17 89 76
7 Jim's Office 255 6,134 104 1-6 523 2,193 206 103 1.00 103 103
Zone 1 subtotal 1,686 25,848 440 10,064 1,619 471 495 471
-Zone 2-
8 Laundry 150 3,010 51 1-6 198 831 506 39 1.00 39 39
9 Mud Room 248 3,027 52 1-6 115 480 235 22 1.00 22 22
10 Sun 233 15,218 259 4-6 507 8,504 1,024 398 1.00 398 398
11 Kitchen 456 12,669 216 3-6 410 5,155 818 242 1.00 242 242
12 Great 472 17,549 299 5-6 462 9,690 1,294 454 1.00 454 454
13 Dining 428 7,287 124 2-6 319 2,670 518 125 1.17 146 125
14 Owner's Suite 252 6,009 102 2-6 323 2,706 795 127 1.00 127 127
15 Bath 1 240 2,302 39 1-6 282 1,180 88 55 1.00 55 55
16 Stairs/Hall 200 0 0 1-6 16 65 0 3 1.00 3 3
17 Closet 255 3,344 57 1-6 262 1,097 88 51 1.00 51 51
Zone 2 subtotal 2,934 70,415 1,200 32,378 5,366 1,517 1,538 1,517
-Zone 3-
18 Changing 280 5,350 91 1-6 184 771 118 36 1.00 36 36
19 Carpet 450 10,571 180 2-6 441 3,695 665 173 1.00 173 173
20 Family 810 9,877 168 2-6 520 4,361 541 204 1.00 204 204
21 Exercise 340 6,340 108 2-6 327 2,739 324 128 1.00 128 128
22 Bath 1 77 607 10 1-6 16 65 0 3 1.00 3 3
23 Guest 272 2,762 47 1-6 360 1,507 531 71 1.00 71 71
24 Mechanical 221 1,046 18 1-6 16 65 0 3 1.00 3 3
25 Wine 72 731 12 1-6 8 32 0 1 1.00 1 1
Zone 3 subtotal 2,522 37,284 635 13,234 2,179 620 620 620
System 1 total 7,142 138,24 2,275 56,386 10,271 2,608 2,653 2,608
3
System 1 Main Trunk Size: 44x12 in.
Velocity: 830 ft./min
Loss per 100 ft.: 0.049 in.wg
r:f..
f•
>:.. :'.. ..::. •:�i;i:.;:{.:{-;;-i....:........... :J:::r::.,r::::::::!::.�:::::::.:::.�:::::::.�:.......rr.......... f::.::•:.::•:::.�:.........: f
;'iY:::::::::::::::�ii: !'�: :�:�:� ii!;i•�: ::�"��:�:�::�:is�::i?':is�:�;�:�i:� :�:�:�:�::ii::;j!i.;:;i:-i::iir:;isiii:�i:�i!is�i:�ii:iii:�iii!iiii::ii�>::�::::i:�i:iia:�i:�i:�i:�i:�i:�ii:�i:�ii:�i:�:::>:::%�:::�::�:5:=:<:i:::::�:�:�>:�::i:;.:
•i:-i:-i:-i::c•.;;--i:.>:iri:-::-is�ii:?i.:i•.ii::••ir.{•;:-::-ii:.,..:;.::.�:.::�:::':::... ,
•::n:•.�:?-:-;':-ix-ii::!•ii:�i:-i:-i:-::-':-:::r::.•,:..:.�:::::::......:..+.•.:��-hh��,,'�� •. .i>:.i:.!.y i�.:.: .:..•.:-�::.:.:::.:.::.::::::::
................................... .:.:.................... ..:.. �io x -i::-:�:i?rf::::::.r.;:"{. :�i:.:. .:::•:-:i;.,;{.:::::::.�::::::.i':::•.r ..:
....................�y;� ................... y.5.'•:�i:fiii}iii::<::;;;::�':::;.r.......r�. ? .!;
nl'v;:.nv:•r:n•r:•v r::r:r:.:�.:.�:,v:::::::.�::::::JJ
:»•� :...r......:...:.:,b;;:::w•n.•v:.w::::::+:!;•i:•i::.�.:�...........:i:r,.w::r.:,v.::::......n..... :....nv:::nw..................n.....v.�:n�•:,�.............::.i..... .....n.....:J.f............
......... .................::•:::•::::.:v:•::::.�:::n:v:.�:w:v:w::�.�:::::::::•w:::J-v:::�i:::::::.iY.;......:::::::i.:i:r4'G'{4•:::::::i:::r....... :::y::..............J............:y:::::::::::
:::J:!!:!.{{!-:{!{%:iiY.!{!4ii:�i}%ry:•ii.{i././Jf.•?i%{{4:!-:l .. ..rr..r...................:..r....r........ r. ..x...... ............. .............nr...,.......... .r...
...r.........................:.............................. ...... ...n........................................ 1...a........:..!..........l........... ...F.J ....n.r....»r.r...f::r:nv:::n�...}iii:.y:.iii:iii:%iiii:i:i:�i::ji:;iiji;i:iwf:.�::::{4ii:•iiii:•i
i:;i:•ii:;i:;:;ii:;iii•!•i:•ii:!•is;::•i:;ii'i{ti:.•i'r'ri:•ii'.ii:::•:•iii?i:4i%ii::iiiiiii:;:;.;:••;..�.•::::::::•�w::•::::.�::::••.�•::::»
... ........;..:-.::{.........::::::::::•i, •:::..•:::ny:::::.yn:::!vn!:i:w:::::::.. •.�:.,-.:�::w:;;;..••-•:ii,•::•::••ii:i'::
.......n.n.........:....:.n....................., .»... .. 4:viiiii:4:•.........»....n......., ....:::.�::.::.:v::•:::::::::Si:•.: 4:•i rSi}:}::•iii':'{!{:.::.:::::nr n .....;....•:4i v:.......:.::....::::
............................................... ................. .... ............ .... ...........r...r....:....::...r..... .. ...»..........»:...:.::»:::..f.•: ..� :ryii::!!ry:iv:i:•iY.?!4:!4:4i}'::•i•» ..... ..
....................:................................................. ......::.;:.:?.i:.i:.;:.:ii.:i:.i:.i;:.ii;:<{::::::: ........................:.....:...: -�a�..�::::.::r:.�::::.::::::r:::.�:..�� ' ;.:
Net Required: 5.55 85%/15% 56,386 10,271 66,656
Recommended: 6.27 75%/25% 56,386 18,795 75,181
:: rJ:::::::ri::;.i,:•;:::::::::::::::::.r::::::::::r:.::::::...r....:.............:::::.f:�J:::::;::::::::.i:.;:.;:.;:<:;.:::::.<.i:!:;::i;>:..::..rr;>i:.iii:>:':::iiiii.
Heating System Coolina System
Type:
Model:
Brand:
Efficiency:
Sound: