Loading...
HomeMy WebLinkAbout2012-01191 - new structure I 11111111111111111111111111M CTY OF ORONO * 2 0 1 2 - 0 1 1 9 1 2750 LLEY PARKWAY DATE ISSUED: 02/13/2013 ORONO, MN 55356- (952) 249-4600 FAX: (952)249-4616 ADDRESS 1065 TONKAWA RD PIN : 08-117-23-13-0001 LEGAL DESC AUDITOR'S SUBD.NO.217 LOT 006 BLOCK 000 PERMIT TYPE NEW STRUCTURE PROPERTY TYPE RESIDENTIAL CONSTRUCTION TYPE SINGLE FAMILY ACTIVITY 101-SINGLE FAMILY HOUSES,DETACHED VALUATION $ 1,000,000.00 NOTE: SEPERATE PERMITS REQUIRED:PLUMBING, MECHANICAL, FIREPLACE,SEWER CONNECTION,LAWN IRRIGATION, WELL(STATE),ELECTRICAL(STATE) NOTE: A FOUNDATION SURVEY REQUIRED PRIOR TO FRAMING INSPECTION. INITIAL. NIT NOTE: CITY APPROVAL OF AN AS BUILT SURVEY REQUIRED PRIOR TO C.O.ISSUANC IIAL RECLAIM SAC FROM DEMO CREDIT 01/18/2000-PERMIT#P02963 NOTE: BE AWARE,IN THE EVENT WEATHER OR OTHER CONDITIONS PREVENT THE COMPLETION OF AN AS-BUILT SURVEY AT THE TIME THE CERTIFICATE OF OCCUPANCY IS REQUESTED,A TEMPORARY CERTIFICATE OF OCCUPANCY MAY BE ISSUED UPON RECEIPT OF A$10,000 ESCROW TO ENSURE COMPLETION OF THE AS-BUILT SURVEY AND ALL SITE IMPROVEMENTS. INITIAL: r APPLICANT PERMIT FEE SCHEDULE 5,956.75 LDK BUILDERS INC 8242 125TH AVE STATE SURCHARGE(VALUATION) 500.00 MILACA,MN 56353- TOTAL 6,456.75 (612)685-9066 Minnesota State License#: 1327 OWNER BEBO,JAMES 1065 TONKAWA RD LONG LAKE,MN 55356- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the State Building Code.This permit may be revoka�7� /�3 / C&Applmitee Signature Date lssucq By Signature Date SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE. i City of Orono Building Permit Application 1 for New Structures or Additions 0- MailiPgO Bdox 66 Permit number: - �\ 0 Crystal Bay, MN 55323-0066 Date received: Street Address:' - 1 Received by: o` 2750 Kelley Park ay / ( �L4d Plan review fee: 3W 9 Orono, MN 5535 ikEsso4` Total Fee: Main: 952-249-4600 Fax: 952-249-4616 www.ci.orono.mn.us This application form must be completed in full and all required information must be submitted. Incomplete applications will be returned. (Please print) GENERAL INFORMATION: .pub Site Address: Will this be a Parade of Homes, Remodelers Showcase Home or other Display Home? F.Yes ❑ No /f yes. a special event permit is required with Police Department and City Council approval 60 days prior to the event. Shuttle bus service will be required unless applicant demonstrates sufficient on-site parking is available. Non-permitted events will not be allowed. CONTRACTOR/APPLICANT INFORMATION: Name: State License # Expiration Date: Phone: (office) (cell) Mailing Address: City: ZIP: Contact Person: Applicant is: Contractor / Homeowner (Circle One) Email and/or Fax: PROPERTY OWNER INFORMATION: Name: L..:, Phone (day) (� 1 Z rZ/-; 2. Address: i<:2 7Y i_ �%� t,�.e /J City: J'1��it ZIP: Email and/or Fax X ;2\ N 4'� ARCHITECT/ ENGINEER INFORMATION: Name: Phone (day): Address: _ I U{�I {���� i\�r! City: 2'rL ��r` City: �� n�t •�; ZIP: r`� `) 2 Email and/or Fax: > ✓ `"7 PROJECT INFORMATION: 1.Type of Project 2. Proposed Use 3. Structure Type 4. Sewage Disposal & Water Supply ;,New Construction Single Family with Residence Addition attached garage Garage/Accessory Bldg. >;�Vublic Sewer ❑ Accessory Building ❑ Single Family with ❑ Deck ❑ Relocation detached garage ❑ Office/Commercial ❑ Private Sewer ❑ Other: (specify) ❑ Multiple Family/Condo ❑ Warehouse ❑ Public ❑ Storage ❑ Public Water "Any earth movement may require ❑ Commercial ❑ Other(specify) MCWD review& permits. ❑ Industrial ❑.Private Well Minnehaha Creek Watershed District(MCWD) ❑ Other: (specify) 18202 Minnetonka Blvd Deephaven, MN 55391 Phone: 952-471-0590 Fax: 952-471-0682 www.minnehahacreek.org Estimated Construction Valuation (excluding land) $ STRUCTURE INFORMATION: 1. Structure Dimensions 1.Structure Dimensions (continued) 2. Type of Construction a. Length (ft.)= Number of bedrooms= ❑Wood/Frame b.Width (ft.)= Number of garage stalls: ❑ Masonry Areas in square feet Attached = ❑ Metal ❑ Pole Bldg. c. Basement= Detached = ❑ ICF d. Vt Story = ❑ On-site Prefab e. 2"d Story= ❑ Off-site Prefab f. '/2 Story = El Other(please specify): _ g.Total Area= REQUIRED SUBMITTALS: All of the information must be submitted in order for your application to be processed: Not Enclosed Applicable ❑ ❑ Permit Application ❑ ❑ Proposed Building Plans ❑ ❑ MN State Energy Code Calculations and Mechanical Code Requirements Form ❑ ❑ Survey (meeting all re uirements ❑ ❑ Stormwater Pollution Prevention Plan ❑ ❑ Hardcover Calculation(s) ❑ ❑ Septic System Site Evaluation Report ❑ ❑ Access Permit ❑ ❑ Wetland Buffer Improvement Plan ❑ ❑ Engineered Plans for Retaining Walls 4 feet or above ❑ ❑ Plan Review Fee ❑ ❑ Other: APPLICANT/OWNER ACKNOWLEDGEMENT: • Agrees to provide all information required or requested by the Building Department; • Agrees to pay the City of Orono for engineering consultant review costs in excess of$500; • Certifies that the information supplied is true and correct to the best of his/her knowledge. The applicant recognizes that they are solely responsible for submitting a complete application being aware that upon failure to do so, the staff has no alternative but to reject it until it is complete,- Acknowledges omplete;Acknowledges the Escrow Agreement is completed and signed; • Understands some or all of the information that you are asked to provide on this application is classified by State law as either private or confidential. Private data is information which generally cannot be given to the public but can be given to the subject of the data. Confidential data is information which generally cannot be given to either the public or the subject of the data. Our purpose and intended use of this information is to annually update our records and records of other governmental agencies required by law. If you refuse to supply the information,the application may not be issued. Agrees that in the event that weather or other conditions prevent the completion of an as-built survey at the time the Certificate of Occupancy is requested, a temporary Certificate of Occupancy may be issued upon receipt of a $10,000 escrow to ensure completion of the as-built survey and all site improvements. Applicant's Signature. Date: Owner's Signature: Date: PLAN REVIEW CHECKLIST FOR NEW STRUCTURES / ADDITIONS Address/Permit Number: Description of work: review b : Date Septic y Approved: Zoning review by: L Date Approved: t Building review by: Q4 L Date Approved: I 1 Grading review by: rvi(j Date Approved: ti Zoning District: Zoninci File#: Reso#: Reso Date: Zoning: Lot Area:0 1J 07 S /AC Width: Lot Coverage: SF _% Survey Submitted: Yes 0 No Date of Survey: (JI Revised date(?): Proposed Setbacks: Fron (Lake) Rear(Street) ( S E W ) ( N S E W ) Other Buildings Wetland Side Side —t—� (11-M t , 7,o Lf / Defined Height: Peak Height: ' FE:�e l FFE minus feet= (Existing Cont04r) Perimeter(linear feet) _ ��j�� 50% 1 #of Sto les k? YES �d FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE: 'G The distance between the lowest FOR A BUILDING ON A SLAB FOUNDA COW: START WITH proposed floor(of the basement or crawl space)and the highest point of the roof. START WITH The distance between the top of slab an If you have a... the highest point of the roof. If you have a... • GABLE OR HIPPED ROOF(no GABLE OR HIPPED ROOF(no windows): Subtract half the windows): Subtract half the distance distance between the highest point between the highest point of the roof of the roof to the low point of the to the low point of the corresponding SUBTRACTION corresponding gable or hipped roof SUBTRACTION gable or hipped roof (BASED ON ROOF GABLE OR HIPPED ROOF(with (BASED ON GABLE OR HIPPED ROOF(with TYPE) windows): Subtract half the ROOF TYPE) windows): Subtract half the distance distance between the top of the between the top of the highest highest window and the highest window and the highest point of the point of the roof roof • ALL OTHER ROOF TYPES(flat, ALL OTHER ROOF TYPES(flat, mansard,etc):No subtraction. mansard,etc):No subtraction. ADDITION Add the distance between the top of slab O SUBT to Subtract the distance between the (BASED ON and the highest existing grade adjacent to I (BASED ON EXISTING basement/crawl space floor and the EXISTING the foundation. GRADES) highest existing grade adjacent to the GRADES foundation OR 10 feet(whichever is less). EQUALS Defined building height EQUALS Defined building height Shoreland District MCWD Permit Received Average Lakeshore Setback Met? Bluff 0 Yes 0 No 0 N/A 0 Yes NO Yes 0 No Yes 0 No 0 N/A Permit Number: Bim' Setback: Stormwater Quality Existing Proposed Variance Required CUP Required Overlay District Tier Hardcover Hardcover ..}- 0 Yes o 0 Yes O Type(s): Type(s): Updated: January 2013 v:\forms\plan review checklist 2013.docx REMARKS (in-house): Fees to be Charged YES NO Permit (/: Plan Review !/ 'Stats SurcFiarge Investigation Fee t/ Si rof SAC Units., Other(specify) Square Footage $ er Square Footage Basement X = $ 18t Floor X = $ 2nd Floor X = $ Garage X = $ Estimated Construction Value: $ !I U v f Orono Inspections Required Work Requiring Separate Permits Required State Permits 0 Site lumbing 0 Grading/ Filling Nell 0 Hardcover Removal Mechanical Fire Electrical Footing D)Septic 0 Water Connection Poured Wall �l``' Fireplace Sewer Connection !Foundation Survey Masonry Lawn Irrigation Radon Rock Bed Mfg. Framing 0 Other(specify) Insulation As-Built Survey Final 0 Wetland Buffer 0 Other(specify) REMARKS (in-house): Other Review: Reviewed by: Date Approved: Access: Existing: 0 YES 0 NO New: 0 YES 0 NO OFFICIAL REMARKS -TO BE NOTED ON PERMIT AND INITIALLED Updated: January 2013 v:\forms\plan review checklist 2013.docx Melanie Curtis From: Melanie Curtis Sent: Monday, February 04, 2013 1:13 PM To: 'Jim Bebo' Subject: RE: Permit Yes, we can issue the permit to you with the intent that the builder will come in to change the permit and sign it later. I'll let the permitting staff know they can get your permit ready to issue. Melanie Curtis 2 952.249.4627 ® mcurtis@ci.orono.mmus From: Jim Bebomailto:jim acias 1 halt.com � �S� w1 Sent: Monday, February 04, 2013 10:21 AM ev To: Melanie Curtis ],r, �e�QD• „0a, 0 Cc: Laura Bolson �1 L Subject: Re: Permit h Melanie �t Thanks for getting back to me. It looks like the builder will be LDK builders but he is out of town until next Monday and will work out details then. My controller sent the additional$500. 1 am paying for the permit direct and would like to start the dirt work can it be issued to me then transferred to builder? From: Melanie Curtis<MCurtis@ci.orono.mn.us> Date: Mon,4 Feb 2013 09:10:51-0700 To:Jim Bebo<jim@aciasphalt.com> Subject: RE: Permit Good morning, Jim The permit is essentially ready to be issued. However, we are still waiting on a couple things that are holding it up: • Builder- have you identified a builder for the project? • Escrow balance-you've provided a $2000 escrow for the demo; the building permit escrow amount is$2500. Please submit an additional $500. Melanie Curtis 952.249.4627 mcurtistc'i_ci.orono.mn.us -----Original Message----- From: Jim Bebo [mailto:jim(c)aciasphalt.com] Sent: Friday, February 01, 2013 5:00 PM To: Melanie Curtis Subject: Re: Permit Thanks off now!! Sent from my I phone On Feb 1, 2013, at 4:56 PM, "Melanie Curtis" <MCurtis@ci.orono.mn.us>wrote: > Oh, ha! I thought all electronics had to be in the locked & upright position...? > I'll check on Monday And get back to you. 1 Address: l O 6 S 710rt-OKAW4 OA 40 TA "' ex Date: //- 9-/2 Prepared by: G-t atsd 6'A C oeit JI'c C/./T/6l ��✓�• HARDCOVER CALCULATION WORKSHEET. r'orA for 44CA4 SETBACK ZONE: (CIRCLE ONE) - fteiemeee, EXISTING HARDCOVER IN ZONE A. House x = S.F. Length Width X, = S.F. X = S.F. B. Garage x = S.F. C. Driveway x = S.F. x = S.F. D. Sidewalk x = S.F. X = S.F. E. Patio/Deck x = S.F. X = S.F. F. Landscape x = S.F. Underlain x = S.F. By Plastic x = S.F. G. Retaining Walls x = S.F. H. Other x = S.F. TOTAL HARDCOVER IN ZONE - S.F. A TOTAL PROPERTY AREA IN ZONE - S.F. B A + B x 100 = % PROPOSED HARDCOVER IN ZONE (including existing hardcover to be retained) A. House x = -5e0 7/ S.F. Length Width X S.F. X '00&rN i /'rc1 r = 3 i 9 S.F. B. Garage x = S.F. C. Driveway x OS' S.F. X = S.F. D. Sidewalk x 1749 47A = 193 S.F. X C-dim CVAIC . 1'TF�f = `12 S.F. C,lifiv rnA-V� Jrf/J 31 E. Patio/Deck x DECK = Z Z/ S.F. E X�1t'�i✓G CA R lN 460< 2 ifS- /aO' Cot Ir = / VS S.F. F. Landscape x = S.F. Underlain x = S.F. By Plastic x = S.F. G. Retaining Walls x — S.F. H. Other x Z•1KE Jrlltf = Y00S.F. TOTAL HARDCOVER IN ZONE _ _ /o: ya S.F. A TOTAL PROPERTY AREA IN 28NE t o 7' - y/, 7��_S.P. B A + BY/, 70 7 x 100 = L Y.,9C % -21 - Melanie Curtis From: Melanie Curtis Sent: Wednesday, December 12, 2012 11:03 AM To: 'jim@aciasphalt.com' Cc: 'Mark Gronberg' Subject: FW: 20121211 1065 Tonkawa Rd -2012-01191 Please see the comments below from our City Engineer. Your survey should be revised to address the issues below or additional information provided as needed in order for the plan review to continue. Please contact me if you have any questions. Melanie Melanie Curtis Planning &Zoning Coordinator City of Orono 2750 Kelley Parkway Orono, MN 55356 Direct Dial: 952.249.4627 Fax: 952.249.4616 Planning &Zoning Office 952.249.4620 Email: mcurtis(&ci.orono.mn.us Website: www.ci.orono.mn.us City of Orono Office Hours Monday - Friday 8:00 am - 4:30 pm From: Jesse Struve Sent: Tuesday, December 11, 2012 2:22 PM To: Melanie Curtis Cc: Christine Mattson Subject: 20121211 1065 Tonkawa Rd - 2012-01191 Melanie, I have reviewed the survey for the proposed house at 1065 Tonkawa Rd and have the following concerns: • There is a sanitary sewer line toward the lake which is not shown on the survey. The survey will need to be updated to show the location of the sanitary sewer, manholes, and any utility easements. • Aerial photos show trees located by the lake. Will the proposed stairs impact any trees? • The proposed retaining wall is shown to be 4' high. If the wall is installed over 4' in height,the applicant will need to have a registered professional engineer prepare plans and specifications for it. • The back of the retaining wall needs to be a minimum of 5' from the property line without a variance. • The survey needs to show the location of the silt fence or other erosion control measures. • Will the applicant need to have a tree preservation plan? • If the driveway entrance is going to be altered the applicant will need a Hennepin County permit. • The applicant will need to get a MCWD permit. Jesse Struve, PE Director of Public Works/City Engineer City of Orono (952) 249-4661- Direct 1 Christine Mattson From: Lyle Oman Sent: Friday, November 30, 2012 4:29 PM To: Melanie Curtis; Christine Mattson Subject: FW: Bebo homebuilding review Lyle Oman Building Official City of Orono TO SCHEDULE AN INSPECTION, CALL: 952.249.4600 952.249.4625 - Direct Dial 952.249.4600 - Main 952.249.4616 - Fax www.ci.orono.mn.us ................................................................................ ................................................................................ Office Hours: Monday- Friday 8:00 am to 4:30 pm ................................................................................ ................................................................................ Physical Address: 2750 Kelley Parkway Orono, MN 55356 Mailing Address: PO Box 66 Crystal Bay, MN 55323-0066 -----Original Message----- From: Jim Bebo [mailto:iim@aciasphalt.com] Sent: Friday, November 30, 2012 3:34 PM To: Lyle Oman Subject: Bebo homebuilding review Lyle I raised the plan slightly raising basement ceiling height to 10' and raising exterior grade in the front. Mark Gronberg is dropping off the revised survey and I will drop off plan Monday morning. Sent from my I phone i New Construction Energy Code Compliance Certificate OOH Co� Per NI 101.8 Building Certificate.A building certificate shall be posted in a permanently visible location inside therCertiflcate Posted building. The certificate shall be completed by the builder and shall list information and values of components listed in Table NI 101.8. 11/19/12 , Mailing Address of the Dwelling or Dwelling Unit Orono,MN 1065 Tonkawa Road a will Name of Residential Contractor MN License Number Contractor to be selected submitted b owner) THERMAL ENVELOPE RADON SYSTEM Type:Check All That Apply X Passive(No Fan) o � r Active(With fan and monometer or other system monitoring device) y a o U v abi 3 U Insulation Location o z " iiCC o 7o, �o d 3 c U O ti O n s O 0 g on nu w 1 1 ;:� I rx Other Please Describe Here Below Entire Slab R-10 X Foundation Wall R-10 X Exterior Perimeter of Slab on Grade X Rim Joist(Foundation) X Rim Joist(0 Floor+) R-19 X I linterior Wall R-19 X Ceiling,flat R-44 IX Ceiling,vaultedR-38 X Bay Windows or cantilevered areas R-38 X Bonus room over garage R-38 X Describe other insulated areas Windows 8 Doors eating or Cooling Ducts Outside Conditioned Spaces Average U-Factor(excludes skylights and one door)U: 10.32 Not applicable,all ducts located in conditioned space Solar Heat Gain Coefficient(SHGC): 10.29 R-value MECHANICAL SYSTEMS VAC CONTRACTOR TO BE SELECTED Qnfo to follow Make-up Air Select aTjpe Appliances Heating System Domestic Water Heater Cooling System Not required per mech.code Fuel Type Natural Gas Natural Gas Electric Passive Manufacturer Powered Interlocked with exhaust device. Model Describe: Input in Capacity in Output in Other,describe: Rating or Size BTUS: Gallons: Tons: Heat Loss: Heat Gain: Location of duct or system: Structure's Calculated 90% SEER: Calculated Efficiency cooli load: Cfm's "round duct OR Mechanical Ventilation System "metal duct Describe any additional or combined heating or cooling systems if installed:(e.g.two furnaces or air Combustion Air Select a Type source heat pump with gas back-up furnace): Not required per mech.code Select Type Passive Heat Recover Ventilator(HRV) Capacity in cfins: Low: High: Other,describe: Energy Recover Ventilator(ERV)Capacity in cfms: Low: High: Location of duct or system: Continuous exhausting fan(s)rated capacity in cfins: Location of fan(s),describe: Cfm's Capacity continuous ventilation rate in cfins: "round duct OR Total ventilation(intermittent+continuous)rate in cfins: "metal duct Created by BAM version 052009 New Construction Energy Code Compliance Certificate top- Per NI 10 1.8 Building Certificate.A building certificate shall be posted in a permanently visible location inside the Date Certi teate Posted TE building. The certificate shall be completed by the builder and shall list information and values of components listed in Table N1101.8. 11/19/12 10 , Maaing Address orthe Dwelling or Dwelling Unit Orono,MN 1065 Tonkawa Road Name of Residential Contractor MN License Number Contractor to be selected submitted by owner HERMAL ENVELOPE RADON SYSTEM Type:Check All That Apply X Passive(No Fan) o � „ Active(With fax and monometer or _ ? other system monitoring device) y a o . Insulation Location � � U po g F ,4 Z w w w�°� w°� � ix ig Other Please Describe Here Beta*Entire Slab R-10 X Foundation Wall R-10 1X lExterior Perhoeter of Slab on Grade X IRim Joist(Foundation) X Rin Joist 1"Floor+) R-19 X Ing wan R-19 X ceillng,no R-44 X Ceiling,vaulted R-38 X ft Wtadows or cantilevered areas R-38 X Bonus room over garage R-38 X Describe other Insulated areas Windows a Doors lHooting or Cooling Duds Outside Conditioned Spaces Average U-Factor(excludes skylights and one door)U: 0.32 IX Not applicable,all ducts located in conditioned space Solar Heat Gain Coefficient(SHGC): 0.29 1R-value MECHANICAL SYSTEMS VAC CONTRACTOR TO BE SELECTED Info to folio Makeup Air Select Type Ps Heating System Domestic Water Heater Cooling System Not required per mech.code Fuel Type Natural Gas Natural Gas Electric Passive Manufacturer Powered Interlocked with exhaust device. Model Describe: Input in Capacity in Output in Other,describe: Rating or Size BTUS: Gallons: Tons: Beat Loss Heat Gain: Location of duct or system: Structure's twalcalated 90% SEER: Calculated KM--d--CY ><I cool' load: Cfin's "round duct OR Mechanical Ventilation System "metal duct Describe any additional or combined heating or cooling systems if installed:(e.g.two furnaces or air Combustion Air Select a Type source heat pump with gas back-up furnace): Not required per meth.code fct Type Passive Heat Recover Ventilator(HRV) Capacity in cfrm: Low: High: Other,describe: Energy Recover Ventilator(ERV)Capacity in cfirts: Low: High: Location of duct or system: Continuous exhausting fan(s)rated capacity in cfins: Location of fan(s),describe: Cfin's Capacity continuous ventilation rate in efins: "round duct OR Total ventilation(intermittent+continuous)rate in dins: "metal duct Created by BAM version 052009 U-- Christine Mattson L From: Christine Mattson Sent: Tuesday, April 09, 2013 8:54 AM To: 'Jim Bebo' Cc: Mark Gronberg; LDKBuilders@yahoo.com; Lyle Oman; Willie Gibbs; Melanie Curtis; lance@elliottllc.com Subject: RE: 1065 Tonkawa Road /#2012-01191 Jim, We just received the site copy of the building plans for 1065 Tonkawa Road, however we have not received the revised plan to review and replace. Please advise when we can expect them. Also, any potential grading or retaining wall changes must be shown on a revised survey. Our engineer will review. Your neighbor must give you a temporary construction easement if you are proposing to be working across the property line. Please don't hesitate to contact me if you have any questions. Christine Mattson Planning Assistant City of Orono 2750 Kelly Parkway I Orono MN 55356 (physical address) PO Box 66 1, Crystal Bay ! MN 55323-0066 (mailing address) W 952.249.4620 1 8 952.249.4616 ® cmattson@ci.orono.mn.us -11� www.ci.orono.mn.us Office Hours: Monday- Friday 8 am to 4:30 pm From: Jim Bebo [mailto:jim@aciasphalt.com] Sent: Friday, March 29, 2013 1:39 PM To: Christine Mattson Cc: Mark Gronberg; LDKBuilders@yahoo.com; Lyle Oman; Willie Gibbs; Melanie Curtis; lance@elliottllc.com Subject: Re: 1065 Tonkawa Road / #2012-01191 Christine, I am going over the plan this weekend to make sure we get any and all changes that we have talked about and clarify before we submit to you next week. This will save everyone's time and we should have to you by tues or wed. Lyle when are you available? Lance is out of town next week and I leave wed afternoon. On a side note as we were excavating we looked at the proposed retaining wall and considered a change. Also on the south side I was considering talking to my neighbor about grading that area different. How do we handle that if we decide to pursue it? Sent from my iPad On Mar 29, 2013, at 8:13 AM, "Christine Mattson"<CMattson@ci.orono.mn.us>wrote: 1 Jim, Thank you. That solution will solve the hardcover issue. Please provide us with two copies of the revised plan sheet which shows the modified door. To keep everyone on the same page, we will review, approve and re-stamp the revised plans. Once approved we will notify you and your builder that the revised "official site copy" is ready to be picked up and switched out with the previous plan page. Further, we ask that you turn in the old (10' wide door version) site copy so that we can be assured your site plan reflects what we have on file. Typically if the change to the door is the only change plan exchange can be done all at one time over the counter so it may be helpful if you schedule a time when Lyle is available and bring the original site plan set for exchange. If you have any questions please let me know. Thank you, Christine— From: Jim Bebo [mailto:jimCaaaciasphalt.com] Sent: Thursday, March 28, 2013 3:53 PM To: Christine Mattson; Mark Gronberg; 'LDKBuilders@yahoo.com' Cc: Lyle Oman; Willie Gibbs; Melanie Curtis; lance@elliottllc.com Subject: Re: 1065 Tonkawa Road / #2012-01191 1 am going to switch the door to 6'. From: Christine Mattson<CMattson@ci.orono.mn.us> Date:Tue, 26 Mar 2013 09:14:34-0600 To:Jim Bebo<iim@aciasphalt.com>, Mark Gronberg<markg@gronbergassoc.com>, "'LDKBuilders@vahoo.com"' <LDKBuilders@yahoo.com> Cc: Lyle Oman<LOman@ci.orono.mn.us>, Willie Gibbs<WGibbs@ci.orono.mn.us>, Melanie Curtis <MCurtis@ci.orono.mn.us> Subject: 1065 Tonkawa Road/#2012-01191 Jim, We received an updated survey dated 3-19-13. The survey showed changes in the proposed location and elevation of the home. While revisiting the approved house plans to approve the recent revisions, we realized a proposed 10' x 8' overhead door is shown which accesses the lower level of the home. This door is considered a garage door and according to the City's hardcover regulations must have a driveway or proof of driveway included in the hardcover calculations. If you wish to revise the plan to reflect an overhead door 6' in width or less the hardcover for a driveway will not need to be provided. The hardcover calculations do not currently reflect a driveway access to the lower 10' x 8' door. The hardcover calculations must be modified to including driveway access to the door or the building plans changed must be changed to reduce the size of the opening. Please advise. 2 Sec. 78-1681. - Driveways, in general. All driveways shall comply with the following minimum dimensional standards: (1) Driveways serving end loading garages shall maintain a width equivalent to the width of all overhead doors extending 15 feet out from the garage doors. (2) Driveways serving side loading garages shall provide a minimum turn around or back up depth of 20 feet, as measured from the garage door(s). (3) Minimum driveway taper ratio shall be 2:1. (4) Driveways shall be at least eight feet in width at the street or private road. (5) A turnaround shall be provided for a driveway with direct access to an arterial or collector roadway, or for a side load garage as determined necessary by the city planner. The minimum dimensions of the turnaround shall be eight feet in width by 12 feet in depth. (6) 'Wheel strip" driveways are allowed, but the entire width of the driveway (from outside to outside of the strips) will be considered hardcover. Christine Mattson Planning Assistant City of Orono 2750 Kelly Parkway Orono MN 55356(physical address) PO Box 66 Crystal Bay MN 55323-0066 (mailing address) Q 952.249.4620 g 952.249.4616 E cmattson@ci.orono.mn.us www.ci.orono.mn.us Office Hours: Monday- Friday 8 am to 4:30 pm 3 Christine Mattson From: Christine Mattson Sent: Friday, March 29, 2013 8:14 AM To: 'Jim Bebo'; Mark Gronberg; 'LDKBuilders@yahoo.com' Cc: Lyle Oman; Willie Gibbs; Melanie Curtis; lance@elliottllc.com Subject: RE: 1065 Tonkawa Road/#2012-01191 Jim, Thank you. That solution will solve the hardcover issue. Please provide us with two copies of the revised plan sheet which shows the modified door. To keep everyone on the same page, we will review, approve and re- stamp the revised plans. Once approved we will notify you and your builder that the revised "official site copy" is ready to be picked up and switched out with the previous plan page. Further, we ask that you turn in the old (10' wide door version) site copy so that we can be assured your site plan reflects what we have on file. Typically if the change to the door is the only change plan exchange can be done all at one time over the counter so it may be helpful if you schedule a time when Lyle is available and bring the original site plan set for exchange. If you have any questions please let me know. Thank you, Christine- From: Jim Bebo [mailto:jim@aciasphalt.com] Sent: Thursday, March 28, 2013 3:53 PM To: Christine Mattson; Mark Gronberg; 'LDKBuilders@yahoo.com' Cc: Lyle Oman; Willie Gibbs; Melanie Curtis; lance@elliottllc.com Subject: Re: 1065 Tonkawa Road / #2012-01191 1 am going to switch the door to 6'. From: Christine Mattson <CMattson@ci.orono.mn.us> Date:Tue, 26 Mar 2013 09:14:34-0600 To:Jim Bebo<iim@aciasphalt.com>, Mark Gronberg<markg@gronbergassoc.com>, "'LDKBuilders@yahoo.com"' <LDKBuilders@vahoo.com> Cc: Lyle Oman <LOman@ci.orono.mn.us>, Willie Gibbs<WGibbs@ci.orono.mn.us>, Melanie Curtis <MCurtis@ci.orono.mn.us> Subject: 1065 Tonkawa Road/#2012-01191 Jim, We received an updated survey dated 3-19-13. The survey showed changes in the proposed location and elevation of the home. While revisiting the approved house plans to approve the recent revisions, we realized a proposed 10' x 8' overhead door is shown which accesses the lower level of the home. This door is considered a garage door and according to the City's hardcover regulations must have a driveway or proof of driveway included in the hardcover calculations. If you wish to revise the plan to reflect an overhead door 6' in width or less the hardcover for a driveway will not need to be provided. I The hardcover calculations do not currently reflect a driveway access to the lower 10' x 8' door. The hardcover calculations must be modified to including driveway access to the door or the building plans changed must be changed to reduce the size of the opening. Please advise. Sec. 78-1681. - Driveways, in general. All driveways shall comply with the following minimum dimensional standards: (1) Driveways serving end loading garages shall maintain a width equivalent to the width of all overhead doors extending 15 feet out from the garage doors. (2) Driveways serving side loading garages shall provide a minimum turn around or back up depth of 20 feet, as measured from the garage door(s). (3) Minimum driveway taper ratio shall be 2:1. (4) Driveways shall be at least eight feet in width at the street or private road. (5) A turnaround shall be provided for a driveway with direct access to an arterial or collector roadway, or for a side load garage as determined necessary by the city planner. The minimum dimensions of the turnaround shall be eight feet in width by 12 feet in depth. (6) 'Wheel strip" driveways are allowed, but the entire width of the driveway (from outside to outside of the strips) will be considered hardcover. Christine Mattson Planning Assistant City of Orono 2750 Kelly Parkway Orono MN 55356 (physical address) PO Box 66 Crystal Bay MN 55323-0066 (mailing address) `d 952.249.4620 A 952.249.4616 ® cmattson@ci.orono.mn.us -'[� www.ci.orono.mn.us Office Hours: Monday- Friday 8 am to 4:30 pm 2 Christine Mattson From: Christine Mattson Sent: Tuesday, March 26, 2013 10:15 AM To: 'Jim Bebo'; 'Mark'; 'LDKBuilders@yahoo.com' Cc: Lyle Oman; Willie Gibbs; Melanie Curtis Subject: 1065 Tonkawa Road /#2012-01191 Jim, We received an updated survey dated 3-19-13. The survey showed changes in the proposed location and elevation of the home. While revisiting the approved house plans to approve the recent revisions, we realized a proposed 10' x 8' overhead door is shown which accesses the lower level of the home. This door is considered a garage door and according to the City's hardcover regulations must have a driveway or proof of driveway included in the hardcover calculations. If you wish to revise the plan to reflect an overhead door 6' in width or less the hardcover for a driveway will not need to be provided. The hardcover calculations do not currently reflect a driveway access to the lower 10' x 8' door. The hardcover calculations must be modified to including driveway access to the door or the building plans changed must be changed to reduce the size of the opening. Please advise. Sec. 78-1681. - Driveways, in general. All driveways shall comply with the following minimum dimensional standards: (1) Driveways serving end loading garages shall maintain a width equivalent to the width of all overhead doors extending 15 feet out from the garage doors. (2) Driveways serving side loading garages shall provide a minimum turn around or back up depth of 20 feet, as measured from the garage door(s). (3) Minimum driveway taper ratio shall be 2:1. (4) Driveways shall be at least eight feet in width at the street or private road. (5) A turnaround shall be provided for a driveway with direct access to an arterial or collector roadway, or for a side load garage as determined necessary by the city planner. The minimum dimensions of the turnaround shall be eight feet in width by 12 feet in depth. (6) "Wheel strip" driveways are allowed, but the entire width of the driveway (from outside to outside of the strips) will be considered hardcover. Christine Mattson Planning Assistant City of Orono 2750 Kelly Parkway Orono MN 55356 (physical address) PO Box 66 Crystal Bay MN 55323-0066 (mailing address) 9 952.249.4620 8 952.249.4616 ® cmattson@ci.orono.mn.us -1� www.ci.orono.mn.us Office Hours: Monday- Friday 8 am to 4:30 pm 1 1011MI 11111111113 CITY OF ORONO * 2013 - 01191 * 2750 KELLEY PARKWAY DATE ISSUED: 11/08/2013 ORONO,MN 55356- (952)249-4600 FAX: (952)249-4616 ADDRESS : 1065 TONKAWA RD PIN : 08-117-23-13-0001 LEGAL DESC AUDITOR'S SUBD.NO.217 LOT 006 BLOCK 000 PERMIT TYPE ESCROW FEE-OTHER PROPERTY TYPE RESIDENTIAL CONSTRUCTION TYPE ESCROW FEE-OTHER NOTE: THIS$7500 ESCROW IS FOR THE TEMPORARY CERTIFICATE OF OCCUPANCY-PAID WITH CHECK# 16751 BEBO,JAMES APPLICANT ESCROW FEE-OTHER 7,500.00 1065 TONKAWA RD TOTAL 7,500.00 LONG LAKE,MN 55356- OWNER BEBO,JAMES 1065 TONKAWA RD LONG LAKE,MN 55356- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the State Building Code.This permit may be revoked at any time for due cause. Applicant Permitee Signature Date Issued By Signature Date SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE. J � t TEMPORARY CERTIFICATE OF OCCUPANCY ESCROW AGREEMENT Orono Building Permit#2012-01191 Demolition Permit#2012-00988 AGREEMENT made this day of Aldr , 202, by and between the CITY OF ORONO, a Minnesota municipal corporation ("City") and James Bebo ("Owners"). Recitals 1. Construction of the new residence located at 1065 Tonkawa Road the ("Subject Property"), legally described as the Northwesterly 128.21 feet of Lot 6, measured by right angles from the northwesterly line thereof, Auditor's Subdivision Number 217, Hennepin County Minnesota, is the subject of building permit application number 2012-01191 has been completed. 2. Winter conditions currently prohibit completion of exterior improvements, final grading, and vegetation establishment. An as-built survey cannot be accurately conducted at this time. 3. Owners request the City issue a temporary certificate of occupancy ("TCO") to the Owners so that the Owners may occupy the new residence. 4. The City will issue a TCO only if the Owners establish an escrow to ensure completion of exterior improvements, continuation of erosion control and submittal of an as-built survey to the City. NOW THEREFORE,THE PARTIES AGREE AS FOLLOWS: 1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow Agreement, the Owners shall deposit $10,000 with the City. All accrued interest, if any, shall be paid to the City to reimburse the City for its cost in administering the escrow account. 2. PURPOSE OF ESCROW. The purpose of the escrow is to assure completion of any exterior improvements, final grading, establishment of vegetation as well as guarantee reimbursement to the City for all out-of-pocket costs the City has incurred (including planning, engineering, in excess of $500, or legal consultant review) or will incur in reviewing the plan. Eligible expenses shall be consistent with expenses the Owners would be responsible for under a building permit application. The escrow will also guarantee reimbursement to the City for all out-of-pocket costs the City has incurred to assure that the work is completed in accordance with the Stormwater Pollution Prevention Plan and the provisions of Orono City Code Chapter 79. The financial security may also be used by the City to eliminate any hazardous conditions associated with the work and to repair any damage to public property or infrastructure that is caused by the work (including planning, engineering, or legal consultant review) associated with building permit #2012-01191 if compliance with the approved building permit is not accomplished. 3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in turn send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners' receipt of bill. 4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make payment to the City within the timeframe outlined in#3 above, shall issue a Stop Work Order until the Owners pay all expenses invoiced pursuant to#3. The City may draw from the escrow account without further approval of the Owners to reimburse the City for eligible expenses the City has incurred. S. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shall be returned to the Owners when the review has been completed and written notification is received from the Owners requesting the funds. 155441 6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible expenses incurred by the City exceed the amount in escrow, the City shall have the right to certify the unpaid balance to the subject property pursuant to Minn. Stat. §§415.01 and 366.012. 7. ACCESS TO SUBJECT PROPERTY. The Owners hereby grant to the City, its agents, employees, officers and contractors, the right to enter upon the subject property for the specific purpose of inspecting and completing any exterior improvements, final grading, establishment of vegetation and the restoration of the subject property should the Owners not complete the work by the specified dates. CITY: CITY OF ORONO OWNERS: By: Its: 155441 DATE TIME J CITY OF ORONO CALLED IN -3--2-7-1--3 INSPECTION NOTICE SCHEDULED _-3-0-7-43 PERMIT NOF2 � -,0Z/W COMPLETED ADDRESS /--25 'Z "Zrlzgy� OWNER JELEPHONE NO.���% CONTRACTOR > DESCRIPTION Lw ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI 0 ❑ LAKESHORE/WETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL Q E] TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT ❑ DEMO-SITE ❑ SEPTIC MAINT ❑ FOLLOW-UP _ ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL v ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL OWNER/CONTRACTOR TO MEET YOU:_YES_NO COMMENTS: W CL cc J O CC O W CC Q Z W z W CC d , WW W, ORKSATISFACTORY.PROCEED ❑ PROJECTCOMPLETE cc W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN El CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑ INSPECTION REQUIRED.CALLTO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on site: Inspector. White Copy/Inspector's File Canary Copy/Site Notice C TIME J CITY OF ORONO CALLEDIN INSPECTION NE SCHEDULED PERMIT NO. O s) /��.�1�� OMPLETED ) ADDRESS 144Z-�- ��G!/Qi OWNER T LEP ONE NO._��3 CONTRACTOR > DESCRIPTION W ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAWGRADING/FILLING 0. ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS Q El FRAMING ❑ MECHANICAL FINAL El TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS ❑ FINAL ❑ SEWER HOOK-UP El COMPLAINT ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP i ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL v ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL OWNER/CONTRACTOR TO MEET YOU:_YES_NO COMMENTS: W 0. t` y A cc U_ r1Aot 13 'C) 1,"t Uj CC / I led W GW A/WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE LU W ❑CORRECT WORK&PROCEED 11ISSUE CERTIFICATE OF OCCUPANCY 0 ElCORRECT WORK,CALL FOR REINSPECTION TEMPORARY C) BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR El CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on site: Inspector. White CopylInspector's File Canary Copy/Site Notice C� ATE TIME CITY OF ORONO CALLED IN �� INSPECTION NOTICE SCHEDULED PERMIT NO. _'011g1 COMPLETED ZL ADDRESS AO&5 OWNER 62ff HONE NO. � CONTRACTOR G /�- a DESCRIPTIONG�` �OY� ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL O El TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT v ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL v ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL OWNER/CONTRACTOR TO MEET YOU:_YES_NO o COMMENTS: CLcc �� 1 a o Pe , A0 Ll 4 c CC of, W CC v A<<S Q z I �), nuof l �S W cc d W ❑WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE LU W ❑CORRECT WORK&PROCEED ElISSUE CERTIFICATE OF OCCUPANCY 0 AMCORRECT WORK,CALL FOR REINSPECTION TEMPORARY U OtFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTOTAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR 11 CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on site: Inspector. , Z4!=1 n Q '� White CopylInspector's File Canary Copy/Site Notice DATE TIME CITY OF ORONO CALLED IN INSPECTION NOTICE SCHEDULED PERMIT NO. Q !� - (�j 1�(I COMPLETED ADDRESS ieA t A A OWNER a TELEPHONE NO.61 .2 CONTRACTOR a It t:> 9 g d;' DESCRIPTION -�/�� f� ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAWGRADING/FILLING It Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS to ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT v ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP I ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL v ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL Z OWNERICONTRACTOR TO MEET YOU:_YES_NO COMMENTS: CAZW a r� ecc � UL If if�A LF We QC f C ll tir J Q Z W W d LU (WQRK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE CC W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR El CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on site: Inspector. White Copy/Inspector's File Canary Copy/Site Notice DATE TIME V CITY OF ORON 5SeC-AIIN INSPECTION N TI SCHEDULED PERMIT NO. CPOLETED ADDRESS G� OWNER T PHONE NO CONTRACTOR DESCRIPTION W ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS Q El FRAMING El MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL v ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL OWNERICONTRACTOR TO MEET YOU:_YES_NO COMMENTS: W Q_ cc upcc0 : brc 0 W Q 2 W z W CC d ORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY C1 BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTOTAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR El CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on sit Inspector. LeZz ` White Copy/Inspector's File Canary Copy/Site Notice 0_ V 5 DATE TIME CITY OF ORONO CALLED IN �_/7 %3 INSPECTION OTICE SCHEDULED PERMIT NO. U��'�� COMPLETED ADDRESS ,/D 4LS OWNER T EPHONE N0.&/}1 (295 k�i l& CONTRACTOR L /� DESCRIPTION - ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP i ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL ❑ PLUMBI ACTOR El SEPTI FINAL ❑ FOUNDATION/REMOVAL OWN CONTREETYOU: ES_NO COMMENTS: W �o a fQcT- e 47IIiA- AS 0 Di` GAS a Qc 0 ac Uj LU d W/��1NORKSATISFACTORY:PROCEED 1-1PROJECTCOMPLETE W ❑CO RECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY OO ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTOTAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (J52) 249-4600 Owner/Contractor on site: 4 Inspector. White Copy/Inspector's File Canary Copy/Site Notice &,It DATE TIME CITY OF ORONO CALLED IN 7—I INSPECTION NOTICE SCHEDULED PERMIT NO aO/RL 191 COMPLETED ,Q ADDRESS /0 OWNER TELEPHONE NO. L�� CONTRACTOR > DESCRIPTION [�f� W ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAWGRADING/FILLING ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS ❑ FRAMING El MECHANICAL FINAL El TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT v ❑ DEMO-SITE ❑ SEPTIC MAINT. ❑ FOLLOW-UP ? ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL v ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL Z OWNER/CONTRACTOR TO MEET YOU:_YES_NO COMMENTS: cc W CL cc J O a CC O U_ W CC Q ti 2 W Z W QC J OW K SATISFACTORY:PROCEED ❑ PROJECT COMPLETE CCW ❑CORRECT WORK&PROCEED C ISSUE CERTIFICATE OF OCCUPANCY ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTOTAKEN INSPECTOR WILL RETURN ❑,STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED ,C INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. I Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on si Inspector_ White Copy/Inspector's File Canary Copy/Site Notice 51,t— Q T ? TIME CITY OF ORONO CALLED IN INSPECTION bjQTjQE SCHEDULED L.30 PERMIT NO. ! 0//f/ COMPLETED ADDRESS d � -- OWNER TELEPHONE NO. - -� CONTRACTOR DESCRIPTION `S/l T ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS h ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT v ❑ DEMO-SITE ❑ SEPTIC MAINT ❑ FOLLOW-UP ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL v ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL 2 OWNERICONTRACTOR TO MEET YOU:_YES_NO COMMENTS: j O O W Q W Z W UJ RK SATISFACTORY:PROCEED ❑PROJECT COMPLETE W ❑CORRECT WORK 3 PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY 0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑PHOTO TAKEN INSPECTOR WILL RETURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 OwnerlContractor on site: Inspector. White Copyflnspector's File Canary Copyfte Notice c� TIME CITY OF ORONO _! LED w 3 INSPECTION NOTIC SCHEDULED PERMIT N COMPLETED ADDRESS co C,; -FU rA OWNER TELEPHONE NO. If(0`td S CONTRACTOR f, �- R(d F U l DESCRIPTION � % V cl.R ��C Zt-I emc,- ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAWGRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS h ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT v ❑ DEMO-SITE ❑ SEPTIC MAINT ❑ FOLLOW-UP ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL v ❑ PLUMBING RI ❑ SEP9QqFINAL ❑ FOUNDATIO /REMOVAL rNERICONTRACTOR TO MEET YOU: YES NO �/MMENTS: vi ° Ccv A-,,rs W13 10 —� ez.. Z W ' a WW ❑WORK SATISFACTORY:PROCEED ❑ ROJECT COMPLET W ❑CORRECT WORK 3 PROCEEDUE CE ATE OF OCCUPANCY OO ❑CORRECT WORK,CALL FOR REINSPECTION ///"' TEMPORARY C1 BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑PHOTO TAKEN INSPECTOR WILL RETURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on sit Inspector. White Copyllnspector's File Canary Copy/Site Notice DTE E VCITY OF ORONO CALLEDIN •�� 3 5' T INSPECTIONOIC SCHEDULED 5 PERMIT NO �� "� ��� COMPLETED ADDRESS OWNERS _ rn G-A-6L, TELEPHONE NO. (0 Z (A-,S-Ct(X�o CONTRACTOR L _b IC. Ldr DESCRIPTION U lr\SA ECLdh 6- `V`g` ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING Q El POURED WALL El MECHANICAL RI ElLAKESHORE/WETLANDS CT ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q B ❑ WATER HOOK-UP ❑ PROGRESS ❑ FINA ❑ SEWER HOOK-UP ❑ COMPLAINT DEMO-SITE ❑ SEPTIC MAINT ❑ FOLLOW-UP L1 DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL v ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL 2 OWNERICONTRACTOR TO MEET YOU:_YES_NO COMMENTS: W a d?p W c Q W W cc J d LU ORKSATISFACTORY.PROCEED ❑ PROJECT COMPLETE W 11CORRECT WORK&PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN ❑CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on sitg: Inspector. (/` White Copy/Inspector's File Canary Copy/Site Notice Planning . Zoning Depadment Memo To: Finance Department From: Christine Mattson, Planning Assistant CC: Street File Date: December 9, 2013 G/L: 101-22205 Re: Escrow Refund Building Permit#2012-01191 pertaining to 1065 Tonkawa Road is complete. The certificate of occupancy is ready to be issued. The Applicant, James Bebo, has requested a refund of his escrow in the amount of$10,000. The following is attached: • Escrow Refund Request • Email from Bolton&Menk indicating no unbilled WIP on this project • Email from Campbell Knutson indicating no unbilled WIP on this project • Original signed escrow agreement • Copy of cash register receipt showing escrow amount received HOLD FOR PICK UP: James Bebo 1065 Tonkawa Road Long Lake, MN 55356 wAstreet files\tonkawa road\1065\escrow refund memo 2011-01191.doc Christine Mattson From: David Martini [davidma@bolton-menk.com] Sent: Wednesday, December 04, 2013 10:10 AM To: Christine Mattson Subject: RE: Unbilled WIP It looks like we may$50.50 for 825 Willow Dr. The others, including 1065 Tonkawa are good. Let me know if you have questions. Thanks. David P. Martini, P.E. Bolton & Monk, Inc. P: (952) 448-8838 ext. 2458 M: (612) 756-4315 email: davidmaCaD-bolton-menk.com From:Christine Mattson [mailto:CMattson@ci.orono.mn.us] Sent:Tuesday, December 03, 2013 2:34 PM To: 'Sherry Charboneau'; David Martini Subject: Unbilled WIP Hi. Please let me know if you have any unbilled WIP for the following. Thank you! Zoning Permit# Building Permit# Address Owner 13-3643 825 Willow Drive S John Brunello 2013-00007 495 Oxford Road Michael Sample 2012-01245 3805 North Shore Drive 2011-01537, 2012- 3340 Graham Hill Rd Leroy& Lisa McCarty 00762 &2012-00904 2012-01042 2643 Thoroughbred Lane Judson &Aleya Champlin 13-3619 1380 Briar Street Paul &Jessica Warner Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway Orono MN 55356(physical address) PO Box 66 Crystal Bay MN ; 55323-0066(mailing address) 9 952.249.4620 g 952.249.4616 ® cmattson@ci.orono.mn.us www.ci.orono.mn.us Office Hours: Monday-Friday 8 am to 4:30 pm Christine Mattson From: Sherry Charboneau [SCharboneau@ck-law.com] Sent: Wednesday, December 04, 2013 9:34 AM To: Christine Mattson Subject: RE: Unbilled WIP Good morning Christine, Nothing for Campbell Knutson on this building permit. Sherry Sherry L. Charboneau Legal Assistant CAMPBELL KNUTSON P.A. 1380 Corporate Center Curve•Suite 317•Eagan,MN 55121 2(651)234-6230 9 Fax:(651)452-5550 ®scharboneau@)ck-law.com•www.ck-law.com From: Christine Mattson [mailto:CMattson(&ci.orono.mn.us] Sent: Wednesday, December 04, 2013 8:37 AM To: Sherry Charboneau; David P. Martini Subject: Unbilled WIP Sorry, one more... 1065 Tonkawa Road Building permit#2012-01191 Jim Bebo Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway Orono i MN ! 55356(physical address) PO Box 66 Crystal Bay 1 MN i 55323-0066(mailing address) 9 952.249.4620 A 952.249.4616 ®cmattson@ci.orono.mn.us -F� www.ci.orono.mn.us Office Hours: Monday-Friday 8 am to 4:30 pm OUR OFFICE WILL BE CLOSED: Wednesday, December 25,2013& Wednesday,January 1,2014 1 TEMPORARY CERTIFICATE OF OCCUPANCY ESCROW AGREEMENT Orono Building Permit#2012-01191 Demolition Permit#2012-00988 AGREEMENT made this day of /Vd , 202, by and between the CITY OF ORONO, a Minnesota municipal corporation ("City") and James Bebo ("Owners"). Recitals 1. Construction of the new residence located at 1065 Tonkawa Road the ("Subject Property"), legally described as the Northwesterly 128.21 feet of Lot 6, measured by right angles from the northwesterly line thereof, Auditor's Subdivision Number 217, Hennepin County Minnesota, is the subject of building permit application number 2012-01191 has been completed. 2. Winter conditions currently prohibit completion of exterior improvements, final grading, and vegetation establishment. An as-built survey cannot be accurately conducted at this time. 3. Owners request the City issue a temporary certificate of occupancy ("TCO") to the Owners so that the Owners may occupy the new residence. 4. The City will issue a TCO only if the Owners establish an escrow to ensure completion of exterior improvements, continuation of erosion control and submittal of an as-built survey to the City. NOW THEREFORE,THE PARTIES AGREE AS FOLLOWS: 1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow Agreement, the Owners shall deposit $10,000 with the City. All accrued interest, if any, shall be paid to the City to reimburse the City for its cost in administering the escrow account. 2. PURPOSE OF ESCROW. The purpose of the escrow is to assure completion of any exterior improvements, final grading, establishment of vegetation as well as guarantee reimbursement to the City for all out-of-pocket costs the City has incurred (including planning, engineering, in excess of $500, or legal consultant review) or will incur in reviewing the plan. Eligible expenses shall be consistent with expenses the Owners would be responsible for under a building permit application. The escrow will also guarantee reimbursement to the City for all out-of-pocket costs the City has incurred to assure that the work is completed in accordance with the Stormwater Pollution Prevention Plan and the provisions of Orono City Code Chapter 79. The financial security may also be used by the City to eliminate any hazardous conditions associated with the work and to repair any damage to public property or infrastructure that is caused by the work (including planning, engineering, or legal consultant review) associated with building permit #2012-01191 if compliance with the approved building permit is not accomplished. 3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in turn send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners' receipt of bill. 4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make payment to the City within the timeframe outlined in#3 above, shall issue a Stop Work Order until the Owners pay all expenses invoiced pursuant to#3. The City may draw from the escrow account without further approval of the Owners to reimburse the City for eligible expenses the City has incurred. 5. CLOSING ESCROW. The Balance on deposit in the escrow, if any, shall be returned to the Owners when the review has been completed and written notification is received from the Owners requesting the funds. 155441 6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible expenses incurred by the City exceed the amount in escrow, the City shall have the right to certify the unpaid balance to the subject property pursuant to Minn. Stat. §§415.01 and 366.012. 7. ACCESS TO SUBJECT PROPERTY. The Owners hereby grant to the City, its agents, employees, officers and contractors, the right to enter upon the subject property for the specific purpose of inspecting and completing any exterior improvements, final grading, establishment of vegetation and the restoration of the subject property should the Owners not complete the work by the specified dates. CITY: CITY OF ORONO OWNERS: r By. Its. 155441 '19 of Orono 2750 Kelley Parkway Orono NN 55356 92_249-4600 Receipt No: 3.010049 Nov 8 2013 Janes Bebo Previous Balance: .00 Permits 2013-01191 1065 Tonkawa 79500.04 Rd 101-22205 Deferred Rev-Developer Deposit Total: 7,500.00 Check - Check No: 16751 7,540.00 Payor: James Bebo Total Applied: 7,500.00 Change Tendered: .04 11/08/2013 11:27AN 111111111111111111110M CITY OF ORONO * 2013 - 01191 * 2750 KELLEY PARKWAY DATE ISSUED: 11/08/2013 ORONO,MN 55356- (952) 249-4600 FAX: (952) 249-4616 ADDRESS 1065 TONKAWA RD PIN 08-117-23-13-0001 LEGAL DESC AUDITOR'S SUBD.NO.217 LOT 006 BLOCK 000 PERMIT TYPE ESCROW FEE-OTHER PROPERTY TYPE RESIDENTIAL CONSTRUCTION TYPE ESCROW FEE-OTHER NOTE: THIS$7500 ESCROW IS FOR THE TEMPORARY CERTIFICATE OF OCCUPANCY-PAID WITH CHECK# 16751 APPLICANT ESCROW FEE-OTHER 7,500.00 BEBO,JAMES TOTAL 7,500.00 1065 TONKAWA RD LONG LAKE,MN 55356- OWNER BEBO,JAMES 1065 TONKAWA RD LONG LAKE, MN 55356- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the State Building Code.This permit may be revoked at any time for due cause. Applicant Permitee Signature Date Issued By Signature Date SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE. BUILDING PERMIT ESCROW AGREEMENT lot ' Orono Building Penmlt#2012.01191 and 104, � 'I Demolition Permit#2012-00988 AGREE MENT made this day of , 20L, by and between the CITY OF ORONO, a Minnesota municipal corporation ("City")and James Bebo "Owners"). Recital I 1. I A building pi�rmit application has been filed for a new principal structure located at 1065 Tonkawa Road the ("Subject Property"), legally described as The Northwesterly 128.21 feet of Lot 6, measured by right ang�as fro ` the northwesterly line thereof, Auditor's Subdivision Number 217, Hennepin County Minnesota. i 2. Own rs request thepCity to review this application. 3. The Pity Nill omm0nce Its review of the application and incur costs associated with said review only if the Ov�ner es blis es n escrow to ensure reimbursement to the City of its costs. i NOW THEREFORE, PARTIES AGREE AS FOLLOWS: 1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrawi Agreement, tie Own rs shall deposit an additional $500, for a total of$2,500 to be held by the City. All accrued interest, if any, shall paid to the City to reimburse the City for its cost in administering the escrow account 2. PU POSE OF ESCROW.The purpose of the escrow is to guarantee reimbursement to the City for 1x11 out-of-pocketcosts the City has incurred (including planning, engineering, in excess of $500, or legal consultant review) 0r will incur i reviewing the plan. Eligible expenses shall be consistent with expenses the Owners world be responsible for under a building permit application. The escrow will also guarantee reimbursement to th City for all ut-of-pocket costs the City has incurred to assure that the work is completed in accordance Oth th StormwaterPollution Prevention Plan and the provisions of Orono City Code Chapter 79. The financial secur' may also be used by the City to eliminate any hazardous conditions associated with the work and to repair a y damage tq public property or infrastructure that is caused by the work (including planning, engineering, or legs consultant review) associated with building permit•#2012.01191 and demolition permit #2012-00988 If corn liance with the approved building permit is not accomplished. s. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in tum send a bill to the Owners. owners shall be responsible for payment to the City within 30 days of the Owners' 1recsipt of bill. 4. DiS URSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make payment to the City within the 'meframe outlined in#3 above, shall issue a Stop Work Order until the Owners pay all expenses invoiced pursuant to #3. The City may draw from the escrow account without further approval of the Owners to reimburse the City foi eligible expenses the City has incurred. 5. CL SING ESCROW. The Balance on deposit in the escrow, if any, shall be returned to the Owners when the r iew has been completed and written notification is received from the Owners requesting the funds. S. CE TIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible expenses incurred by the City xc the amount in escrow, the City shall have the right to certify the unpaid balance to the subject property pu uant to Minn. Stat. §§415.01 and 366.012. CITY: ITY OF ONO 0 etil By: I Its: iiiiiiiiiiiiiiiiiiiiiillillilillim CITY OF ORONO * 2013 - 00072 * 2750 KELLEY PARKWAY DATE ISSUED: 01/28/2013 ORONO, MN 55356- (952) 249-4600 FAX: (952) 249-4616 ADDRESS 1065 TONKAWA RD PIN 08-117-23-13-0001 LEGAL DESC AUDITOR'S SUBD.NO. 217 LOT 006 BLOCK 000 PERMIT TYPE ESCROW FEE-APPLICANT PROPERTY TYPE RESIDENTIAL CONSTRUCTION TYPE ESCROW FEE-APPLICANT NOTE: THIS$500 ESCROW IS CONNECTED TO BUILDING PERMIT#2012-01191 AND DEMO PERMIT#2012-00988 PAID BY JAMES BEBO-CHECK# 16569 APPLICANT ESCROW FEE-APPLICANT 500.00 BEBO,JAMES ESCROW FEE-DEVELOPER 0.00 1065 TONKAWA RD TOTAL 500.00 LONG LAKE, MN 55356- OWNER BEBO,JAMES 1065 TONKAWA RD LONG LAKE, MN 55356- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the State Building Code.This permit may be revoked at any time for due cause. Applicant Permitee Signature Date Issued By Signature Date SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE. DEMOLITION PERMIT 2012-00988 ESCROW AGREEMENT AGREEMENT made this Z>' � day of OCf c 20/Z, by and between the CITY OF ORONO, a Minnesota municipal corporation ("City")and Jim Bebo ("Owners"). Recitals 1. An application for a demolition permit has been filed for an accessory structure located at 1066 Tonkawa Road ("Subject Property")legally described on attached Exhibit"A". 2. In conjunction with the demolition, erosion control measures are required as shown on attached Exhibit"B". NOW,THEREOFRE,THE PARTIES AGREE AS FOLLOWS: 1. DEPOSIT OF ESCROW FUNDS. Contemporaneously with the execution of this Escrow Agreement, the Owners shall deposit $2,000 with the City. All accrued interest, if any, shall be paid to the City to reimburse the City for its cost in administering the escrow account. 2. PURPOSE OF ESCROW. The purpose of the escrow is to guarantee reimbursement to the City for all out-of-pocket costs(including planning, engineering, or legal consultant review)the City has incurred to assure that the erosion control measures are installed and maintained so the property complies with the provisions of Orono City Code Chapter 79. The financial security may also be used by the City to eliminate any hazardous conditions associated with the work and to repair any damage to public property or infrastructure that is caused by the work. If compliance with the approved Land Disturbance Permit is not accomplished within the allowable time period, the City may bring the project into compliance by use of the security. 3. RIGHT OF ENTRY. The Owners hereby grant the City, its agents, employees, officers and contractors the right to enter the property to perform all work and inspections deemed appropriate by the City in conjunction with the required erosion control measures, including but not limited to constructing or completing any and all of the agreed upon improvements should the Owners' contractor not complete those improvements by the date specified herein. 3. MONTHLY BILLING. As the City receives consultant bills for incurred costs, the City will in turn send a bill to the Owners. Owners shall be responsible for payment to the City within 30 days of the Owners' receipt of bill. 4. DISBURSEMENT FROM ESCROW ACCOUNT. In the event that the Owners do not make payment to the City within the timeframe outlined in#3 above, shall issue a Stop Work Order until the Owners pay all expenses invoiced pursuant to #3. The City may draw from the escrow account without further approval of the Owners to reimburse the City for eligible expenses the City has incurred. 6. CLOSING ESCROW. Any remaining amount of the financial security deposited with the City for faithful performance of the plans and specifications and any related remedial work will be released after the completion and inspection of all such measures and the establishment of final stabilization for the Subject Property. 6. CERTIFY UNPAID CHARGES. If the project is abandoned by Owners, or if the eligible expenses incurred by the City exceed the amount in escrow, the City shall have the right to certify the unpaid balance to the subject property pursuant to Minn. Stat. §§415.01 and 366.012. CITY: CIT OF O OW S: By: Its: 150784 t2�3 I \ BOUNDARY AND TOPOGRAPHIC SURVEY FOR WNGHAEL R.WRfSkEY jig IN LOT 6,AUD:SUB.NO.217 3i HENNEPIN COUNTY, MINNESOTA 1 0 110- 01 0 0 80 SCALE IN FEET Zai if?low EXISTING HOUSE /-A yp� cneeiNNO �J �2Cy IFcwoExwrnowoFrnoAes ]$$ ; '3 1B Q =12921MdLot0.N.fd.BNN kmNmMr21T. ` Gln Th=b yWais/r0ouidwY+rq a�yd M.Ee.�G.wRM (C ogMboBmd.naY60�+tl19bW6+�M0Yd0eAY y /lam Q.� •:YmeYhYfPM O ��\ \ _ -SI. -w MWnN WMIWu�m YumddWn a DEMOLITION PERMIT 2012-00988 ESCROW AGREEMENT EXHIBIT "A"- LEGAL DESCRIPTION 150784 DEMOLITION PERMIT 2012-00988 ESCROW AGREEMENT EXHIBIT "B" - EROSION CONTROL MEASURES 150784 City of Orono 2750 Kelley Parkway Orono 92_249-4600 Iii 55356 Receipt No: 3.007743 Oct B, 2012 James Bebo Planning and Zoning 2 .� 1065 Tonkawa Rd , 101-22205 Deferred Rev-Developer Deposit Total: 2,000.00 Check Check No: 16518 2,000.00 Payor: James Bebo 2 0 .00 Total Applied: , Change Tendered: .00 10/08/2012 02:08PN r CITY OF ORONO * 2012 - 00997 * 2750 KELLEY PARKWAY DATE ISSUED: 10/08/2012 ORONO, MN 55356- (952) 249-4600 FAX: (952) 249-4616 ADDRESS 1065 TONKAWA RD PIN 08-117-23-13-0001 LEGAL DESC AUDITOR'S SUBD.NO.217 LOT 006 BLOCK 000 PERMIT TYPE ESCROW FEE-TIED TO BUILDING PERMIT PROPERTY TYPE RESIDENTIAL CONSTRUCTION TYPE ESCROW FEE-TIED TO BUILDING PERMIT NOTE: ESCROW TIED TO DEMO PERMIT#2012-00988-PAID BY:JAME BEBO CK#16518 APPLICANT ESCROW FEE-BUILDING 2,000.00 BEBO,JAMES TOTAL 2,000.00 1065 TONKAWA RD LONG LAKE,MN 55356- OWNER BEBO,JAMES 1065 TONKAWA RD LONG LAKE, MN 55356- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the State Building Code.This permit may be revoked at an�fimefforue cause. A li ant itee Signature Date PP � � g Issued By Signature Date SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE. Permit ��.. _ PIN 1.4 4 ► ►I ❑ u�N O �� Permit C: 2012-01191 Update_,Ad d re Permit Address: 11065Tonkawand r Main PIPS Address, r Additional PIN Addresss General I Fees Inspections(13) 1 Notes Applicant Detail CO Detail Seq Inspection Type Inspector Date Status H Fee Rec 1 Radon Prevention Inspection _- WGIB X5124/2013F Y 0 2 lRadon Prevention Inspection REINSPECTION LOMA 6!7/2013 P Y 0 3_ _i Footing - _ WGIB 3128/2013''P 0 44Poured Wal€ WGIB 1415/2013 P Y 0 5 IFoundatron Surve B/4 Fram€ng WGIB fif13f2013 P Y 0 6 j Framing _. .._ WGI6 •719/2013 P Y 0 • 7 Insulation ___ WGIB 7!18/2013 P - Y 0 • 8 Escrow Refund Requested 9 _Escrow Refunded _ _ _ 10 F€nal__._ .___.._ WGIB -__ 11!1!2013 Y 0 12 Erosion Control WGIB 41512013 Y 0 13 Lath - ------ - - -- .WGIB 9112/2013 P 0 Add New Delete