Loading...
HomeMy WebLinkAbout1998-010302 - new residence PERMIT CITY OF ORONO PERMIT TYPE: 2750 Kelley Parkway- P.O. Box 66Permit Number: '1 J C11 NG Crystal Bay, Minnesota 55323 Date Issued: 8`1 - (612)473-7357 06. 0 2 9ED SITE ADDRESS: 1040 TONKAWA RD jG 8-1 1 1-3-00 13 DESCRIPTION: NEW RESIDENCE Building Permit Type SGL FAMILY-NEW Building Work Type REE'*I DENCE UBC* Occupancy R-3 Construction Type VN Zoning LR-16 Census Code 101 1 - FAM. DETACH REMARKS: SEPARATE PERMITS REQUIRED FOR PLBG, MECH, FIREPLACE, LAWN IRRIGATION AND STATE WELL AND ELECTRICAL PERM 1TS. PROVIDE REVISED SURVEY TO SHOW AVERAtISE ! ,_:34QRF= _::'FZTFRAI'�� ­Q4IF_QRMT TY - - ---- --- - FEE SUMMARY: VALUATION $1 ; S001000 Base Fee $6,327 . 25 Plan Review $4, I5I . 71 Surcharge -------1zQQ_-QQ Total Fee $11 . 238 . 96 CONTRACTOR: Applicant - ST . LIC: .OWNER: LAVER HOMES, INC: 147-5:'_3:_3:"_-)0 20079015 WINSLOW BUXTON 390 FERNDALE RD W 1040 TO*%"AWA RD WAYZATA MN 55391 ORONO MN 5.5356 .12) 47J5—:-3':-33() 484-3061 THE UNDERSIGNED HEREBY REQUESTS PERMISSION 1-11 MAKE: T'148REAL­ IMPROAMI COMPL I ANCZ, VU TR: ALL, "Cl T SPECIFIED AND AGREE S TO DOXL WOW" IN STRICI , OF' ' ORONO ORDINANCES AND STATE OF MINNESOTA SUIL01COD Rt U I RT CV. D L APPLICANT/PERM ITEE SF*)P*2�FIE ISSUED BY:SIGNATURE Total Fee: $ Date Received: Entered By: Permit#: 3n �- C OF ORONO - BUILDING PERMIT APPLICATION All information must be submitted in full before plan review will be started. (please print all information) --- ------------------___— THE APPLICANT IS: (circle one) OWNER OR CONTRACTOR JOB SITE ADDRESS: J ()q6- Tb K)K UA ZIP: NAME OF OWNER: l )/YJS I.OW L3U XTO 0 PHONE: (home) q�q- 306 1 MAILING ADDRESS: CITY: (work) ZIP: CONTRACTOR: LhUtk HOmE 5S, 17Nc- PHONE: 75- 333d CONTACT PERSON:-7o oC Ka,0- 1'+'IOBiLE R: e qc( - eg-3 8 MAILING ADDRESS:50"? Fbt210QA1 E ;�OQW CITY: („}4X2fits}' ZIP: S STATE LICENSE: # 026C)71Qat ARCHITECT/ENGINEER: Byzoa scom irr- PHONE: q76`ba Aa MAIIdNG ADDRESS: 3a0 irY1191 D► LBA 5 o-k CITY: (,J4 YZ>f ff ZIP: 5534 NAME: REGISTRATION'# TYPE OF WORK: New Addition Accessory Structure Move Remodel/Alteration Land Alteration PROPOSED WORK(describe indetail): _CONSbW(U -2bN Of &)bL(j KOmE- STORIES: a SQ.FEET OF EACH FLOOR: t2l!S66 `TOM NO. OF BEDROOMS: GARAGE STALLS: ATT. DET. ESTIMATED CONSTRUCTION VALUATION(excluding land): $ SOD dr-0 I hereby apply for a building permit and I acknowledge that the information above is complete and accurate; that the work will be in conformance with the ordinances and codes of the City and with the State Building Code; that I understand this is not a permit and work is not to start without a permit; and that the work will be in accordance with the approved plan. APPLICANT'S SIGNATURE: DATE: ,C- 13 -9k NOTE! Parade Parade ofHomees events require separate permit approval by Police Department and City Council 60 days prior to the event. Non permitted events will not be allowed. 9 Sec.13.04 RIGRTS OF SUBJECTS OF DATA Subd. 1. Type of data. The rights of individual on whom the data is stored or to be stored shall be as set forth in this section. Subd.2. Information required to be given individual. An individual asked to supply private or confidential data concerning himself shall be informed of: (a)the purpose and intended use of the requested data within the collecting§tate agency, political subdivision,or statewide system; (b)whether he may refuse or is legally required to supply the requested data;(c)any known consequence arising from his supplying or refusing to supply private or confidential data;and(d)the identity of other persons or entities authorized by state or federal law to receive the data. This requirement shall not apply when an individual is asked to supply investigative data,pursuant to section 13.82,subdivision 5, to a law enforcement officer. The commissioner of revenue may place the notice required under this subdivision in the individual income tax or property tax refund instructions instead of on those forms. Subd. 3. Access to data by individual. Upon request to a responsible authority,an individual shall be informed whether he is the subject of stored data on individuals,and whether it is classified as public,private or confidential. Upon his further request,an individual who is the subject of stored private or public data on individuals shall be shown the data without any charge to him and, if he desires, shall be informed of the content and meaning of that data. After an individual has been shown the private data and informed of its meaning,the data need not be disclosed to him for six months thereafter unless a dispute or action pursuant to this section is pending or additional data on the individual has been collected or created. The responsible authority shall provide copies of the private or public data upon request by the individual subject of the data. The responsible authority may require the requesting person to pay the actual costs of making,certifying,and compiling the copies. The responsible authority shall comply immediately,if possible,with any request made pursuant to this subdivision,or within five days of the date of the request,excluding Saturdays,Sundays and legal holidays,if immediate compliance is not possible. If he cannot comply with the request within that time,he shall so inform the individual,and may have an additional five days within which to comply with the request,excluding Saturdays, Sundays and legal holidays. Subd.4. Procedure when data is not accurate or complete. An individual may contest the accuracy or completeness of public or private data concerning himself. To exercise this right,an individual shall notify in writing the responsible authority describing the nature of the disagreement. The responsible authority shall within 30 days either: (a)correct the data found to be inaccurate or incomplete and attempt to notify past recipients of inaccurate or incomplete data, including recipients named by the individual;or(b)notify the individual that he believes the data to be correct. Data in dispute shall be disclosed only if the individual's statement of disagreement is included with the disclosed data. The determination of the responsible authority may be appealed pursuant to the provisions of the administrative procedure act relating to contested cases. DATA PRIVACY ADVISORY In accordance with M.S. 13.04,Subd.2, "Rights of subjects of data", we would like to inform you that your request for a permit or license from the City of Orono or any of its departments may require you to furnish certain private or confidential information. You are notified that: 1. The information you furnish will be used to determine your qualification for the permit or license requested. 2. You may refuse to supply data, but refusal may require that the City deny the permit or license. 3. The information may be shared with other local, state or federal agencies to the extent necessary to process the permit or license. 4. If your requested permit or license requires Council action to approve, some information may become public. 5. You have certain rights under M.S. 13.04 (available upon request) to review private data on yourself. 6. Your full name is required to process this application or permit. First Middle bast Address City State Zip Phone I understand my rights as stated above. Signature CHECK OFF LIST FOR ISSUANCE OF PERMITS FOR OFFICE USE ONLY ADDRESS OR LEGAL: /O y p -rw<A w,4 PID: DESCRIPTION OF WORK: /vtty ---------------------------------------------- W ZONING REVIEW BY: DATE APPROVED: s--2 0 4 f4 BUILDING REVIEW BY: DATE APPROVED: s-- Z$- 59 ------------------------------------------------------------- FEES TO BE CHARGED: Misc. Fees Calculated By: PERMIT Yes r- ' No PLAN REVIEW Yes No SEWER CONNECTION STATESURCHARGE Yes No WATERCONNECTION INVESTIGATION FEE Yes No v PARK FEE SAC Ycs No SITEINSPECTION Number of SAC Units CAJ--DT F.*&, OTHER (specify) ----------------------------------------------------- 101 ---------------------------------------------------- ZONING CHECKLIST zoning District: 0t-1/3 Fire Department: (AwG Wgg Post Office: ,v� a ry School District: p,tp^rp i Lot Area: Sq.ft.6 OflK Acres /. St Width Z7 Depth Survey Submitted: Yes�_ No Date of Survey: Proposed Setbacks: + Fww (Lake): _ 1116 Right Side: j 0 Roar (Street): L4 00( + Left Side: 10` Adjacent Structures: /j//,¢ Wetland: N(p� Building Height: Def. Hgt. Peak Hgt. Lot Coverage: p. K— Grading: Staff Approval Date: ate' B 0 y� - ,. Council Approval Date: Septic: Staff Approval Date: A11,4 By: Zoning File: # 2319 Resolution: # OZN Resolution Date: /-Z&-Sft Shoreland District: Uef Avg. Setback: C% K— Bluff Setback: W1,4 Lot Coverage: Existing Proposed Hardcover: 0-75' 75-250' 250-500' 500-1000' Hardcover Variance Required: Yes No Date of Council Approval: REMARKS (in house): 26 BUILDING REVIEW CHECK LIST UBC: /Z.3 CONSTRUCTION TYPE: VN Sq Footage $ Per Sq Ftg Basement x = 1st Floor x = 2nd Floor x = Garage x = x = TOTAL Estimated Construction Value: Inspections Required: Work Requiring Separate Permits: Site X Plumbing Fire Hardcover Removal ,PC Mechanical Water Connection k_ Footing Septic Sewer Connection X_ Framing oC Fireplace A_ Lawn Irrigation , --ff_ Insulation X (Masonry) Other Wall Board (Mfg.) _X Well (State Permit) Final Grading/Filling k Electrical (State Permit) Other --------------------------------------------------------------------------- REMARKS (IN HOUSE): ------------------------------------------------------------------------------------------------------------------------ REVIEW BY OTHERS: DATE: Access: Existing New Access Approval: Date By: --------------------------------------------------------------------------------------------------------------------- REMARKS(TO BE NOTED ON PERMIT): (2=V+S C-S s uR u Av e."c,.C- cA t"Stfe" s-Q-T63 A C k Gx� Rte. 27 •� fiAKllLU�I✓It 1.:.-�Ll,�i.:� � 1U.� �� v1ttL�ri�;Lt �--'��,c:�� ,� ,. :, . ._. :,Y i SETBACK ZONE: (CIRCLE ONE) 0-7D 75-250' 25 500-1000' inna /- .EXISTING HARDCOVER IN ZONA f A. House x - S.F. fib' Len_eth Width x = S.F. x = S.F. x — S.F. B. Garage x = _ S.F. C. Driveway x = S.F. x -- = S.F. D. Sidewalk x _ _ S.F. x = S.F. E. Patio/Deck x _ = S.F. x = S.F. F, Landscape x = S.F. Underlain x = S.F. By Plastic x = S.F. Or Fabric G. Other x = S.F. TOTAL HARDCOVER IN ZONE S.F. A TOTAL PROPERTY AREA IN ZONE S.F. B A — B x 100 = "o PROPOSED HARDCOVER IN ZONE /Vp A. House x = S.F. Length Width x = S.F. x = S.F. x = S.F. B. Garaae x = S.F. _..___..C,_.. Driveway x = S.F. x — S.-F-., �-Ie,�igY D. Side waiic x = 74 S.F. x = S.F. E. Patio/Deck x = S.F. x = S.F. F. Landscape x = S.F. Underlain x = S.F. By Plastic z = S.F. Or Fabric G. Other z — S.F. TOTAL HARDCOVER IN ZONE S.F. A TOTAL PROPERTY AREA IN ZONE - 6e� S.F. B A -7¢ - B _`-f��� x 100 14 HARDCOVER CALCULATION WORKSHEET' SETBACK ZONE: (CIRCLE ONE) 0-75' 75-250' 250-500' 500-1000' �,Q000SEo HARDCOVER IN ZONE E A. House x = S.F. ___... _.. ..._. .... Length . _ .. Width .. x = S.F. x = . S.F. x — S.F. B. Garage x — S.F. C. Driveway x — S.F. x = S.F. D. Sidewalk x S.F. x _ = S.F. E. Patio/Deck x = S.F. x = S.F. F. Landscape x = S.F. Underlain x = S.F. By Plastic x = S.F. G. Other x = --- S.F. TOTAL HARDCOVER IN ZONE - S.F. A TOTAL PROPERTY AREA IN ZONE - S.FB A - B x 100 PROPOSED HARDCOVER rN ZONE A, House/Cwxl(,'r l CD-!irmo Offk x — _ y9�� S.F. Length Width x = S.F. x = S.F. x = S.F. B. Garage' x = S.F. C. Driveway. x S.F. x S.F. lioFw�ck 30 D. Sidewalk 0•fTEP x = 70 S.F. �� x = 25,0 S.F. cove. rue O------- E. Patio/Deck- x = 200 S.F. x — S.F. x S.F. Underlain - x _ S.F., ., .., By Plastic x S.F. �i1 c COAs`1 �D G. ��tierx = 761 A/C /prop S.F. TOTAL HARDCOVER IN ZONE - 689Q S.F. A TOTAL PROPERTY AREA IN ZONE - Z3,24OC7 S.F. B A X899 + B. x 100 = Z9. 7Y % T 13 ' �v��U�✓ / L.�u F� /zlG/�17 HARDCOVER CALCULATION WORKSHEET' SETBACK ZONE: (CIRCLE ONE) 0-75' 75-250' 250-50 500-1000' EXISTING HARDCOVERIN ZONE A. House x = S.F. Length width x = S.F. x = S.F. x — S.F. B. Garage x = S.F. C. Driveway x — S.F. x = S.F. D. Sidewalk x — S.F. .. x = S.F. E. Patio/Deck x = S.F. x = S.F. F. Landscape x — S.F. Underlain x = S.F. By Plastic x = S.F. G. Other x = S.F. TOTAL HARDCOVER IN ZONE - S.F. A TOTAL PROPERTY AREA IN ZONE - S.F. B A - B x 100 = % PROPOSED HARDCOVER IN ZONE A. House x — S.F. Length Width x = S.F. x = S.F. S.F. B. Garage' x = S.F. C. Driveway x = 3-1100 S.F. x = S.F. D. Sidewalk x = S.F. x = S.F. E. Patio/Deck x = S.F. x S.F. F. Landscape x = S.F. Underlain x = S.F. By Plastic x — S.F. G. Other oea,,e &-,14c4-f x = 70 S.F. TOTAL HARDCOVER IN ZONE - SS/70 S.F. A TOTAL PROPERTY AREA IN ZONE - 38726 S.F. B A ✓`/7 0 ,- B a7ZO x l00 = IV. 13 % 13 z-AUER HARDCOVER CALCULATION WORKSHEET' ray i-26--g� SETBACK ZONE: (CIRCLE ONE) 0-75' 75-250' 250-500' EXISTING HARDCOVER IN ZONE A. House x = S.F. Length Width x = S.F. x = S.F. x — S.F. B. Garage x — S.F. C. Driveway x = S.F. x = S.F. D. Sidewalk x — S.F. x ^ = S.F. E. Patio/Deck x = S.F. x = S.F. F. Landscape x — S.F. Underlain x = S.F. By'PCastic _ x G. Other x _ S.F. TOTAL HARDCOVER IN ZONE - S.F. A TOTAL PROPERTY AREA IN ZONE - S.F. B A - B x 100 = % PROPOSED HARDCOVER IN ZONE A. House x — S.F. Length width x = S.F. x = S.F. x = S.F. B. Garage' x = S.F. C. Driveway x = /DSO S.F. x = S.F. D. Sidewalk x = S.F. x = S.F. E. Patio/Deck x x — . S.F. F. Landscape x = S.F. Underlain x = S.F. By Plastic x -- S.F. G. Other x — S.F. TOTAL HARDCOVER IN ZONE - /o.So S.F. A TOTAL PROPERTY AREA IN ZONE S.F. B A /A3 S'O - B /eV$ZJ x 100 — /t'.412 % 13 ! 104C> Ttm-KAWev Y. SETBACK ZONE: (CIRCLE ONE) 0-75' 75-250' 250-500' 500-1000' IZ1Z/197 EXISTING HARDCOVER IN TONE A. House x = S.F.F. Length Width x = S.F. C�anyr; x = S,F. x = S.F. B. Garage x = S.F. C. Driveway x = S.F. x = S.F. D. Sidewalk x = S.F. x = S.F. E. Patio/Deck x = S.F. x = S.F. F. Landscape x = S.F. Underlain x = S.F. By Plastic x = S.F. Or Fabric G. Other x = S.F. TOTAL HARDCOVER IN ZONE S.F. A TOTAL PROPERTY AREA IN ZONE S.F. B A — B x 100 = % PROPOSED HARDCOVER IN ZONE /va GM,4N��-5 A. House x = S.F. Length width x = S.F. x = S.F. x = S.F. B. Garage x = S.F. C. Driveway x — S.F. x = S.F. D. Sidemai y x = 74' S.F. x = S.F. •E. Patio/Deck x = S.F. x = S.F. F. Landscape x = S.F. Upderlain x = S.F.. By Plastic z = S.F. Or Fabric G. Other TOTAL HARDCOVER IN ZONE - _ S.F. A TOTAL PROPERTY AREA IN ZONE i S.F. B A '7¢ B 4U x 100 O. _17- 14 14 HARDCOVER CALCULATION WORKSHEET' fPv /-Zg-- 9'? /'Pv s . SETBACK ZONE: (CIRCLE ONE) 0-75' 75-250' 250-500' 500-1000' fell -HARDCOVER IN ZONE A. House x = S.F. Length Width x = S.F. x = S.F. x = S.F. B. Garage x — S.F. C. Driveway x = S.F. x = S.F. D. Sidewalk x = S.F. x — S.F. E. Patio/Deck x = S.F. x = S.F. F. Landscape x — S.F. Underlain x = S.F. By Plastic x = S.F. G. Other x = S.F. TOTAL HARDCOVER IN ZONE - S.F. A TOTAL PROPERTY AREA IN ZONE - S.F. B A - B x 100 = % PROPOSED HARDCOVER IN 'LONE A. House,601K '6 fg:gx Of6K x — i y9�p S.F. Length Width x = S.F. x = S.F. x = S.F. B. 'Garage' x = S.F. C. Driveway x = //OQ S.F. x = S.F. 1/oEw,tck 30 D. Sidewalk j XrCR x = 10 S.F. " 1' x = ZSO S.F. Cojve. jr"e 2o E. Patio/Deck- x = 'ZOO S.F. y'uTu�c Ir.I�R�,v.I r x — 7/ S.F. R6TI/vNc �ei,�ee�' yS F-. iandseepo- x = S.F. Underlain x = S.F. By Plastic x S.F. %Ac CoA"V SD G. 6�dNcr x — 76 S.F. A/c /-4'#f --7 6 TOTAL HARDCOVER IN ZONE - d 9l O S.F. A TOTAL PROPERTY AREA IN ZONE - 23;20v S.F. B A 010 B x 100 = Z9. 71:3 % 13 15�UA/-ON / ZA LE CA i0/4/y • HARDCOVER CALCULATION WORKSHEET' f-Pv i-2 6-98 rPd S-/y. 9,? SETBACK ZONE: (CIRCLE ONE) 0-75' 75-250' 250-50 500-1000' 6 nv EXISTING HARDCOVER-IN ZONE A. House x = S.F. Length width x = S.F. x = S.F. x — S.F. B. Garage x S.F. C. Driveway x — S.F. x = S.F. D. Sidewalk x = S.F. x _ = S.F. E. Patio/Deck x = S.F. x = S.F. F. Landscape x — S.F. Underlain x = S.F. By Plastic x = S.F. G. Other x = S.F. TOTAL HARDCOVER IN ZONE - S.F. A TOTAL PROPERTY AREA IN ZONE - S.F. B A - B x 100 = % PROPOSED HARDCOVER-IN ZQNE A. House x — S.F. Length Width x = S.F. x = S.F. x = S.F. B. Garage' x = S.F. C. Driveway x = 51-100 S.F. x = S.F. D. Sidewalk x = S.F. x = S.F. E. Patio/Deck x — S.F. x — S.F. F. Landscape x = S.F. Underlain x = S.F. By Plastic x — S.F. G. Other u-,14a r x — 70 S.F. TOTAL HARDCOVER IN ZONE - 5'4170 S.F. A TOTAL PROPERTY AREA IN ZONE - "72d S.F. B A s117y r B. 3 720 x 100 = /y, 13 % 13 �vXroN /Z AuE,e IV/9/97 HARDCOVER CALCULATION WORKSHEET rPU i-26-9,? SETBACK .ZONE: (CIRCLE ONE) 0-75' 75-250' 250-500' 500-1000' " 709 6 L-9P "I EXISTING HARDCOVER IN ZONE C11dAQj A. House x S.F. Ungth Width x = S.F. x = S.F. x — S.F. B. Garage x S.F. C. Driveway x S.F. x = S.F. D. Sidewalk x S.F. x — S.F. E. Patio/Deck x = S.F. x = S.F. F. Landscape x — S.F. Underlain x = S.F. By Plastic x = S.F. G. Other x = S.F. TOTAL HARDCOVER IN ZONE - S.F. A TOTAL, PROPERTY AREA IN ZONE - S.F. B A s B x 100 = g; PROPOSED HARDCOVER IN ZONE A. House x — S.F. Ungth Width x = S.F. x S.F. x = S.F. B. Garage x = S.F. C. Driveway x = /O S O S.F. x = S.F. D. Sidewalk x = S.F. x = S.F. E. Patio/Deck x = S.F. x — S.F. F: Landscape x — S.F. Underlain x = S.F. By Plastic x — S.F. G. Other x = S.F. TOTAL HARDCOVER IN ZONE - /pSo S.F. A TOTAL PROPERTY AREA IN ZONE - /0080 S.F. B A /d So -- B. 141084 x 100 13 Buxton ' MNcheck COMPLIANCE REPORT i I Minnesota Energy Code I Permit MNcheck Software Version 2 . 0 I I Minnesota Department of Public Service 1-612-296-5175 1-800-657-3710 I Checked by/Date I I COUNTY: Hennepin STATE: Minnesota ZONE: 2 CONSTRUCTION TYPE: Single Family DATE: 5-6-1998 DATE OF PLANS: May, 1998 TITLE: Buxton Residence COMPLIANCE: PASSES Required UA = 1161 Your Home = 992 Area or Insul Sheath Glazing/Door Perimeter R-Value R-Value U-Value UA --------------------------------------- ----------------------------------------- CEILINGS 2181 44 . 0 0 . 0 60 CEILINGS : Raised Truss 1242 38. 0 0 . 0 32 WALLS : Wood Frame, 16" O.C. 5652 21 . 0 1 . 6 279 WALLS : Masonry 155 13 . 0 0 . 0 12 GLAZING: Windows or Doors 1253 0 . 300 376 GLAZING: Windows or Doors 454 0 . 310 141 GLAZING: Windows or Doors 208 0 . 270 56 DOORS 60 0 . 270 16 DOORS 64 0 . 320 20 HVAC EFFICIENCY: Furnace, 92 . 0 AFUE Page 1 Buxton ------------------------------------------------------------------------------- COMPLIANCE STATEMENT: The proposed building design represented in these documents is consistent with the building plans, specifications, and other calculations submitted with the permit application. The proposed building has been designed to meet the requirements of the Minnesota Energy Code. Builder/Designer Date NEW HOME FIELD INSPECTION ENERGY CHECKLIST MINIMUM REQUIREMENTS I OPTIONAL (CATEGORY 2) I (CATEGORY 1) I FOUNDATION: I [ ] Exterior foundation wall I insulation installed: I R- i [ ] Slab-on-grade insulation I installed: R- I [ ] Ducts in slabs have R-5 „I insulation bottom and sides I I I PENETRATIONS : I [ ] Window and door frames sealed I [ l Foundation rim joist sealed airtight [ ] Framed wall openings into attic I [ ] Upper story band joists sealed I sealed airtight [ ] Other joints in wall sealed I Page 2 Buxton [ J Dropped ceiling air-blocked I [ l Ceiling poly sealed to top of interior partition walls I [ ] Plumbing penetrations sealed I [ ) Exterior walls behind tub I and shower sealed I [ ] Plumbing vent stack sealed I [ ] Chimney flues sealed at ceiling I [ ] Perimeters of all grills and registers sealed to vapor I barrier 1 I [ ] Electrical service sealed i [ ] Recessed light fixtures sealed 1 [ ] Wire penetrations into attic I [ ] Electrical boxes sealed to sealed I vapor barrier [ ] Telephone, cable TV I penetrations sealed I [ ] Fans sealed where vapor barrier I [ ] Fan housings air sealed penetrated I I I NEW HOME FIELD INSPECTION ENERGY CHECKLIST PAGE 2 MINIMUM REQUIREMENTS I OPTIONAL (CATEGORY 2) I (CATEGORY 1) I INSULATION: I I [ ] Vapor barrier installed I Page 3 • Buxton i [ J Interior foundation wall ; I ( ) Vapor barrier installed I ( ) Insulation installed: R- I ( } Moisture barrier installed I I [ ] Attic insulation installed: I R- I [ ] Attic card posted with proof of bags installed I [ ] Floor insulation installed: I R- I [ ] Wall insulation installed: I ( ) R-19 ( ) R-21 ( ) R- I I WIND WASH BARRIERS: I [ ] Wind wash barrier installed at I [ ] All exterior joints in attic edge I building envelope sealed [ ] overhangs (cantilevered floors and bay windows) have wind wash I barriers I I MECHANICAL: 1 �I [ ] Ducts running outside conditioned I [ ] Residential mechanical space sealed and insulated I ventilation system with minimum of R-8 I installed (Mandatory if one [ ] Returns in same space as furnace I or more item in this column sealed I is checked) [ ] Ducts in unheated spaces I [ ] Water heater has pipe insulation or heat traps installed I [ ] Furnace AFUE: I Page 4 • - Buxton ] Central Air SEER: I I ----NOTES TO FIELD (Building Department Use Only) ------------------------- ❑ Page 5 BRUCE W (SCHMITT 0 cS (SOCIATE (S - PA. 320 MANITOBA AVENUE SOUTH WAYZAT , 1-1614 (612) 476-6222N FAX(61TA 2) Q C H I T E C T cS January 20, 1999 Mr. Bruce Vang Building Inspector City of Orono P.O. Box 66 Crystal Bay, MN 55323 RE: The Buxton Residence 1040 Tonkawa Road Dear Mr. Vang: Enclosed for your review please find a report from Richard Eckroad, a structural engineer, which relates to the rear stairs at the Buxton residence. Unless I hear from you otherwise, I will assume that this report meets with your requirements. In regard to your concerns relating to the front curved stairs at the Buxton residence, please he advised that Mr. and Mrs. Buxton have personally inspected these stairs and have approved them as roughed in. I did advise them of our concerns relating to this staircase, however, they have chosen to stay with the stairs as currently roughed in. Sincerely, bCEW. SC ITT &ASSOCIATES, P.A. W. Schmitt BWS/jm Enclosure cc w/enc: Ron Lauer, Lauer Homes , R Richard E.Eckroad.Inc. Consulting Structural Engineers 10130 36th Place North - Plymouth,Minnesota 68441 - (612)544-8599 January 19, 1999 Comm.No. 102-99 Mr. Bruce Schmitt Bruce Schmitt&Assoc. 320 Manitoba Ave.S. Wayzata, MN 55391 Re: House at 1040 Tonkawa Rd., Orono, MN Dear Sir, Reference is made to the design of the stair stringers for stair`B" in the above referenced home. The structural stringers shall be a 1/2 in. x 9 in. A36 steel plate by about 10 ft. long welded into a"dogleg", and bolted to the side of the 2 x 12 wood stair stringers and landing framing and ex- tending horizontally through the landing. Use 5/8 in. dia. bolts at 12 in. o.c. staggered up and down and add two additional bolts near the support points at each end and near the weld point. Use a full penetration weld plate to plate where the stair run meets the landing piece. Support at the ends is on beams or walls designed by others. Sincerly, Richard E. Eckroad P.E. Structural Engineer de f John H. Dahlmeier 612-472-4761 p. 2 � r J.H. Dahlmeier Engineering Inc. Febniary 6, 1999 J. L. White Company 8168 W. 125th Street Savage, MN 55378 Attn: John White Re: Residence Under Construction 1040 Tonkawa Orono,MN Commission No. 98275 Gentlemen: The purpose of this letter is to report the findings of a structural engineering review of the steel beam connections for this residence. ASSIGNMENT J. H. Dahlmeier Engineering Inc. has been retained to provide a structural engineering review and report regarding the steel framing connections for the residence under construction at 1004 Tonkawa, Orono, MN as directed by John White of J. L. White Company. BACKGROUND Due to some connection misfits, field welding was used to connect several steel members in the framing system for this residence. The City Building Inspections Department desires an independent structural engineering review of these connections. OBSERVATIONS AND COMMENTS 1. Site visits were conducted by John H. Dahlmeier of J. H. Dahlmeier Engineering Inc. on December 19, 1998 and February 3, 1999 to review existing conditions. 2. Detailed information regarding framing layout, loads and construction was obtained during the first site visit. Connections are essentially standard angle-beam welded connections. 2434 Commerce Boulevard Mound, MN 55364 (612) 472-4746 FAx (612) 472-4761 John H. Dahlmeier 612-472-4761 p. 3 ' J. L. White Company February 6, 1999 Page 2 of 2 STRUCTURAL ANALYSIS 3. Based on the above information, a structural analysis was conducted regarding the connections. Based on this information, it was determined that all welds should be a minimum 3/16"fillet along the length of the angle. 4. J. L. White agreed to inspect all welds and provide a minimiun of 3/16" welds at all connections. 5. A follow-up inspection on February 3, 1999 was conducted to review upgraded welds. All welds meet the minimum design requirement of 3/16" fillet weld based on visual observations. PROFESSIONAL OPINION 6. It is my professional engineering opinion that the connections for the steel framing for this residence are structurally adequate and meet the requirements of the Code. If you have any questions,please contact me. Sincerely, J' H' H.DA MEIER ENGINEERING,INC. Jo H. Dahlmeier, P.E. JHD:Im I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly registered professional engineer under the laws of the State of Minne ta. Minn ota egistration No. 9212 A DATE STIME CITY OF ORONO CALLED IN INSPECTION NOTICE SCHEDULED 40 PERMIT NO. COMPLETED ADDRES 14 ! PVJ OWNER / / CONTR 7 A TELEPHONE NO. 7 55' 3 333 GWPTION 01 FOOTING 11 MECHANICAL RI 18 EXCAWGRADING/FILLING 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS H O 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS 07 DEMO—SITE 27 SEPTIC MAINT. 21 COMPLAINT J 07 DEMO—FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL OWNER/CONTRACTOR TO MEET YOU:_YES_NO COMMENTS: LU Q. cc O O cc cc �` O U_ cc SSL C Q 1.20 LU e4 W O U1 WORK SATISFACTORY:PROCEED C PROJECT COMPLETE ac W ❑CORRECT WORK&PROCEED 1.- ISSUE CERTIFICATE OF OCCUPANCY ❑ CORRECT WORK,CALL FOR REINSPECTION TEMPORARY BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. r, PHOTO TAKEN INSPECTOR WILL RETURN CITATION ISSUED 1:1STOP ORDER POSTED.CALL INSPECTOR ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance.473-7357 Owner/Contractor on 1 : Inspector.- )_%i�6 White Copylinspector's File Canary Copy/Site Notice DATE TIME CITY OF ORONO CALLED IN /& /?8 INSPECTION NOTICE , a- SCHEDULED '71f319-Y / OC) PERMIT NO. COMPLETED 47 ADDRESS OWNER CONTR. TELEPHONE NO. 'iL-7�^ �7 75� DESCRIPTION W0101 FOOTING' 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING W 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS h O 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL Z OWNER/CONTRACTOR TO MEET YOU:_YES_NO o COMMENTS: QC a � J O a O LL W cc Q Z W W cc Z, d WW WORK SATISFACTORY:PROCEED El PROJECTCOMPLETE W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY OO ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY U BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance.473-7357 Owner/Contractor o ' e: Inspector. - White Copy/Inspector's File Canary Copy/Site Notice CITY OF ORONO CALLED IN — OTEV 16.1 • TI INSPECTION NOTICE SCHEDULED 7 " 13 PERMIT NO. n/0 3da COMPLETED ADDRESSa- OWNER Ga"ODn CONTR teQ TELEPHONE NO. DESCRIPTION T 01 FOOTING 11 MECHANICU RI 18 EXCAV/GRADING/FILLING Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS H 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z04 WALL BD. 12 WATER HOOK-UP SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP 06 PROGR 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT v 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL v 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL NER/CONTRACTOR TO MEET YES_NO COMMENTS: W a J O cc O W c Q Z W Z W rz d W ❑WORK SATISFACTORY.PROCEED ❑ PROJECT COMPLETE LU W El WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN ElSTOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance.473-7357 Owner/Contractor n s te: Inspector. White Copylinspectoes File Canary Copy/Site Notice DATETIME CITY OF ORONO CALLED IN II 0a !0! 00 4 INSPECTION NOTICE SCHEDULED PERMIT NO. COMPLETED ADDRESS ��/OWNER CONT . TELEPHONE NO. DESCRIPTION W 01 11 MECHANICAL RI 18 EXCAWGRADING/FILLING 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS ULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL Z OWNERICONTRACTOR TO MEET YOU:_YES_NO COMME TS: a to Ct f (� o S airy s cc 0 LL w cc Q z W z W CC d Wcc ❑WORK SATISFACTORY:PROCEED ElPROJECT COMPLETE W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY C) ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTOTAKEN INSPECTOR WILL RETURN ❑ CITATION ISSUED ❑STOP ORDER POSTED.CALL INSPECTOR ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance.473-7357 Owner/Contra r o��site: Inspector. v White CopylInspector's File Canary Copy/Site Notice DATE I E CITY OF ORONO CALLED IN */_ INSPECTION NOTICE SCHEDULED PERMIT NO. O/� 3 0,:2— COMPLETED ADDRESS a'� / OWNER )A CONTR. TELEPHONE NO. IT 3 S DESCRIPTIONX' _ W 01 FOOTI 11 MEC ICAL RI 18 EXCAV/GRADING/ ILLING 13 MECHANICAL FINAL 19 IAKESHORE/WETLANDS 03 INSULA ION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT v 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL OWNER/CONTRACTOR TO MEET YOU:_YES NO COMMENTS: W a cc J O a Cc O W ac Q Z W W cc j d LAJORKSATISFACTORY:PROCEED 1:1PROJECTCOMPLETE W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN ❑ CITATION ISSUED ElSTOP ORDER POSTED.CALL INSPECTOR ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the nexti spection 24 hours in advance.473-7357 Owner/Contractor i Inspector. White Copy/Inspector's File Canary Copy/Site Notice DAT,E/ TIlM�E� CITY OF ORONO CALLED IN `y INSPECTION NOTIC f`��Q -Z/ SCHEDULED � - 3— G'i 3 : cJ PERMIT NO. COMPLETED ADDRESS OWNER CONTR. TELEPHONE NO. 4L EL /:3 92 DESCRIPTION W 01 FOOTING 711 11 MECHANICAL RI 18 EXCAWGRADING/FILLING O�IWQ_,, 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS O 3 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z 04 WALL B 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT J 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL v 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL Q OWNER/CONTRACTOR TO MEET YOU:_YES_NO Z COMMENTS: cc W a cc J O cc O W Q Z W Z W d WORK SATISFACTORY:PROCEED ElPROJECTCOMPLETE W LIC ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY W Q ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. El PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance.473-7357 Owner/Contra n e: Inspector. White Copylinspector's File Canary Copy/Site Notice DATE TIME CITY OF ORONO CALLED IN 3- - -',?O INSPECTION NOTICE SCHEDULED PERMIT NO. 010 3( COMPLETED ADDRESS �U D -�8�� 'z" XCA OWNER Z,,aWl/ CONTR. z� TELEPHONE NO. DESCRIPTION W 01 FOOTIN 11 MECHANICA I 18 EXCAV/GRADING/FILLING 'Ll-02 FRAMING 13 MECHANICAL FINAL 19 LAKESHOREIWETLANDS O 3 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL Q OWNERICONTRACTOR TO MEET YOU:_YES_NO Z COMMENTS: cc W Q. ac J O cc O W W Q Z W z W CC Z) dW /WORK SATISFACTORY:PROCEED 11 PROJECTCOMPLETE CC ❑CORRECT WORK R PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY W O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. El PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ❑ CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance.473-7357 Owner/Contractor onsite: Inspector. White Copyllnspector's File Canary Copy/Site Notice DATE TIME CITY OF ORONO CALLED IN INSPECTION NOTICE SCHEDULED PERMIT NO. 02.. COMPLETED ADDRESS AL (1 OWNER �t CONT TELEPHONE NO. DESCRIPTION W 01 FOOTING 11 MECHANICAL RI 18 EXCAWGRADING/FILLING W 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS O 3 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL v 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL OWNER/CONTRACTOR TO MEET YOU:_YES NO COMMENTS: W a J O cc O W W CC Q Z W z W CC j d WXO RKSATISFACTORY:PROCEED ❑ PROJECTCOMPLETE cc ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY W ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ❑ CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next i spection 24 hours in advance.473-7357 Owner/Contractor stt Inspector. 'v White Copy/Inspector's File Canary Copy/Site Notice PATE TIME CITY OF ORONO CALLED IN INSPECTION NOTICE SCHEDULED PERMIT NO. COMPLETED r `( ADDRESS AT OWNER �Q�[ CONTR. TELEPHONE NO. DESCRIPTION Aaz_ t W 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS O 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z 4 WALL BD 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL Q OWNER/CONTRACTOR TO MEET YOU:_YES NO Z R COMMENTS: W a O O W W cc Q Z W z W oc j ORI RKSATISFACTORY:PROCEED Ll PROJECT COMPLETE ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑ CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next insDection 24 hours in advance.473-7357 Owner/Contrac it Inspector. White Copylinspector's File Cana pylSite Notice DATE �TIME qS, CITY OF ORONO CALLED IN INSPECTION NOTICESCHEDULED 3 PERMIT NO. 6IG30,r4 COMPLETED ADDRESS le) 610 IA' LI-066�ca OWNER CONTR. S TELEPHONE NO. ^g$3�5 DESCRIPTION14c, h ��� `� /e&-e �y f W 01 FOOTING 11 MECHANI AL RI 18 EXCAV/GRADING/FILLING W 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS Q 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION 05 FIN 14 SEWER HOOK-UP 06 PROGRESS 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP ? 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL Q OWNER/CONTRACTOR T MEET YOU:_YES_NO �J o CO MENTS: /' (/I^ `— -.-IC-IfoC cc 1- Q LQ i2 C� 1 4-17 cc: j4e l � S z // r� & , LU W ElWORK SATISFACTORY:PROCEED P, PROJECT COMPLETE 'r CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY W ` /1 O }L1 gORRECT WORK,CALL FOR REINSPECTION TEMPORARY Ci (( �BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ❑ CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance.473-7357 Owner/Contractor on site: Inspector.Z ' Q /e?_- CA'L L 1l r White Copy/Inspector's File Canary Copy/Site Notice C) DATE TIME CITY OF ORONO CALLED IN / �3—7,c, �2-cv INSPECTION NOTICE SCHEDULED -en PERMIT NO. O/D 3 0 Z COMPLETED Z 4 =y ADDRESS /0-5/0 +% OWNER CONTR. T aA.cL&,- TELEPHONE NO. DESCRIPTION LW 01 FOOTING 11 MECHANICAL RI 18 EXCAWGRADING/FILLING LL Q 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS y 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL 24 WAL� 12 WATER HOOK-UP 17 SITE INSPECTION 05 FINAL D 14 SEWER HOOK-UP 06 PROGRESS 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT v 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP = 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL v 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL OWNERICONTRACTO O MEET YOU:_YES_NO ZL 10 COf �� /^ -�)MENTS: CZ cc G < LLJ cc pGi LL e s Cr Q a W z W QC d W ElElWORK SATISFACTORY:PROCEED PROJECT COMPLETE QC'WCORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY W Q ❑CORRECT WORK,CALL FOR REINSPECTION _TEMPORARY BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. [I PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ❑ CITATION ISSUED ❑INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance.473-7357 Owner/Contractor on site: Inspector., oGt"r-) White Copy/inspector's File Canary Copy/Site Notice DATE 7 TIME CITY OF ORONO CALLED IN INSPECTION NOTICE SCHEDULEDe q"06 PERMIT NO. /rDS©a- COMPLETED /D ADDRESSa-- OWNER CONTR. Z-a-(�� 7 /�� TELEPHONE NO. / DESCRIPTION �-Pr n� 30d4,V$ G}Pj�4- -Mo- 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS In O 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION 05 FINA 14 SEWER HOOK-UP 06 PROGRESS 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT v 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL v 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL Q OWNER/CONTRACTOR TO MEET YOU:_YES_NO Z o COMMENTS: W a cc o_z LI L vn csz (� Q s PfC n 14 f,41 Z W z W CC Z) d W ❑WORK SATISFACTORY.PROCEED [71 PROJECTCOMPLETE CC ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY W Q �)15ORRECT WORK,CALL FOR REINSPECTION TEMPORARY 0 BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ❑ CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance.473-7357 O grlContracto\r�in site: Inspector,�C.t-,G C%;-4177 White Copylinspector's File Canary Copy/Site Notice DATE TIME CITY OF ORONO CALLED IN J6 '3'� �?esea�cl�le2 INSPECTION NOT/IC SCHEDULED PERMIT NO. L6 COMPLETED 0 'go ADDRESS 16V6 S I'1 K ZA20— OWNER CONTR. LQUf-d/ TELEPHONE NO. 3 '1Q-2&38 DESCRIPTION W 01 FOOTING 11 MECHANICAL RI 18 EXCAWGRADING/FILLING ILL 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS Q 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION ? 05 FINAL 'LO �u{� 14 SEWER HOOK-UP 06 PROGRESS 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT v 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL Q OWNER/CONTRACTOR TO MEET YOU:_YES_NO Z COMMENTS: 0 Q z SE'. 7 J ��►� W tu cc 1 (✓ ' (.�/ Q 1 ORK SATISFACTORY:PROCEED 11 PROJECT COMPLETE CORRECT WORK&PROCEED El ISSUE CERTIFICATE OF OCCUPANCY Q �CO RRECTT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN Q,STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED �PINSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance.473-7357 Owner/Contra/ptor on site: Inspector. ZgG ,- ! of White Copy/Inspector's File Canary Copy/Site Notice Dom`a,Tbb TIME CITY OF ORONO CALLED IN INSPECTION NOTICE SCHEDULED J::; PERMIT NO. COMPLETED ADDRESS OWNER CONTR. TELEPHONE NO. YGO 2— DESCRIPTION J W 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLING 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS Q 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION QFINAL 14 SEWER HOOK-UP 06 PROGRESS EMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT J 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL v 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL Q OWNERICONTRACTOR TO MEET YOU:_YES NO Z o COMMENTS: cc W a cc O cc O W cc Q Z W Z W cc W ORK SATISFACTORY:PROCEED PROJECT COMPLETE W 7 CORRECT WORK&PROCEED I UE CERTIFICATE OF OCCUPANCY W Q ❑ CORRECT WORK,CALL FOR REINSPECTION TEMPORARY BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. C' HOP TO TAKEN INSPECTOR WILL RETURN CITATION ISSUED [I STOP ORDER POSTED.CALL INSPECTOR ❑ INSPECTION REQUIRED.CALLTO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. 249-4600 Owner/Contor on site: I n spectoGC�`��—.y White Copy/Inspector's File Canary Copy/Site Notice