Loading...
HomeMy WebLinkAbout2003-P06950 - mechanical CITY'`OF ORONO PERMIT 2750'Kelley Parkway- PO Box 66 Permit Number: P06950 Crystal Bay, Minnesota 55323 Permit Type: Mechanical Permits (952) 249-4600 Date Issued: 10/28/2003 SITE ADDRESS: 847 Tonkawa Rd Long Lake,MN 55356 PID: 08-117-23-21-0003 DESCRIPTION: Proposed Use: Residential Permit Class: General Permit Type: Mechanical Permits Permit Sub-type(s): Multiple Mechanical Items DETAILS: Approved per resolution#: Separate permits required: NOTICES/REMARKS: FEE SUMMARY: Permit Fee: $ 625.00 Valuation: $ 50,000.00 State Surcharge Fee: $ 25.00 Misc.Fee: $ 1.50 TOTAL FEE: $ 651.50 APPLICANT: Seasonal Control,Inc. OWNER: Dennis&Shawn Vaillant 7620 Lyndale Ave S 847 Tonkawa Rd Richfield,MN 55423 Long Lake,MN 55356 THE UNDERSIGNED HEREBY REQUESTS PERMISSION TO MAKE THE REAL IMPROVEMENTS SPECIFIED AND AGREES TO DO ALL WORK IN STRICT COMPLIANCE WITH ALL CITY OF ORONO ORDINANCES AND STATE OF MINNESOTA BUILDING CODE REQUIREMENTS. Val—(c APPLICANT PERMITEE SIGNATURE ISSUED BY SIGNATURE Copies: 1-File(Siznitures Required). 1-Applicant. 1-Monthlv Reports. 1-Assessing. 1-Finance Page 1 CITY OF ORONO APPLICATION FOR MECHANICAL PERMIT Box 66 (2750 Kelley Parkway) Crystal Bay, MN 55323 GENERAL INFORMATION I. You may apply for mechanical permits by mail or in person at the City offices. Applications will be reviewed and a permit will be issued within two working days. 2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS POSTED ON THE JOB SITE. 3. Mechanical Designs-Complete calculations,details and specifications are required for each heating, ventilation,humidification-dehumidification, and air conditioning installation including heat loss/heat gain calculation, design temperatures, equipment ratings and identification as to type, manufacturer and model. Data shall be presented on form provided. Identification of and specifications for water heating equipment shall also be provided. 4. When any new construction or remodeling is involved, a separate building permit must be obtained. 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code requirements. 6. All work must be inspected(rough-in and final). Call(952)249-4600. 24-hour notice required. 7. House Heating Test Record must be submitted before final. Instructions Complete all items on this application. Compute the permit fee. Sign and date the certification. INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call (952) 249-4600. Please check one: [ New ❑ Addition ❑ r Re aiRe R p ❑ Replace � esidential ❑ Commercial JOB SITE: 9&/-( �'o u#CA k/A ?,4D n, Zip: 5 3 56 Owner's Name: 5Tosi ayooD AILLA-A/T Phone Number: qS z Mailing Address: `-c4 Zo DR City: ptQ I ff f 34e Zip: �y y 3 S� N Q- Contractor's Name: -, �QoC hone Number: k1q Z 3 Mailing Address: ZZ &M C 5T ity: Si LDS i5 4wzip: S S "16 Seasonal Control Inc 6225 Cambridge St Box A2 Space 29 St Louis Park, MN 55416 , PERMIT FEE CALCULATIONS) 2002 State Statute ❑ Yes This Section Applies The replacement of a Residential fixture or appliance that meets all three of the following requirements: 1) Does not require modification to electrical or gas service. 2) Has a total cost of$500.00 or less; excluding the cost of the fixture or appliance: and 3) Is improved,installed or replaced by the homeowner or licensed contractor. Skip next section; Cost of Permit $ 15.00 State Surcharge $ .50 Mail-In Fee $ 1.50 If above does not apply, follow guidelines below: 1. Contract Price* is .0125% of job with a Minimum Fee of($35.00) `- 50 000 ' x .4125 $ (contract price) (minimum$35.00) 2. State Surcharge. **Add the State Building Code Division a Minimum Fee of($ .50) !S-D DaO"° x .0005 $ ZS o`o (contract price) (minimum$.50) 3. Postage and Handling (Only mail-in applications) $ 1.50 4. TOTAL PERMIT FEE (Add lines 1-3 above) $ 6s/,So *CONTRACT PRICE or JOB COST means the actual or estimated dollar amount charged for the permitted work including materials,labor,profit,and other fixed costs. It is the amount to be charged to the customer for the work done.If any material, equipment,labor,or installation is furnished by the owner,tenant or any other party the reasonable market value of such items must be added to the estimated cost or contract price for permit fee purposes.In the event that there is a dispute on the amount of the job cost,the City may request the submission of a signed copy of the actual contract. **The STATE SURCHARGE is.0005 of the contract price under$1,000,000 or$.50-whichever is greater.For valuations over $1,000,000 call the Department of Inspectional Services for the price. The undersigned hereby applies to the City for issuance of a Mechanical Permit,agrees to do all work in strict accordance with the ordinances of the City and the regulations of the MinnesAa State Building Code,and certifies that all statements made on this application are complete,true orrect. Applicant's Signature: Date:f0 Z du Approved By: Date: 3 SYSTEM DESCRIPTION HEATING SYSTEMS Quantity: , Make: 1—ev kf©$, Le-Ari(/ Model: 14M 61 - 1!5-0 /�� ��l�AA 6 SO - &A IPZ�3 ?� L F r� Fuel: 0s l ri'ry� ' Z��i0 Flue Size: 3 V C Input BTUs: 0 (O0 aea0 Output BTUs: CFM: COOLING SYSTEMS Quantity: _L Make: b--ff41hC — /✓D.x LC.'1�A�c Model: •''716 T-0 g ff5 27-0-Z,� S 217.6 3 0 Tons: H.Power FIREPLACES GAS LINE ONLY ® Gas factory fireplace ❑ Installing a Gas Line Only ❑ Wood burning factory fireplace with flue ❑ Wood Stove ❑ Wood stove with flue Brand Name �� �-� Model No. Pr9► /1!T 0 F j VENTILATION No.�_Kitchen Exhaust duct recalculatingZ_�cfm No. Bath Exhaust(must have ct outside)G_ (00 -Zj�o cfm No. Other Fans: Locations -?-- - cfm FUEL STORAGE (MUST BE APPROVED BY FIRE MARSHAL) ❑ Installation or ❑ Removal ❑Fuel oil: gallons ❑ underground ❑ inside ❑outside ❑ LP Gas: gallons ❑ Other Gas opening 2 BUILDING AND INSPECTION DIVISION. DEPARTMENT OF COMMUNITY OEVELOPMENT, 2215 HEAT�LOSS CALCULATIONS ROAD, BLOOMINGTON. MINNESOTA~55�oLD Sr+Sa-ail Weatherstrips _! AG"a H.V. construction No. INSULATION [itoc BLOC 11e'indows Doors , Reference Out. Wall Int.Wall CeilingI Roof T Floor Kind How Applied Yes—No I Yes—No 19_ Fl,{ Room I Length 25 Width Height te4Room Length /7 QI'idth (q He] ht la Windows and Doors—Crackage and Area 23 Wi ows and Doors—Crackage and Area Width Mntnt No. at Llneat ft. Area ��\ width Hetgst Na of Lineal ft. Area ?I e. of Dane O(Dane Lanta o=cracl[ p it, /_ No. or Dane et Dana .lists of track 8C.tt. f' ` to T v -44OL- O Z _Z lee 1 (D Z Coef. Btu 2 2-V. Coef. Btu Infiltration I ltrati Class Glass S � tl CK _ F.xp. wall rJ Exp.wail Net exp. wall z 03 Net ext a Int. wall Int.w*n� Ceiling eS Ceiling _ '1'� L.S Floor Floor Total Biu. '9 3 Total Btu. Required sq. ft. E.D.R. or sq. ins. W.A. Leader area 1(6 Required 9. fL EDR or sq. i"W.A. Leader area 11.1_5=10 Room Length /S' Width Height !O - } y Fl. lou. m I Length - Width t L Height Windows and Doors--Crackage and Area ! -+— Width Helght No.of Lineal It. Area Win&w; and Doom-Craclage and Arta No. or pan* et Dane lights of eraek p.It. width sleight Na of Lineal It. Area { Na of Daae of Dano lights of crack sti.ft Z� 7-4 I TV 6 v Coef. Btu Coef. 13tu 1rlbltratiol: ?/ S D Infiltration Class Class Exp. wall Exp.wall _ Net exp. waU Nes tip.wall Int. wall I Int.wall Ceiling B Ceiling Floor _ Floor Total Btu. m 7�7 Total Btu. Required sq. ft. E.D.R. or sq. ins. WA Leader area Required sq. h. or sq. ins. WA Lader arra Fl. Room j Length /(,,, Width Height ! R- 2 � t. mll.ength /Z Width f Heighty Windows and Doors-Crackage and Area r t- Windows and Doors-Crackage and Area 60 Width Height No.of Lineal It. Area Width Height No.of Lineal ft Area No. of Dane or Dane lights of crack M, tLt Na of Dano of Dano light* of crack p.IN. r� Z 1! xL 511—1 Coef. Btu Infiltration SK 3 Infiltration ClassZ Class45- 4900 Exp. wall Exp.wall Net up. wall -2-Z O Net exp. wall — Int, wall Int. wall Ceiling Z Z Ceiling Floor Floor jt2- Total Btu. Total Btu. Required sq. ft. E.D.R. or sq. ins. W.A. Leader area Required sq. h. ED.R.or sq. ins. WA. Leader area BUILDING AND INSPECTION OivtSICN. DEPARTMENT OF COMMNITY HEAT•LOSS CALCULATIONS ROAD UBLOOMINGTON. MNNESOTANSS 311 SMPEE a Gal-sail 11Bit Weatherstrips AG"d' Construction No. INSULATION Otaom n Windows Doors Refercnce Out. Wall Int.Wall Ceiling Roof Floor Kind L How Applied fes—No I Y o 19_ t nom I Length Width Height I t,D Room length Width Height Windows and Doors—Crackage and Area 1Windows and Doors--Crackage and Area tvtdtn H. int �,. of Llneel ft. Area '7 width ?r o. of pane of Dane lisnu or crac •C !c. No. or Dan* of pane lights elf cranealck sq.It. � t 314 Coef. Btu 1coe f. 'Btu Infiltration ( 3. g 3 Infiltration Glass �, 5o Class � _ F.xp. wall Exp.wall Net exp. wall r!0 Net e: 5 Int. wall Int.wa Ceiling 52) Ceiling 20 FloorFl oor Total Btu. 2,7 tal Btu. Required sq. ft. E.D.R. or sq. ins. WA. Leader area Requited sq. fL E.DR or sq. ins. WA Leader area 1,,F7•l L-r✓r t/G Room( Length Width Height Fl.I Room I Length Width Height Windows and Doors—Crackage and Area / Windows and Doors--Ctacka a and Area width Height N0. et Lle..l ft Area g No. of pane et pane light& of etaek p,ft. � Width Haight No.of Lineal rt. Area No. of pane of base lights of track eq.ft 9T14b Z /6 7,0 17 Coef. Btu Coef. Bt�s Infiltration 2S /1A'S Infiltration ChsS L Class Exp. wall E:p. wall Net exp. wall Net exp. wall Int. wall r I inL wall Ceiling J ZrJ 810- 1 Ceiling Floor S� Z S D Floor Total Btu. Total Btu. Required sq. ft. E.D.R. or sq. ins. WA Leader area Required sq, ft. E.D.R. or sq. ins. W.A. Leader arca yFl. YoWV# Roam I Length 7 Width Height l FLI Room I Length Width Height Windows and Doors—Crackage and Area Windows and Doors—Crackage and Area Width Height No.of Lta.al ft. Area Width Height Ne.•f Lineal ft. Area No. of pane of pan• llghte of crack ed. ft s No. et pane of pane lights of crack e0.ft d- Coef. Btu Coef. Btu Infiltration 3 Infiltration Glass 7J S Glasa Exp. wall S Exp.wall Net exp. wall Z, Net exp.wall Int.wall tInt.wall Ceiling L Z n Ceiling Floor Z Z.5, Floor Total Btu. Total Btu. Required sq. ft. ED.R. or sq. ins. W.A. Leader area Required sq. h. ED.R. or sq. ins. WA Lader area r p ./ •1 �N�R/Ny n . ..- li O� t BUILDING AND INSPECTION OIvISICN, DEPARTMENT OF HEAT.LOSS CALCULATIONS Roao,"BLOOM BLOOMINGTON, MINNESOTA 2215 WEST41 S~Sal 5811 AS.H.V. Weatherstrips all Guide Construction No. INSULATION t3toc n Windows � Doors Reference ; Out. Wall f Int.Wall Ceiling Roof Floor Kind How Applied Yes—No Yes—No 19— F1.1 Room J Length P Width /C Height(op I Fl-1 1-if t!N Room I Length I WidthHei ht Windows and Door s—Crackage and Area Windows and Doors- rackage aid Area Width Ne.4nt Na. of Lineal Ct. Area Wlot a Helgat Na of Lineal ft. A»a No. of Dana of pane I,[k�a of crack tae ft. Ne et pan• of pan• ll ata of eraca p.ft. � �/J a L f Coef. Btu Coef.----Eto Infiltration latration S Glass Class �5 Fsp. wall Exp wall Net exp. wall Net ex �) Int. wall Int.w Ceiling _ Ceiling Floor z,S Floor Total Btu. Total Btu. Required sq. ft. E.D.R. or sq. ins. W.A. Leader area Required:Q. ft. EDR or sq. las. RIA Lader area f Fl•I Fo ya Room I Length 17 Width I Height FLS No.of Room M Length Width Height p Windows and Doors--- at Land Area i(I Ir Are WIdtO Height No. Lineal f4 Windows and Doors—Zrackaga and a !o Area Ne. of pane et pane a a of crack sq.ft. Width Salglt o Na of Lineal ft. Area I f No. Of pass of Mo* 11[hts of crack at.ft ----L3 g, 71 -- Z L S3 I /o b 1 /8 t C«f. Btu Infiltration T - 43)e o Coef• Btu Infiltration S Class Class Festa. wallS Fsp, wall Net exp. wall /$o Net exp.wall Int. wallInt. '� wall Ceiling Ceiling Floor ' Floor Total Btu. _ -- Total Btu. Required sq. ft. E.D.R. or sq. ins. WA Leader area Required sq. ft. E.D.R or sq. ins. WA Leader area Roan 1 Length Width Height 1 FLI e w t Room I Length / Width Height I,6 Windows and Doors—Crackage and Area ' Windows and Doors—Crackage and Area 12 -_ Width Hel[nt No.of Lineal It. Area / Midis Height NO. of Oen• of pane N[at• of crack p.It. \y Na of pan* or pato lights of crack ate.ad Lineal ft- rR Z (a B >L 3 1P �© I Y, lC• Coef. Btu C«f. Btu infiltration 35 Infiltration Class glass Exp. wall Exp.wan Net exp. wall r Net exp.wall Int. wall In'L wall Ceiling / Ceiling Floor Floor Total Btu. Total Btu. Required sq. ft. E.D.R. or sq. ins. W.A. Leader area Required sq. ft. ED.R or sq. ins. WA Luder area Bl11LOING ANO INSPECTION OIVISION. OCPARTMENT OF COMMUNITY OLO SM8 IO�1-44AkO ALCULATIONS ROA08LOOMNGTON, MINNESOTA'NEST41 Vk"atherstri s A CHde INSULATION Bit t3toom I R Construction No. Windows � Doors Refcrcnce Out. Wall Int.Wall Ceiling Roof boor Kind How Applied Yes—No Yes—No 19— J oom! Length 2 Width Z j Height Fl.{ Room Length ZZ, Width Nei ht Windows and Doors—Crackage and Arca t f f Windows and Door}--Cracka;e and Area Width Ht,ght Na. of Lineal ft. Area width Height No.of Ltaeal it. Aria No. of pan♦ of pane lithia et crack as ft. No. of pan et p•ne to of track >a• a 23 SU t7 c, Coef. Btu _ y '5(, 2 f. Btu Infiltration I 5 3 / Infiltration -1 Orb Class 60 Glass _ Fxp, wall Exp.wall Net exp. wall Zb . Net.e Int.wall Int.w Ceiling Ceiling AONW- Floor Floor Total Btu. 8O Total Btu. Requilied sq. ft. E.D.R. or sq. ins. WA. Leader area Required sq. ft. FDR or sq. ins. W.A. Leader area 0bR,j Room) Length j Width ,6 Height 11 5�(,tt Room l Lenstls L8 Width / Height 17 Windows and Doors---Crackage and Area-.t Waal tL Area Width Height N '�iadows and Door—Craclug a and Area N:. No. of parvo of p•n. 11 his et crack so- tt ' Width rtHglt Ns et Lla.ai tL Area Na. of pane or pass lights or crack p.In. �- /1 Coef. Btu Coef Bt Infiltration infiltration Glass Class Exp. wall Exp.wall Net c:p. wall _ r Net exp.wall Int. wallint.wall T- ie Ceiling Ceiling Floor � _Floor Total Btu. X2.5 Total Btu. Required sq. ft. E.DT4 or sq. ins. WA Leader area r Required sq. ft. ED.R or sq. ins. WA Leader arta Room I Length zk Width r Heigh_ t�� 1sa�.) ED Room I Length 23 Width Height 9k Windowsand Doors—Crackage and AreaWindows and Doors—Crackage and Area Width Height No.oI Llae•I ft. Area Mldtl Height Na st Linea!tt was s Ne, et paw. of p•n. nthse et creek W. tt. No. of pate of vaso lights of crack so.tt Q T, 3ZW 460 I 3 z— g b S 60 ► 5'r Coef. Btu Coef. Btu Infiltration Inhltra6on r X 68 Glass Glass (p'1 4!r 44a/ Exp. wall Exp.wall Z, Net exp. wall 'L q,S Net exp. wall tdL y Z Int. wall int.wail Ceiling Ceiling Floor Z7 -70-o o Floor Total Btu. Total Btu. Required sq. ft. ED.R. or sq. ins. W.A. loader area Required sq. ft. ED.R. or sq. ins. WA. Lader area v+ ` BUILCtNG ANO INSPECTION DIVISION. OEPARTMENT OF COMMUNITY VELOPMENT. 2215 553SHSol-Sall HEAT.-LOSS CALCULATIONS AOAOBLOOMINGTON• MINNESOTA 41 catherstrips `�G ide Construction No. INSULATION oil n Ve'i Doors Reference Out. Wall Int.Wal! Ceiling Roof not triad How Applied Ye , o es—No (( 19_— �l.J Vo (Length Cb Width Q He nom Length Width Height p _ Windows and Doors—Cra:kage and Area Windows and Doors--Crackage and Area tvto(n He.;nt ha. al Lineal ft. Area width Hat e.of LINe•i it. Area No. or pane of pan. 64h 14.1 al crack so It. Ne. of pan• .,4".0 h• _'Ill[oto of eratk N.ft. ZZ Z { Coef.1Btu i 1 _ Co,f.1 i Btu Infiltration ___ Inbltration Glass Clus _ Fxp. wall — Exp.wall Net exp. wall Int. wall Int.w Ceiling _ Ceiling — Floor 2+5 _ Floor - ZS I _ Total Btu. Total Btu. _— Required 1q. ft. E.D.R. or sq.-ins. GV --.A. Leader arca Re fired ft. ED4 or so. ins. WA Lender area - - 99 611r`' Room Length 2Width Height Room I Length Wall Height O Windows and Doors—Lrackage and Area W _ Windows and Doors--Craekzge and Arra Q wlatk Height No of Lia..l et was wlata H.tgae N• •t ua•at ft. Area " No. of pane of Dane lights a(crack •p. ft Na •f pad• •t Pasw, lights of crack z v —, Coef.1 Btu1.1 1 ptu Infiltration Y_« Int ration Glass _��-- Class —fir Exp. wan Exp.wan _ Net exp. wall _ Net a:p.wall Int. wall in'L wall Ceiling I Ceiling Floor _ 2•Sr Floor Total Btu. — — _.�/ Total Btu. Required sq. ft. E.D.R. or sq ins. WA Leader area Required sq h. D. or sq. ins. WA Leader area If 4— �t _. &_R.Room Len gth Width Height � FL mLen Zv Width 2L Height Windows and Doors--Cracks Se and Area Windows and Doors—Craekage and Arra 1 Width Het[rtt No of Lineai it. Area fI width Height Na•t Lln•al tL Ana No. o[Dano of D•n• I[hte of crack .y. It L j _Ks •f •e •t 3 Da pad No.lightsof •f crack $4.ft �Z _ Coef. Btu____j Coef. Btu Infiltratioa Infiltration 3 Class Class Exp, wall Exp.wall Net exp. wall Net exp. wall r Int. wan Int wall Ceiling Ceiling Floor Z„b Floor Total Btu. Total Btu. Required sq. ft_E.D.R. or sq. ins. W.A. Leader area Required sq. ft. ED.R, or sq. ins. WA. Lader area DATE TIME CITY OF ORONO CALLED IN INSPECTION NOTICE SCHEDULED / AW — PERMIT NO.J2 0(0 q SO COMPLETED ADDRESS OWNER CONTR.S2 C`261' � Ok=rro/ TELEPHONE NO. CSP - ( o l a- DESCRIPTION cc(4± iJ_)C (� 01 FOOTING 11HANICAL RI 18 EXCAV/GRADING/FILLING Q 02 FRAMING 1 ECHARrCAL 19 LAKESHORE/WETLANDS h 03 INSULATION 24/25 WOOD BURNERIFIREPLACE 34 TREE REMOVAL Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT v 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL v 10 PLUMBING FINAL 36 FOUNDATIOWREMOVAL OWNERICONTRACTOR TO MEET YOU:—YES—NO COMMENTS: a j 0 cc 0 W W c Q 2 W W ac tai WORK SATISFACTORY:PROCEED ,�ROJECT COMPLETEcc ✓ W ❑CORRECT WORK&PROCEED ❑ISSUE CERTIFICATE OF OCCUPANCY 0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY C1 BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑PHOTOTAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED ❑INSPECTION REQUIRED.CALLTO ARRANGE ACCESS. Call for the nex nspection 24 hours in advance. (952) 249-4600 Owner/Contr n i e: Inspector. White Copyllnspector's File Canary Copy/Site Notice DATE TIME CITY OF ORONO CALLED IN4-04 INSPECTION NOTICE SCHEDULED f' ` PERMIT NO. X50 COMPLETED ADDRESS �I � OWNER CONTR. TELEPHONE NO. DESCRIPTION � � 01 FOOTING 11<A4Er& ICAL RI 18 EXCAV/GRADING/FILLING Q 02 FRAMING 13 MECHANICA INAL 19 LAKESHORE/WETLANDS y 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL (z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT `j 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL 10 PLI NG FIN j 36 FOUNDATION/REMOVAL Z OWN RIcONTRACTOR O MEET YOU: 1_/YES_NO cc COMME W cc J O cc O W cc Q Z W Z W Z) d W� ,-,El WORK SATISFACTORY:PROCEED 11 PROJECT COMPLETE W0❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY C0 ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor o ite: Inspector. White CopylInspector's Fi Canary Copy/Site Notice