Loading...
HomeMy WebLinkAbout2013-00530 - demo CITY OF ORONO * 2 0 1 3 - 0 ®® 2750 KELLEY PARKWAY DATE ISSUED: 06/26/2013 ORONO, MN 55356- (952) 249-4600 FAX: 952)249-4616 ADDRESS 760 TONKAWA RD PIN 05-117-23-34-0007 LEGAL DESC PARTENS POINT 1 ST DIV LOT 013 BLOCK 000 PERMIT TYPE DEMOLITION PROPERTY TYPE RESIDENTIAL CONSTRUCTION TYPE DEMO-PRINCIPAL STRUCTURE ACTIVITY 645-SINGLE FAMILY HOUSES(ATT&DET NOTE: 1. FOUNDATIONS/ALL DEMO DEBRIS TO BE REMOVED FROM GROUND&DISPOSED OF OFF SITE,PER PCA REGULATIONS. 2. WELLS MUST BE ABANDONED. 3. INSPECTIONS DONE BEFORE BACKFILLING. NOTE: A 24-48 HOUR NOTICE IS REQUIRED FOR ALL INSPECTIONS. CALL(952)249-4600. SEWER MUST BE DISCONTINUED AT THE CITY SERVICE BY QUALIFIED CONTRACTOR BEFORE DEMO PERMIT IS ISSUED. CHECK TO MAKE SURE THIS PERMIT HAS BEEN PULLED BEFORE ISSUING THIS PERMIT. APPLICANT DEMOLITION-PRINCIPAL STRUCTURE 75.00 SCHRADER&COMPANIES STATE SURCHARGE DEMO 5.00 4725 EXCELSIOR BLVD 4300 ST LOUIS PARK,MN 55416- DEMOLITION-ACCESSORY STRUCTURE 50.00 (952)465-3582 TOTAL 130.00 Minnesota State License#: BC592473 OWNER BORDSON,BRENT&NANCY 760 TONKAWA RD LONG LAKE,MN 55356- AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to the approved plans and specifications,applicable City approvals,and the State Building Code. This permit is for only the work described and does not grant permission for additional or related work which requires separate permits. All provisions of laws and ordinances governing this type of work shall be compied with whether or not specified herein.This permit will expire and become null and void if construction authorized is not commenced within 180 days of the date of issuance,or if construction is suspended for a period of 180 days at any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with t tate uilding Code.This permit may be revoked at ime fo e cadse. Applicant Perm'ee Signature Date Pp IssuaC By Signature Date SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE. 2-q-)3 C,L_ 4(') O City of Orono FOR CITY USE ONLY P.O.Box 66 Date Received-_p Permit#p;1�13-0O 56 0 ,2750 Kelley Parkway Crystal Bay,MN 55323 Amount: $ SAC Credit: (952)249-4600 ' Homeowner(s)Signed: ❑Yes yF L� Resolutions(if any)Signed: None Required lgKES H O�� ZoningDisclosure Si one Required Y CITY OF ORONO - DEMOLITION PERMIT (All permits must be approved by the Building Official and/or Zoning Department) Job Site / Owner Information: Type: X Residential �-�❑ Commercial J Site Address: 760 / 5Nk4 H/� �D L�N� 141 � � 5535 Owner: NANCY ,0"So t1) Mailing Address: 5RM18r 10V55' City: // Zip: Phone: b1Zq• $� ' /76 7 Email: N4wle-y 0► /'t e- MdD1?6M• Cor" Contractor/Applicant Information: Contractor/App.: CyXJW tCo• Contact Person: /P Address: / 7Z S �,xC�-$I eqt, gwp State License#: Z Y 7 3 City: Sr• L&VIs eA�� Zip: Expiration Date: 3 31//C/ Phone: !SZ - V�o5' .35 8 Z Email: 1540ysf .SCh&xt Vn,Gowpi#w16 S, tom SPECIAL CONDITIONS & HOLD HARMLESS AGREEMENT General Instructions: - 1. You may be required to obtain other permits, i.e.: well abandonment, sewer, etc. 2. Work must not begin unless the permit,card is available on the job site. 3. A 24-48 hour notice is required for all inspections. Call (952) 249-4600. 4. Sewer must be discontiriued at the City service by qualified contractor before demo permit is issued. Demolition by means of: ❑ Manual Disassembly A Heavy Equipment ❑ Other Permit(s) Issued: X Sewer Disconnection /�] Well Abandonment# In return for issuance of said Demolition Permit, the undersigned owner hereby agrees to: ✓1. Submit a survey, aerial photo Ar sketch showing all structures on the property. Note which structures are to be demolished. /2. Submit a survey, aerial photo or sketch showing proposed erosion control measures in accordance with Chapter 79, Construction Site Runoff Control. /3. 3. Submit a copy of permit approval from the Minnehaha Creek Watershed District (MCWD). The City will not issue a demolition permit without a copy of the permit(s) from the MCWD or documentation stating permit(s)are not required. 413 .2_� ! 4. Submit a$2,500 escrow and an escrow agreement signed by the property owner. 5. Keep all structure(s)enclosed and/or secured until such time as demolition Is complete. 6. Keep all demolition debris off adjoining property and/or the public rights-of way unless specific prior approval Is obtained in writing for temporary use thereof: 7. Completely remove foundadon(s)from the ground. t3. Completely dispose of all demolition deice off site In accordance with at applicable PCA requirements. 9. Abandon water wells in accordance with State Health Department regulations. 10.Call for an Inspection when all debris has been removed,before backfilling. 11.Within 5 working days of superstructure removal,a final inspection shag be requested. The site shag be left clean and dear of all debuts, Wthh any excavation filled with earth level with the adjacent ground elevation(except when such excavation is to be used as part of a new building and such new building Is actually under oonskuc don) 12.Abandon septic systems per l4nnesots Rules Chapter 70W. AN septic tarks must be pumped, crushed and tilled with native sills. An inspection Is required after the tanks are pumped and before the tanks are crushed and filled. 13.The undersigned owner shall and hereby does Indemnify and hold harmless the City of Orono, ks agents, Moyes$and assigns from and against all Bairns, damages, losses or expenses, Including attorney fees, against the Cky, Its agents, employees and assigns arift out of or resulting from the demolition described herein as performed by the property owner, his employees.agues,subcahtractors or assigns. PERMff TYPE AND FEE CALCULATION J� $75.00—Principal Structure $ 'Is ct • [� $50.00—Accessory Structure x_L(how many) S'67 1. Subtotal of above permit requested $ /Z S- 2. State Surcharge 5.00 3. TOTAL PERMIT FEE (add lines 1-2 above) $ 7 •'� The undersigned herby applies to the City of Orono for Issuance of a Demotion Permit, agrees to do all the work In a strict accordance with the ordinances of the City and the regulations of the State of Minnesota,and certifies that aM statements made on this application are complete,true and correct. ApplicanVa Signature: V ' Date: (e i3 Owner's Signature: - � ��_ Date: T 0=i -i _ Approved By: Date: L - Z.4 - 1 V Z.y -1_ ir0 .4e11 •Zoning Disdosure Required YES ❑ NO 'This must be filled out by Zoning — e pran r.a Zoning Official must sign all applications. •Approved By: Date: (Zoning MINNEHAHA CREEK WATERSHED DISTRICT QUALITY OF WATER QUALITY OF LIFE Pursuant to Minnesota Statutes Chapter 103D, and on the basis of statements and information contained in the permit application, correspondence, plans, The Minnehaha Creek maps, and all other supporting data submitted by the applicant, and made a part Watershed District is hereof by reference, PERMISSION IS HEREBY GRANTED to the applicant named below for use and development of land in the Minnehaha Creek committed to a leadership Watershed District. role in protecting, improving and managing Issued to: Nancy Bordson Permit No: 13-219 the surface waters and Location: 760 Tonkawa Road Orono affiliated groundwater Purpose: Erosion Control— Single Family Home resources within the Date of Issuance: 06/13/2013 Date of Expiration: 06/13/2014 District,including their relationships to the By Order of th Board of Managers / ecosystems of which (; Steve Christopher they are an integral part. District Technician We achieve our mission This permit is not transferable without District approval, and is valid to the date of through regulation, expiration. No activity is authorized beyond the expiration date. If the permittee requires more time to complete the project, an application for renewal of the capital projects, permit must be received by the District at least 30 days before expiration. education,cooperative The applicant is responsible for compliance with all District Rules and for the endeavors,and other action of their representatives, contractors, and employees. programs based on Conditions: Project to be completed as described in plans submitted to the sound science, MCWD office on June 05, 2013 according to the provisions of this permit. innovative thinking,an . Properly install and maintain all required erosion control measures until the disturbed areas are re-stabilized informed and engaged When the site is re-stabilized and the MCWD staff has constituency,and the performed a final inspection, all silt fences must be removed cost effective use of public funds. (Statement concerning fees for inspections, violations, etc... on following page) 18202 Minnetonka Boulevard, Deephaven,MN 55391 •Office: (952)471-0590• Fax: (952)471-0682*www.minnehahacreek.org Inspection/Analysis/Monitoring Fees A site inspection and monitoring by District staff will be performed where the activity involves: • a commercial/industrial/multi-family residential development • a single family residential development greater than 5 acres or of any size if within the Minnehaha Creek subwatershed • any alteration of a floodplain or wetland • dredging within the beds, banks or shores of any protected water or wetland • a violation • any project which in the judgment of the District staff should be inspected due to project location, scope, or construction techniques In these cases, the applicant shall pay to the District a fee equal to the actual costs of field inspection of the work, including investigation of the area affected by the work, analysis of the work, and any subsequent monitoring of the work, which in the case of a violation shall be at least$35. Standard Fee Schedule District professional staff $ 57.74* District interns $ 36.44* District clerical staff $ 42.16* Consulting Senior Engineer $ contracted rate Consulting Engineer/Technician $ contracted rate District Counsel $ contracted rate Application fee $ 10.00 Copy costs $ .25 + actual staff time Color copy costs $ 1.00 + actual staff time * Hourly PRINCIPAL STRUCTURE DEMOLITION PERMIT ZONING DISCLOSURE & DECLARATION i y� To the property owner: Demolition of the principal dwelling structure on a property may \KfSHv��/ automatically terminate certain rights which may have accrued to the property by virtue of the continued existence of that building. This means you may give up some or all of the zoning rights currently associated with the principal structure (setbacks, hardcover, size of building, etc) with its removal. • Rebuilding on a substandard lot of record (i.e. a lot that does not meet the zoning district required lot area or width standards) may, with few exceptions, require variance approval by the City Council, and such approval is neither automatic nor guaranteed but requires that a.practical difficulty be demonstrated.,. • Additionally, all current zoning standards will have to be met by the new principal dwelling including setbacks, and building footprint, hardcover (impervious surface), &height limitations, etc. • Where municipal sewer is not available, provision of two (2) conforming on-site septic treatment sites is mandatory for a new dwet}ing.- • Unless specifically approved by the City, all accessory structures must be removed at the time of principal dwelling demolition. This also applies to seasonal and permanent docks, which may not be re-installed until a new principal dwelling has reached the framing stage. The following information is presented for the purposes of advising the property owner of the implications of removal of the principal dwelling on the property: 1. Property Address: 760 Tonkawa Rd PID# 05-117-23-34-0007 2. Zoning District:A--1..R-1B I Required Lot Area: 1.0 1 Required Lot Width: 140' Shoreland? Y21 N Actual Lot Area: 0.53 acre* I Actual Lot Width: 102'at 75'SB* * cording to Hennepin County data Lot area variance 's no required. Lot width variance i n required. City Code 78-72 3. Required Setbacks: Front NA Rear 30' Side 10' Side Street I NA Lakeshore Lot: I Lake (Front) 75' 1 Street(Rear) 30' Average Lakeshore Setba : si n 1' 4. Massing &Lot Coverage by Structures limited o/ of lot a does not apiplyto r > 2 c 5. Hardcover limitations: Are NOT applicable—or - Are applicab Stormwater Quality Overlay District Tie1 2 3 4 5 Tier 1 hardcover limit = 25%of gross lot 0( a 6. ✓ Municipal sewer is available. Municipal sewer is not available; on-site system testing and design must be provided confirming that two conforming drainfield sites are available. 7. _Wetland(s) present; a 35-foot setback is required. The undersigned property owner hereby acknowledges receipt of the above information. Staff Initials Property Owner's Signature Date (Original: Street File; Copy: Property Owner) Created: April 2013 Melanie Curtis From: Melanie Curtis Sent: Friday, June 21, 2013 11:43 AM To: 'Nancy Bordson' Cc: 'brody@schradercompan ies.com'; Christine Mattson Subject: 760 Tonkawa Rd - Demo Permit Attachments: Escrow Demo.pdf; Principal Structure Demolition Permit.pdf Nancy—please print and sign the attached. Also a $2500 escrow is required for the demolition permit. Thanks! Melanie Curtis Planning &Zoning Coordinator City of Orono 2750 Kelley Parkway Orono, MN 55356 Direct Dial: 952.249.4627 Fax: 952.249.4616 Planning &Zoning Office 952.249.4620 Email: mcurtisCdci.orono.mn.us Website: www.ci.orono.mn.us City of Orono Office Hours-SUMMER HOURS Monday - Thursday 7:30 am - 5 pm Friday 7:30 am - 11:30 pm 1 CITY OF ORONO CALLED IN ,%/ TIME INSPECTION NOTICE SCHEDULED PERMIT NO.a -n2:630 COMPLETED ADDRESS OWNER �TE,6EPHON NO. CONTRACTOR DESCRIPTION ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS y ❑ FRAMING ❑ MECHANICAL FINAL 0 E] TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT ❑ DEMO-SITE ❑ SEPTIC MAINT ❑ FOLLOW-UP ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL v ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL 2 OWNER/CONTRACTOR TO MEET YOU:_YES_NO y COMMENTS: W a j O ac O 2 W cc Q 2 W z W cc J W / RK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE W ❑CORRECT WORK&PROCEED ❑ ISSUE CERTIFICATE OF OCCUPANCY O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY C.1 BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN El CITATION ISSUED 11STOP ORDER POSTED.CALL INSPECTOR ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on site: Inspector. White Copy/Inspector's File Canary Copy1Slte Notice d1—Q ATE TIME CITY OF ORONO CALLED IN / INSPECTION NO I53� SCHEDULED �— - PERMIT NO. COMPLETEPj ADDRESS 700 OWNER TELEPHONE NO. 1 CONTRACTO > DESCRIPTION ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS ti ❑ FRAMING ❑ MECHANICAL FINAL O ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS ❑ FINAL ❑ SEWER HOOK-UP ❑ COMPLAINT J ❑ DEMO-SITE ❑ SEPTIC MAINT ❑ FOLLOW-UP i ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL v ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL OWNERICONTRACTOR TO MEET YOU:_YES_NO COMMENTS: W CL O CC A O O W Q _-pUj W O W ❑WORK SATISFACTORY:PROCEED ❑ PROJECT COMPLETE W ❑CORRECT WORK&PROCEED El ISSUE CERTIFICATE OF OCCUPANCY OO ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORECOVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN ❑STOP ORDER POSTED.CALL INSPECTOR ❑CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on site: Inspector. White Copy/Inspector's File Canary Copy/Site Notice DATE TIME CITY OF ORONO CALLED IN ' INSPECTION IgOTI-CE SCHEDULED PERMIT NO. D -'06.53( COMPLETED ADDRESS 760 - / OWNER TELEPHONE NO. 763 ql Z ZbS CONTRACTOR Sk/Z � DESCRIPTION F117,V Oe"yt� tv ❑ FOOTING ❑ PLUMBING FINAL ❑ EXCAV/GRADING/FILLING Q ❑ POURED WALL ❑ MECHANICAL RI ❑ LAKESHORE/WETLANDS ti ❑ FRAMING ❑ MECHANICAL FINAL ❑ TREE REMOVAL Z ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ SITE INSPECTION Q ❑ RADON SLAB ❑ WATER HOOK-UP ❑ PROGRESS ElFINAL E] SEWER HOOK-UP El COMPLAINT v ❑ DEMO-SITE ❑ SEPTIC MAINT ❑ FOLLOW-UP ❑ DEMO-FINAL ❑ SEPTIC INSTALL ❑ HARD COVER REMOVAL ❑ PLUMBING RI ❑ SEPTIC FINAL ❑ FOUNDATION/REMOVAL Z OWNER/CONTRACTOR TO MEET YOU:_YES_NO COMMENTS: cc W a cc J O cc O U_ W CC Q 2 W W G4W ❑WORK SATISFACTORY:PROCEED ❑ m4WECT COMPLETE Uj W ❑CORRECT WORK&PROCEED F-1ISSUECERTIFICATE OF OCCUPANCY OO ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑ PHOTO TAKEN INSPECTOR WILL RETURN 11STOP ORDER POSTED.CALL INSPECTOR El CITATION ISSUED ❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS. Call for the next inspection 24 hours in advance. (952) 249-4600 Owner/Contractor on site: Inspector. White CopylInspector's File Canary Copy/Site Notice ADVANCE SURVEYING di ENGINEERING CO. 6� Tom x w5300 S.Hwy.No.101 Minnetonka,MN 55345 Phone(952)474 7964 Fax(952)225 0502 W W W.ADVSUR.COM SURVEY FOR: GREGG LARSEN SURVEYED:March,2012 DRAFTED:March 19,2012 REVISED:May 30,2012,to show contours. LEGAL DESCRIPTION: Lot 13,Parten's Point 1st Division,Hennepin County,Minnesota SCOPE OF WORK&LRvIITATIONS: 1.Showing the length and direction of boundary lines of the above legal description. The scope of our services does not include determining what you own,which is a legal matter. Please check the legal description with your records or consult with competent legal counsel,if necessary,to make sure that it is correct,and that any matters of record,such as easements,that you wish shown on the survey,have been shown. \ 1 2.Showing the location of existing improvements we deemed important. 3.Setting new monuments or verifying old monuments to mark the comers of the property. \ 4.Showing and tabulating hard cover area and the area of the lot for your review and for the review of such governmental \ agencies that may have jurisdiction over hard cover requirements. 5.Showing elevations on the site at selected locations to give some indication of the topography of the site.We have also \ provided a benchmark for your use in determining elevations for construction on this site.The elevations shown relate only to the benchmark provided on this survey. Use that benchmark and check at least one other feature shown on the \ survey when determining other elevations for use on this site or before beginning construction. \ STANDARD SYMBOLS&CONVENTIONS: \ "0"Denotes 1/2"ID pipe with plastic plug bearing State License Number 9235,set,unless otherwise noted. \ r CERTIFICATION: I hereby certify that this survey was prepared by me or under my direct supervision and that I am aessional Engin_eeragdrO ssional Surveyor under the Laws of the State of Minnesota \ Parker P.E.&P.S.No.9235 �, \ tOa _ L o arena O ��O \ s6�•� 11fr" ��16 Sj Q' '�-un • �� 151.00!' EA �y,!, 4 NIT SE„ygi ,\ / .� �2SO•�! app o� � � ���w/oM '✓"\ 4�, \ \`s�'�e ���' lota \ H J'' \ _�G, 1 �\NEIL-, \ . .\ ��},\ 0�;••`\ Q} ._ \f` \ }S�. ' �eusm''e•>.v`e wP[ �f.nxWN O�"'.- � \� � .�c�', \ \ \�\Z.r�F i`,,_-�_ r"`'I`�` c` ' / L Tv�a��°0� _ �'' --�1�•� -- o ` 2fi48 E 9sz. f, ��— \\ \\\\ 7 - OusnSG I GRAPHIC SCALE b 1 \ GARAGE 2�0 oo--t{{o zo 40 `\ •, ( IN Feer) \ =' 0#22. NO. 1.20085 TOPO 5 30 1,2 7 (moo