HomeMy WebLinkAboutRe: as-built-2017 00 DATE TIME CIN OF ORONO CALLED IN INSPECTION NOTICE SCHEDULED g7-I _ PERMIT NO. 2�D J 6C63(o COMPLETED Z7 ADDRESS coup — w KawoL 0, OWNER TELEPHONE NO. CONTRACTOR IL c DESCRIPTION ❑ FOOTING ❑ DEMO-FINAL ❑ SEPTIC FINAL ❑ POURED WALL ❑ PLUMBING RI ❑ EXCAV/GRADING/FILLING O ❑ FOUNDATION WATERPROOF ❑ PLUMBING FINAL ❑ TREE REMOVAL Z ❑ RADON SLAB ❑ MECHANICAL RI ❑ SITE INSPECTION ❑ FRAMING ❑ MECHANICAL FINAL ❑ RATED WALLS ❑ INSULATION ❑ WOOD BURNER/FIREPLACE ❑ COMPLAINT ❑ FINAL ❑ WATER HOOK-UP ❑ FOLLOW-UP W ❑AS BUILT-SURVEY [3SEWER HOOK-UP ❑ FOUNDATION/REMOVAL Q ❑ DEMO-SITE ❑ SEPTIC INSTALL Z OWNHUCOKTRRCTOR TO MEET YOU:_YES_NO COMMENTS: 1p C !C l✓f W W W O WORK SATISFACTORY:PROCEED ❑PROJECT COMPLETE W ❑CORRECT WORK&PROCEED O ISSUE CERTIFICATE OF OCCUPANCY W C O CORRECT WORK,CALL FOR REINSPECTION TEMPORARY V BEFORE COVERING PERMANENT ❑CORRECT UNSAFE CONDITION WITHIN HOURS. ❑PHOTO TAKEN INSPECTOR WILL RETURN CITATION ISSUED O STOP ORDER POSTED.CALL INSPECTOR O INSPECTION REOUIRED.CALL TO ARRANGE ACCESS. Can for Vw next Nnspw*m 24 hours In asldw om (952) 249-4600 site: wid Copymspsetoes FRO CsnsryCopyiM Nodos . f Christine Mattson From: Adam Edwards Sent: Friday,August 04, 2017 8:22 AM To: Christine Mattson Cc: Melanie Curtis Subject: RE: 660 Tonkawa Road/#2016-00536 Chris, The as-built appears to conform to the intent of the approved plan. An inspector should conduct a site visit and confirm the following: 1.The survey accurately depicts conditions on the ground. 2.The site is stabilized to the point the any remaining erosion control can be removed. 3.The Drainage pattern on the south side of the home does not direct surface water onto the neighboring property. Adam From:Christine Mattson Sent:Tuesday,August 01,201710:10 AM To:Adam Edwards<aedwards@ci.orono.mn.us> Cc: Melanie Curtis<MCurtis@ci.orono.mn.us> Subject: RE:660 Tonkawa Road/#2016-00536 Adam, We received an as-built survey for 660 Tonkawa Road. Please review and provide comments. Thank you! From:Adam Edwards Sent: Friday,September 09, 201611:17 AM To:Christine Mattson<CMattson@ci.orono.mn.us> Cc: Melanie Curtis<MCurtis@ci.orono.mn.us> Subject: RE:660 Tonkawa Road/#2016-00536 Chris, The surveys in the packet are not As builts. They appear to be revised site/grading plans. Changes from the last plan appear to be the addition of some retaining walls. I've stamped it approved however have the following comments. 1. The site plan still does not depict the sanitary sewer line. (note- I red lined it on the last set of plans) see also green line on image below. Any earth disturbing activities within its vicinity must be coordinated with Public works to ensure adequate cover(min of 8 ft) is retained above the pipe. 1 Christine Mattsonl �� From: Roger Peitso Sent: Tuesday, September 05, 2017 8:24 AM To: Christine Mattson Subject: RE: 660 Tonkawa Rd No, That is where the turf had not been established was on the road side of the house. Roger From:Christine Mattson Sent: Friday, September 01, 2017 10:26 AM To: Roger Peitso<rpeitso@ci.orono.mn.us> Subject: FW: 660 Tonkawa Rd Roger, This site looks better. Do you think you need to visit the site or will the pictures suffice? Chris- From:James Lura [mailto:ilura@pillarhomes.com] Sent: Friday,September 01, 2017 10:17 AM To: Christine Mattson<CMattson@ci.orono.mn.us> Subject: FW: 660 Tonkawa Rd Christine The first two photos are your original photos. The next two photos are existing conditions. James From: James Lura Sent: Friday, September 01, 2017 10:15 AM To: 'CMattson@ci.orono.mn.us' Subject: FW: 660 Tonkawa Rd Christine Hopefully we are in good shape here. Are the pictures good enough or do you need to do a site inspection. If so, please let me know a general time frame so that I can give the homeowners the feed back. Thank you James From: Mike Ladd [mailto:Mike.Ladd(-@cohasset.com] Sent: Friday, September 01, 2017 10:02 AM 1 lo: unrlsune IVId LU)Un�,I,IVIdLLJUf1LwL,I.UiUiw.11111.ua- Subject: 660 Tonkawa Rd Christine 2 I wanted to check on the status of 660 Tonkawa Rd. I turned in the as built survey on Monday. Thank you James Lura Pillar Homes 3 IN z a Poll fir INV IT FAM "9 Y ��.'� � Lam' Y� L �.1�� ��• f ; ? r r.?ir ' F G 4` k`aU o e .fir.. Christine Mattson From: Christine Mattson Sent: Tuesday,August 08, 2017 8:49 AM To: 'James Lura' Cc: 'mike.ladd@cohasset.com' Subject: RE: 660 Tonkawa Rd Attachments: IMG_0085.JPG; IMG_0084.JPG Hi James The as-built survey has been submitted and reviewed. The City finds the as-built survey reflects current site conditions; however, rear(street side)of the property does not have established vegetation. Attached are some photos taken at the site. Per City code, established vegetation means perennial cover with a density of 75%. Seed blankets or sowing grass seed it not considered established vegetation. Please call for a re-inspection after vegetation is established. Don't' hesitate to contact me if you have any questions. Christine Mattson Planning Assistant City of Orono 2750 Kelley Parkway I Orono I MN 155356(physical address) PO Box 66 I Crystal Bay I MN 55323-0066(mailing address) 9 952.249.4620 18 952.249.4616 ® cmattson@ci.orono.mn.us I -2� www.ci.orono.mn.us Summer Office Hours: (Monday,May 22 through Friday,September 1,2017) Monday-Thursday: 7:30 am to 5 pm Friday: 7:30 am to 11:30 am OUR OFFICE WILL BE CLOSED: Monday,September 4, 2017 ........... .... From:James Lura [mailto:jlura@pillarhomes.com] Sent:Wednesday,August 02, 2017 11:39 AM To:Christine Mattson<CMattson@ci.orono.mn.us> Subject:660 Tonkawa Rd Christine I wanted to check on the status of 660 Tonkawa Rd. I turned in the as built survey on Monday. Thank you James lura Pillar Homes i t `sIZ4 4 s �rye .• _ 'Y vp µll 1 r2 'f T. �• Y F _ N.` r7H n. FS Ilk l '�' ' � n �'�,� fit' a � "•�10 �` rs'• 1 F ,tj xZ 1, eY .Yia i4 r .t r�r':a'f �,� �k+ .. � I \ ,y �,.x'� , f ,�?y ��#�a7 �`a• 4(1 17 I. P d u 1 t � . f r R Ak t: I F� a t.,. Y, y I � J At ; o,• * w -Ad&Mkkl AWL. IFF I A n +S u _.of -r AA MW1wrM � � I / fit .41 ft. J 4 r � i ,.r s J i+. TIC f I _ r 1 1 µ 11 r , City of Orono �otio Hardcover Calculation Worksheet 1 Property Address: 6,.60 TGk.�eI t•,viE� Lted 00c. -ro(i ivBR C4 1k) e FsyOp` Prepared by: Date: _ G 0A-ldfRGifA110C1 7-f;,Ixc. 7-,/9-/7 Stormwater Quality Overlay District Tier: (Circle one) Tier Tier 2 Tier 3 Tier 4 Tier 5 Step 1: XISTI HARDCOVER In the following table identify all items of existing hardcover on the property, keyed by letter to Certificate of Survey (survey must accompany this form). Use as many lines as necessary to accurately depict existing hardcover status of the property. For Tier 1 properties, identify any features by letter which are split at the 75' setback line and calculate hardcover square footage separately for each portion. Key Survey Hardcover Item(Describe) Length x Width Total (Square Feet (Example) (Garage 24'x 30' 720 S.F. A S S.F. B G S.F. C If S.F. D E S.F. S.F. F I ,,,f S.F. G n44 S.F. H S.F. I S.F. J /o R S.F. K S.F. L , S.F. M z Zjk F170A.rc S.F. N TMr49 7 S.F. O S.F. P S.F. Q ek AgAQCog S.F. R c&- _r 2f3 S.F. S S.F. T S.F. U D rr k it j1r F'If T"&A 9' 1349 S.F. V S.F. W S.F. X S.F. Y S.F. Z S.F. 1 Total Existing Hardcover 5.757 S.F. Excludable Hardcover See City Code Sec 78-1884): &aLL ogfrrlagr O -7 S.F. • G S.F. • fr Z04"16, 3 S.F. S.F. S.F. 2 Total Excludable Hardcover SV S.F. 3 Net Existing Hardcover Subtract line 2 from line 1 Y S.F. 4 Total Lot Area S.F. Proposed Hardcover Percentage [(3)+(4)] 23-S.7 % RECEIVED(Prop°sed Hardcover next page) Subdivision Application-Jams 2016 This is an information packet fforffi n o w� MP �Y re9�i,���r�d►lZiry a assn ade to ensure the accuracy of the informaWiL in;however,If any Information is not consistent with provisions of the City Code,the Code provisions will prevail. Page 18 CITY OF ORONO 2CI(O '00531r Ai -DWI f 0C.. Ca U