HomeMy WebLinkAbout2000 - final inspection-no permit on file DATE TIME
CITY OF ORONO CALLED IN
INSPECTION TIC Old SCHEDULED
PERMIT NO. COMPLETED _ .mow 3- �O
ADDRESS O O
OWNER CONTR. CCS
TELEPHONE NO. 9LLk(l-_I0(00
DESCRIPTION �r�hG�. Qema
W 01 FOOTING 11 MECHANICAL RI 18 EXCAWGRADING/FILLING
02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
y
Q 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
J 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
J 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
OWNER/CONTRACTOR TO MEET YOU:_YES_NO
Z,) CID EN)[S:
W ' deze
Q C,/,o �a -P �c 21 .
O
`C D s�
Q
z
W
W
Z)
LOU
W RK SATISFACTORY:PROCEED OJ ECT COMPLETE
�
W 11CORRECT WORK&PROCEED L ISSUE CERTIFICATE OF OCCUPANCY
Q ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
BEFORE COVERING
PERMANENT
❑CORRECT UNSAFE CONDITION WITHIN HOURS. PHOTO TAKEN
INSPECTOR WILL RETURN
"
1', STOP ISSUED STOP ORDER POSTED.CALL INSPECTOR �
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. 249-4600
Owner/Contractor on site:
Inspector. G
White Copy/Inspector's File Canary Copy/Site Notice